Proposed View - Summer. Existing View - Summer. Proposed View - Winter. Existing View - Winter

Similar documents
Environmental Impact Assessment (EIA)

Jersey Future Hospital. Executive Summary of the Planning Application

APPENDIX 7 Town Planning Assessment

West Gate Tunnel Project. Incorporated Document May Incorporated document pursuant to section 6(2)(j) of the Planning and Environment Act 1987.

Board Order 29S.PA0049

JERSEY FUTURE HOSPITAL CO025 PROOF OF CONCEPT SITE OPTION ADDENDUM APPENDIX 2 VERIFICATION OF PREVIOUS SITE DESELECTION

Replacement Golf Course Facilities and Residential Development, Churston. Environmental Statement Non-Technical Summary

3 Development Process 3.1 Stage One page Stage Two page Stage Three page CENTRAL PICKERING DEVELOPMENT PLAN

Departure from the Development Plan. Town Council objection to a major application. DETERMINE

NORTH CIRCULAR ROAD - REGENERATION IN ACTION

Kaufland supermarket and complementary uses, part 1550 Pascoe Vale Road, Coolaroo Incorporated Document (Insert date) 2019

LIST OF LIVE AND DETERMINED PLANNING APPLICATIONS RELATING TO THE WIDER BRENT CROSS CRICKLEWOOD REGENERATION SCHEME

FANSHAWE PARK ROAD/RICHMOND STREET INTERSECTION IMPROVEMENTS. PUBLIC INFORMATION CENTRE 2 June 16, 2016

an Inspector appointed by the Secretary of State for Communities and Local Government

The Van Ness Campus. Weekly Construction Bulletin #259

Thank you for coming. We want to hear your views on proposed improvements to the A1 between junction 65 (Birtley) and junction 67 (Coal House).

TRANSPORT AND WORKS ACT 1992 TRANSPORT AND WORKS (APPLICATIONS AND OBJECTIONS PROCEDURE)(ENGLAND AND WALES) RULES 2006

Chapter 4. Route Window C12: Mile End Park and Eleanor Street Shafts

Description Details submitted pursuant to discharge of condition 5 (Design Code) attached to planning permission 13/01729/OUT.

Town And Country Planning Act 1990 (As Amended) Town And Country Planning (General Development Procedure) Order 1995

1. Welcome. Background

MASTER PLAN N0. 76 (SITE DEVELOPMENT PLAN DETAILED PLANNING AREA 12 PRECINCT 13) 2013

UTT/16/1466/DFO GREAT DUNMOW MAJOR

Non-technical summary

CAMPUS PLANNING COMMITTEE STAFF REPORT SAMARITAN SPORTS MEDICINE INSTITUTE AT OSU 10/21/2013

Application Recommended for Approval Hapton with Park Ward

APPLICATION NUMBER CB/15/00297/OUT Land West of Bidwell (Houghton Regis North Site. Houghton Regis

Public Consultation. Land at Monks Farm, North Grove. Welcome

Services Department F May 28, 2007

Road Safety Impact Assessment

ACU DEVELOPMENT PLAN OBJECTION RESPONSE

Planning and Regeneration PO Box 28, Birmingham B1 1TU DECISION DOCUMENT APPLICATION NUMBER: 2017/05933/PA TOWN AND COUNTRY PLANNING ACT 1990

Lighting. Lighting Strategy. Public Realm

Document Information Cover Sheet

Humber Bay Shores Precinct Plan Final Report

LAND SECURITIES REDEVELOPMENT OF NEWNHAM COURT SHOPPING VILLAGE, MAIDSTONE

No.2 Whitehall Riverside, Leeds July 2013

AGINCOURT SECONDARY PLAN

DESIGN OF FOOTBRIDGES

Chapter 22. Alternatives to the Proposed Project

Developer, new connection and infrastructure charges

6. REGIONAL AND COMMUNITY FACILITIES DESIGNATIONS 6.1. OBJECTIVES FOR REGIONAL AND COMMUNITY FACILITIES LAND USE DESIGNATIONS

East Grove Public Realm

WELCOME. This consultation at this early stage is an opportunity to share your comments and suggestions with us.

GREATER CAMBRIDGE CITY DEAL. Urban Design Guidance for Transport Infrastructure Projects

Whitchurch Bridge Approach Road

Citizen Information Meeting

FIRE SAFETY 2013 ANNUAL REPORT. Author: Senior Fire Safety Advisor Contact Details for further information: Frank Barrett

Artists impression of the Park Promenade and plot H4 with café and restaurant uses that is still subject to change

The Site. Welcome to the public exhibition for Boothferry Road, Hessle.

Welcome. Walk Around. Talk to Us. Write Down Your Comments

Chapter 7 Route window W20 Dover Road and Leigh Road bridges. Transport for London

I-494 Rehabilitation Project SP (I-394 to Fish Lake Interchange) June 2014 Section 4(f) De Minimis Determination

Town Center (part of the Comprehensive Plan)

Planning Committee 04/02/2015 Schedule Item 6. Smith Farm Estate, Old Bridge Close, Northolt, UB5 6UA.

IOWA HIGHWAY 57 / WEST 1 ST STREET STUDY PUBLIC INFORMATIONAL MEETING APRIL 22, 2014

SOUTH CAMBRIDGESHIRE DISTRICT COUNCIL. REPORT TO: Planning Committee 1 April 2015 Planning and New Communities Director

MAIDSTONE MEDICAL CAMPUS LTD LAND AT NEWNHAM PARK, MAIDSTONE

The London Borough of Lewisham hereby accepts that the amendment(s) described in the schedule below is (are) non material.

Creating new homes. Potential for formal. Attenuation. We would like to know what you think about the proposed master plan...

Making the case for Sustainable Transport Project Potential

Report Author/Case Officer: Debbie Kirk Contact Details:

Ebbsfleet Development Corporation

Soil Erosion & Sediment Control Plan Requirements for Submittal to the Cape Atlantic Conservation District

CONCEPT PLAN APPLICATION

Welcome. Site/11/04. Site/11/03. Proposed Site. 11,400 new homes needed in east Cambs

V/Jy(Ls(_vtf. City of Richmond. Report to Committee CS To:

Euston Community Forum. 11 June Maria Fidelis School

SOUTH CAMBRIDGESHIRE DISTRICT COUNCIL. Planning and New Communities Director

REFERENCE: 15/01661/FUL Registered: 16 March 2015 Expiry date: 25 October 2016

1071 King Street West Zoning Amendment Application - Preliminary Report

Response by the Wiltshire Archaeological and Natural History Society

1 INTRODUCTION 1.1 INTRODUCTION

Test Valley Borough Council Southern Area Planning Committee 8 January 2019

PENRHYN QUARRY BETHESDA GWYNEDD. Proposed Inert Recycling Facility DESIGN AND ACCESS STATEMENT


Boundaries and Fencing

3.1 The hybrid planning application proposes the following description of development:

SOUTH CAMBRIDGESHIRE DISTRICT COUNCIL. Planning and New Communities Director

PHASE III: Reserved Matters Submission

OUR JOBS Innisfil Heights Strategic Settlement Employment Area Planning Policy Update. Council Workshop April 22, 2015

East Panorama Ridge Concept Plan Amendment

YMCA Erdington (Phase 2), 300 Reservoir Road, Erdington, Birmingham, B23 6DB

COUNTY COURT HOUSE REDEVELOPMENT AREA PLAN

An integrated access, parking and public realm plan for Liberty Square, Thurles, Co. Tipperary

PROJECT SPOTLIGHT TOUR: LANGAN LEADER JANUARY 2018

Planning Proposal Toronto Road, Booragul. Amendment to Lake Macquarie Local Environmental Plan (LMLEP) 2014

PORTOBELLO ROAD Waterford House. 93 Sub Sta. St Peter's Church KENSINGTON PARK ROAD TF A R C H I T E C T U R E 2-3 WOODSTOCK STREET LONDON W1C 2AB

Land at Rampton Road. Cottenham

ARLINGTON COUNTY, VIRGINIA

Fire Safety Management

TRANSPORT & INFRASTRUCTURE

Welcome to our exhibition

Peter Brett Associates LLP (PBA) act on behalf of db symmetry ltd in respect of the proposed symmetry park, Kettering development (the Site).

ABOUT CALA HOMES CALA HOMES

Birmingham University, Pritchatts Road, Adjacent to Gisbert Kapp Building, Edgbaston, Birmingham, B15

WELCOME! 8 8:30 6: TH STREET IMPROVEMENTS. Open House. Presentation & Q&A

Ohlone College Measure G Project Scope Revisions

TOWN AND COUNTRY PLANNING ACT 1990 (AS AMENDED).

Radiation Protection Program Updates

Transcription:

Proposed View - Summer Existing View - Summer Proposed View - Winter Existing View - Winter

CrownCopyrightADB CrownCopyrightADB Department Legend Second Floor First Floor Cardio-Respiratory, Diabetes & Dietics Clinical Investigations l Space Clinic Support tology & Neurology Reception & Pre-Assessment re-assessment Department Legend Second Floor Department Legend Cardio-Respiratory, Second Floor Diabetes & Dietics Cardio-Respiratory, Diabetes & Dietics Clinical Investigations Clinic Support Clinical Investigations Clinic Support Department Legend First Floor Reception & Pre-Assessment Reception & Pre-Assessment Clinic Support Flexible Clinical Space Pain, Rheumatology & Neurology 0mm 100mm Physiotherapy Reception & Pre-Assessment 0m ent Legend taff Zone ication / Medical Secretaries n and Concourse eception & on Department Legend First Floor Clinic Support Flexible Clinical Space Pain, Rheumatology & Neurology Physiotherapy Reception & Pre-Assessment Department Legend First Floor Department Legend Seco Cardio-Respiratory Clinical Investigatio Clinic Support Clinic Support Flexible Clinical Space Pain, Rheumatology & Neurology Reception & Pre-As Physiotherapy Reception & Pre-Assessment Department Legend Central Staff Zone Communication / Offices & Medical Secretaries Reception and Concourse Stores, Reception & Distribution Department Legend Ground Floor dashed line denotes location of above Department Legend Ground Office Floor Space 11.31 11.29 11.31 Office Space Department Legend Reception & Concourse Staff Facilities Central Staff Zone Reception & Concourse Staff Facilities Communication / Offices & Medical Secretaries Reception and Concourse Stores, Reception & Distribution Rev Date Revision Notes Dn Rv Client Project Drawing Title Intelligence Buildings Infrastructur e www.ibigroup.com Westaway Court, Elizabeth Place, St Helier, Jersey, JE2 3XG Unnamed NOT YET ISSUED ORIGINAL ACCESS 11.31 11.29 11.31 11 Department Legend Central Staff Zone Communication / Offices & Medical Secretaries Reception and Concourse Stores, Reception & Distribution R C Departm C P O W J P 11.15 Job Number 51092 Scale@A0 As indicated Drawing Number SK-A-200-103 Drawing Originated Date Purpose Maison Le Pape PAS 1192 Status Code dashed line denotes location of above Revision P 11.20 ORIGINAL ACCESS 10.98 ll =0.70m D R U S J 5 11.13 SUB-STATION 11.15 S A D wall ht=0.70m 11.13 S 11.02 11.03 11.03 11.12 Department Legend Ground Floor Office Space 11.02 wall ht=0.70m 11.12 Department L Circula 11.03

Main Entrance - View from Parade Gardens Elizabeth Place Rear entrance view from Savile Street Savile Street Parade Gardens Rear view from Elizabeth Place Site Location Plan

PLACE 0) 6 SAVILE STREET - EXISTING 1 : 500 Existing elevation - Elizabeth Place (not to scale) +17.900 +13.100 +25.573 MAISON LE PAPE +5.900 PROPOSED ELEVATION ELIZABETH PLACE +12.988 +10.382 +12.231 +15.162 +11.336 Parameter Elevation - Elizabeth Place Parameter elevation - Elizabeth Place (not to scale) ) 3 PARADE GARDENS - PROPOSED 1 : 500 7 PARADE GARDENS - +13.100 EXISTING 1 : 500 ELIZABETH PLACE STREET WESTAWAY COURT +17.900 Existing elevation - Parade Gardens (not to scale) MAISON LE PAPE GARDENS Illustrative scheme elevation - Elizabeth Place (not to scale) +25.573 Parameter Elevation - Parade Gardens ELIZABETH +15.080 PLACE PROPOSED ELEVATION Parameter elevation - Parade Gardens (not to scale) MAISON LE PAPE Precedent images 0) +8.618 34 Existing elevation - Savile Street (not to scale) ) 4 MAISON LE PAPE - PROPOSED 1 : 500 +17.900 +13.100 Outline of existing building PARADE GARDENS +9.000 WESTAWAY COURT +5.900 SAVILE STREET Illustrative scheme elevation - Parade Gardens (not to scale) ) 8 MAISON LE PAPE - EXISTING 1 : 500 Parameter Elevation - Savile Street Parameter elevation - Savile Street (not to scale) Precedent images 32 PARADE GARDENS PROPOSED ELEVATION SAVILE STREET

Neighbourhood Vibration Phase 1

Air quality, noise & vibration control and mitigation Potential vibration effect without mitigation Identify risks to each specific department Develop specific control and mitigation strategy Communication & scheduling Physical measures (primary & Secondary)

Environmental protection barrier

Environmental protection for the St Elmo sub-station

Surveys Survey Type Lidar survey Below ground services (GPR) Topographical Survey Drainage CCTV Acoustics Vibration Complete/Anticipated Completion Date Complete Complete except for remote highways and junctions Complete except for remote highways and junctions Final phase of jetting and survey to be completed and services drawing updated. Anticipate one week of site works. To be completed ASAP A number of surveys completed. New scheme will be assessed to inform further surveys required A number of surveys completed. New scheme will be assessed to inform further surveys required Ground Investigation BH101 Borehole complete. Monitoring July and August BH102 Borehole complete. Monitoring July and August BH103 Borehole complete. Monitoring July and August BH104 Borehole complete. Monitoring July and August BH105 Borehole complete. Monitoring July and August BH106 Borehole complete. Monitoring July and August BH107 Borehole complete. Target date for monitoring August/September BH108 Borehole complete. Monitoring July and August BH109 Incomplete. Target date post-demolition BH110 Incomplete. Target date post-demolition BH111 Incomplete. Target date post-demolition BH112 Incomplete, target date end of May 2018 Water Monitoring As noted above Gas Monitoring As noted above Electrical Surveys To be defined during Stage 2 design Mechanical surveys To be defined during Stage 2 design Asbestos Survey On vacation of buildings to be demolished Condition Surveys Prior to any works commencing Structural surveys MSCP in August 2018 Traffic Surveys Complete

First physical works Service road, Westaway Court, Sutherland Court, Kensington Place Properties Ground Investigation All properties on construction route (dock to site and back) - condition surveys Relevant highways and junctions - Topographical and services survey Westaway Court Asbestos survey Soft strip N Key Location of highway/ junction works All highway works to be agreed with DfI Streetworks and Highway Maintenance Westaway Court People s Park junction Signalise junction to enable construction traffic St Elmo Soft strip and temporary propping Demolition, including footway closure Esplanade/Kensington Place Amend junction to enable construction traffic Kensington Place Acquisition of properties, surveys and soft strip Removal of traffic calming measures prior to demolition Patriotic Street MSCP Modifications for additional staff car and motorcycle parking Gloucester/Newgate Street Drainage connection Gloucester Street Car Park Staff car parking to be relocated to PSMSCP and car park cleared and plant etc. installed

Demolition traffic routes Traffic Flow Existing Changed Construction

Traffic management during works Construction/ Emergency Traffic only Open to traffic outside of Working hours

Traffic flow Stage 1 1 4 During construction - building A 5 2 3 NB - All potential transport proposals presented above are preliminary and discussions with DfI and the Parish of St Helier are ongoing. 1 2 3 4 5 In the first stage of construction (2018-2021) the following measures will be introduced: Junction improvement scheme Minor junction works Relocation of staff motorcycle and car parking Temporary road closure Temporary two-way traffic on Kensington Place and reversing one-way traffic on Lewis Street For details on the subsequent construction phases, please view the planning application online at www.futurehospital.je

Transport 1 A new entrance building on the Parade will allow drop-off for patients 4 2 Parking Patriotic Street car park will be extended, providing: 58 extra spaces direct covered access to the new hospital more parking designated for hospital users on-call staff parking increased disabled parking motorcycle parking Bicycles there will be 150 spaces for staff cycles in the basement and 50 cycle spaces around the new hospital for public use 2 3 1 3 4 Ambulances can access the emergency department from Gloucester Street and Kensington Place, via a new link to Newgate Street. Westaway Court Patient-only parking at Westaway Court will be accessed from Savile Street. A layby for Patient Transport Services is proposed on Elizabeth Place.