Sustainable Storm Water Management

Similar documents
Southeast Michigan Council of Governments

FLEET AVENUE GREEN STREET USES VACANT LOT FOR CSO REDUCTION. Thomas M. Evans, AECOM Cleveland, Ohio

GREEN STREETS & INFRASTRUCTURE: A COUNTY APPROACH. Mimicking Nature to Manage Stormwater in Developed Areas

NEORSD Green Infrastructure Grant (GIG) Program Opening Remarks

Ted Turner Drive Resilience Corridor Challenge

DC Clean Rivers Project Green Infrastructure Program

Green Infrastructure Overview

Green Infrastructure & Low Impact Development

Climate Smart Communities Green Infrastructure Case Studies

Old Mill Community Association Bioretention Facility

Building Green: An Update on Atlanta's Green Infrastructure Approach

The Benefits and Challenges Associated with Green Infrastructure Practices

Stormwater Regulations & Considerations Morse Study Area. Pam Fortun, P.E. CFM Senior Stormwater Treatment Engineer Engineering Services Division

Tale of Two Cities: Exploring How Two Communities are Using Green Infrastructure to Reduce Flood Risk

Green Infrastructure Modeling in Cincinnati Ohio. Small Scale Green Infrastructure Design Using Computer Modeling

Using Green Infrastructure To Protect Water Quality

From and

Watershed Planning Workshop

Green Bus Tour. International Water Association. Sponsored by the Metropolitan Sewer District of Greater Cincinnati and Greater Cincinnati Water Works

Alternative Uses of Compost: Rain Gardens and Green Solutions for Stormwater Management

Stormwater Management at The University of New Orleans

Managing Stormwater Runoff with Green Infrastructure "Enhancing Community Resiliency to the Changing Climate"

SUNY Green Infrastructure Summit. April 17, 2014

Green Infrastructure for Stormwater Management in Syracuse, New York. Atlantic States Legal Foundation, Inc.

DC Clean Rivers Project - Green Infrastructure Program. ACEC What s New at DC Water?

Sustainable Stormwater Management through Green Infrastructure. Jersey City Public School #5

Impervious Cover Assessment and Reduction Action Plan for Woodstown, New Jersey

Stormwater Low Impact Development - A Natural Solution

Green Streets An Innovative Street Design Approach

Reducing New York City s CSOs Using Green Infrastructure

Physical Approaches to Flood Mitigation

JCCC Campus Stormwater Project: Retrofitting Yesterday s Parking Lots With Today s Best Management Practices

Potential Green Infrastructure Strategies May 6, 2015 Workshop

INTRODUCTION TO GREEN INFRASTRUCTURE HOW WE CAN PROTECT OUR COMMUNITIES AND OUR WATERS Maywood Public Library Bergen County, New Jersey

Ken Kortkamp, PE San Francisco Public Utilities Commission San Francisco, CA

CITY OF TUMWATER 555 ISRAEL RD. SW, TUMWATER, WA (360) (360) (FAX)

Retrofitting Low Impact Development (LID) for Stormwater at Sacramento State. City of Sacramento Sacramento State Facilities Management

Draft Impervious Cover Assessment for Fair Haven Borough, Monmouth County, New Jersey

Draft Impervious Cover Reduction Action Plan for West New York, Hudson County, New Jersey

Moving from Pilots to a Program: Seattle s Green Infrastructure Program: September 20, 2012

Intercept, Detain and Release. Custer Avenue CSO Relief GRESHAM, SMITH AND PARTNERS

2012 Saginaw Bay Watershed Conference

Citywide Integrated Stormwater Management Plan (ISMP) DRAFT ACTION PLAN REVIEW Public Consultation November 16 th, 2016

LOUISIANA STATE UNIVERSITY COMPREHENSIVE & STRATEGIC CAMPUS MASTER PLAN. APPENDIX G - Stormwater Study Findings & Stormwater Solutions

Tour of Nonpoint Source Pollution Reduction Projects in the Western Lake Superior Watershed

March 30, 2017

Rainscaping. Rainscaping includes rain gardens, bioswales, combinations of. A guide to local projects in St. Louis

Small Town Sustainable Stormwater Solutions

San Francisco Bay Pilot: Sausal Creek Community Leader Charrette May 11, 2016 Marcus Griswold

Green Innovation Grant Program

2016 WORKSHOP LVR Field Trip

Arlington County Watershed Retrofits. Greg Hoffmann Center for Watershed Protection

SECONDARY BENEFITS OF STORMWATER BMPS. Growing Sustainable Communities, October 2017

Stormwater Retrofitting: The Art of Opportunity. Presented by the Center for Watershed Protection

3/7/2013. Compliance & Sustainability

Green Roofs and Stormwater Management Virginia Stovin

Williamsburg Boulevard Green Streets Project. April 27, 2011 Williamsburg Middle School

Two Sides of the Green Infrastructure Coin. Jaren Hiller, PE, LEED AP Nathan Guequierre

GREATER NEW HAVEN WPCA. GREEN REDEVELOPMENT REDUCES CSOs IN NEW HAVEN. Tom Sgroi, P.E. Director of Engineering, GNHWPCA

Project. Project Type:

HEALTH SCIENCES BUILDING REDEVELOPMENT PROJECT

6.5 Lakewood Gulch. Basin Snapshot

Managing Stormwater within the Road Right-of-Way: An Urban NAI Approach

NDIA Environment, Energy, and Sustainability Symposium & Exhibition Denver, Colorado May 2009

E x E C U T I v E S U M M A R y / P L A N N I N G C O N T E x T 14 //

Beyond Rain Gardens Advancing the Use of Compost for Green Infrastructure, Low Impact Development, & Stormwater Management

Impervious Cover Reduction Action Plan for City of Vineland, Cumberland County, New Jersey

PrairieWalk Pond Lisle, IL

John F. Kennedy STEM High School Green Infrastructure Information Sheet

Neighborhood Drainage Infrastructure Improvements Using Green Initiatives. Village of Hinsdale, IL

4.5 City of Indianapolis Stormwater Green Infrastructure Guidance: Bioretention (rain gardens) Bioretention Fact Sheet Bioretention Technical Design

Third Ave CSO Integrated Green Infrastructure

Sustainable Stormwater Retrofit Best Practices

Detroit Stormwater Rules and Drainage Fee Updates

Horsley Witten Group Sustainable Environmental Solutions. Rich Claytor, P.E. Janet Bernardo, P.E. horsleywitten.com

Deer Creek Watershed Stakeholders Committee

green Infrastructure in the Milwaukee Region

MUNICIPAL SEPARATE STORM SEWER SYSTEM 2009 ANNUAL REPORT

Stormwater Runoff and the District of Columbia RiverSmart Homes Defined:

Impervious Cover Assessment for Salem City, Salem County, New Jersey

Low Impact Development for your homes, businesses & streets

Draft Impervious Cover Assessment for West New York, Hudson County, New Jersey

EXISTING PLANS Harriet Festing Center for Neighborhood Technology Midlothian Community Meeting March 12, 2015

WEFTEC.06. ** City of Caldwell, Idaho

Green Infrastructure and the Urban Forest: Thinking Outside the Planter Box

Draft Impervious Cover Reduction Action Plan for Newark, Essex County, New Jersey Volume 3

Impervious Cover Assessment for Berlin Township, Camden County, New Jersey

LID. Low Impact Development: Protecting Oregon s waters as we grow

Draft Impervious Cover Assessment for North Plainfield Borough, Somerset County, New Jersey

NYC Green Infrastructure Program

Draft Impervious Cover Assessment for Mountainside Borough, Union County, New Jersey

Draft. Impervious Cover Reduction Action Plan for Dunellen Borough, Middlesex County, New Jersey

Retrofit of the Gwinnett County DWR Facility Using Low Impact Development Practices SESWA 2012 Annual Conference October 19, 2012

Community Gardens: Rainwater and Solar Harvesting Project

FACT SHEET: Pervious Pavement with Infiltration

Storm Water Quality and Shoreline Restoration Improvements - Grant Funding Request City of Mound Carlson Park Bolton & Menk Project No.

Green Infrastructure and Low-Impact Development Technologies

Green Infrastructure Basics

Water in storm drains does not go to a treatment plant

A Blueprint for Reuse of Distressed Parcels

Transcription:

Incorporating Water Management into the Community Planning Process August 16, 2012 Sustainable Storm Water Management Samantha Brown Environmental Engineer SD1

SD1 s Service Area CVG Airport SD1 Service Area (146,640 acres / 172 sq. mi.) Combined Sewer System (6,036 acres / 9.8 sq. mi.)

Combined Sewer Overflows (CSOs) 2 billion gallons annually 97 CSO locations Sanitary Sewer Overflows (SSOs) 80 million gallons annually 126 SSO locations Storm Water Runoff (NSP+MS4) 70 billion gallons annually Hydromodification Primary Challenges 209 miles of sewer infrastructure adjacent to rivers and streams

Combined Sewer System (CSS) 97 total CSOs (frequency of activations) 0-10 per year 31-60 per year 11-30 per year > 60 per year

Combined Sewer Overflows

SD1 s Watershed Based Consent Decree Federal Court Order signed and entered in April 2007 Requires SD1 to develop and implement Watershed Plans Address CSOs and SSOs Update Watershed Plans every 5 years First Watershed Plans submitted June, 2009 Resubmitted March, 2010 Final Plan Completion: December 31, 2025

Watershed Based Approach Integrate green/gray/watershed controls to improve water quality Establish priorities based on regional objectives Address overflows in context with other sources of pollution Utilize 5-year planning cycles to identify affordable solutions that are targeted towards highest priorities Green Infrastructure Gray Infrastructure Watershed Controls

Sustainable Stormwater Management Projects Integrated Planning Leads to Multi-faceted Solutions: CSO Reduction Stormwater Quality Improvements Flooding Community Revitalization Water in Basements Hydromodification Community Connectivity

Environmental Triple Bottom Line Benefits Improves the quality of storm water runoff entering the region s streams and rivers by reducing CSO volumes Opportunity for Covington to introduce landscaping into an urban environment Improves habitat Social Improves aesthetics Signs can be incorporated to serve as gateways Recreational opportunities Economic Less expensive than traditional gray infrastructure Communities can apply for funding SD1 has set aside for public/private partnerships

Identifying Implementation Opportunities System-wide Opportunities High level, long-term strategies for water quality improvement Include both separate and combined systems Partnering Opportunities Needed for large-scale implementation Partnerships can build public support, advance water quality goals 10

GrIPP Green Infrastructure Partnership Program - Partnerships with non-residential properties (private or city/county) - Separate Storm Sewer and Combined Sewer Systems - Business-case evaluations Memorial Parkway Biofiltration Swales Ft. Thomas St. John Church Rain Garden - Bellevue 11

SD1 & City of Covington Partnerships I-75/71 R/W Terraced Reforestation Prisoner s Lake Water Harvesting 12 th Street Biofiltration Swale MainStrasse Gateway Madison Avenue Streetscape Brent Spence Bridge Coordination Eastern Avenue Church Street/Holy Cross Project Examples

Terraced Reforestation of Interstate 75-71 ROW Existing Conditions 17 Acre drainage area Gateway to KY Estimated Benefits 3.1 MG CSO reduction annually 71% reduction in peak flow

Looking South Project Site Looking North

Final Design Elements Bioretention 12 Linear cells, 4,900 ft total Soil mix (3,800 cys) Underdrain system Erosion / sediment control Erosion control blanket (3,900 sys) Straw wattle (4,700 ft) Plantings / vegetation Shrubs (40+) Trees (280+) Native seeding (8 ac)

Prisoner s Lake Water Harvesting Drainage Area = 57 acres Prisoner s Lake = 4 acres Removal of Sedimentation Clay Liner Embankment Repair Golf Course Water Usage = 10M gal/year

Prisoner s Lake Water Harvesting CSO Reductions o Removes 425,000 gallons from the combined sewer system SD1 Rate-Payer Benefits o A typical storage facility would cost $5/gallon, totaling to $2.2 Million o o Rain Water Harvesting = $1.2 Million for Design and Construction 50% Stimulus Grant City of Covington Irrigation Costs o Devou Park G.C. previously spending $20,000/year for potable water for irrigation

12 th Street Biofiltration Swale Existing Conditions 1 acre of street and hillside runoff enters the combined system Proposed Features Bioretention planter boxes Bioswale and rain garden Estimated Benefits 300,000 gallon CSO reduction annually Costs $77,500 $0.26/gallon of CSO reduction

12 th Street Biofiltration Swale Site drainage area = 49.4 square miles (31,625 acres)

MainStrasse Gateway Parking lot improvement project Incorporate rain gardens to capture storm water runoff Estimated 0.5MG CSO reduction Provides economic and social green street benefits Rain Gardens Gateway into MainStrasse Village

MainStrasse Gateway

Madison Avenue Streetscape City has completed two phases of a three phase streetscape project along Madison Avenue Green Infrastructure included in Phase III design Retrofit existing bump-out with a rain garden Install a new bump-out with a rain garden

Madison Avenue Streetscape Solves current standing water issue Improves aesthetics of a primary street through the City Bump-out provides safe gathering space for patrons of the Madison Theater Cost savings

Impacts to Goebel Park will need to be mitigated when the Brent Spence Bridge project is constructed Willow Run is the largest CSO in the area Overflow areas currently located within the park Brent Spence Bridge Goebel Park

Brent Spence Bridge Goebel Park

Eastern Avenue Partnering with Covington Schools to install a rain garden in the parking lot Water ponds near catch basin on Eastern Avenue during large rain events

Eastern Avenue Reduces amount of water entering the combined system Enhances the aesthetics of the school Prevents water from ponding in the street

Church Street Safety concerns with students crossing the street Converting to one-way street Examining opportunities to incorporate green elements Performing business-case evaluations

Moving Forward Monitoring effectiveness of pilot projects Continued partnerships with private and public entities Continued coordination between Covington and SD1 to identify opportunities for green infrastructure

QUESTIONS? Mike Yeager, P.E., MPA Assistant City Engineer City of Covington myeager@covingtonky.gov (859) 292-2153 Samantha Brown Environmental Engineer SD1 sbrown@sd1.org (859) 547-1666