Underground Service Alert (USA) Program Regulatory Compliance Program Page 2

Similar documents
The Gas Company Public Awareness Information Pipeline Installation & Maintenance-Southern California Gas Company (SoCalGas)

EXHIBIT A BE IT ORDAINED BY THE MAYOR AND THE CITY COUNCIL OF THE CITY OF BELLEVUE, NEBRASKA.

University of Delaware

Chapter ALARM SYSTEMS

I. Scope: II. Environmental Health and Safety Fire Alarm System Impairment Program - Guideline Revision Date: April, 2018


BIRCH RUN TOWNSHIP SAGINAW COUNTY, MICHIGAN ORDINANCE # ALARM SYSTEM ORDINANCE

Westerville, OH Code of Ordinances. CHAPTER 969 Alarm Systems

PUBLIC SERVICES ELEMENT GOALS / POLICIES / MEASURES

REQUEST FOR PROPOSALS CLEANING SERVICES

GUIDELINES FOR EMERGENCY PLANNING AND PREPAREDNESS. High-Hazard

Methods, approaches, and procedures to minimize active agricultural land impacts during pipeline construction, surface restoration, and pipeline

Shelter in Place. Fact Sheet. At School. City of Edmonton. Why Would You Need to Shelter in Place

LOS ANGELES UNIFIED SCHOOL DISTRICT REFERENCE GUIDE

CITY OF ST. AUGUSTA STEARNS COUNTY MINNESOTA ORDIANCE NO AN ORDINANCE ESTABLISHING REGULATIONS FOR STORMWATER MANAGEMENT

El Segundo Fire Department. Unified Program (UP) Form CONSOLIDATED CONTINGENCY PLAN I. FACILITY IDENTIFICATION

Methods, approaches, and procedures to minimize active agricultural land impacts during pipeline construction, surface restoration, and pipeline

CITY OF GRETNA, NEBRASKA ORDINANCE 804 AN ORDINANCE CREATING CHAPTER 10 BUSINESS REGULATIONS, ARTICLE 12, ALARM SYSTEMS; TO DEFINE ALARMS; REQUIRING

Workplace Safety North

SUBMITTAL REQUIREMENTS: FINAL PLAN REVIEW- PROJECT DEVELOPMENT PLAN (PDP)

City of Larkspur. Notice of Mitigated Negative Declaration for the 285

... Williams Gas Pipeline

5.0 CONTINGENCY PLAN. It is necessary to amend the plan if:

ORDINANCE NO

Authorized individuals to be notified. Include two (2) persons with access to the premises to allow emergency access.

CHAPTER Committee Substitute for Committee Substitute for Committee Substitute for House Bill No. 973

Master Emergency Action Plan. NHA Johnston Project 40 Scholar Drive, Clayton, NC 27520

Boise Municipal Code. Chapter 9-04 EXCAVATIONS

Occupant Emergency Plan Revised 9/09/2008

ARTICLE 4-13 ALARM SYSTEMS * Division 1. Generally

GUIDELINES FOR PERMEABLE SIDEWALK-LANDSCAPING PERMIT

Subject: Fire Protection Impairment Program Reference: NFPA (see bottom of page 5) Effective Date: August 2014 Distribution All YC Employees

DONALD H. BERG, ARCHITECT

Rancho Cucamonga Fire Protection District Prevention Bureau Standard

MONTGOMERY COUNTY RULES GOVERNING ALARMS SECTION 1. PURPOSE SECTION 2. DEFINITIONS

HAZARDOUS MATERIALS/WASTE EMERGENCY CONTINGENCY PLAN University of Southern Maine Portland Campus

Initial Version Revision No. 0 Next Review Date: Preparation: Safety Mgr Authority: President Issuing Dept: Safety Page: Page 1 of 6

Emergency Evacuation Plan South Patterson Building (SPB)

Fire System Impairment Policy

DESIGN CRITERIA PACKAGE

ORDINANCE NO

Regulations Regarding Emergency Planning & Preparedness for Long Term Care Facilities. Regulation Explanation Document Reference

EMERGENCY PREPAREDNESS & RESPONSE PROCEDURE

HAZARDOUS MATERIALS/WASTE EMERGENCY CONTINGENCY PLAN University of Southern Maine Portland Campus

Article 3: Police Regulated Occupations and Businesses. Division 37: Burglary, Robbery and Emergency Alarm Systems

IRO Reliability Coordinator Real-time Reliability Monitoring and Analysis Capabilities

IYRS School of Technology & Trades RCRA CONTINGENCY PLAN Bristol Facility 40 CFR 265 Subpart D 29 CFR Emergency Evacuation

Expo Line Transit Project. Project Status Update Meeting West End Corridor Segment C

AREA LIGHTING TABLE OF CONTENTS PUD SERVICE TERRITORY & CONTACTS FOR YOUR PROPERTY OVERHEAD FEED UNDERGROUND FEED. Electrical Service Requirements

RFP Addendum 2 March 31, 2016

Contingency/Emergency Plan for all Hazards Page 1 of 9

THIS ORDINANCE ONLY AFFECTS EXISTING FIRE ALARM SYSTEMS.

VALLEY COUNTY MINIMUM STANDARDS FOR PRIVATE ROAD DESIGN AND CONSTRUCTION

Template Options v1 1

This chapter shall be known as the "City of Bayfield Alarm Systems Ordinance."

Fire evacuation drill

PART D. Emergency Alarms. Section 402. Definitions. The following definitions shall apply in the interpretation and enforcement of this ordinance:

Public Notice of Amendment to New Shoreham General Ordinances Chapter 5 Fire Prevention and Protection New Article IV Fire Alarm Ordinance

Emergency Action Plan. Revised: 1/22/2018

Emergency Notification Plan. Developed By: Cleveland State University Police Department Office of Emergency Management

EMERGENCY RESPONSE GUIDEBOOK South Hamilton Campus February 2016 Reviewed and Updated

IRVING FIRE DEPARTMENT EMERGENCY PLANS

Securities Dealing Policy

LABC Gas Well Incident City Council Report

SURREY FIRE SERVICE. Construction Fire Safety Plan Bulletin

FIRE SAFETY AND EVACUATION PLANNING FOR ASSISTED LIVING FACILITIES AND NURSING HOMES

maintaining the health, safety and welfare of the citizens of the City and its visitors; and

CONDITIONS OF SERVICE - NBN SERVICES 1. ABOUT

Tennessee Code/TITLE 62 PROFESSIONS, BUSINESSES AND TRADES/CHAPTER 32 FIRE PROTECTION/PART 1 FIRE PROTECTION SPRINKLER SYSTEMS

Emergency Guidebook WEAPONS ON CAMPUS ACTIVE SHOOTER BOMB THREAT FIRE / EXPLOSION CRIME REPORTING EVACUATION HAZMAT SPILL HIGHWAY HOSTAGE SITUATION

Standard Development Timeline

2430 Roman Forest Blvd. Ray Ricks Roman Forest, Texas Ordinance No. 215-A

These telephone numbers are provided as a general aid to emergency notification. Be advised that additional agencies may be required to be notified.

UNIFIED PROGRAM AGENCY (CUPA)

DEPARTMENT OF PUBLIC SAFETY DIVISION OF FIRE PREVENTION AND CONTROL

MUNICIPALITY OF EAST HANTS BYLAW F-500 FIRE AND BURGLAR ALARM BYLAW A BYLAW IN AMENDMENT TO BYLAW 5-1 BURGLAR ALARM BYLAW

EMERGENCY ACTION PLAN

SPILL PREVENTION AND RESPONSE PLAN

UNIVERSITY OF TOLEDO

UNIVERSITY. Facilities Management

MARINA BAY NEIGHBORHOOD PRESENTATION. City of Richmond Officer Bradley A. Moody Memorial Underpass. April 11, 2012

Transportation Systems and Utility Infrastructure

FIRE & LIFE SAFTEY STANDARD

ELEVATOR RESCUE PROCEDURE

City Council Agenda Cover Memora-ndum

AGENDA SPECIAL MEETING OF THE CITY COUNCIL OF THE CITY OF PARK RIDGE

ARTICLE 17 SITE PLAN REVIEW

SCALES NW EMERGENCY ACTION PLAN

SPECIFIC PLAN Requirements

Emergency Action Plan

NON-PRIORITY PROJECT WATER QUALITY PLAN (NPP)

LANDSCAPE GUIDELINES. Submitted by the Landscape Committee of The Village Townhomeowners Association

Enclosed are the required forms for completing an application for a Steep Slope Disturbance Permit with the

MNEC NFPA 72 WHITE PAPER

Los Angeles International Airport Rules and Regulations SECTION 08 FIRE AND SAFETY

NATURAL GAS SAFETY. Your safety. Our priority Update

Final Design Activity Descriptions July, 2017

EMERGENCY ACTION PLANS HOW READY ARE YOU?

Safety, Health, and Environmental Standard

School EMERGENCY PLAN

Transcription:

Regulatory Compliance Program Page 2 1.0 PURPOSE AND SCOPE The purpose of this policy is to provide guidelines for compliance with notification requirements during excavation projects performed by City employees as defined below. In addition, the City also has the responsibility to mark its subsurface installations for other entities as part of the regional notification system. These notification requirements are designed to identify subsurface installations which may be impacted by the excavation. The requirements for notification before excavation are located in Section 4216 of the California Government Code and Section 1541 (b)(1-4) of Title 8 of the California Code of Regulations. Definitions of the terms used in this program are found in Attachment A. 2.0 RESPONSIBILITY City employees are required to follow their department s established procedures (e.g., Standard Operating Procedures, General Orders, Manual of Operations, etc.) and this safety program related to notification requirements during excavation projects. In any case, where a City excavator damages (e.g., scrapes, dents, nicks, breaks, etc.) an underground facility, the excavator must directly contact the owner/operator of the facility and describe the damage as soon as possible. 3.0 PROCEDURES AND REQUIREMENTS 3.1 Notification Requirements a. Except in an emergency, every person planning to conduct any excavation shall contact the regional notification center (Underground Service Alert at 800-227-2600) at least two working days, but not more than 14 calendar days, prior to commencing that excavation. b. The excavator must delineate the area to be excavated with white paint or other suitable markings. If it is not practical to delineate the area to be excavated with paint, the excavator will convey this to the regional notification center and other arrangements will be made. c. A record of all notifications by excavators to the regional notification center shall be maintained by the department for at least three years. 3.2 Inquiry Identification Numbers The regional notification center will provide an inquiry identification number to the person contacting the center regarding an excavation. This number is valid for 28 calendar days. The number can be revalidated for a longer period of time upon agreement with the center and the excavator prior to its 28-calendar day expiration. The inquiry identification number must be kept at the job site for the duration of the work being performed.

Regulatory Compliance Program Page 3 3.3 Field Markings a. An operator of a subsurface installation who receives notification from the regional notification center of any proposed excavation work will, within two working days or before the start date of the excavation work (whichever is later excluding weekends and holidays), locate and field mark the approximate location of the subsurface installation. b. Operators of subsurface installations shall make reasonable efforts to conform to the following color code based on the type of installation. Color Red Yellow Orange Blue Green Purple Type of Installation electric distribution, power, transmission, or municipal electric installations gas distribution, transmission, and installations; oil distribution, transmission, and installations; and installations containing or transporting dangerous materials, products, or steam telephone and telegraph installations, police and fire communication installations, and cable TV installations water installations sewer installations reclaimed water, irrigation and slurry lines c. If at any time during the excavation an operator s marks are no longer visible, the excavator shall contact the regional center to apprise them of the situation. The regional center will in turn contact the operator who must relocate and remark the subsurface installation within two working days. 3.4 Subsurface Installations Within Excavation Areas a. The excavator shall determine the exact location of subsurface installations within the area to be excavated by utilizing hand tools in the area delineated by the operator s field markings. This must be done prior to the use of any power-operated or power-driven excavating or boring equipment within the approximate location of the subsurface installation. b. Exception: Power-operated or power-driven excavating or boring equipment may be used for the removal of pavement if there are no subsurface installations within the pavement. If the exact location of the subsurface installation cannot be determined by hand excavating as described above, the excavator shall request the operator to provide additional information to the extent possible to determine the exact location of the subsurface installation.

Regulatory Compliance Program Page 4 3.5 Emergencies and After-Hour Work a. Emergency excavation work, as defined in Attachment A, does not require notification to the regional notification center. As a precaution, it is recommended that the regional center be notified during working hours (6:00 a.m. - 7:00 p.m.) of any emergency excavation. The regional center will label the notification as a priority request and will notify affected owner/operators as such. This does not guarantee immediate response from the affected owner/operators, but it does serve to alert them as to the situation. b. Emergency excavation performed after normal working hours presents a great challenge to the excavator. The regional notification center will not be available but there may be local owner/operator contacts that will be able to respond or offer information over the phone. Telephone numbers are listed in Attachment B. c. The safety of the crew performing any emergency excavation must be a priority. All reasonable efforts should be taken to contact those owner/operators whose underground facilities represent the greatest hazard to the excavation crew. The greatest hazards are posed by gas, electric, and chemical pipeline installations. Due to the high cost of damage, fiber optic owner/operators should also be contacted.

Regulatory Compliance Program Page 5 Attachment A DEFINITIONS UApproximate location of subsurface installationsu: A strip of land not more than 24 inches on either side (laterally) of the exterior surface of the subsurface installation. This does UnotU pertain to depth. UExcavationU: Any operation in which earth, rock, or other material in the ground is moved, removed, or otherwise displaced by means of tools, equipment, or explosives in any of the following ways: grading, trenching, digging, ditching, drilling, auguring, tunneling, scraping, cable or pipe plowing and driving, or any other means. UExcavatorU: Any person, firm, contractor or subcontractor, owner, operator utility association, corporation, partnership, business trust, public agency, or other entity with which their, or his or her, own employees or equipment performs any excavation. UEmergencyU: A sudden, unexpected occurrence involving a clear and imminent danger demanding immediate action to prevent or mitigate loss of, or damage to life, health, environment, property, or essential public services. Unexpected occurrence includes, but is not limited to fires, floods, earthquakes or other geologic movements, riots, accidents, damage to a subsurface installation requiring immediate repair, or sabotage. UInquiry identification numberu: The number which is provided by a regional notification center to every person who contacts the center pursuant to Section 4216 of the Government Code. The inquiry identification number shall remain valid for not more than 28 calendar days from the date of issuance. After 28 calendar days, the number must be revalidated with the regional center. UOperatorU: Any person, corporation, partnership, business trust, public agency, or other entity, which owns, operates, or maintains a subsurface installation. This does UnotU include an owner of real property where subsurface facilities are exclusively located if they are used exclusively to furnish services on that property and the subsurface facilities are under the operation and control of the owner. Regional notification center: A nonprofit association or other organization of operators of subsurface installations which provides advance warning of excavations or other work close to existing subsurface installations, for the purpose of protecting those installations from damage, removal, relocation, or repair. The regional notification center for purposes of this program is commonly referred to as Underground Service Alert (USA). The phone number is 1-800-227-2600. Subsurface installation: Any underground pipeline, conduit, duct, wire, or other structure, except nonpressurized sewer lines, nonpressurized storm drains, or other nonpressurized drain lines.

Regulatory Compliance Program Page 6 Attachment B AFTER-HOURS AND EMERGENCY CONTACTS OWNER/OPERATOR PHONE NUMBER Underground Service Alert North 800-227-2600 PG&E 800-743-5000 SMUD 916-732-5955 ATT 916-638-8493 Sprint 800-521-0579 Kinder Morgan 916-369-9772 SBC 916-453-6090 (If voice mail answers, press 4 to be transferred as urgent)