Comments on the proposed scope are requested from WCC/NBBC officers to be provided to SLC Rail by 25 th March 2016 and sent to

Similar documents
Replacement Golf Course Facilities and Residential Development, Churston. Environmental Statement Non-Technical Summary

University Park, Worcester Non Technical Summary December 2011

Town and Country Planning (Environmental Impact Assessment Regulations) 2011 SCOPING OPINION

PANSHANGER QUARRY, Hertfordshire

7 Scoping and Introduction to the Assessments

Grantham Southern Quadrant Link Road Environmental Statement

Departure from the Development Plan. Town Council objection to a major application. DETERMINE

Interim Advice Note 76 / 06 ASSESSMENT PART 1 AIMS AND OBJECTIVES OF ENVIRONMENTAL ASSESSMENT. Contents

Environmental Impact Assessment

LONDON BRIDGE STATION ENVIRONMENTAL STATEMENT NON-TECHNICAL SUMMARY

London Road, Derker. Non Technical Summary. Introduction

Welcome to our exhibition

Barvills Solar Farm Environmental Statement Non-Technical Summary

WELCOME. Welcome and thank you for visiting today.

M4 Corridor around Newport Environmental Statement Volume 3: Appendices

7. The Landscape. 7.1 Introduction. Environmental Impact Statement (EIS) Scoping Report

WELCOME GYPSY LANE. Wider Site Location plan. Proposals for the development of LAND OFF FOXLYDIATE LANE WEBHEATH. Proposals for the development of

Longbridge Town Centre Phase 2 Planning Application

volume 11 environmental assessment section 2 environmental impact assessment Part 7 ha 218/08

Sustainability Statement. Whitby Business Park Area Action Plan

LAND AT WEST YELLAND. Environmental Statement Non-Technical Summary Welbeck Strategic Land LLP

The Place Solar Farm

Parish of Repton NEIGHBOURHOOD DEVELOPMENT PLAN

Chapter 4. Route Window C12: Mile End Park and Eleanor Street Shafts

Tandridge Local Plan Assessing the Ecological Suitability of 183 sites considered for development Tandridge District Council, Surrey

Date: TOWN AND COUNTRY PLANNING (ENVIRONMENTAL IMPACT ASSESSMENT) REGULATIONS 2011: REGULATION 13 SCOPING OPINION

Meridian Water Phase 1 Application

UTT/16/1466/DFO GREAT DUNMOW MAJOR

DEFGH. Crystal Place Park. Environmental Impact Assessment (EIA) Elin Thomas and Emily Low Waterman Environmental

Development of land adjacent to Braggs Farm Lane and Rumbush Lane, Dickens Heath. Welcome. Today s exhibition. The proposal site

Velindre Cancer Centre Environmental Statement Vol.1: Environmental Statement Text. Chapter 1: Introduction

TOWN AND COUNTRY PLANNING ACT 1990 (AS AMENDED).

Thank you for coming. We want to hear your views on proposed improvements to the A1 between junction 65 (Birtley) and junction 67 (Coal House).

WHITELEY TOWN COUNCIL NORTH WHITELEY DEVELOPMENT SEPTEMBER 2014

NON-TECHNICAL SUMMARY

Ref: A073350/SM/sm Date: 13 September 2013

LIST OF LIVE AND DETERMINED PLANNING APPLICATIONS RELATING TO THE WIDER BRENT CROSS CRICKLEWOOD REGENERATION SCHEME

ABBEY MANOR GROUP/SAINSBURY S SUPERMARKETS LTD

BREEDON NORTHERN LIMITED

The Hadean-Creation studio.

LAND AT MIDDLETON STONEY ROAD AND HOWES LANE, BICESTER ENVIRONMENTAL STATEMENT NON-TECHNICAL SUMMARY. June 2017 Our Ref: Q70433

M2 JUNCTION 5 IMPROVEMENTS STUDY ENVIRONMENTAL STUDY REPORT

9 Archaeology & Cultural Heritage

Archaeology and Planning in Greater London. A Charter for the Greater London Archaeology Advisory Service

LAND AT HOWES LANE, BICESTER ENVIRONMENTAL STATEMENT NON-TECHNICAL SUMMARY. March 2017 Our Ref: Q70433

Newcourt Masterplan. November Exeter Local Development Framework

Appendix B Figures L1 and L2 - Townscape Analysis

Environmental Statement (Volume 1) Non Technical Summary

SOUTH EAST LINCOLNSHIRE LOCAL PLAN: HOUSING PAPER DONINGTON (JUNE 2016)

TOWN AND COUNTRY PLANNING ACT 1990

Kier Infrastructure and Overseas Limited Greenburn Surface Mine, Dalgig Farm Site

Welcome to our Public Consultation

ES 5. Drakelow Park. Environmental Statement. Volume 5: Non Technical Summary. Lead Author Waterman Energy, Environment and Design Ltd

A38 Derby Junctions. Preliminary Environmental Information Report: Non-Technical Summary

NON TECHNICAL SUMMARY

Non-Technical Summary

Re-location of Rugby Farmers Mart

Carterton Construction Ltd is bringing forward plans for up to 85 new family homes and extra care facilities on land east of Burford.

Planning, Taxi Licensing and Rights of Way Committee Report. Valid Date: 29/06/2016

CORRECTIONS WITHIN DESIGN MANUAL FOR ROADS AND BRIDGES AUGUST 2009

ROCHFORD LOCAL DEVELOPMENT FRAMEWORK: Sustainability Appraisal/ Strategic Environmental Assessment. Rochford Core Strategy Preferred Options Document

Test Valley Borough Council Southern Area Planning Committee 8 January 2019

Land at Rampton Road. Cottenham

Wyvern Park Skipton Environmental Statement. Non-technical Summary - April 2015

The Town and Country Planning (Environmental Impact Assessment) (Wales) Regulations 2016, Regulation 13 Scoping Opinion

South Whitehaven, Cumbria EIA

Plumpton Neighbourhood Development Plan Revised Pre Submission Document - Regulation 14 Consultation

Moat Lane Regeneration Project Environmental Statement

South Macclesfield Development Area, Phase 1 Environmental Statement Non- Technical Summary. For Engine of the North

HARDWICK GREEN, King s Lynn. Welcome to our Exhibition. What are your views? Introduction to the site and proposals. About us

Assessing the impact of smallscale wind energy proposals on the natural heritage

Statement of Community Involvement LAND OFF SOUTHDOWN ROAD HORNDEAN, HAMPSHIRE

Burgess Hill, Land South of Freeks Farm Phase 1 of Burgess Hill Northern Arc East Environmental Statement Non-Technical Summary September 2016

HS2 Hybrid Bill Petitioning. Summary of SMBC Asks 23/09/13. Background

SOUTH CAMBRIDGESHIRE DISTRICT COUNCIL. REPORT TO: Planning Committee 1 April 2015 Planning and New Communities Director

Lead Local Flood Authority SuDS Policy Statement

APPLICATION REFERENCE: PL/2016/02759/PPFL

INTRODUCTION NORTH HEYBRIDGE GARDEN SUBURB

VALLEY PARK, DIDCOT. Non-Technical Summary. December On behalf of Taylor Wimpey UK Limited, Persimmon Homes and Hallam Land Management Ltd.

WELCOME LAND EAST OF TYE LANE, WALBERTON. Above all, it s about people

Lower Don River West Remedial Flood Protection Project TABLE OF CONTENTS. Page. Executive Summary

South Macclesfield Development Area Environmental Statement Non-Technical Summary March 2017

Rapid Transit Implementation Working Group September 14, 2017

SUBJECT TO ATTACHED SCHEDULE OF THIRTY SIX CONDITIONS

Land East of Horndean, Hampshire. Environmental Statement Non-Technical Summary October 2014

1 INTRODUCTION 1.1 INTRODUCTION

PROPOSED RESIDENTIAL DEVELOPMENT ON LAND SOUTH OF SUTTON ROAD, LANGLEY, MAIDSTONE

College Green Project Environmental Impact Assessment Report

A1 Scotswood to North Brunton Public Information Exhibition Executive Summary

SOUTH CAMBRIDGESHIRE DISTRICT COUNCIL. Planning and New Communities Director

Welcome to this public consultation event for the proposed South Western Relief Road. Thank you for taking the time to come along.

BEDFORD BOROUGH COUNCIL PLAN IMPLEMENTATION MONITORING REPORT

Hounsome Fields, Basingstoke Environmental Statement Non- Technical Summary. For Wates Developments Ltd and Pellipar Investments Ltd

LAND SECURITIES REDEVELOPMENT OF NEWNHAM COURT SHOPPING VILLAGE, MAIDSTONE

RYEDALE SITES LOCAL PLAN MATTER 3 HOUSING ALLOCATION SITE REF.SD5 LAND EAST OF WHITBY ROAD, PICKERING DAVID WILSON HOMES REPRESENTOR ID: 1073

SOUTH CAMBRIDGESHIRE DISTRICT COUNCIL. Planning and New Communities Director

DESIGN AND MANAGEMENT OBJECTIVES PART 7 HA 92/01 SCHEME DEVELOPMENT, IMPLEMENTATION & MANAGEMENT SUMMARY

METHODOLOGY FOR IMPACT ASSESSMENT ON HERITAGE ASSETS IDENTIFICATION OF THE RECEPTOR ASSESSMENT OF THE RECEPTOR S IMPORTANCE

BRIDGE OF DON MASTERPLAN & PLANNING SUMMARY

26 September 2014 CONSULTATION EXPIRY : APPLICATION EXPIRY : 22 July 2014 SUMMARY RECOMMENDATION: PERMISSION

Transcription:

Introduction WCC have indicated that in advance of the surveys and assessments being undertaken consultation should be undertaken with technical officers of both Warwickshire CC and Nuneaton and Bedworth Borough Council. This report sets out the scope of the surveys and assessments which are proposed to be undertaken in support of the planning application. Comments on the proposed scope are requested from WCC/NBBC officers to be provided to SLC Rail by 25 th March 2016 and sent to Supporting information: Surveys and Assessments Arboriculture Baseline Survey Work A survey of all the trees which have the potential to be adversely impacted by the wider scheme will be undertaken. Allied to this details of any Tree Preservation Orders at the site will be requested from Nuneaton and Bedworth Council. The survey will be carried out in accordance with BS5837:2012 - Trees in relation to design, demolition and construction. The trees will be surveyed as individual specimens or as groups based on similar species and age composition. This level of survey will be such that it meets the requirements of BS 5837:2012 which states that trees growing as groups or woodland should be identified and assessed as such. The BS defines the term group as trees that form cohesive arboricultural features either aerodynamically (e.g. trees that provide companion shelter), visually (e.g. avenues or screens) or culturally including for biodiversity (e.g. parkland or wood pasture). The individually recorded trees will include those growing in isolation or limited to significant trees, i.e. those that are mature specimens, dominant trees in groups or those that are of high landscape, arboricultural or cultural significance. The survey will capture unique details about the trees including species, height, age, diameter at breast height, condition, any management recommendations and their retention values. Reporting A Tree Constraints Plan(s) will be produced showing the trees surveyed. The Arboricultural Impact Assessment (AIA) will be undertaken for those trees within the red line boundary and those adjacent to the works that require planning permission. This will include details of root protection areas and crown spreads. Interalia these plans will be used by designers to inform the layout of the proposals as the scheme progresses. The individual trees or the start and end points of tree groups will be plotted onsite by the Arboriculturist. In the event that some trees of significance have the potential to be adversely impacted then mitigation may be recommended. 1

Noise and Vibration Baseline Survey Work A survey of the existing noise characteristics of the site will be undertaken. This will seek to plot the location of receptors that may be sensitive to noise or change in noise characteristics and baseline measurements will be taken at or close to a sample of these receptors. The guidance from WCC indicates that notwithstanding that noise impacts will arise outside of the red line boundary and from permitted development these should be assessed and submitted in support of the planning application(s). The results of the baseline noise survey will be used to identify impacts that could arise during both the construction and operational phases of the development. Guidance on undertaking environmental noise surveys is provided in the IEMA Guidelines for Environmental Noise Impact Assessment, BS7445-1:2003, and the Calculation of Road Traffic Noise (1988). he survey will be conducted over as single day, during good weather conditions, avoiding periods of precipitation and wind speeds above 5m/s. The survey will be following the shortened measurement procedure of Calculation of Road Traffic Noise (CRTN). It should be noted that the noise survey work can only be carried out in suitable weather conditions (i.e. prevailing dry/still conditions). Assessment The assessment will have regard to the requirements of the Design Manual for Roads and Bridges (DMRB) Volume 11, Section 3, Part 7 Noise and Vibration. This involves undertaking assessments of the potential for changes in levels of noise and vibration, both during the construction and operation of a road project. The following are proposed to be undertaken: A noise survey would be undertaken during a single day Baseline data would be collected for the key residential receptors. A construction noise and vibration assessment would be undertaken following the guidance and methodologies of BS 5228 Code of practice for noise and vibration control on construction and open sites Parts 1 and 2. Where required, mitigation measures would be outlined for the construction phase. Predictions of potential changes in levels of traffic noise would be undertaken following the procedures of CRTN and additional guidance as set out in DMRB. The resultant changes in levels of noise would then be assessed following the methodology of DMRB. Mitigation options for operational noise would be proposed where necessary/appropriate. One further scenario with mitigation would be modelled and assessed. Road traffic data is proposed to be used for all road links within 1km of the proposed scheme. In addition, road traffic data for the wider area will also be used where links show a 25% increase or 20% decrease in traffic volume or significant changes in traffic speeds or heavy goods composition. A vibration survey is not proposed to be undertaken. However, a generic appraisal of traffic vibration impacts will be undertaken as per the requirements of DMRB. 2

Air Quality Baseline Survey Work A survey of the existing nitrogen dioxide levels is proposed to be undertaken. This would utilise diffusion tubes and would provide additional background data. The survey would be undertaken for 3 months at circa 7 no. survey locations around the scheme. In addition, 3 no. tubes would be colocated with the local authority s continuous monitoring site in order to derive an adjustment factor in line with technical guidance. Subject to agreement the diffusion tubes would be placed on the exterior of residential properties. The tubes will be changed over once a month (around the end/beginning of each month). The following are the proposed locations for the diffusion tubes: Heath End Road area near junction with Bermuda Road; Heath End Road area between Tenlons Road and Bermuda Road; Heath End Road (west of Tenlons Road); Tenlons Road; Bermuda Road; and Near The Bridleway / bridge Assessment The assessment for air quality is proposed to include the following; A desk review of existing baseline conditions; an assessment of the impacts from construction; and an assessment of the impacts once the proposed scheme is complete. A review of the available baseline data supplemented with additional data from the proposed survey work. A qualitative assessment of the potential nuisance from dust arising during the construction of the Scheme undertaken in accordance with the Highways Agency s Design Manual for Roads and Bridges (DMRB. An assessment of the potential impact of construction traffic on air quality using the screening method outlined in the DMRB and the associated DMRB screening tool (Annex C & D of DMRB 11:3:1 and available at http://dft.gov.uk/ha/standards/guidance/airquality.htm). An assessment of the potential impacts on air quality impacts arising once the proposed scheme is complete using the screening method given in the Highways Agency s DMRB and air quality assessment tools from DEFRA s Technical Guidance LAQM.TG(09). An estimation of the pollutant concentrations at representative receptors within 200m of the proposed scheme and other affected roads (defined according to the change criteria given in the DMRB) will be made and this will be compared with statutory air quality criteria. The assessment will consider the base year (2013), and without (do-minimum) and with (dosomething) the proposed scheme in the opening year of 2018. A comparison of estimated and measured concentrations will be undertaken. Verification will be undertaken for a base year, using the principles laid out in DEFRA s Technical Guidance LAQM.TG (09). Additional receptor points will be included to represent the location of any monitoring sites within 200m of the affected road network. 3

A sensitivity test will be undertaken in accordance with DEFRA guidance to account for uncertainty in estimating concentrations of NO2 in future years. Ecology Methodology No further survey work is proposed to that already carried out and supplied to the Local planning authority. The only exception is for bat emergence surveys to be undertaken at Bermuda Bridge. Two dusk/dawn emergence or re-entry surveys of the Bermuda Bridge which is being re-furbished as part of the works. Surveys will be in accordance with the Bat Surveys Good Practice Guidelines 2nd Edition (Bat Conservation Trust 2012). The survey(s) would be carried out by two suitably experienced ecologists. The surveyors would be positioned on the bridge at dusk or dawn to monitor the presence of roosting bats in the structure. The evening survey would begin approximately 15 minutes before sunset and continue at least 2 hours after sunset, with the morning survey beginning approximately 1.5 hours before sunrise and continuing until sunrise. In the event that any bats are identified roosting within the structure it may be necessary to undertake further survey to support an application for a Natural England license for the works. Reporting The report will follow the Chartered Institute of Ecology and Environmental Management (CIEEM) 2012 Guidelines for Preliminary Ecological Assessment. It will include revision (where appropriate) to the following: Methodologies for the ecological assessment; Results of the additional bat survey work undertaken (inclusive of appropriate survey result maps; Nature conservation evaluation of all ecological receptors identified as being present within the Site boundary and ecological impact assessment of the proposals on these ecological receptors; and Mitigation measures that could be implemented to reduce or avoid adverse impacts and additional measures that could be implemented to enhance the site for the benefit of wildlife. Geology, Soils and Contaminated Land A desk based assessment of the scheme has been carried out which concluded that the proposed scheme could be affected by contaminated land relating to historical landfills / waste both on site and in the general area and ground stability. Ground Investigation Works currently being undertaken will provide further details on the likely contamination and extent of the landfill sites in relation to the scheme boundary. The results of this work will be used to update the previously undertaken report and a further review of the potential impact of the scheme with respect to the geology and soils topic will be carried out. The assessment methodology will take account of the Design Manual for Roads and Bridges (BMRB): Volume 11, Section 3, Part 11 (Geology and Soils). In the assessment both construction and operation phases are proposed to be considered. 4

Hydrology including FRA The assessment work carried out to date identifies the potential for significant environmental effects on the water environment to arise from the proposed scheme. The proposed scheme is likely to be affected by the following key water related environmental constrains: flood zones, groundwater aquifers and water related ecologically designated sites foul and surface water infrastructure. Assessments are proposed to be undertaken to update the Level 1 Flood Risk Assessment in line with the Design Manual for Roads and Bridges (BMRB): Volume 11, Section 3, Part 10 (Road Drainage and the Water Environment). Landscape and Visual Impact Although the Request for a screening opinion indicated that the application would be submitted with a Landscape and Visual Impact Assessment (LVIA) the guidance from WCC did not indicate that this was required in support of the application. Based on this guidance the it is recommended that no further work be undertaken and that the preliminary the preliminary LVIA be submitted. This includes a baseline survey, identification of potential visual and landscape constraints and opportunities for enhancement. This work is proposed to inform the detailed design and in doing so will allow representative visual receptors to be identified and assessed through the use of OS plans and Google Earth, alongside site photographs taken during the screening/scoping phase. No further survey work is proposed. Cultural Heritage A scoping report has been prepared by and provide a high-level assessment of potential environmental impacts on significant heritage assets. This preliminary cultural heritage assessment includes: A data search for designated heritage assets within a 1km study area surrounding the proposed site; A high-level review of non-designated heritage assets, as available on Heritage Gateway; A broad assessment of likely impacts on cultural heritage; and Impacts to the built heritage were considered within the previous assessment work and it was considered that this element could be scoped out of any further assessment. The assessment identifies the archaeological assets within the red line boundary, it would establish the value of those assets, the impact of the scheme, and recommend mitigation measures deemed necessary. The assessment has been undertaken in accordance with Design Manual for Roads and Bridges, Vol 11: Environmental Assessment including: 5

Baseline information of archaeological assets for a study area of 500m from the boundary of the proposed site; Data from the following sources: The National Heritage List for England for information on designated heritage assets, the Warwickshire Historic Environment Record for known heritage resource including archaeological sites, find spots and archaeological priority areas; The submitted report will detail recommendations for further assessment and/or mitigation, if necessary; and Consultation with the Warwickshire County archaeologist would be undertaken, as per DMRB guidance. Transport Assessment Methodology A Transport Assessment (TA) of the proposed scheme is proposed to be prepared in accordance with Transport Evidence Bases in Plan Making, specifically Travel Plans, Transport Assessments and Statements in decision-taking. The scope of the TA report would include the following elements: Policy Review; a review of transport related policy, including national and local guidance. Baseline Assessment; current baseline conditions, an overview road network and sustainable travel facilities available in the local area, including walking, cycling and public transport facilities. The Baseline Assessment will also include an assessment of the personal injury accident (PIA) record for the surrounding highways and a summary of the findings of the Parking Surveys. Scheme Description; an overview of the proposed scheme, including improvements to pedestrian and cycle facilities/connectivity. A review of the existing parking and an assessment of the potential impacts of the proposed scheme, taking into consideration the parking being proposed. Operational Assessment The Nuneaton S-Paramics Traffic Model will be used to provide scenario traffic flows to inform the TA including; Opening Year, Future Year, With the Bermuda Scheme; and With the A444 Corridor Improvements. The TA would include assessment of the capacity for existing and proposed junctions for the AM and PM peak periods at; Heath End Road / Bermuda Road junction; Heath End Road / Tenlons Road junction; Heath End Road / The Raywoods junction; Heath End Road / Hare and Hounds Lane junction; Bermuda Road / Tenlons Road junction; and The Griff Roundabout. The impacts of the proposed junctions would be assessed following the finalising of their detailed design; 6

WCC have indicated that further investigation is required to assess whether enhancement at the following locations should form part of the Scheme ( Table 2 ); 7 Arbury Road / Heath End Road; Arbury Road / Westbury Road; and Arbury Road / Church Road. For the purpose of the Transport Assessment it is considered that these junctions will need to be assessed in terms of junction capacity models. The rationale is that regardless of whether they are included in the Scheme or not, they are considered sensitive locations within the local area and therefore the operational impact of the Scheme will need to be considered. Traffic Management It is anticipated that the construction of the scheme may require some temporary road closures and traffic regulation orders (TROs), in particular in relation to the proposed parking restrictions. The TA will include a preliminary summary of possible closures, temporary and permanent TROs as a result of the proposed scheme. These list will then provide a framework for the TRO process which would be commenced following planning approval. Final Report; a final report for submission with the planning application for the scheme. Following guidance received from WCC the potential impact on pedestrian circulation and PROW network will be assessed. Lighting WCC have indicated that in there is the potential for sensitive receptors to be adversely impacted by street and other associated lighting. The planning application is proposed to be supported by a baseline survey and assessment of the potential for sensitive receptors to be adversely impacted by light spillage. This will include details of the proposed new street lighting and any mitigation that may be required. Human Health The guidance provided by WCC indicates that the application is not required to be accompanied by a discrete assessment of the potential impacts of the scheme on human health. However, the assessments of potential impacts on human health arising from changes to the local air quality and potential for (traffic) accidents should be undertaken so as to enable statutory consultees to deduce the potential impacts on human health. As such the scope of the Safety Audit and Air Quality assessments is expected to explicitly address these aspects and be the subject of consultation with the respective WCC and NBBC officers. Economic and Social The guidance indicates that the application should be supported by a statement which inter alia identifies the social and economic benefits which will accrue from the approval of the planning application and the wider scheme. It is proposed that the research undertaken in support of the economic viability case for the scheme is referenced as part of this statement. It is not proposed to undertake any updates to this assessment. The assessment of the social benefits is proposed to be qualitative.

The economic and social aspects of the scheme will be included within the planning statement to accompany the application. This will be prepared by SLC Rail. Consultation The Bermuda Connection scheme has been the subject of extensive public consultation. Discussions with WCC as part of the screening and scoping of the validation have confirmed that no further public consultation is required to be undertaken by the applicant. 8