RCF Closed Circuit Cooling Towers RCC Evaporative Condensers

Similar documents
Evaporative Cooling Equipment Installer / Contractor Pre Start-Up Checklist

VTL Open Cooling Towers... B98. Benefits... B100. Construction Details... B102. Custom Features and Options... B103. Accessories...

IDCF & IDC3 Evaporative Condensers

COOLING TOWERS SERIES 3000 COOLING TOWERS CONDENSERS EVAPORATIVE CLOSED CIRCUIT COOLING THERMAL STORAGE

I.O.M. #116 7/10 INSTRUCTION MANUAL INSTALLATION OPERATION MAINTENANCE. Covers Models from 25 to 100 tons.

RCF Closed Circuit Cooling Tower RCC Evaporative Condenser OPERATION & MAINTENANCE MANUAL

/ Aquatower Fiberglass Cooling Tower /

FXV - CXV. Operating and Maintenance Instructions. Series 1500 Evaporative Fluid Coolers and Evaporative Condensers

Fan Guard. Fan Guard ASSEMBLY INSTRUCTIONS FOR INDUCED DRAFT PRODUCTS

Aquatower STEEL COOLING TOWER. engineering data and specifications

ENGINEERING DATA AND SPECIFICATIONS. Marley Aquatower FIBERGLASS CROSSFLOW COOLING TOWER

Closed Circuit Cooling Towers

Equipment Maintenance Checklist

Product Introduction...D85. Benefits...D87. Construction Details...D89. Custom Features & Options...D91. Accessories...D93. Engineering Data...

Closed Circuit Cooling Towers

InterSeptor Centrifugal Separators Operating & Maintenance Manual

Standard and CELDEK Evaporative Cooler Modules Installation, Operation, and Maintenance Manual

Installation, Operation, and Maintenance Information

Series V VCA Evaporative Condenser

Baltimore Aircoil Company VX equipment has. Operating and Maintenance Instructions

INSTALLATION, OPERATION AND MAINTENANCE MANUAL IFB HEATING COILS

Baltimore Aircoil Company VX equipment

Construction Standards Page

Installer s Guide CRS-2500 Single Packaged Two Stage Indirect-Direct Evaporative Cooler 2500 CFM (4250 CMH)

CELDEK Evaporative Cooler Module Installation, Operation, and Maintenance Manual. CELDEK Evaporative Cooler

INSTALLATION, OPERATION, AND MAINTENANCE MANUAL

Standard and CELDEK Evaporative Cooler Modules Installation, Operation, and Maintenance Manual

Installation, Start-Up and Service Instructions

Series 5000 Industrial Modular Cooling Tower. Series 5000 Cooling Tower. engineering Data

Layout. Guidelines11. Chapter 11: Layout Introduction

POTENTIAL FOR WATER DAMAGE DUE TO SUMP OVERFLOW

Product Introduction...D33. Benefits...D35. Construction Details...D37. Custom Features & Options...D39. Accessories...D41. Engineering Data...

MODELS B1PA024, 030 AND 036

Compass Series Open Cooling Towers

ClearSpan Fabric Room Divider Installation Guide

C. ASME Compliance: Fabricate and label water chiller heat exchangers to comply with ASME Boiler and Pressure Vessel Code: Section VIII, Division 1.

Installation, Operation and Maintenance LOK-FLANGE Multitube Heat Exchangers

Evaporative Condensers

Maintain. a TOWER of POWER. Part One How to. Don t let out of site, out of mind prevent you from keeping cooling towers running efficiently

Hood Depot Internatioonal, Inc., Phone S. Powerline Road, Deerfield Beach, FL

Engineering Specifications for HXV Closed Circuit Hybrid Cooling Tower

Baltimore Aircoil Company Series VL equipment

INSTALLATION INSTRUCTIONS

Assessment Schedule - TS8

Rigging and Assembly Instructions

KINGS COUNTY JAIL EXPANSION PHASE III COUNTY OF KINGS SECTION

Un-Used Series CXV Evaporative Condenser

Closed Circuit Coolers Technology for the Future, Available Today

Air Handler Installation Manual

Remote Split System Units

KR Series Air Defrost Unit Coolers Operating and Installation Manual

Improving Condenser Safety In Cold Chain Facilities

Evaporative Cooling products

OWNERS INSTRUCTION MANUAL FOR FIXED INSTALLATION COMMERCIAL AND RESIDENTIAL EVAPORATIVE AIR CONDITIONERS

CONTENTS. B. System Design and Performance Requirements

Installation, Start-Up and Service Instructions

Field Start-Up Sheet Direct Fired Gas Equipment

Michigan State University Construction Standards. COOLING TOWERS Page SECTION COOLING TOWERS PART 1 - GENERAL 1.1 RELATED DOCUMENTS

SECTION AIR COMPRESSORS AND ACCESSORIES

42CE Fan Coil Unit. 42CE Fan Coil Unit (340~2720m 3 /h) Read the instructions thoroughly before installing, operating and maintaining the unit.

SSL / SBS Sales Guide BLOWER-COILS REDUCED-FOOTPRINT, VERTICAL

OPERATION AND MAINTENANCE INSTRUCTIONS MODEL 530 VIBRATORY LOSS-IN-WEIGHT FEEDER

DENVER PUBLIC SCHOOLS DESIGN AND CONSTRUCTION STANDARDS This Standard is for guidance only. SECTION PUMPS

Aquatower User Manual

Compass Series Cooling Towers OPERATION & MAINTENANCE MANUAL

PCT Cooling Towers OPERATION & MAINTENANCE MANUAL

SECTION COMPRESSED-AIR EQUIPMENT FOR LABORATORY FACILITIES

CENTRIFUGAL LIQUID CHILLERS YMC 2 MODEL A WITH OPTIVIEW CONTROL CENTER. R-134a. INSTALLATION Supersedes: N1 (611) Form N1 (512) LD14000

Installation, Operation, and Maintenance Information

Operation & Maintenance Manual

ISOLATED DIRECT DRIVE PLENUM FAN (IDDP)

SECTION PACKAGED COMPRESSOR AND CONDENSER UNITS

DARTMOUTH COLLEGE DESIGN January 3, 2012 & CONSTRUCTION GUIDELINES

COLMAC COIL. Installation, Operation, and Maintenance ENG Rev A. Air Cooled Fluid Coolers. Contents. When you want Quality, specify COLMAC!

CS 2. Central Station Air Handlers Double Wall & Single Wall Installation, Operation & Maintenance Manual. Form No. 6120A

RHGN-H: COMMERCIAL AIR HANDLER WITH VARIABLE FREQUENCY DRIVE (VFD) NOMINAL 10 TONS R-410A REFRIGERANT 2-STAGE AIR-FLOW

Guide Specifications

38XTZ ABZ 007, 008, 016, 020 and ALZ 011 and 014. Split system air-cooled air conditioners. Models 38XTZ 016 to 024 MASTER LINK I

Baltimore Aircoil RCF CLOSED CIRCUIT COOLING TOWERS. ...because temperature matters COUNTERFLOW INDUCED DRAFT

What is a Closed circuit Cooling Tower (CCT)?

User Manual Box Exhaust Fan Series (Belt Drive)

Product Introduction...E35. Benefits...E37. Construction Details...E39. Custom Features & Options...E41. Accessories...E44. Engineering Data...

SECTION STEAM CONDENSATE PUMPS

SPECIFICATION DELETED SECTION CENTRIFUGAL HVAC FANS

JCseries EVAPORATIVE CONDENSER. engineering data

CROSSFLOW REPLACEMENT FILL KITS. Replacement Fill Kits Specifically Designed for All Types of Crossflow Cooling Towers (BAC, Marley, etc.

Manual installation AW-D. Direct Gas Fired Make-Up Air Series. Revision: v001 Issue Date: 12/12/ Price Industries Limited. All rights reserved.

INSTALLATION INSTRUCTIONS FMB/FMC SERIES MULTI-POSITION AIR HANDLER

INSTALLATION INSTRUCTIONS FOR LIGHT COMMERCIAL SELF-CONTAINED PACKAGED HEATING & COOLING UNIT 3 TON - 5 TON CPC/CPH SERIES

Evaporative Condensers

TM Series. Induced Draft, Counter Flow Optional Accessories

Smoke Vent with Manual Winch. Installation, Operation and Maintenance

Condensing Unit Installation and Operating Instructions

High Profile Evaporator

V-Cube. Floor-by-floor, Vertical Self-contained System. Capacities: tons. Installation, Operation and Maintenance Instructions Manual

A. Section includes Factory Packaged, Modular units, providing cooling and heating for air distribution systems.

TECHNICAL GUIDE SPLIT-SYSTEM AIR-COOLED EVAPORATOR BLOWER 25, 30, 40 & 50 TON LA300, LB360, 480 & 600 (50 Hz) PROVEN PERFORMANCE GENERAL FEATURING

40 RM/RMS Packaged Air-Handling Units

"This is only the scope of work for the project. For more information, interested parties should contact Procurement at

Instructions for the BASIC Air Handling System, Sizes General 1.1 Description of the System

Transcription:

RCF RCC RCT RCF Closed Circuit Cooling Towers RCC Evaporative Condensers ASSEMBLY & RIGGING INSTRUCTIONS

RCF Closed Circuit Cooling Towers and RCC Evaporative Condensers should be rigged and assembled as outlined in this bulletin. These procedures should be thoroughly reviewed prior to the actual rigging and assembly of the equipment to acquaint all personnel with procedures to be followed and to assure that all necessary equipment will be available beforehand. Be sure to have a copy of the certified drawing available for reference. If you do not have a copy of this drawing, or if you need additional information about this unit, contact your BAC Representative. The model number and serial number of the unit are located on the label provided on the unit.

Table of Contents rigging & assembly instructions 2 Introduction 3 Shipping 3 Pre-rigging Checks 4 Freeze Protection 4 Location 4 Eliminators 4 Warranties 5 Rigging Guidelines 6 Rigging 8 Section Assembly 1

1 RCF closed circuit cooling towers rcc evaporative condensers Introduction Shipping Pre Rigging Checks Freeze Protection Location eliminators Warranties

Shipping BAC Cooling Equipment is factory assembled to assure uniform quality and minimum field assembly. For the dimensions and weights of a specific unit or section, refer to the certified drawings. Introduction Shipping Pre-rigging Checks Check Unit Before Rigging When the unit is delivered to the jobsite, it should be checked thoroughly to ensure all required items have been received and are free of any shipping damage prior to signing the bill of lading. The following parts should be inspected: Pulleys and Belts Bearings Bearing Supports Fan Motor(s) Fan(s) and Fan Shaft(s) Float Valve Assembly(s) Water Distribution System Coils Cold Water Basin Strainer(s) Interior Surfaces Exterior Surfaces Air Inlet Louvres Unit Weights Before rigging any unit, the weight of each section should be verified from the unit certified drawing. Some accessories add additional weight as shown on the respective accessory drawings. Anchoring The unit must be properly anchored in place. Miscellaneous Items: All bolts, nuts, washers, and sealer tape required to assemble sections or component parts are furnished by BAC and shipped with the unit. A checklist inside the envelope attached to the side of the unit marked Contractor s Installation Instructions indicates what miscellaneous parts are included with the shipment and where they are packed. WARNING: Ensure that no water, or debris has collected in the basin or elsewhere in the unit. Such accumulations will add substantially to the equipment s lifting weight. Refer to the suggested support details on the certified drawing for locations and quantity of the mounting holes. Anchor bolts must be provided by others. Holes suitable for 16 mm bolts are provided for bolting the unit to the support beams or concrete sump. The unit must be level for proper operation and ease of piping. Support beams must also be level. Shim if necessary to level unit. 3

WARNING: In the event of extended lifts or where hazards exist, the lifting devices should be used in conjunction with safety slings WARNING: Only personnel qualified to do so should undertake operation, maintenance and repair of this equipment. Proper care, procedures and tools must be used in handling, lifting, installing, operating, maintaining and repairing this equipment to prevent WARNING: Each unit must be located and positioned to prevent the introduction of discharge air into the ventilation systems of the building on which the unit is located and of adjacent buildings. Safety Adequate precautions appropriate for the installation and location of these products should be taken to safeguard the equipment and the premises from damage and the public from possible injury. When the fan speed of the unit is to be changed from the factory set speed, including the use of a variable speed device, steps must be taken to avoid operating at or near the fan s critical speed which could result in fan failure and possible injury or damage. Consult with your local BAC Representative on any such applications. Connecting Pipework All piping external to BAC cooling equipment must be supported separately. In case the equipment is installed on vibration rails or springs, the piping must contain compensators to eliminate vibrations carried through the external pipework. Location All evaporative cooling equipment must be located to ensure an adequate supply of fresh air to the fans. When units are located adjacent to walls or in enclosures, care must be taken to ensure the warm, saturated, discharge air is not deflected and short-circuited back to the air intakes. Eliminators Plastic eliminators are not designed to support the weight of a person or to be used as storage or work surface for any equipment or tools. Use of these eliminators as a walking, working or storage surface may result in injury to personnel or damage to the equipment. Units with plastic eliminators should not be covered with a clear plastic tarpaulin. Warranties Please refer to the Limitation of Warranties applicable to and in effect at the time of the sale/purchase of these products. 4

2 Rigging Guidelines RIGGINg section assembly

WARNING: The basin and casing components must be rigged seperately. Never assemble the unit before lifting as the lifting devices are not designed to support the weight of the entire assembled unit. Rigging To simplify rigging and installation RCC and RCF units are shipped in sections consisting of a basin and a casing section. Refer to the table below and Figures 1 and 2 for the recommended minimum size of the spreader bar and the recommended vertical dimension H from the lifting device at the base of each unit or section to the spreader bar. In the event of extended lifts or where hazards exist, the lifting devices should be used in conjunction with safety slings placed under the unit. The proper rigging sequence is outlined below: 1. Lift the basin section into place 2. Lift the casing section into place and secure to the basin (See section assembly) 3. Securely bolt the unit to the supporting steel Nominal Box Size No. of Sections Dimensions (for each cell) mm. Basin Casing Min. H1 Min. H2 Min.W 5'X5' 1 1 1500 1700 1675 6'X'6 1 1 1700 2000 1980 7'X7' 1 1 1900 2200 2285 8'X8' 1 1 2200 2500 2590 9'X9' 1 1 2400 2700 2895 10'X10' 1 1 2700 3000 3200 11'X11' 1 1 2900 3300 3500 7'X10.5' 1 1 3300 2200 3270 8'X12' 1 1 3600 2500 3880 9'X13'5 1 1 3900 2700 4335 10'X15' 1 1 4500 3000 4790 11'X16.5 1 1 5000 3300 5250 6

RCF, RCC Rigging Figure 1: Lifting the basin section Figure 1 shows the proper rigging of BAC RCC and RCF cooling equipment for installation. Casing sections may be hoisted short distances by using the lifting devices provided at the top of each unit as shown in Figure 2. Figure 2: Lifting the casing section 7

WARNING: When lowering a section into place, ensure that nothing can be trapped between the upper and lower flanges Section Assembly To join the casing section to the basin, lower the casing into place as shown in Figure 3 using the basin-to-casing joining brackets as a guide to fit into the casing section corner posts. Bolt the two sections together at each post. Figure 3. Joining casing to basin section 8

COOLING TOWERS CLOSED CIRCUIT COOLING TOWERS ICE THERMAL STORAGE EVAPORATIVE CONDENSERS HYBRID PRODUCTS PARTS & SERVICES w w w. B a l t i m o r e A i r c o i l. c o. z a BAC AFRICA Baltimore Aircoil Company SA (Pty) Ltd, Portland Road, Phillipi, Cape Town, South Africa Telephone: +27 (21) 371 7121, Fax: +27 (21) 374 2081