I-4 Poinciana Parkway Connector Project Development and Environment (PD&E) Study. OCX Board Meeting

Similar documents
Poinciana Parkway Extension Project Development & Environment Study

Poinciana Parkway Southport Connector Project Development and Environment (PD&E) Study

PD&E STUDY SR 9/I-95 FROM SOUTH OF SR 870/COMMERCIAL BOULEVARD TO NORTH OF CYPRESS CREEK ROAD FM # ETDM 14222

FEASIBILITY / PROJECT DEVELOPMENT & ENVIRONMENT STUDY LAKE / ORANGE COUNTY CONNECTOR (US 27 TO SR 429) ENVIRONMENTAL ADVISORY GROUP MEETING NO.

I-95 Interchange & Ellis Road PD&E Study

FDOT/FTBA Construction Conference Work Plan

AASHTO SUBCOMMITTEE ON DESIGN. June 15, 2006 MARK ROBINSON, P.E. DISTRICT 5 INTERSTATE PROGRAM MANAGER FLORIDA DEPARTMENT OF TRANSPORTATION

I-4 Beyond the Ultimate. Florida Transportation Builders Association February 9, 2018

PUBLIC HEARING. Thursday, December 14, 2017 FDOT Urban Office 2198 Edison Avenue Jacksonville, FL 32204

Public Hearing. Charlotte County-Punta Gorda MPO - Meeting Rooms A and B March 14, open house at 4 p.m., formal presentation at 5 p.m.

DRAFT MAP AMENDMENT FLU 04-4

Figure 5. Previously Identified Viable Corridors

Kick-off Meeting. FM No: ETDM No: 14050

Boca Raton II Tri-Rail Station PD&E Study and 30% Documents Public Kick-Off Meeting. August 29, 2017 Spanish River Library

SUNBRIDGE PARKWAY PRELIMINARY DESIGN STUDY. November 30, 2017

MDX SR 836/DOLPHIN EXPRESSWAY SOUTHWEST EXTENSION

Purpose of Tonight s Meeting

Panama City Beach Community Redevelopment Agency ON THE MOVE IN PCB

ALIGNMENT SEGMENTS & OPERATIONALLY INDEPENDENT SECTIONS

SUNBRIDGE PARKWAY PRELIMINARY DESIGN STUDY. Board of County Commissioners Public Hearing

Agenda. Introductions and Overview Study Purpose Study Approach Key Analysis Components Study Context Development Activity ( )

Interchange Justification Report (IJR) and PD&E for S.R. 8 C.R. 4 (Antioch Road) Interchange

Gratigny Parkway East Extension Project Development & Environment (PD&E) Study

BeltLine Corridor Environmental Study

AGENDA ITEM 3A Red Hills Coastal Parkway

Welcome. Tina Fischer. East Tampa Area Community Working Group September 25, Collaborative Labs, St. Petersburg College

SAN MARTIN BOULEVARD OVER RIVIERA BAY PROJECT DEVELOPMENT & ENVIRONMENT (PD&E) STUDY

State Highway 121 Southwest Parkway. Fort Worth s Transportation Success Story in Design and Cooperation

We d like to thank you for attending this Wekiva Parkway Section 8 Preliminary Design Update hosted by the Florida Department of Transportation.

North Carolina Department of Transportation Project Development and Environmental Analysis Branch

ROAD CONSTRUCTION. 36 June 2014 ROADS&BRIDGES

DRAFT SECTION 4(f) EVALUATION INTERSTATE 73 FEIS: I-95 to I-73/I-74 in North Carolina

Revised Long Range Transportation Plan

I. DESCRIPTION OF PROPOSED ACTION... 1 A. General Description... 1 B. Historical Resume and Project Status... 2 C. Cost Estimates...

WHAT IS THE PURPOSE OF THE OPEN HOUSE?

Public Information/Cultural Resources Committee Workshop August 15, Florida Department of Transportation District One

A Connected Region for Our Future. Tampa Bay Regional Planning Council

Southern Gateway Project and Public Green

Appendix H ETDM Screening Results Meeting Minutes

WELCOME! 8 8:30 6: TH STREET IMPROVEMENTS. Open House. Presentation & Q&A

COLLIER BOULEVARD (CR 951) CORRIDOR

Public Information Meeting

HILLSBOROUGH COUNTY Greenways and Trails Plan Update. Executive Summary. Date

Welcome. South Seminole Heights Civic Association, Inc. Tampa Interstate Study Supplemental Environmental Impact Statement.

South Dakota 100 Corridor Preservation

SOUTHWEST CORRIDOR EXTENSION. Environmental Evaluation and Basic Engineering Results PUBLIC MEETING/OPEN HOUSE November 18, 2009

SCTPO Project Summary September 2014

Construction Engineering & Inspection

Project Overview. Get Involved. Public Information Meeting. Contact Information

NORTHEAST RIVER CROSSING FUNCTIONAL PLANNING STUDY

Please be advised that the VOLUSIA TRANSPORTATION PLANNING ORGANIZATION (TPO) REAPPORTIONMENT SUBCOMMITTEE will be meeting on:

Public Open House. Welcome! Presentation at 5:15 p.m. Please sign-in at the registration table

SR 836 Southwest Extension

Illiana Corridor CPG/TTF Meeting #1

PROJECT STATEMENT LOCATION/DESIGN PUBLIC HEARING. 19 th AVENUE NORTH EXTENSION PROJECT FROM SPRINGDALE DRIVE TO NORTH 2 ND STREET/U.S.

SUMMARY. Support the Southeast Arkansas Regional Intermodal Facility.

Sustainable Development Call for Projects Western Infrastructure Project Submissions

Better Cycling. The City will update the cycling master plan (London ON Bikes) based on the approved BRT network.

NORTH-SOUTH CORRIDOR STUDY EXECUTIVE SUMMARY. Executive Summary

PROJECT BACKGROUND. Preliminary Design Scope and Tasks

Northeast Connector Expressway Extension Concept, Feasibility and Mobility Study Environmental Advisory Group Meeting #1 June 26, 2018

SR 916/NW/NE 135 Street Public Hearing

5.0 IMPLEMENTATION STRATEGIES

Borderland Expressway Coalition Status Report Camino Real RMA Board Meeting. El Paso, TX April 11, 2018

Draft Plan Recommendations

Pond Siting Report Update

MEETING SUMMARY. East Central Florida Corridor Evaluation Study MEETING PURPOSE Project Advisory Group Meeting #3 MEETING DATE

SUMMARY Downtown Malabar Meeting on July 30, 2013 State Road (SR) 514 (Malabar Road) Project Development and Environment (PD&E) Study

ALTERNATIVES. NCDOT made an early decision to first determine how to build the project (construction method) followed by what to build (alternatives).

SH 199 Corridor Master Plan. Community Meeting No. 2 May 31, 2017

APPENDIX I PUBLIC MEETING AT PROJECT INCEPTION

TAC/CAC, TPO Project Update February 2016

Project Overview. Fairfax County Parkway Widening Fairfax County. Get Involved. Public Information Meeting. Contact Information

Corridor Management Committee. September 29, 2017

RESOLUTION NO. R Refining the route, profile and stations for the Downtown Redmond Link Extension

SR 924 West Extension to the HEFT

Welcome. Northern Segment of Hwy 100 I-90 to South of Madison Street Meeting Goals:

Welcome to the. Citizen Information Meeting for the Martinsville Southern Connector Study. The purpose of this meeting is to:

7.0 SOCIAL, ECONOMIC, AND ENVIRONMENTAL ISSUES

Iowa 100 Extension Project Visualizations for Design and Public Involvement ASCE Transportation Conference November 6, 2013 Ames, Iowa

Alaskan Way, Promenade, and Overlook Walk Final EIS Appendix D - Supplemental Draft EIS Comments and Responses October 2016.

Palm Beach County (University Drive Removal) and Broward County (Transportation Element) Remedial Amendments

1.0 EXECUTIVE SUMMARY

MEMORANDUM & CITY COMMISSION BRIEFING Orlando Avenue Landscape Plans Consent Agenda Item

BRIDGE PROJECT QUESTIONNAIRE

OSCEOLA COUNTY PLANNING SERVICES SOUTH LAKE TOHO MASTER PLAN

PASCO COUNTY METROPOLITAN PLANNING ORGANIZATION 2014 LIST OF PRIORITY PROJECTS SEPTEMBER 11, 2014

I-84 Hartford Project Open Planning Studio #12. April 25, 2017

Creative Engineering Group Inc, (Creative) Construction Engineering and Inspection (CEI) Professionals

Overview of Southwestern Pennsylvania Commission s (SPC) 2040 Long Range Transportation Plan (LRTP)

Chesterfield County Project Update

Date: April 10, 2017 City Council Work Session April 24, 2017: Status Report on the Comprehensive Plan Update and Transportation Master Plan

RCS: Prepared for: DEPARTMENT OF THE AIR FORCE Eglin Air Force Base. Okaloosa County, Florida. July Prepared by:

West Bay Parkway (Segment 2) Land Suitability Mapping Analysis Technical Memorandum

LITTLE ELM CAPTIAL IMPROVEMENT BOND STREET PRESENTATION

Dwelling Units Max 12 dwelling units per acre/min 8 dwelling units per acre. Development Mix 80% non residential/20% residential

FDOT D4 Complete Streets

Chapter 5: Natural Resources and Environment

Transportation Committee

Fairfax County Parkway (Route 286) Widening Project

Transcription:

I-4 Poinciana Parkway Connector Project Development and Environment (PD&E) Study Presentation for: OCX Board Meeting January 14, 2014 Financial Project ID: 433693-2-22-01 ETDM No.: 13957 - Poinciana Parkway I-4 Segment

Today s Presentation Project Status Corridor Evaluation Typical Section Key Environmental Considerations Corridors Public and Agency Involvement Corridor Report Next Steps Schedule Questions 2

OCX Master Plan Osceola Pkwy Extension I-4 Poinciana Parkway Connector Central Polk Parkway Poinciana Parkway (Design Build) Poinciana Parkway Northeast Connector Expwy Southport Connector 3

I-4 Poinciana Parkway Connector Study Area Osceola and Polk Counties FDOT Districts 1 and 5 MetroPlan Orlando (2030 LRTP) Polk TPO Water Management Districts: South Fl, Southwest Fl Reedy Creek 4

Proposed Improvement A new alignment Upgrades to existing roadways New or modified interchange with I-4 Coordination with other projects Extension of Ernie Caldwell Blvd Central Polk Parkway PD&E Study I-4 Reevaluation Southport Connector PD&E Study Proposed Poinciana Parkway Bridge 5

Study Process Scoping Allows for Public and Agency Input ETDM Programming Screen Start PD&E Study July 2013 Purpose and Need Corridors Agency Project Advisory Group October 30, 2013 Public Meeting #1 December 10 & 12, 2013 Initial Alternatives Public Meeting #2 Viable Alternatives Public Meeting #3 Draft Environmental Document Final Environmental Document Public Hearing Agency/Public Review & Comment ETDM = Efficient Transportation Decision Making 6

Project Purpose and Need Primary Goals Improve roadway connection from I-4 to Poinciana Enhance mobility Improve overall traffic operations Promote regional system linkage Secondary Objectives Support economic development Enhance safety/emergency response/evacuation 7

Corridor Typical Section Consistent with OCX Master Plan typical section width Proposed 4 lanes are expandable to 6 lanes Includes potential future transit Use 425-foot wide corridor for analysis 400 Typical Section from OCX Master Plan FUTURE TRANSIT 8

Key Environmental Considerations Social Environmental Justice Pedestrian/Bicycle Community Cohesion Cultural Section 106/Historic and Cultural Resources Section 4(f)/Parks and Recreation/Conservation Natural Wetlands Section 7/Wildlife & Habitat Physical Floodplains Contamination Farmlands Air/Noise Utilities/Railroad Construction Visual / Aesthetic Secondary/ Cumulative 9

Identify Corridors North Map South Map 10

Corridor Analysis: Identify land suitable for alternatives development Avoid major constraints 425-ft width min. North Map 11

Corridor Analysis: Identify land suitable for alternatives development Avoid major constraints 425-ft width min. South Map 12

Six Potential Corridors 1. I-4/World Drive 2. I-4/SR 429 3. I-4/CR 532 4. I-4/CR 54 5. Central Polk Pkwy/Ernie Caldwell 6. Central Polk Pkwy/Cypress Pkwy 13

Corridor 1 I-4 / World Drive World Drive Facing Northwest Poinciana Parkway Bridge Segment 14

Corridor 2 I-4 / SR 429 Poinciana Parkway Bridge Segment 15

Corridor 3 I-4 / CR 532 I-4 at CR 532 Facing North Poinciana Parkway Bridge Segment 16

Corridor 4 I-4 / CR 54 Poinciana Parkway Bridge Segment 17

Corridor 5 Central Polk Pkwy/Ernie Caldwell Planned Central Polk Pkwy Poinciana Parkway Bridge Segment 18

Corridor 6 Cypress Parkway Poinciana Parkway Bridge Segment Planned Central Polk Pkwy Future Study North of Cypress Pkwy. Facing South 19

Corridor Report Comparative Evaluation of: Purpose and Need Satisfaction Potential Environmental Involvement Social, Cultural, Natural, Physical Engineering Considerations Access to I-4 or Central Polk Parkway Utilities Interchange spacing Estimated project costs 20

Next Steps Traffic studies Agency review corridor evaluation methodology Revise corridors per comments following Public Meeting Evaluate revised corridors Prepare Alternatives Corridor Evaluation Report FHWA coordination Identify corridors for further evaluation Develop initial alternatives 21

Project Schedule TODAY 22

Contact information Amy Sirmans, PE FDOT Project Manager Phone: (386) 943-5404 Toll Free: 1-800-780-7102 Email: Amy.Sirmans@dot.state.fl.us Website: www.i4poincianaconnector.com Written comments and questions can be mailed to: ` I-4 Poinciana PD&E Study Attention: Amy Sirmans Florida Department of Transportation 719 S. Woodland Blvd., MS1-501 Deland, FL 32720 23

I-4 Poinciana Parkway Connector Project Development and Environment (PD&E) Study Thank You