Earthen embankments, which

Similar documents
APPENDIX E COMPACTION CHARACTERISTICS AND EQUIPMENT

-AIHL NOISE UNIFIED SOIL CLASSIFICATION SYSTEM. Aqx. R CORPS OF ENGINEERS, U. S. ARMY APPENDIX A

POND Construction. Perry L. Oakes, PE State Conservation Engineer Natural Resources Conservation Service

Subsoil conditions are examined using test borings, provided by soil engineer (geotechnical).

Road Soil. Curtis F. Berthelot Ph.D., P.Eng. Department of Civil Engineering. Road Soil Introduction

Low Gradient Velocity Control Short Term Steep Gradient [1] Channel Lining Medium-Long Term Outlet Control Soil Treatment Permanent

Compaction. Compaction purposes and processes. Compaction as a construction process

Technical Specification Guidelines

2014 Iowa FFA Soil Judging CDE Exam

Raingardens. Conserving and Protecting Water L

2018 Iowa FFA Soil Judging CDE Exam 1. Landscape positions characterizes the location of the soil on the landscape and identifies potential risks.

Soil Structure, Density, and Porosity. Laboratory #4

Subject Name: RESERVOIR AND FARM POND DESIGN (2+1) CONTENTS

IOWA FFA STATE SOILS CDE SATURDAY, OCTOBER 13, 2007 AMES, IOWA

Soil characteristics that influence nitrogen and water management

1 Describe the concept of soil texture and its importance. 2 Determine the texture of a soil sample.

Indirect Design Comparison of the structural strength of the pipe (Three- Edge-Bearing Test) to the field supporting strength of a buried pipe.

ATT-19/95 MOISTURE-DENSITY RELATION, Standard Compaction, µm Material

Land Capability Classifications

Soil Physical Properties

Prof. B V S Viswanadham, Department of Civil Engineering, IIT Bombay

NYC Envirothon 2017 Soil Science Review. Richard K Shaw USDA-NRCS

Introduction to Compaction

2.1.4 Roof Downspout Rain Gardens

Specifying Soils for Plant Growth

2016 Area 3 Envirothon Muskingum County Soils Test ANSWER KEY

Loam: About 40% sand, 40% silt, 20% clay. Mixture of pore sizes to balance water retention and aeration. Considered the best soil for growing crops.

DIRT! APES Laboratory Activity

URBAN SOILS & SEATTLE EXAMPLES

Introduction. A soil is an earth concrete. Composition of a soil

Area 3 Envirothon Soils Questions Key

HYDRAULIC DESIGN involves several basic

Examining soils in the field. Examining soils in the field. Environment Agency thinksoils examining soils in the field

E R O S I O N C O N T R O L

THE TENNESSEE VEGETABLE GARDEN

Soil Texture and Structure. Chris Thoreau February 24, 2012

Urban Conservation Practice Physical Effects ESTABLISHMENT, GROWTH, AND HARVEST NUTRIENT MANAGEMENT

BMP 6.7.3: Soil Amendment & Restoration

SOIL BASICS & CONSERVATION

ON LANDSCAPING, SOILS, SOIL AMENDMENTS AND PROPER SEED ESTABLISHMENT (BOTH GRASS LAWNS AND MEADOWS).

SOIL SEPARATES. Soil Evaluator Day 2, Presentation 3-3/27/2018. Soil Texture, Page 1 TITLE 5 SOIL EVALUATOR CERTIFICATION TRAINING SOIL TEXTURE

Soil Quality / Understanding Soil Health what are we missing?

Lecture-4. Soil Compaction. Dr. Attaullah Shah

Soil CLASS. VII Soil Soil is an inseparable part of our life. Explain Humus Weathering The nature of soil: Soil Profile Horizons.

CENTER PIVOT DESIGN AND MANAGEMENT FOR FORAGE PRODUCTION. W. Howard Neibling, Glenn E. Shewmaker, and Christi L. Falen 1 ABSTRACT

State of Nevada Department of Transportation Materials Division

CHAPTER 8 SLOPE STABILITY ANALYSIS

Why Control and Prevent Erosion?

B & W Engineering Laboratories, Inc. P.O. Box Memphis, Tennessee (901)

Soil testing Page 1. Contrary to what is widely believed, the colour of the soil reveals very little about its fertility.

The relationship between soil (growing

Sydney Road Reclaimed Water Main, Plant City, Florida. Prepared for: Jones Edmunds & Associates, Inc.

Soils and Land Use Test

2012 FINAL SOILS AREA 2 Envirothon Questions Answer KEY

(Refer Slide Time: 03:23)

Geotextiles and Loess: Long-Term Flow

DRIVABLE GRASS GUIDELINE FOR PLANTED INFILL INSTALLATION

SECTION PLANTING SOIL for SOIL CELLS. This specification defines material and performance requirements for soils which are to be used

2016 Iowa FFA Soils Evaluation CDE Exam

Design, Construction and Maintenance of Irrigation Reservoirs in Ontario

If you are not able to turn in your notebook see me or Dan ASAP

Unit 1 Lesson 5 Soil Formation. Copyright Houghton Mifflin Harcourt Publishing Company

a. OVERALL PROFILE DEPTH: Assess the depth to the first restrictive layer, which can be a tree root, a rock or an

Figure 1. Bioswale along roadside. Photo courtesy of CalTrans. Figure 2. Diagram of typical bioswale (adapted from UDFCD 1999)

O horizon: the O-horizon is made up of organic material. The horizon is found at the soil surface.

Merrill Zwanka Geotechnical Materials Engineer SCDOT Research and Materials Lab February Definitions Sampling and Testing Classification

Iowa FFA Soil Career Development Event 2008

RAIN GARDEN ILLINOIS URBAN MANUAL PRACTICE STANDARD. (feet) CODE 897 DEFINITION

CHAPTER 4. SPECIAL CONDITION EROSION CONTROL MEASURES

Infiltration. Keep Water Where it Falls. Frank Franciosi Novozymes

The following general requirements will be met for all planter box installations:

511 - RIP RAP - OPSS 511 ROCK PROTECTION - OPSS 511 GRAVEL SHEETING - OPSS 511 GEOTEXTILE - OPSS 511

Subgrade Preparation. Subgrade Preparation. Subgrade 3/27/2016. Tim Crosby: Grading Superintendent Chris DeJulio: Site Manager

2017 Iowa FFA Soil Judging CDE Exam

Soil Interpretations Erosion and Sedimentation Control Planning and Design Workshop

UNIFIED FACILITIES GUIDE SPECIFICATIONS

If your soil has a high salinity content, the plants

Table 4.7.1: Swales Potential Application and Storm Water Regulation

3 PHYSICAL PROPERTIES

Homework Activity Jar Test for Soil Texture

Components of Soil. Humus: (a carbon sink) Dark brown or black color indicates high nitrogen content.

Tilth: Tilth: Soil Structure and its Management. Tilth: Soil Structure and its Management

Horner-McLaughlin Woods: Soil Types

EARTH SCIENCE CONCEPTS -Geologic time scale

4/23/2018. Soil John Wiley & Sons, Inc. All rights reserved. Lecture 14

Image: Montana NRCS USDA

There are different types of weathering weathering and weathering. Both types work together to change Earth s surface.

Soil Health Practices in the Landscape

C-12. Dry Pond. Design Objective

2008 SWMM, 2010 Revision City of Tacoma

CHECKLIST BMPs for FIELD NURSERIES REGULATIONS, SITE SELECTION, WATER MANAGEMENT

APPLICATIONS IN FILTRATION AND DRAINAGE & EROSION CONTROL

Introduction to Environmental Science. Soil Characteristics. Chapter 11 Soil

Overview of Chapter 14

Soil Water Relationships

WEATHERING AND SOIL FORMATION. 8th Grade- Mr. Stelma

Soil Horizons cont. Oa- highly decomposed Oi-undecomposed

Girtridge Monitor Farm Meeting

2011 Wisconsin Envirothon Soils and Land Use Exam

Windbreaks, weed control, mulches, and compost all tend to conserve water

Transcription:

Design and Construction of Earthen Embankments for Animal Liquid-Waste Containment Howard Neibling and Dean Falk Earthen embankments, which can be used to contain water for a variety of purposes, may also be used to construct animal liquid-waste storage lagoons. A properly designed facility, whether for animal waste or process water, will have adequate storage capacity for the intended use and for any surface water run- off that may be generated from the 25-year, 24-hour design storm, if applicable. It will be constructed in such a manner that the embankment will not fail, and in the case of animal liquidwaste storage be constructed using materials and practices that will assure minimal seepage from the sides and bottom of the lagoon. Situations where seepage may occur from a water storage structure are shown in figure. Precautions to prevent such seepage are shown in figure 2 and will be discussed later. Procedures for determining the size of an animalwaste containment facility are beyond the scope of this paper. They are adequately discussed in Figure. Situations in Which Seepage May Occur from a Water Storage Structure. Seepage through strata or pockets of permeable material. These may or may not be exposed during excavation. 2. Seepage along roots and root cavities. If trees in the vicinity of the embankment are cut, the roots will die, leaving cavities through which water will flow. 3. Seepage along the plane between the original ground and the embankment fill material. 4. Seepage under the embankment and through a layer of permeable material. 5. Seepage through the embankment. 6. Seepage along pipes passing through embankment. 7. Flow through muskrat burrows and cavities created by other burrowing animals. 8. Seepage over the entire basin at sites where the soil is permeable throughout the profile. Source: Adapted from R. P. Beasly, J. M. Gregory, and T. R. McCarty, Erosion and Sediment Pollution Control, 2d ed., (Ames: Iowa State University Press, 984), 242-43. Cooperative Extension System Agricultural Experiment Station CIS 053

Figure 2. Precautions to Take During Construction of a Water Storage Structure to Prevent Seepage. Make a thorough site investigation prior to construction. Either move to another site or give special treatment, such as installation of a compacted blanket of impervious material. 2. Remove all roots from the embankment area prior to construction. 3. Remove all debris and sod and scarify soil surface before adding fill. Possibly construct core trench. 4. Block flow by construction of a core trench. 5. Build the embankment with proper top width and side slopes; remove all brush, roots, and debris from the borrow area so it will not be deposited in the embankment; place the less permeable material on the water side of the embankment and the more permeable material in the downstream part; place fill in thin layers and compact thoroughly. 6. Install anti-seep collars and properly bed the pipe and compact earth around it. 7. Build embankments with proper top width and side slopes; manage the lagoon to minimize water-level fluctuation; keep the embankment clear of brush and debris. 8. Scarify the basin area to a depth of 8-0 inches, compact the loosened soil at optimum moisture content to form a dense layer, and on more permeable soils, install a blanket of compacted low-permeability earth. Source: Adapted from Beasley et al., 242-43. Idaho Waste Management Guidelines for Confined Feeding Operations, published by the Division of Environmental Quality, Idaho Department of Health and Welfare. Facility Design and Construction to Prevent Slope Failure or Excess Seepage Design and construction of a facility that will function properly begins with selection of a suitable site. Proper site selection, soil evaluation, lagoon sizing, and construction practices are necessary to create a lagoon that meets environmental constraints at the least possible cost. Site Investigation Investigate the suitability of the area to hold water and to provide a stable embankment foundation. The highest seasonal water table must be at least 2 feet, but preferably more, below the bottom of the lagoon. A high water table will weaken lagoon embankments and also increase the likelihood of the transfer of nutrients and other chemical constituents from the lagoon to the shallow ground water. Use of an existing canal bank as one side of the lagoon should be avoided if possible since rapid drawdown of either the lagoon or canal could cause slope failure. In certain cases, however, with an adequate embankment width, low-permeability fill material, relatively low embankment height, and careful management of both lagoon and canal levels, a canal bank may be used. In these cases a professional should evaluate the site to determine its suitability. To determine the suitability of a soil layer for use as a liner, soil textural analyses should be done for each identifiable layer of soil from the surface to at least foot below the proposed elevation of 2

the lagoon bottom. The soil texture under the lagoon bottom and in the material along the sideslopes will determine whether a soil or synthetic liner is required to limit the seepage rate per square foot to the acceptable level of x 0-5 cm/sec. For a hydraulic gradient (water depth/liner thickness) of 8, the corresponding hydraulic conductivity (also called permeability) would be.25 x 0-6 cm/sec or 0.003 feet/ day. Generally, a soil with at least 5 percent clay can be compacted to meet this requirement. For soils with less than 5 percent clay in a -foot thickness in the lagoon bottom or sides, a -foot layer of acceptable material (>5% clay) may be hauled in and used with proper compaction. If the water depth is greater than 8 feet, the liner thickness will need to be increased to assure that the maximum water depth/liner thickness ratio never exceeds 8. Synthetic geotextile liners may also be used on the lagoon bottom and sideslope areas below the high water line, although they are subject to tearing or puncture if the lagoon is subsequently cleaned. Soil liners are also subject to damage from cleaning. To prevent such damage, geotextile or soil liners should be covered with at least foot of any soil material or rounded rock. Design Considerations Core trench dimensions (#4 in Fig 2.), embankment height, top width, side slopes, freeboard, and slope protection are some of the factors that should be specified by the design. The need for a cutoff wall and its dimensions and the embankment height required to provide sufficient storage are beyond the scope of this paper. Top width: Embankments must have a minimum top width to provide slope stability and to minimize opportunity for seepage due to burrowing animals or flow through the fill material. Top width should increase as embankment height increases. USDA- Natural Resources Conservation Service (NRCS) minimum top Proctor Compaction Class Maximum Dry Optimum Permeability Group Density in Pounds Water Content, K, Symbol Description per Cubic Feet Percent Feet/Day GW Well-graded, clean gravels, gravel-sand mixtures >9 <3.3 73.97±35.62 GP poorly graded clean gravels, gravel sand mixtures >0 <2.4 75.34±93.5 GM Silty gravels, poorly graded gravel-sand silt >4 <4.5 >.00082 GC clayey gravels, poorly graded gravel sand clay >5 <4.7 >.00082 SW Well-graded clean sands, gravely sands 9±5 3.3±2.5 (*) 2 SP Poorly graded clean sands, sand gravel mix 0±2 2.4±.0 >.04 SM Silty sands, poorly graded sand-silt mix 4± 4.5±.0.4.02055±.035 SM-SC Sand-silt-clay mix with slightly plastic fines 9± 2.8±0.5.0029±.0064 SC Clayey snads, poorly graded sand-clay mix 5± 4.7±0.4.00082±.00055 ML Inorganic silts and clayey silts 03± 9.2±0.7.0062±.00063 ML-CL Mixture of organic silt and clay 09±2 6.8±0.7.00036±.0009 CL inorganic clays of low-to-medium plasticity 08± 7.3±0.3.00022±.00008 OL Organic silts and silt-clays, low plasticity (*) (*) (*) MH Inorganic clayey silts, elastic silts 82±4 36.3±3.2.00043±.00027 CH Inorganic clays of high plasticity 94±2 25.5±.2.0004±.0004 OH Organic and silty clays (*) (*) (*) ± indicates 90 percent confidence limits of the average values 2 * denotes insufficient data Table. Typical Values of Optimum Moisture Content and Maximum (Standard Proctor) Dry Density Source: US Department of Interior Bureau of Reclamation, Design of Small Dams, (US Government Printing Office, 974), 37. 3

width (T) is determined based on embankment height (H) as: H<0 = T = 8 H = 0-20 = T = 0 H = 2-30 = T = 2 If the top of the embankment is used as a road, top width must be at least 2 feet. Side slopes: Side slopes of settled embankments should be at least 2: or flatter on the inside of the lagoon (e.g., 2 feet horizontally for every foot vertical change) and 2: or flatter on the outside of the lagoon. Flatter slopes may be required on the water side of the embankment relative to the outside slope depending upon lagoon depth and soil characteristics to assure slope stability. Slopes flatter than 2: may be required if soil mechanics tests indicate slope stability problems. Flatter slopes may also be desirable if mechanical equipment is used for mowing or other site maintenance. A 4: slope is required for machine operations. Slope protection: On larger ponds or lagoons, or those located in unprotected windy areas, wave action can erode the embankment and compromise facility integrity. Rip-rap (rock blanket), good grass cover, or other soil surface protection can be used to prevent bank erosion. Another alternative is to construct the inner slope at 4:, although this requires significantly more fill material. Settlement: Some extra embankment height must be added to assure that the top of the embankment is at the design height after the soil has settled. Some settling will occur regardless of compaction method used. If the material is placed in 6-inch layers with a moisture content acceptable for compaction and compacted with wheel scrapers or rollers, add 5 percent to the design embankment height. If a bulldozer is used for construction and compaction, add 0 percent. Freeboard: Some height of settled fill above design water level is required to prevent overtopping by waves or to accommodate unanticipated storage needs. For lagoons under 660 feet long, minimum freeboard is foot if all lot runoff requiring storage is considered, or 2 feet if lot runoff is not considered. Larger lagoons require 2 feet of freeboard. Available Soil Moisture Remaining Feel or Appearance of Soil and Moisture Deficiency Loamy Sand Application of Water in in/ft of Soil Sandy Loam Application of Wa in in/ft of Soil 0 to 25 % Dry, loose, single grained; flows through fingers.90 to.70 Dry, loose, flows through fingers.3 to.0 25 to 50% Appears to be dry, will not form a ball with pressure.70 to.45 Appears to be dry, will not form a ball.0 to.65 50 to 75% Appears to be dry, will not form a ball with pressure.45 to.20 Tends to form a ball under pressure, but seldom holds together.65 to.30 75 percent to field capacity (00%) Tends to stick together slightly, sometimes forms a very weak ball under pressure.20 to.00 Forms weak ball, breaks easily, will not stick.30 to.00 Field capacity (00%) Upon squeezing, no free water appears on soil, but wet outline of ball is left on hand.00 Upon squeezing, no free water appears on soil, but wet outline of ball is left on hand.00 Table 2. Soil Feel and Appearance Method for Determining Moisture Content in Loamy Sand, Sandy Loam, Silt Loam, and Clay Loam 4

Preparation of Site and Borrow Area All debris (trees, brush, logs, rocks larger than 6 inches, etc.) should be removed from the foundation site and the soil borrow area for embankment or lining material. Strip the top 6 inches of soil to remove grass, weeds, and roots. If the vegetation and roots are not removed from the foundation area, they provide a thin permeable layer between the original soil and the embankment that permits seepage that could cause embankment failure. After removal of surface vegetation, scarify the soil surface within the foundation area to provide a better bond with the fill material. This will prevent further water seepage between the foundation/fill interface. Permeability, cm/h.6.4.2 0.8 0.6 0.4 0.2 0..2.3.4.5.6.7.8 Bulk Density, g/cm 3 Figure 3. Constant-Head Laboratory Permeability for Soil Cores Compacted to Varying Bulk Densities Source: W. H. Neibling et al., Underground outlet terrace systems in the deep loess hills mechanisms of failure and potential solutions, Project no. 482, (Final report to the Missouri Soil and Water Conservation Districts Commission, 993). ter Loam and Silt Loam Application of Water in in/ft of Soil Clay Loam Silty Clay Loam Application of Water in in/ft of Soil Powdery dry, sometimes slightly crusted, but easilybroken down into powdery condition 2.0 to.5 Hard, baked, cracked; sometimes has loose crumbs on surface 2.2 to.65 Somewhat crumbly, but holds together with pressure.5 to.0 Somewhat pliable; will ball under pressure.65 to.0 Forms a ball somewhat plastic; but will sometimes slick slightly with pressure.0 to 0.5 Forms a ball; ribbons out between thumb and forefinger.0 to.55 Forms a ball; is very pliable; slicks readily; if relatively high in clay 0.5 to.00 Easily ribbons out between fingers; has slick feeling.55 to.00 Upon squeezing, no free water appears on soil, but wet outline of ball is left on hand.00 Upon squeezing, no free water appears on soil, but wet outline of ball is left on hand.00 Ball is formed by squeezing a handful of soil very firmly. Source: Idaho Department of Health and Welfare Division of Environmental Quality, Idaho waste management guidelines for confined feeding operations, (IDHW-DEQ, Twin Falls, Idaho, 993), 73-74. 5

Core trench construction: In some cases, depending on embankment height and the foundation and fill materials, a core trench (shown in figure 2) will be required to prevent seepage at the foundation/fill interface. Core trench construction is not usually required for the embankment heights and fill materials used in southern Idaho. If needed, the width and depth should be determined as a part of the embankment design. The trench should be excavated to the width and depth specified, with side slopes of : or flatter. It should be backfilled with the most impervious material available. Standing water should be avoided in the core trench during backfill, but adequate moisture should be present for proper compaction. (See Optimum Soil Moisture Content section for consequences of excess soil water content.) Installation of compacted, low-permeability blanket: In soils with less than 5 percent clay and a maximum lagoon water depth of 8 feet, a -foot-thick blanket of compacted fill material may be used to control seepage from the lagoon sides and bottom. Because the purpose of this layer is to prevent seepage, it must be uniform in characteristics and properly placed and compacted. Therefore, blanket material must contain no brush, roots, sod, or other degradable materials and should contain no cobbles or rock fragments larger than 6 inches in diameter. The material should be at least 5 percent clay or a soil demonstrated by laboratory or field testing to have a permeability that will give seepage per unit area of less than x 0-5 cm/sec with the design lagoon water depth and liner thickness. These factors are all considered in the following equation: v = k x (h/d) where: v = seepage per unit area ( x 0-5 cm/sec maximum) k = hydraulic conductivity of the liner as determined by field or laboratory testing, cm/sec h = maximum lagoon water depth, feet Dry density, lb/cu ft 32 28 24 20 6 2 08 04 00 2 4 5 3 6 d = liner thickness, feet If a blanket is used over the entire pond basin, a core trench is not required. The blanket material should be placed in uniform-thickness layers in lift thickness depending on the compaction equipment used. Maximum lift thicknesses are 8 inches for a sheepsfoot roller, 6 inches for pneumatic-tired equipment, and 4 inches for tracked equipment, such as bulldozers. If. Well-graded coarse to fine sand. Denver, CO 2. Very fine silty sand. Denver, CO 3. Oxidized clay till. Chicago, IL 4. Clayey sand. Clinton, MS 5. Glacial clay till. Champaign, IL 6. Ohio River flood plain silt. Cincinnati, OH 7. Sandy silt. Wallula Gap, WA 96 4 6 2 6 20 24 28 Water content, percent of dry weight Figure 4. Moisture-Density Relations for Various Types of Soils as Determined by ASTM Method D-698 Source: R. B. Peck, W. E. Hanson, and T. H. Thornburn, Foundation Engineering, (New York: John Wiley and Sons, 974), 6. 7 6

a sheepsfoot roller is used, the entire surface should receive at least 6 passes before more fill is added. Minimum roller weight is 2,500 pounds per foot of roller width, and maximum speed is 3 mph. If either pneumatic or tracked equipment is used, the wheels or tracks should cover the entire fill area before a new lift is placed. Soil Compaction/ Bentonite Addition Effects on Permeability For a typical 8-foot-deep lagoon with a -foot-thick soil liner, the USDA-NRCS recommended design limit for liner permeability is 0.003 feet per day or less. Representative permeability (hydraulic conductivity) values in table for a number of materials will help place this value in perspective, although density of repacked samples is not given. Research has shown the sealing effects of organic mats (manure), which are estimated to reduce permeability to about one-tenth of the original permeability. However, cases have been observed where sealing did not take place for some reason. Therefore, USDA-NRCS guidelines require the maximum seepage rate per unit area of x 0-5 cm/sec to be met entirely by a combination of water depth, soil liner thickness, and soil permeability. Any sealing effects of organic mats are an extra improvement. Proper soil compaction can reduce permeability to about onetenth that of the same soil in a poorly compacted state. A permeability-compaction relationship for a silt loam soil similar in properties to those that might be used Density of Compacted Soil, lb/ft 04 02 00 98 96 94 92 90 2 3 4 5 6 7 8 9 20 2 22 23 24 25 26 Soil Water Content, Percent of Dry Weight Figure 5. Moisture-Density Relations for Bold Silt Loam, Ray Morris Farm, Holt County, Missouri Source: Neibling et al. to line lagoons in much of southern Idaho is shown in figure 3. Optimum Soil Moisture Content To achieve a highly compacted, low-permeability state, the soil must be compacted at the proper moisture content. The relationship between the degree of soil compaction per unit compactive effort and soil moisture is shown in figure 4 for a variety of soil textures. This relationship is determined by the use of an ASTM test known as the Proctor density test. Moisture content for a sandy soil should be between about 9 and 2 percent by weight to achieve maximum compaction. At moisture contents drier than optimum, insufficient moisture is present to lubricate soil particles so they can move into a more dense arrangement. Under soil moisture conditions wetter than optimum, soil particles move against each other too easily. As a result, when compacted, soil moves laterally from under the compacting device rather than being consolidated in place. As shown in figure 4, compaction is poor for very wet soils. The optimum moisture range for finer soils, such as the flood-plain silt shown by curve no. 6 in figure 4, would be in the 6-20 percent range. A moisture-density relationship like that for a silt loam soil similar to many found in southern Idaho is shown in figure 5. Typical values of optimum moisture content and maximum dry densities are summarized in table. Rubber-tired farm equipment or bulldozers can achieve about 90 percent of maximum (standard Proctor) density while a sheepsfoot roller can achieve 95 percent. 7

.6.4.2 Permeability, cm/h 0.8 0.6 0.4 0.2 0 0 2 3 4 5 6 7 8 9 0 Percentage Bentonite Figure 6. Constant-Head Laboratory Permeability for Soil Cores with Varying Percentage of Bentonite Added to Dry Soil ) Bulk density is.0 (loose pour with no compaction). Source: Neibling et al. For most soils, optimum compaction occurs near field capacity, the moisture content one to three days after irrigation or a heavy rainfall. For a sandy soil this occurs about one or two days after irrigation and for a silt loam or heavier soil, about three days after irrigation. A method of determining soil moisture for irrigation purposes, described in table 2, can be adapted as a quick field guide for optimizing soil compaction. Optimum compaction will occur when the soil feel and appearance fall in the 75 percent to field capacity (00%) range. Soil/Bentonite Mixtures Bentonite is a clay mineral that expands in volume when wet. When added to a soil, the bentonite expands to fill soil pores and thus reduce soil permeability. Figure 6 shows the reduction in permeability produced by addition of varying percentages of bentonite to a dry soil that was loose-poured (bulk density of.0 or 62.4 lb/cubic foot dry density) into the permeability cell. Similar reductions can be expected from higher compaction levels. Figures 3 and 6 show that permeability was about equal for a silt loam compacted to a bulk density of.5 (about 94% of standard Proctor in this soil) and the same soil at a bulk density of.0 (no compaction) with 8 percent bentonite added. Addition of 8-0 percent bentonite to a soil that was then compacted to 90 or 95 percent of standard Proctor would result in quite low permeability. The exact value must be determined by laboratory testing. Further Reading Idaho Department of Health and Welfare Division of Environmental Quality. 993. Idaho waste management guidelines for confined feeding operations. IDHW DEQ, Twin Falls, Idaho. 82 pp. US Department of Agriculture Natural Resources Conservation Service. 993. Design and construction guidelines for considering seepage from agricultural waste storage ponds and treatment lagoons. Technical Note 76 (Revision ), South National Technical Center, Ft. Worth, Tex. 37 pp. Authors Howard Neibling, Extension Water Management Engineer, and Dean Falk, Extension Dairy Specialist, Agricultural and Biological Engineering Department and Animal and Veterinary Science Department, University of Idaho, Twin Falls Research and Extension Center. Issued in furtherance of cooperative extension work in agriculture and home economics, Acts of May 8 and June 30, 94, in cooperation with the U.S. Departments of Agriculture, LeRoy D. Luft, Director of Cooperative Extension System, University of Idaho, Moscow, Idaho 83844. The University of Idaho provides equal opportunity in education and employment on the basis of race, color, religion, national origin, gender, age, disability, or status as a Vietnam-era veteran, as required by state and federal laws. November 997,000 $2.50 8