Proposed View - Summer Existing View - Summer Proposed View - Winter Existing View - Winter
CrownCopyrightADB CrownCopyrightADB Department Legend Second Floor First Floor Cardio-Respiratory, Diabetes & Dietics Clinical Investigations l Space Clinic Support tology & Neurology Reception & Pre-Assessment re-assessment Department Legend Second Floor Department Legend Cardio-Respiratory, Second Floor Diabetes & Dietics Cardio-Respiratory, Diabetes & Dietics Clinical Investigations Clinic Support Clinical Investigations Clinic Support Department Legend First Floor Reception & Pre-Assessment Reception & Pre-Assessment Clinic Support Flexible Clinical Space Pain, Rheumatology & Neurology 0mm 100mm Physiotherapy Reception & Pre-Assessment 0m ent Legend taff Zone ication / Medical Secretaries n and Concourse eception & on Department Legend First Floor Clinic Support Flexible Clinical Space Pain, Rheumatology & Neurology Physiotherapy Reception & Pre-Assessment Department Legend First Floor Department Legend Seco Cardio-Respiratory Clinical Investigatio Clinic Support Clinic Support Flexible Clinical Space Pain, Rheumatology & Neurology Reception & Pre-As Physiotherapy Reception & Pre-Assessment Department Legend Central Staff Zone Communication / Offices & Medical Secretaries Reception and Concourse Stores, Reception & Distribution Department Legend Ground Floor dashed line denotes location of above Department Legend Ground Office Floor Space 11.31 11.29 11.31 Office Space Department Legend Reception & Concourse Staff Facilities Central Staff Zone Reception & Concourse Staff Facilities Communication / Offices & Medical Secretaries Reception and Concourse Stores, Reception & Distribution Rev Date Revision Notes Dn Rv Client Project Drawing Title Intelligence Buildings Infrastructur e www.ibigroup.com Westaway Court, Elizabeth Place, St Helier, Jersey, JE2 3XG Unnamed NOT YET ISSUED ORIGINAL ACCESS 11.31 11.29 11.31 11 Department Legend Central Staff Zone Communication / Offices & Medical Secretaries Reception and Concourse Stores, Reception & Distribution R C Departm C P O W J P 11.15 Job Number 51092 Scale@A0 As indicated Drawing Number SK-A-200-103 Drawing Originated Date Purpose Maison Le Pape PAS 1192 Status Code dashed line denotes location of above Revision P 11.20 ORIGINAL ACCESS 10.98 ll =0.70m D R U S J 5 11.13 SUB-STATION 11.15 S A D wall ht=0.70m 11.13 S 11.02 11.03 11.03 11.12 Department Legend Ground Floor Office Space 11.02 wall ht=0.70m 11.12 Department L Circula 11.03
Main Entrance - View from Parade Gardens Elizabeth Place Rear entrance view from Savile Street Savile Street Parade Gardens Rear view from Elizabeth Place Site Location Plan
PLACE 0) 6 SAVILE STREET - EXISTING 1 : 500 Existing elevation - Elizabeth Place (not to scale) +17.900 +13.100 +25.573 MAISON LE PAPE +5.900 PROPOSED ELEVATION ELIZABETH PLACE +12.988 +10.382 +12.231 +15.162 +11.336 Parameter Elevation - Elizabeth Place Parameter elevation - Elizabeth Place (not to scale) ) 3 PARADE GARDENS - PROPOSED 1 : 500 7 PARADE GARDENS - +13.100 EXISTING 1 : 500 ELIZABETH PLACE STREET WESTAWAY COURT +17.900 Existing elevation - Parade Gardens (not to scale) MAISON LE PAPE GARDENS Illustrative scheme elevation - Elizabeth Place (not to scale) +25.573 Parameter Elevation - Parade Gardens ELIZABETH +15.080 PLACE PROPOSED ELEVATION Parameter elevation - Parade Gardens (not to scale) MAISON LE PAPE Precedent images 0) +8.618 34 Existing elevation - Savile Street (not to scale) ) 4 MAISON LE PAPE - PROPOSED 1 : 500 +17.900 +13.100 Outline of existing building PARADE GARDENS +9.000 WESTAWAY COURT +5.900 SAVILE STREET Illustrative scheme elevation - Parade Gardens (not to scale) ) 8 MAISON LE PAPE - EXISTING 1 : 500 Parameter Elevation - Savile Street Parameter elevation - Savile Street (not to scale) Precedent images 32 PARADE GARDENS PROPOSED ELEVATION SAVILE STREET
Neighbourhood Vibration Phase 1
Air quality, noise & vibration control and mitigation Potential vibration effect without mitigation Identify risks to each specific department Develop specific control and mitigation strategy Communication & scheduling Physical measures (primary & Secondary)
Environmental protection barrier
Environmental protection for the St Elmo sub-station
Surveys Survey Type Lidar survey Below ground services (GPR) Topographical Survey Drainage CCTV Acoustics Vibration Complete/Anticipated Completion Date Complete Complete except for remote highways and junctions Complete except for remote highways and junctions Final phase of jetting and survey to be completed and services drawing updated. Anticipate one week of site works. To be completed ASAP A number of surveys completed. New scheme will be assessed to inform further surveys required A number of surveys completed. New scheme will be assessed to inform further surveys required Ground Investigation BH101 Borehole complete. Monitoring July and August BH102 Borehole complete. Monitoring July and August BH103 Borehole complete. Monitoring July and August BH104 Borehole complete. Monitoring July and August BH105 Borehole complete. Monitoring July and August BH106 Borehole complete. Monitoring July and August BH107 Borehole complete. Target date for monitoring August/September BH108 Borehole complete. Monitoring July and August BH109 Incomplete. Target date post-demolition BH110 Incomplete. Target date post-demolition BH111 Incomplete. Target date post-demolition BH112 Incomplete, target date end of May 2018 Water Monitoring As noted above Gas Monitoring As noted above Electrical Surveys To be defined during Stage 2 design Mechanical surveys To be defined during Stage 2 design Asbestos Survey On vacation of buildings to be demolished Condition Surveys Prior to any works commencing Structural surveys MSCP in August 2018 Traffic Surveys Complete
First physical works Service road, Westaway Court, Sutherland Court, Kensington Place Properties Ground Investigation All properties on construction route (dock to site and back) - condition surveys Relevant highways and junctions - Topographical and services survey Westaway Court Asbestos survey Soft strip N Key Location of highway/ junction works All highway works to be agreed with DfI Streetworks and Highway Maintenance Westaway Court People s Park junction Signalise junction to enable construction traffic St Elmo Soft strip and temporary propping Demolition, including footway closure Esplanade/Kensington Place Amend junction to enable construction traffic Kensington Place Acquisition of properties, surveys and soft strip Removal of traffic calming measures prior to demolition Patriotic Street MSCP Modifications for additional staff car and motorcycle parking Gloucester/Newgate Street Drainage connection Gloucester Street Car Park Staff car parking to be relocated to PSMSCP and car park cleared and plant etc. installed
Demolition traffic routes Traffic Flow Existing Changed Construction
Traffic management during works Construction/ Emergency Traffic only Open to traffic outside of Working hours
Traffic flow Stage 1 1 4 During construction - building A 5 2 3 NB - All potential transport proposals presented above are preliminary and discussions with DfI and the Parish of St Helier are ongoing. 1 2 3 4 5 In the first stage of construction (2018-2021) the following measures will be introduced: Junction improvement scheme Minor junction works Relocation of staff motorcycle and car parking Temporary road closure Temporary two-way traffic on Kensington Place and reversing one-way traffic on Lewis Street For details on the subsequent construction phases, please view the planning application online at www.futurehospital.je
Transport 1 A new entrance building on the Parade will allow drop-off for patients 4 2 Parking Patriotic Street car park will be extended, providing: 58 extra spaces direct covered access to the new hospital more parking designated for hospital users on-call staff parking increased disabled parking motorcycle parking Bicycles there will be 150 spaces for staff cycles in the basement and 50 cycle spaces around the new hospital for public use 2 3 1 3 4 Ambulances can access the emergency department from Gloucester Street and Kensington Place, via a new link to Newgate Street. Westaway Court Patient-only parking at Westaway Court will be accessed from Savile Street. A layby for Patient Transport Services is proposed on Elizabeth Place.