John F. Kennedy STEM High School Green Infrastructure Information Sheet

Similar documents
Vailsburg Park Green Infrastructure Information Sheet Location: 112 S Munn Avenue, Newark, NJ Site Use: Park

Rain Garden Maintenance Manual

Rain Garden Maintenance Manual

Invasive Plant Removal, Slope Stabilization, and Native Planting Manual

Green Infrastructure Overview

Impervious Cover Assessment and Reduction Action Plan for Woodstown, New Jersey

Draft Impervious Cover Assessment for West New York, Hudson County, New Jersey

Managing Stormwater Runoff with Green Infrastructure "Enhancing Community Resiliency to the Changing Climate"

Draft Impervious Cover Reduction Action Plan for West New York, Hudson County, New Jersey

Impervious Cover Assessment for Netcong Borough, Morris County, New Jersey

Draft Impervious Cover Reduction Action Plan for Newark, Essex County, New Jersey Volume 3

STORMWATER TOOL. Rain Garden

Impervious Cover Assessment for Salem City, Salem County, New Jersey

Draft. Impervious Cover Reduction Action Plan for Dunellen Borough, Middlesex County, New Jersey

Draft Impervious Cover Assessment for North Plainfield Borough, Somerset County, New Jersey

Impervious Cover Assessment for Edison Township, Middlesex County, New Jersey

Draft Impervious Cover Assessment for East Amwell Township, Hunterdon County, New Jersey

Draft Impervious Cover Reduction Action Plan for Newark, Essex County, New Jersey Volume 2

Draft Impervious Cover Assessment for Mountainside Borough, Union County, New Jersey

GREEN INFRASTRUCTURE FEASIBILITY STUDY LITTLE FALLS

GREEN INFRASTRUCTURE FEASIBILITY STUDY HARRISON

Impervious Cover Assessment for Berlin Township, Camden County, New Jersey

Draft Impervious Cover Reduction Action Plan for West Long Branch Borough, Monmouth County, New Jersey

Draft Impervious Cover Assessment for Woodbridge Township, Middlesex County, New Jersey

Draft Impervious Cover Assessment for Fair Haven Borough, Monmouth County, New Jersey

Case Study: Parsippany-Troy Hills

Impervious Cover Assessment for Byram Township, Sussex County, New Jersey

Draft Impervious Cover Reduction Action Plan for Newark, Essex County, New Jersey Volume 1

INTRODUCTION TO GREEN INFRASTRUCTURE HOW WE CAN PROTECT OUR COMMUNITIES AND OUR WATERS Maywood Public Library Bergen County, New Jersey

Impervious Cover Reduction Action Plan for City of Vineland, Cumberland County, New Jersey

Draft Impervious Cover Assessment for Branchburg Township, Somerset County, New Jersey

Use of Best Management Practices

GREEN INFRASTRUCTURE FEASIBILITY STUDY GARFIELD

Impervious Cover Assessment for Upper Deerfield Township, Cumberland County, New Jersey

4. CONCEPT PLAN DEVELOPMENT

Green Infrastructure & Low Impact Development

Homeowners Guide to Stormwater BMP Maintenance

Draft Impervious Cover Assessment for Millstone Township, Monmouth County, New Jersey

Planning, Design, and Construction of Green Infrastructure.

Impervious Cover Reduction Action Plan for Hampton Township, Sussex County, New Jersey

Lesson 2: Stormwater Best Management Practices (BMPs)

GREEN STREETS & INFRASTRUCTURE: A COUNTY APPROACH. Mimicking Nature to Manage Stormwater in Developed Areas

Draft. Impervious Cover Reduction Action Plan for Fair Haven, Monmouth County, New Jersey

Kittson Parkway / Watershed Park Parking Lot

Small Town Sustainable Stormwater Solutions

GREEN INFRASTRUCTURE FEASIBILITY STUDY GLOUCESTER CITY

Creating Tools for Urban and Suburban Communities to Reduce Flooding and Improve Water Quality in New Jersey

Williamsburg Boulevard Green Streets Project. April 27, 2011 Williamsburg Middle School

Map Reading 201: Where Does the Water Go?? Map Reading Map Reading 201. Interconnected Systems

Impervious Cover Project for Climate Resilience in New Jersey

Old Mill Community Association Bioretention Facility

Sustainable Stormwater Management through Green Infrastructure. Jersey City Public School #5

Appendix I. Checklists

5. LOW IMPACT DEVELOPMENT DESIGN STANDARDS

RainScaping. Sustainable Landscape Solutions for Stormwater Management

ACTION PLAN FOR RETROFITTING THE EXISTING MS4 WITH STRUCTURAL BMPS

USDA Rain Garden Video fluid_planet.html

Final Report: Appendix G. LID Driveway Retrofit and Teaching Tool at Bristol County Agricultural High School, Dighton - Supporting Information

Stormwater Management Techniques WMPF LAND USE TRAINING INSTITUTE MARCH 14, 2018

Urban Stormwater Retrofit Program Highlights

GREEN INFRASTRUCTURE DESIGNS RAIN GARDEN

Structural Stormwater Best Management Practices

LOUISIANA STATE UNIVERSITY COMPREHENSIVE & STRATEGIC CAMPUS MASTER PLAN. APPENDIX G - Stormwater Study Findings & Stormwater Solutions

PAVING PARKING AREAS AND ROADS DESCRIPTION. Alternate Names: Pavement Practices, Impervious Paving

Post Construction BMPs

soak up the rain NEW HAMPSHIRE Jillian McCarthy NH Dept. of Environmental Services

Final Impervious Cover Assessment for Upper Deerfield Township, Cumberland County, New Jersey

DCBP APPENDIX B Action Plan for Retrofitting Structural BMPs

Low Impact Development for your homes, businesses & streets

Urban Rain Gardens: Capturing our local water. Martha Berthelsen The Watershed Project

Appendices: Glossary. General Terms. Specific Terms. Low Impact Development Approaches Handbook

Sustainable Storm Water Management

City of Paterson Green Infrastructure Initiative

Local Stormwater Retrofit Case Studies. Westmoreland County Conservation District Updated 11/2011

Evaluating Urban Stormwater Retrofits in the SE US Coastal Plain

Green City, Clean Waters

Rain Garden Site Selection and Installation

Stormwater Low Impact Development - A Natural Solution

Slow it, Spread it, Sink it using Green Stormwater Infrastructure

SUPPORTING DOCUMENT STORMWATER POLLUTION PREVENTION PLAN (SWPPP) NARRATIVE

How to Update a Storm Water Management Program (SWMP) to Incorporate Total Maximum Daily Load (TMDL) BMPs

From and

Appendix G. Detailed Design

Appendix D - Technical Design Criteria for BMPs

Erosion Control for Home Builders in the. City of Jacksonville

Bioretention. Matt Scharver Northeast Ohio Regional Sewer District. #ProjectCleanLake

Page 19 L.L.C. (Previously the United Salad Co. Garage) 939 SE Alder St.

WATERSHED RESTORATION PLAN

ATTACHMENT A STORMWATER MANAGEMENT TECHNIQUES Cahill Associates Environmental Consultants

Stormwater Drainage Assessment For Single Family Residence

SIMPLIFIED APPROACH TO STORMWATER MANAGEMENT FOR SMALL PROJECTS

Retrofit of the Gwinnett County DWR Facility Using Low Impact Development Practices SESWA 2012 Annual Conference October 19, 2012

The Engineer/Developer s Perspective on Storm Water Management

GREEN ON THE HORIZON. Challenges of Integrating LID into New Development. Southeast Stormwater Association

J. Paul Guyer, P.E., R.A.

Feet. Overland. Drainage Area Boundary. To Swale. Swale. To Catch Basin. Culvert Pipe. To Drain Outfall. NRCS Soil Area Boundary

Post Construction BMP Inspection. Scott Taylor, P.E. Stormwater

A Review of Green Infrastructure Projects Implemented in the Grand Traverse Region

Urban Conservation Practice Physical Effects ESTABLISHMENT, GROWTH, AND HARVEST NUTRIENT MANAGEMENT

APPENDIX A. Proposed Guidance and LID checklists for UConn and Town of Mansfield

Transcription:

John F. Kennedy STEM High School Green Infrastructure Information Sheet Location: 127 Preakness Avenue Paterson, NJ 07522 Ward: 2 Green Infrastructure Description: Bioswale and bioretention system series Site Use: School Watershed Name: Molly Ann Brook Targeted Pollutants: total nitrogen (TN), total phosphorus (TP), and total suspended solids (TSS) in surface runoff Estimated Stormwater Captured and/or Treated Per Year: 115,600 gallons Implementation Date: 10/17/2017 Green Infrastructure System: A 480 sq. ft. bioswale connects to two rain garden cells sized at 360 sq. ft. and 460 sq. ft. Drainage Area: 4,385 sq. ft. (parking lot runoff) Funding Sources: New Jersey Department of Environmental Protection 319(h) Partners/Stakeholders: Rutgers Cooperative Extension Water Resources Program, New Jersey Department of Environmental Protection, Great Swamp Watershed Association, Paterson Public Schools Board of Education and Facilities, STEM High School Staff and Students, Passaic County Appendix A: Green Infrastructure Feasibility Study for the City of Paterson, pages 50-51 Appendix B: Site Concept Plan Appendix C: Site Design Plan Appendix D: Site Photograph Current Condition

John F. Kennedy STEM High School Green Infrastructure Information Sheet APPENDIX A: Green Infrastructure Feasibility Study for the City of Paterson Pages 50-51

50 JFK HIGH SCHOOL 97 Preakness Ave Paterson, NJ 07522

The site is JFK High School located at 97 Preakness Avenue. The site slopes towards the south where all the stormwater flows directly into the Passaic River. The school has no external downspouts. There are large areas of parking that could be repaved soon; pervious pavement should be considered. There is a park adjacent to the school with many resident geese; a riparian buffer would help to deter the geese and filter runoff. In the adjacent park a bioswale could be implemented to slow and filter runoff entering the waterway. 51 SUITABLE GREEN INFRASTRUCTURE STRATEGIES: a rain gardens curb cuts stormwater planters a rain barrels buffers cisterns a pervious pavement bioswales depaving JFK HIGH SCHOOL 97 Preakness Ave Paterson, NJ 07522

John F. Kennedy STEM High School Green Infrastructure Information Sheet APPENDIX B: Site Concept Plan

John F. Kennedy STEM High School Green Infrastructure Information Sheet APPENDIX C: Site Design Plan

JOHN F. KENNEDY HIGH SCHOOL PASSAIC COUNTY, NEW JERSEY CHRISTOPHER C. OBROPTA, Ph.D., P.E. PROFESSIONAL ENGINEER - NJ LICENSE # 37532 DATE 06/21/17 DATE 02.15.17 REV 04.17.17, 06.21.17 APPROVED CCO CHECKED MAL DRAWN K PROJECT DESCRIPTION: STORMWATER RUNOFF FROM THE EAST SIDE OF THE PARKING LOT WILL BE REDIRECTED INTO A BIOSWALE THROUGH A CURB CUT. THE BIOSWALE WILL DISCHARGE INTO A TIERED BIORETENTION SYSTEMS. ANY OVERFLOW FROM THE SYSTEM WILL BE DIRECTED TO A NEARBY CAH BASIN. LOCATION MAP: LEGEND: 100 EXISTING FENCE EXISTING DRAINAGE AREA EXISTING TREE EXISTING CONTOURS REVISIONS No. DATE DESCRIPTION 1 04.17.17 LEGEND UPDATED LIST OF DRAWIN: 100.00 CODE EXISTING SPOT ELEVATIONS SPOT ELEVATION CODES: - TOP OF CURB BL - BUILDING CORNER PL - PARKING LOT - EDGE OF PAVEMENT EXISTING BUILDING EDGE OF PAVEMENT - GROUND SHOT UP - UTILITY POLE - CAH BASIN EXISTING CENTERLINE EXISTING UTILITY POLE EXISTING CAH BASIN LIMIT OF WORK PROPOSED GREEN INFRASTRUCTURE PROPOSED SWALE CHANNEL JOHN F. KENNEDY HIGH SCHOOL PASSAIC COUNTY, NJ COVER SHEET SHEET NAME TITLE 100 PROPOSED SWALE TOP OF BANK PROPOSED CONTOURS COVER COVER SHEET 100.00 CODE PROPOSED SPOT ELEVATIONS P-1 EXISTING CONDITIONS AND DEMOLITION PLAN SPOT ELEVATION CODES: BASE - RAIN GARDEN BASE TOG - TOP OF GABION P-2 PROPOSED SITE PLAN P-3 PLANTING PLAN DT-2 DT-3 DT-4 RAIN GARDEN DETAILS BIOSWALE AND CURB CUT DETAILS PLANTING AND LANDSCAPE DETAILS SOIL EROSION AND SEIDMENT CONTROL SHEET NAME COVER

99 105.42 105.42 104.89 106.06 106.12 PLAN NOTES: 1. CONTRACTOR SHALL SCHEDULE MEETING WITH ENGINEER AND PROPERTY OWNER PRIOR TO MOBILIZATION. 2. CONTRACTOR SHALL VERIFY ALL INFORMATION INCLUDING ELEVATIONS AND UTILITIES PRIOR TO MOBILIZATION. 3. CONTRACTOR SHALL BE RESPONSIBLE FOR OBTAINING REQUIRED APPROVALS FROM AUTHORITIES WITH JURISDICTION OVER PROPOSED WORK. 4. CONTRACTOR SHALL COORDINATE AND CONFIRM PROJECT SCHEDULE AND WORKING HOURS WITH ENGINEER AND PROPERTY OWNER AND PROCEED IN ACCORDANCE WITH LOCAL REQUIREMENTS. 5. CONTRACTOR SHALL COORDINATE UTILITY MARK OUT PRIOR TO MOBILIZATION. 6. CONTRACTOR SHALL DEMO AND REMOVE ALL EXISTING ASPHALT PAVING AS SHOWN ON PLAN. 7. CONTRACTOR SHALL HAUL REMOVED DEBRIS OFF SITE UNLESS OTHERWISE NOTED BY PROPERTY OWNER. 8. SOIL TESTING TO BE PERFORMED PRIOR TO ONSET OF CONSTRUCTION TO ENSURE ADEQUATE INFILTRATION. CHRISTOPHER C. OBROPTA, Ph.D., P.E. PROFESSIONAL ENGINEER - NJ LICENSE # 37532 DATE 06/21/17 DATE 02.15.17 REV 04.17.17, 06.21.17 APPROVED CCO CHECKED MAL DRAWN K DRAINAGE AREA (4,385 SF) 104.18 103.96 100.12 100.11 102 101 EXISTING 100.54 CAH BASIN 100 100.65 100.12 103.71 PREAKNESS AVENUE REVISIONS No. DATE DESCRIPTION 1 04.17.17 DRAINAGE AREA ADJUSTED 2 06.21.17 SOIL TESTING NOTE ADDED JOHN F. KENNEDY HIGH SCHOOL 99.80 99.10 99.34 99.18 98.58 BL 97.66 99 98.72 98.50 98.29 96.80 BL 96.21 BL 98.13 98.02 97.08 96 98 97 MH 97.94 97.57 96.81 96.21 97.76 97.26 96.08 95.69 96.92 EXISTING MANHOLE 97.59 95.97 95.51 95.53 96 97.12 97 98 99 LIMIT OF WORK (4,700 SF) EXISTING CAH BASIN 100 101 102 99.67 102.60 102.41 JOHN F. KENNEDY HIGH SCHOOL PASSAIC COUNTY, NJ EXISTING CONDITIONS AND DEMOLITION PLAN 95.72 95.73 94.72 94.77 94.77 95 95 95.48 97 97.26 98 100 100.00 OCC1 101 102 103 EXISTING CAH BASIN 104.33 103.49 N 0 20' 40' SCALE 1" = 20'-0" EXISTING PLAN SHEET NAME P-1

99 100.12 100.11 100.54 99.80 99.10 100 2 DT-2 3 DT-2 100.12 JOHN F. KENNEDY HIGH SCHOOL 3 INLET PROTECTION (NOTE 1) CURB CUT AND CONCRETE FLOW PAD INV. = 99.05 PLAN NOTES: 1. CONTRACTOR SHALL SCHEDULE MEETING WITH ENGINEER AND PROPERTY OWNER PRIOR TO MOBILIZATION AND CONSTRUCTION. 2. CONTRACTOR SHALL VERIFY ALL INFORMATION INCLUDING ELEVATIONS AND UTILITIES PRIOR TO CONSTRUCTION. 3. CONTRACTOR SHALL VERIFY ALL PROPOSED MATERIALS WITH PROPERTY OWNER AND ENGINEER PRIOR TO CONSTRUCTION. 4. CONTRACTOR SHALL STAKE OUT LOCATIONS OF PROPOSED RAIN GARDENS, STONE CHANNELS, AND TRENCH DRAIN AND OBTAIN APPROVAL FROM ENGINEER PRIOR TO INSTALLATION. 5. CONTRACTOR SHALL INSTALL CONVENTIONAL ASPHALT AS SHOWN ON PLAN. THE ASPHALT AND CONCRETE MIXING PLANT, HAULING AND PLACING EQUIPMENT, AND INSTALLATION SHALL BE IN CONFORMANCE WITH NAPA IS 131 AND THE NJDOT STANDARD SPECIFICATIONS FOR ROAD AND BRIDGE CONSTRUCTION, 2007 OR LATEST VERSION. 6. CONTRACTOR SHALL GRADE SITE AS SHOWN ON PLAN. CUT SOIL SHALL BE REUSED ON SITE FOR FILL LOCATIONS. 7. CONTRACTOR SHALL HAUL EXCESS SOIL OFF SITE UNLESS OTHERWISE NOTED BY PROPERTY OWNER. 8. ALL FINISHED ELEVATIONS SHALL MAH ADJOINING PAVEMENT ENSURING SMOOTH TRANSITIONS AND NO TRIPPING HAZARDS. 9. CONTRACTOR SHALL BE RESPONSIBLE FOR RESTORING ALL AREAS DISTURBED DURING CONSTRUCTION TO ORIGINAL CONDITIONS. NOTE 1: STONE SHALL BE COMPRISED OF 3"-5" DIAMETER CLEAN, WASHED RIVER STONE. ALL AREAS OF EROSION PROTECTION STONE SHALL BE UNDERLAIN WITH GEOTEXTILE FABRIC (GEOTEX 801 BY PROPEX OR APPROVED EQUIVALENT). NOTE 2: UNDERDRAIN IS TO BE IMPLEMENTED IF INFILTRATION IS INADEQUATE AT THE SITE. CHRISTOPHER C. OBROPTA, Ph.D., P.E. PROFESSIONAL ENGINEER - NJ LICENSE # 37532 DATE 06/21/17 DATE 02.15.17 REV 04.17.17, 06.21.17 APPROVED CCO CHECKED MAL DRAWN K 99 99.34 60.00' 98.58 BL 99.18 98.72 98.29 GRADE TO BE ADJUSTED TO KE TOP OF GABION LEVEL WITH 97.66 FINISHED GRADE ELEV. 98.50 ELEV 8.0' 3.0' 96.80 BL 98.50 98 96.21 BL 99 1 DT-2 PROPOSED BIOSWALE (480 SF) INV. IN = 99.00 INV. OUT = 97.90 98.02 INLET PROTECTION ALL DISTURBED SOIL TO BE MULCHED 97.08 98.13 3 96 17.8' 3 97.57 97 98 97.90 ELEV 98.00 TOG 2 DT-2 97.75 TOG 96.50 BASE INLET PROTECTION (NOTE 1) 97.50 TOG 3 DT-2 96.81 MH 97.94 25.8' 97 35.0' CURB CUT AND CONCRETE FLOW PAD INV. = 98.15 96.21 97.76 96 96.08 97.00 TOG 1 96.92 16.7' 5 97.26 9.0' 96.50 TOG 95.00 BASE 95.69 2 9.0' 96.00 TOG 6 STONE-LINED CHANNEL WITH GABION BASKETS GABION START TOP= 98.00 BOTTOM = 97.00 GABION END TOP = 97.50 BOTTOM = 96.50 PROPOSED RAIN GARDEN 1 (360 SF) (100 SF BERM, 260 SF BASE) MIN BERM ELEV. = 97.00 BASE ELEV. = 96.50 97.59 95.50 ELEV 95.97 95.51 96 95.53 5 STONE-LINED CHANNEL WITH GABION BASKETS GABION START TOP= 97.00 BOTTOM = 96.00 GABION END TOP = 96.00 BOTTOM = 95.00 GRADE TO BE ADJUSTED TO KE TOP OF GABION LEVEL WITH FINISHED GRADE ELEV. 97.12 4 6 1 2 97 ROCK-LINED OVERFLOW CREST ELEV.= 95.50 (NOTE 1) 98 PROPOSED RAIN GARDEN 2 (460 SF) (155 SF BERM, 305 SF BASE) MIN BERM ELEV. = 95.50 BASE ELEV. = 95.00 99 100 101 99.67 102 102.60 REVISIONS No. DATE DESCRIPTION 1 04.17.17 SPOT ELEVATIONS AND GRADING ADJUSTED JOHN F. KENNEDY HIGH SCHOOL PASSAIC COUNTY, NJ PROPOSED SITE PLAN 95.72 95.73 94.77 94.77 95 95.48 101 102 95 100 97.26 98 94.72 97 100.00 OCC1 N 0 10' 20' SCALE 1" = 10'-0" SITE PLAN SHEET NAME P-2

PV JE PV CS N RF JE JE RF CS CO CO JE CS RF LS JE LS 0 5' 10' SCALE 1" = 5'-0" PLANTING PLAN SHEET NAME P-3 DT-3 1 2 DT-3 PROPOSED PLANTING PLAN JOHN F. KENNEDY HIGH SCHOOL PASSAIC COUNTY, NJ PLANTING PLAN REVISIONS No. DATE DESCRIPTION 1 04.17.17 ADJUSTED BASED ON ALTERED RAIN GARDEN CHRISTOPHER C. OBROPTA, Ph.D., P.E. PROFESSIONAL ENGINEER - NJ LICENSE # 37532 DATE 06/21/17 DRAWN K APPROVED CCO PLANT SPECIES PLANTING SCHEDULE TYPE KEY BOTANICAL NAME COMMON NAME RAIN GARDENS QUANTITY SIZE PERENNIALS Echinacea purpurea PURPLE CONEFLOWER 100 1 QUART JE Juncus effusus SOFT RUSH 100 1 QUART LS Lobelia cardinalis CARDINAL FLOWER 50 1 QUART RF Rudbeckia fulgida BLACK EYED SUSANS 100 1 QUART SHRUBS CS Cornus sericea RED TWIG DOGWOOD 9 #2 CONT. CO Cephalanthus occidentalis BUTTONBUSH 6 #2 CONT. BIOSWALE PERENNIALS JE Juncus effusus SOFT RUSH 75 1 QUART PV Panicum virgatum SWIHGRASS 125 1 QUART CHECKED MAL DATE 02.15.17 REV 04.17.17, 06.21.17

SHEET NAME JOHN F. KENNEDY HIGH SCHOOL PASSAIC COUNTY, NJ RAIN GARDEN DETAILS REVISIONS No. DATE DESCRIPTION 1 04.17.17 DETAILS ADDED FOR GABION CHANNEL 2 06.21.17 SOIL TESTING NOTE ADDED CHRISTOPHER C. OBROPTA, Ph.D., P.E. PROFESSIONAL ENGINEER - NJ LICENSE # 37532 DATE 06/21/17 DRAWN K CHECKED MAL APPROVED CCO DATE 02.15.17 REV 04.17.17, 06.21.17

SHEET NAME DT-2 JOHN F. KENNEDY HIGH SCHOOL PASSAIC COUNTY, NJ BIOSWALE AND CURB CUT DETAILS REVISIONS No. DATE DESCRIPTION CHRISTOPHER C. OBROPTA, Ph.D., P.E. PROFESSIONAL ENGINEER - NJ LICENSE # 37532 DATE 06/21/17 DRAWN K CHECKED MAL APPROVED CCO DATE 02.15.17 REV 04.17.17, 06.21.17

LS Lobelia cardinalis Echinacea purpurea RF Rudbeckia fulgida JE Juncus effusus PV Panicum virgatum CO Cephalanthus occidentalis CS Cornus sericea PLANTING SCHEDULE SHEET NAME DT-3 JOHN F. KENNEDY HIGH SCHOOL PASSAIC COUNTY, NJ PLANTING AND LANDSCAPE DETAILS REVISIONS No. DATE DESCRIPTION CHRISTOPHER C. OBROPTA, Ph.D., P.E. PROFESSIONAL ENGINEER - NJ LICENSE # 37532 DATE 06/21/17 DRAWN K CHECKED MAL APPROVED CCO DATE 02.15.17 REV 04.17.17, 06.21.17

SOIL EROSION AND SEDIMENT CONTROL NOTES Hudson Essex Passaic Soil Conservation District http://hepsoilnj.org HSCD251SESCNOTESrev2014 SHEET NAME DT-4 JOHN F. KENNEDY HIGH SCHOOL PASSAIC COUNTY, NJ SOIL EROSION AND SEDIMENT CONTROL DETAILS REVISIONS No. DATE DESCRIPTION CHRISTOPHER C. OBROPTA, Ph.D., P.E. PROFESSIONAL ENGINEER - NJ LICENSE # 37532 DATE 06/21/17 DRAWN K CHECKED MAL APPROVED CCO DATE 02.15.17 REV 04.17.17, 06.21.17

John F. Kennedy STEM High School Green Infrastructure Information Sheet APPENDIX D: Site Photograph Current Condition October 17, 2017