THE PLANNING AREA 2.1 PLANNING AREA LOCATION

Similar documents
VISION & EXECUTIVE SUMMARY

I'm requesting the attachment be included for formal hearings and review and presented during the next meeting.

3.5 VISUAL AND AESTHETIC QUALITIES

BRISBANE BAYLANDS INFRASTRUCTURE PLAN FEBRUARY 2011 APPENDIX O DRAFT

4 LAND USE DESIGNATIONS

Includes Update Adopted by City Council in January 2018 Resolution CHAPTER II THE PLANNING AREA. Physical Setting. Demographic Setting

S o u t h C e n t r a l O u t l i n e P l a n. Leduc Business Park. North Leduc Industrial Area Structure Plan C it y of Led u c.

PROJECT DESCRIPTION ENVIRONMENTAL SETTING. Project Site Location FIGURE 1 - REGIONAL LOCATION MAP

2. INTRODUCTION 2.1 AUTHORITY 2.2 PURPOSE AND INTENT 2.3 SITE LOCATION

Transportation Committee

A. WHAT IS A GENERAL PLAN?

Comprehensive Plan Advisory Panel Meeting #3

Ten Mile Creek Planning Area

Chapter 5: Natural Resources and Environment

OP Council Resolution June 16, Planning and Development Services

5.1 AESTHETICS AND VISUAL RESOURCES Physical Setting

Planning Districts INTRODUCTION

General Location Annex, Rezone & Preliminary Plat Lansdowne Addition, Unit Three

APPENDIX C SPECIAL PLANNING AREAS

CHAPTER 10 AESTHETICS

7.5 Impacts on the Section 4(f) Properties

CHAPTER 7: Transportation, Mobility and Circulation

APPENDIX D: BACKGROUND AND VISION

The impacts examined herein take into account two attributes of aesthetic values:

Mitchell Ranch South MPUD Application for Master Planned Unit Development Approval Project Narrative. Introduction

LAND USE MEADOWS PLANNING AREA

1INTRODUCTION. Purpose of the Truckee Railyard Master Plan

Right-of-Way Acquisitions and Relocations Technical Memorandum

Written Statement for Keizer Station Area B Amendment. Master Plan Amendment for Keizer Station Area B GENERAL INFORMATION

Century Highfield Sub Area Plan

Transportation. Strategies for Action

Nob Hill Pipeline Improvements Project EIR

YONGE STEELES CORRIDOR SECONDARY PLAN. Young + Wright / IBI Group Architects Dillon Consulting Ltd. GHK International (Canada) Ltd.

Derry Green Corporate Business Park

Elm Fork Land Use. Trinity River Corridor Project Committee May 13, 2013

I-355 Corridor Master Plan Update

UNIVERSITY OF MICHIGAN:

C ity of Grande Prairie Development Services Department

4.1 AESTHETICS AND VISUAL QUALITY

The South Macleod Trail Community and Employment Centre

Background Summary Report

Strategic Growth Area #1 Northampton Boulevard Corridor Area

Drexel, Barrell & Co.

Leduc Industrial Outline Plan SE W4

2.0 Hi s t o r y & Existing Co n d i t i o n s

1.0 Circulation Element

4. ENVIRONMENTAL IMPACT ANALYSIS 7. LAND USE AND PLANNING

Welcome. Comprehensive Plan & Transportation Plan Open House November 7, 2012

City of Grande Prairie Development Services Department

LAND USE CHAPTER V GOALS: The City of Brisbane will...

124 Subarea Visions. Vision Plan. A. Nelessen Associates, INC I Visioning I Planning I Urban Design

Urban Development Areas Bedford County

Central and East Neighbourhoods - Hermitage Outline Plan

3.5. Visual and Aesthetic Qualities

José Campos Manager of Planning and Design Review SPUR San José Symposium October 12, 2018

A P P E N D I X B - O P P O R T U N I T Y S I T E S

EXHIBIT B PROJECT NARRATIVE POULSBO MEADOWS

Northeast Quadrant Plan

Northern Branch Corridor SDEIS March 2017

ECR. el camino real master plan. settings and opportunities. The City of San Mateo SMWM. Adopted by the San Mateo City Council September 18, 2001

Staff Report and Recommendation

III. PROJECT DESCRIPTION

A. LAND USE AND PLANNING POLICY

22a. Existing Condition. 22b. Simulation of NE 20th Street Alternative (D3)

2.0 PROJECT DESCRIPTION

LAND USE TANGLEWILDE/THOMPSON PLACE PLANNING AREA. C. Identified Neighborhood Groups and Homeowner s Associations

Midtown Greenway Land Use and Development Plan Executive Summary

Developer s Program. The Station at East 54

Assembly Amendments to Anchorage 2040 Land Use Plan Adopted on September 26, 2017

NOTICE OF PREPARATION

East Corridor Final Environmental Impact Statement

Introduction 1. Contents. Draft:

Visitacion Valley/ Schlage Lock

920 BAYSWATER AVENUE PROJECT

City of Grande Prairie Development Services Department KENNEDY DEVELOPMENTS LTD. OUTLINE PLAN OP-09-01

Outline Plan in Belvedere (Ward 9) at Street SE, LOC (OP)

Southeast Quadrant Plan

Gold Line Bus Rapid Transit Transit Oriented Development (BRTOD) Helmo Station Area Plan

Asbury Chapel Subdivision Sketch Plan

Mississippi Skyway Preliminary Engineering Report

2 PLANNING AREA DESCRIPTION

CHAPTER 1. Ms. Guajardo s Class - Central Elementary CH 1 1

Town of Wheatfield Local Waterfront Revitalization Program

11: Good Design - Boor Site

LAND PARK COMMUNITY PLAN

3.5 VISUAL AND AESTHETIC QUALITIES

2. Form and Character. 2.1 Introduction. 2.2 The Downtown Addition Plan. 2.1 Introduction

POCKET COMMUNITY PLAN

Chapter 5: Recreation

CITY OF LAKEWOOD 2012 THREE-MILE PLAN

COLVER ROAD INDUSTRIAL CONCEPT PLAN

Drexel, Barrell & Co.

Physical Connectivity Do not have structures that physically divide the community more than it is divided today

Town of Rico Three Mile Plan for Annexation

Master Plan Objectives and Policies

Proposed Water Ski Wakeboard Cable Park (former Cedar Run Horse Park) Kevin Bechard Deputation to Committee of the Whole June 4, 2018

M E M O R A N D U M January 6, 2017

Station Area Plan Introduction & Draft Alternatives Review

ENVIRONMENTAL SETTING

SHEFFIELD PARK Paulding County, GA DRI #588

Transcription:

2. The Planning Area Brisbane Baylands Specific Plan 21 2 THE PLANNING AREA 2.1 PLANNING AREA LOCATION The Baylands is located approximately midway between San Francisco s central business district and its international airport, as illustrated in Figure 2.1, and is one of the largest undeveloped tracts of urban land on the west San Francisco Bay Peninsula. The site is well served by regional transportation systems. U.S. Highway 101 is a major north-south freeway that provides direct access to the site from interchanges at Harney Way and Sierra Point Parkway. The Caltrain commuter rail between San Francisco and Gilroy and the Union Pacific freight lines both pass through the center of the Baylands. Rail spurs currently serve existing businesses in the area. With construction of the planned Intermodal Station at the north end of the Baylands, Caltrain and the San Francisco Municipal Railway ( MUNI ) T-Third Street Light Rail Transit (LRT) both will serve the area directly. In addition, implementation of the planned BRT along Geneva Avenue would ultimately connect Hunter s Point and Candlestick Point to the Baylands and Balboa Park BART. Within the City of Brisbane, the site is bounded by commercial and industrial development to the west, Central Brisbane to the southwest, the Sierra Point business park and municipal marina to the southeast (i.e., east of the freeway), and the Recology waste collection and recycling center on the north. Low intensity commercial development and manufacturing uses within Daly City border the area to the northwest (i.e., along Bayshore Boulevard north of Geneva Avenue); this area is part of Daly City s Bayshore Redevelopment Area. In Central Brisbane, adjacent to the Planning Area, offers an appealing small town environment. The Lagoon at the south end of the Baylands offers unique natural resources and passive recreational potential.

22 Brisbane Baylands Specific Plan 2. The Planning Area Figure 2.1 Location Map Credit: Microsoft Corp (2005), Navteq (2004), & US Census addition, Daly City s Geneva Avenue Urban Design Plan envisions higher intensity uses along that corridor in the future, including residential infill. Such improvements to the Bayshore Boulevard and Geneva Avenue corridors within Daly City would be consistent with the type of development envisioned within this Specific Plan. To the north immediately across the San Francisco city and county line that serves as the area s northernmost Brisbane Baylands border, the former Schlage Lock site City of Brisbane and other vacant industrial properties, parking for the Bayshore Caltrain Station, and the northern portion of the Recology facility are located in San Francisco s Visitacion Valley neighborhood. An affiliate of UPC owns the Schlage Lock site and is proposing the Vistacion Valley Transit- Oriented Development (VVTOD) Project on the site, which would complement the development proposed by this Specific Plan. Office parks, residential development, and the San Francisco 49er s Candlestick Park are located on Candlestick Point northeast of the area and east of the freeway. Just north of Candlestick Point is the proposed Hunter s Point Redevelopment project, which is transforming the former shipyard into a mixed-use area of housing, businesses, and a green technology incubator. The entire east side of the Baylands area is bounded by U.S. 101, and beyond that opens out to dramatic views of San Francisco Bay and the East Bay skyline. Several regional and local parks, including San Bruno Mountain State and County Park, Candlestick Point State Recreation Area, and McLaren Park are within a short walking or driving distance of the Baylands. Existing segments of the Bay Trail are located along Sierra Point Parkway and along Harney Way, with a connecting segment planned between the northern edge of Brisbane Lagoon and Beatty Avenue.

2. The Planning Area Brisbane Baylands Specific Plan 23 Aerial view of the Baylands, looking north towards San Francisco The total area of the Brisbane Baylands Specific Plan area consists of approximately 548 upland acres (25 percent of the city s total land area) and 136 acres of Lagoon subarea, including 110 acres of open water, totaling 684 acres. 1 Although not all of the Lagoon district and its perimeter property are owned by Universal Paragon Corporation (UPC), they are mostly included within the Planning Area in order to provide comprehensive planning for and ensure protection of the Lagoon and public access to the entire Lagoon edge. 1 Acreage was derived from the ALTA/ACSM Land Title Survey prepared by David Evans and Associates, Inc., October 2000; Sunquest Properties (Universal Paragon) Parcel survey prepared by Brian Kangas Foulk, September 1989; and the LUK 2006 ALTA for the Lagoon sub-area.

24 Brisbane Baylands Specific Plan 2. The Planning Area 2.2 PLANNING AREA CHARACTER Consistent with its historic and recent uses, the Planning Area has a disturbed, industrial character with low visual quality that is in significant contrast to its highly scenic setting on San Francisco Bay and in the shadow of San Bruno Mountain. Existing development adjacent to the Planning Area is reflective of the area s industrial character and low visual quality. The north end of the Planning Area is bounded by the various waste collection, recycling, and distribution centers. The western edge is bordered by Bayshore Boulevard, while the busy U.S. 101 freeway corridor borders the Planning Area to the east. The former Southern Pacific railyard and the still active railroad tracks used by Caltrain commuter and Union Pacific freight trains travel north and south through the Planning Area The Kinder Morgan Energy Partners, L.P. fuel storage facility (tank farm) which occupies an out-parcel in the southwest portion of the site (i.e., it is not included in the Planning Area and not under ownership of UPC) represents a particularly negative visual element from within the site as well as from Central Brisbane and other surrounding areas. Physically, the area is largely undeveloped, comprising mainly disturbed areas that were formerly part of the San Francisco sanitary landfill. Since the landfill s closure in 1967, the area has been used as a repository for clean fill materials from construction sites in the region and for recycling of sand, dirt, gravel, and other construction materials. Over time, these activities, which are authorized under a permit from the City of Brisbane, have resulted in a somewhat variable topography (as a result of the constant movement of materials in and out of the site) with elevations that are on average 20 to 30 feet above the surrounding grades. The drainage channel bisecting the eastern portion of the Baylands provides limited habitat. The open areas in the eastern portion of the Baylands have been altered by fill operations.

2. The Planning Area Brisbane Baylands Specific Plan 25 These elevated grades not only provide an effective cap on the former landfill site, but also allow for dramatic views out from the site in all directions to San Francisco Bay to the east, Visitacion Valley and McLaren Park to the northwest, San Bruno Mountain and Central Brisbane to the west and southwest, and Brisbane Lagoon to the south. The continuous movement of fill material into and recycled materials out from the site has generally prevented the establishment of any significant vegetation. One key feature that remains despite the fill operations is the drainage channel that runs east-west through the center of the Planning Area. This drainage channel, which carries runoff from the Visitacion Creek watershed west of the site to the Bay, supports a narrow strip of wetland and riparian vegetation, and is held as an easement by the City of Brisbane. The only existing development within the Planning Area includes two building supply businesses (Sierra Lumber and Van Arsdale-Harris) that are located in the northern portion. Both of these businesses are anticipated to be relocated to an alternate site in order to This view from the City of Brisbane shows the fuel tanks and Ice House Hill in the foreground and downtown San Francisco in the background. Much of the Baylands is visible just beyond Ice House Hill and the tank farm.

26 Brisbane Baylands Specific Plan 2. The Planning Area provide enhanced operations for both businesses, and contiguous development within the Planning Area. The proposed site for these two businesses is located between the railroad right-of-way and Tunnel Avenue, just south of its current location. While the Specific Plan generally accommodates the proposed relocation, the precise details regarding the relocation will be addressed in a separate application. 2.3 LAND OWNERSHIP As illustrated in Figure 2.2, UPC owns the vast majority of the upland portion of the Specific Plan area and more than half of the Lagoon subarea. Areas enclosed by but excluded from the Specific Plan Area include the tank farm owned by Kinder Morgan Energy Partners (23.5 acres) and the Machinery & Equipment building parcel and former rail access south of Ice House Hill. These parcels are not part of the Specific Plan and are likely to maintain their current operations for the foreseeable future. The parcels on which Sierra Lumber and Van Arsdale-Harris Lumber operate total 8.6 acres and are located within the Specific Plan Area. The proposed new location for these businesses totals approximately 16 acres bounded by Tunnel Avenue, Visitacion Creek Park, and the Caltrain rail tracks. This proposed land swap will better integrate these viable uses into the overall plan for the area and enhance their operations. The proposed relocation and design of new facilities for these two businesses will be addressed in a separate application and will be subject to City approval. In addition to its upland holdings, UPC owns a major portion of the Lagoon itself totaling approximately 75 acres, or 55 percent, of the Lagoon. UPC s upland and Lagoon properties are non-contiguous, separated by a 600-foot-wide strip of Lagoon property owned by the California State Lands Commission. The City of Brisbane owns a 60-foot-wide right-of-way for Lagoon Way, crossing the southern end of the Planning Area between the freeway off-ramp and Tunnel Avenue. In addition, the Bayshore Sanitary District holds a 60-foot-wide access ( roadway ) easement that follows Tunnel Avenue south of the Sierra Lumber site and then veers west to access the pump station. Union Pacific holds a 30-foot-wide railroad right-of-way parallel and west of Tunnel Avenue near the Sierra Lumber and Van Arsdale-Harris sites. Caltrain operates on a 100-foot rail corridor easement, under ownership by the Peninsula Corridor Joint Powers Board (PCJPB). Several utilities easements travel under Tunnel Avenue and the Caltrain rail corridor. Additionally, communication easements travel southward along the western boundary of the Specific Plan Area south of the Kinder Morgan tank farm,

Visitacion Valley Transit-Oriented Development (VVTOD) 2. The Planning Area Brisbane Baylands Specific Plan 27 Specific Plan Boundary UPC Ownership State Lands Commission Ownership Access Easement Railroad Easement Drainage Easement Waterline Easement Utility Easement Main Street Industrial Way Figure 2.2 UPC Ownership 2004 Ice House Hill PG&E Easements Pipeline Easements Lagoon Way Communication Easements Brisbane Lagoon Note: Ownership was derived from a variety of sources, including the ALTA/ASCM Land Title Survey. This data is intended for planning purposes only. Brisbane Baylands Specific Plan Universal Paragon Corporation N 0 350 700 1400 feet 2.2 EXISTING LAND OWNERSHIP

28 Brisbane Baylands Specific Plan 2. The Planning Area and two 10-foot pipeline easements extend eastward from the southern base of the tank farm to the eastern edge of the Specific Plan area. Finally, a drainage easement follows the existing drainage channel and a waterline easement crosses the Baylands and terminates at the tank farm. A number of existing City-owned rights-of-way are not under ownership by UPC, but are included in the Specific Plan area and recommendations. This includes in particular Industrial Way, an access road at the western boundary of the Planning Area at the intersection of Main Street. Improvements to the right-of-way will be negotiated through a separate approval and development process. As previously noted, the Sierra and Van Arsdale-Harris lumber businesses will likely relocate. Ownership transfers or swapping will be addressed in a separate application and will be subject to City approval. Additionally, some improvements are suggested outside of the Planning Area and should be addressed as part of existing or proposed circulation elements separately by the City. These may be implemented through a collaborative process with the City of Brisbane in future planning efforts.