Aspects of the. Following these key guidelines during a compressor changeout can ensure a successful, more efficient replacement.

Similar documents
Reference Document RD-0007-E GUIDELINES FOR THE UTILIZATION OF R-404A R-452A. Page 1 of Tecumseh Products Company LLC. All rights reserved.

Publication # RD-0003-E Rev 1, 10/17 SERVICE GUIDELINES HCFC R22 TO HFC REFRIGERANT BLENDS

The complete approach to the care and management of A/C & refrigeration systems

Some of these procedures need to be performed to conform to requirements of the Clean Air Act.

Calhoon MEBA Engineering School. Study Guide for Proficiency Testing Refrigeration

The Essentials Of Working With R-410A

R-407A R-448A R-449A

AIR CONDITIONING. Carrier Corporation 2002 Cat. No

Residential Piping and Long Line Guideline

Condensing Unit Installation and Operating Instructions

1. Can SUPER SEAL ACR, SUPER SEAL HVACR & SUPER SEAL COMMERCIAL be used interchangeably? No, use as per application guidelines below:

CS/CD/CP AIR COOLED CONDENSING UNITS (P/N E207120C R2)

SERVICING PROCEDURE R-410A LEAK TEST EVACUATION CHARGING. Bard Manufacturing Company, Inc. Bryan, Ohio Manual Page 1 of 11

Air Conditioning Operation and Troubleshooting Matt Dunham

B. A. T. Basic Appliance Training

SECTION 2 SAFETY, TOOLS AND EQUIPMENT, SHOP PRACTICES UNIT 10 SYSTEM CHARGING

Hoshizaki America, Inc.

14. The center port of the manifold is used for evacuation, charging and refrigerant recovery.

ariazone 601HD Refrigerant Recovery & Recycling Unit User's manual

Condensing Unit Installation and Operating Instructions

HVACR Refrigeration

Scroll Chillers: Conversion from HCFC-22 to HFC-410A and HFC-407C

ENERGY EFFICIENCY PERFORMANCE SAVINGS SERVICE MANUAL R-290

AE R4 July 2015 Guide for the Use of R-290 Refrigerant in Copeland Refrigeration Compressors

REFRIGERANT RECOVERY Log Book

PARALLEL RACK SYSTEM INSTALLATION & OPERATIONS MANUAL With Master Rack Compressor Sequencer

Recommendations to retrofit positive existing installations running with HFCs (R404A & R507) RETROFIT POSITIVE & MEDIUM REFRIGERATING SYSTEMS

SECTION 7 AIR CONDITIONING (COOLING) UNIT 41 TROUBLESHOOTING

Ariazone 601HD Refrigerant Recovery&Recycling unit

INSTALLATION INSTRUCTIONS TXV Horizontal Duct Coils EHD

HVAC Compressor Replacement. Terry Bell, Carmichael Engineering Ltd. Moderator: Daniel Gardiman, Carmichael Engineering Ltd.

SERVICE MANUAL FOR MODEL RM-10

Instructors: Contact information. Don Reynolds Doug McGee Factory Tech Support

This chapter is devided into two sections:

R-290 SERVICE MANUAL SWF MODELS. Principals and Best Practices for servicing HC refrigeration equipment

INSTALLATION INSTRUCTIONS TXV Horizontal Slab Coils WLSH

Air Cooled Condenser Installation and Operating Instructions

Desiccants & Driers. By Norm Christopherson

HEAT PUMPS. Carrier Corporation GT72-01 Cat. No

RS-70 is suitable as a direct replacement for R-22 in low, medium and high temperatures in a great number of applications:

RSES SERVICE APPLICATION MANUAL TABLE OF CONTENTS AUGUST 2016

INSTALLATION INSTRUCTIONS TXV Horizontal Duct Coils EHD

INSTALLATION INSTRUCTIONS TXV Coils EDM, EDD, EDA

National Maritime Center

HEATING AND VENTILATION

Due to its low temperature glide about 1.5 approx. (75% less than R-407C and R-427A), it is suitable for a wide range of applications.

SECTION 8 AIR SOURCE HEAT PUMPS UNIT 43 AIR SOURCE HEAT PUMPS

10/4/2013. The Changing State of Refrigerants

HOSHIZAKI MODULAR CRESCENT CUBER MODEL KM-280MAH KM-280MWH SERVICE MANUAL

Air Conditioning Repairs: Maintenance Required

12 In Row. Installation Manual. MISSION CRITICAL Air Conditioning Systems. ClimateWorx International Inc.

NUMBER: ISSUED: JULY 13, /336 73/23 STACKABLE CRESCENT CUBER KM-1300SWH-E SERVICE MANUAL FOR QUALIFIED SERVICE PERSON HOSHIZAKI

Refrigeration and. Modern. Air Conditioning. Bracciano, BS, M.Ed., Ed. Sp. Alfred F. Andrew D. Althouse, BS, (ME), MA. Carl H. Tumquist, BS, (ME), MA

Contractor Service Tips

SERVICE MANUAL FOR MODEL RM-49

HOSHIZAKI CUBELET ICE DISPENSER MODEL DCM-240BAF SERVICE MANUAL

User s Information and Installation Instructions

APPLICATION & SERVICE GUIDE

GDM/FLM/STA/STG/STM/STR/T/TAC/THAC/TS/TSD/TVM Series Cabinets

Hoshizaki America, Inc.

KM-900MAF KM-900MWF KM-900MRF KM-900MRF3

SERVICE MANUAL FOR MODEL RM-26

Bert A. McJimsey, Ph.D. Research Engineer The Trane Company Tyler, Texas. Dick Cawley, P.E. UPG Technology Team Leader The Trane Company Tyler, Texas

Often fellow technicians, co-workers and field personnel CHARGE REFRIGERANT DETERMINING PROPER SYSTEM

OPER LV Wheeler Way

SECTION REFRIGERATION EQUIPMENT. A. Section Includes: Refrigeration equipment for insulated cold storage rooms including necessary accessories.

Service Step by Step Trouble-Shooting Check-List

Hoshizaki America, Inc.

KM-630MAF KM-630MWF KM-630MRF

OPERATING INSTRUCTIONS

Hoshizaki America, Inc.

To accomplish this, the refrigerant fi tis pumped throughh aclosed looped pipe system.

NO: 9-16 DATE: 2/11/16 EMERSON CLIMATE TECHNOLOGIES WHOLESALERS -EXECUTIVES -PRODUCT MANAGERS -EMERSON TM TECHNICAL SPECIALISTS -BRANCH PERSONNEL

User s Information and Installation Instructions

Kolpak/RDI Refrigeration System Installation & Operation Manual

September 2016 AE Application Guidelines for Copeland CS**KIE Compressors in Ice Machines AE4-1421

Service. 18, 21, & 22 Cu. Ft. Bottom Mount Refrigerators

REFRIGERANT CHANGEOVER

Refrigerant changeover guidelines

User s Information and Installation Instructions

OPERATING INSTRUCTIONS

Installation Instructions

SERVICE MANUAL FOR QUALIFIED SERVICE PERSON HOSHIZAKI 89/336 73/23 SELF-CONTAINED CRESCENT CUBER KM-150BAF-E KM-150BWF-E

Suction Accumulators. Introduction. Suction Accumulators

Series 6, Vertical Floor-Mount Units

NO. 15FD-742 ISSUED: AUG. 10, 2007 REVISED: SEP. 30, 2013 HOSHIZAKI SELF-CONTAINED CRESCENT CUBER KM-30A KM-35A KM-50A KM-75A MODEL SERVICE MANUAL

!"#$%&'(&) !(*$%"'&!$() !"#$

Series 6, Vertical Floor-Mount Units

F-2000MLF(-C) F-2000MWF(-C) F-2000MRF(-C) F-2000MRF3(-C)

WMHP Series R410a Heat Pump INSTALLATION INSTRUCTIONS

WARRANTY LABOR CLAIM

OPERATION & MAINTENANCE MANUAL AC860

Frigi Tech International, Inc Prairie Wind Lane,. Houston, Texas T: F:

Installation 50% Service 20% Components 20% Applied Knowledge 10%

Hoshizaki America, Inc.

Doc. Code Emission Revision Date Page /36

DESIGN STANDARDS SECTION 15600

Chapter 2. Alternatives to HCFCs and their Characteristics

Room Air Conditioner Service and Parts Manual

AE Application Guidelines for Refrigeration Copeland Discus Compressors with R-410A

Transcription:

Aspects of the Compressor Retrofit Following these key guidelines during a compressor changeout can ensure a successful, more efficient replacement. B y J o h n P r a l l a n d D e n n y M a r t i n All images courtesy of Embraco North America. As much as industry professionals would like to believe that compressors will last forever, the truth is compressors will eventually fail in the field. This failure necessitates replacing the compressor, and with the complicated systems in the field today, this is not always such a simple process. Following good practices and procedures are critical to prevent premature failure of the replacement compressor. Below are guidelines to consider that will ensure the life of the replacement compressor. Six key aspects of the retrofit process 1. Refrigerant recovery: All refrigerant must be removed from the system before beginning the compressor replacement process. Since modern refrigerants are either an ozone-depleting gas or a greenhouse gas, law mandates that the refrigerant cannot be vented directly into the atmosphere. gbe sure to disconnect all electrical power circuits and lockout before proceeding. Install a piercing valve in the process tube or use the high- and low-side service valves, if available. gconnect the service manifold to the system valves and to the refrigerant recovery machine (be sure the machine is approved for the refrigerant being removed), along with a properly approved refrigerant recovery cylinder. gwhen the recovery process is complete the system can be prepared for the nitrogen purge prior to brazing in the new compressor. 2. Follow standard refrigeration practices: Proper pipe-fitting and brazing techniques are critical to ensuring 12 RSES Journal AUGUST 2013 It is important to keep the replacement compressor within ±10% of the original compressor capacity. a long life for the replacement compressor. Be sure to deburr any copper lines that were cut with a tubing cutter. It is recommended to purge the system with nitrogen to prevent any oxidation from forming on the inside of the tube while brazing. Oxidized particles and loose copper pieces can get caught in the orifices of the metering devices as well as damage the compressor bearings. 3. Cleanliness: As stated above, it is important to keep debris out of the refrigeration system because dirt and debris can damage the system. Whenever a compressor is replaced, be sure to replace the filter-drier. A suction-line filter-drier should also be installed in the event of a compressor burnout. This will help prevent debris and particulates from reaching

the metering devices and the compressor. Also, be sure to wait until you are ready to braze in the compressor before pulling the rubber plugs on the tubes. If the plugs are pulled too soon, there is a risk of moisture in the air mixing with the oil in the compressor. Modern oils, such as polyolester and alkyl benzene have the ability to act like a sponge and will soak up the humidity from the atmosphere. This moisture will react with the copper in the system forming acids and sludge that will clog the system and potentially damage the compressor. As a general rule, the compressor should not be open to the atmosphere for more than 15 minutes. This duration is a period when the compressor is vulnerable and easily affected by climate conditions, so it is best to minimize the time between the removal of the plug and the brazing in of the compressor. To maintain a longlasting refrigeration unit, pulling a deep vacuum of 500 microns or lower is crucial after the compressor is replaced. During the evacuation step, moisture is removed by reducing the pressure in the system until water is vaporized (boiled) and then removed by the vacuum pump. Again, this will prevent acid and sludge buildup from the moisture reacting with the copper in the system. 4. Charging: Technicians should also be conscientious of charging the system properly. Too little charge and the system will never meet the temperature setpoints, or the system will run for a longer period than it should. Also, too little refrigerant will cause the compressor motor to run hot, as it is designed to be cooled by suction gas. Too much charge and there is a risk of flooding the compressor with liquid, which can wash lubricant from the bearings and potentially cause component failure. Add refrigerant to the system until it is able to achieve stable conditions at the proper setpoints. Be sure to check the documentation from the manufacturer for the proper refrigerant charge, and it is always recommended to weigh in the charge with an electronic charging scale. Circle Reader Service No. 86 AUGUST 2013 RSES Journal 13

Type Low Back Pressure (LBP) Evaporating temperatures between -31 and 14 Medium Back Pressure (MBP) Evaporating temperatures between 14 and 32 Medium/High Back Pressure (M/HBP) Evaporating temperatures between 14 and 59 High Back Pressure (HBP) Evaporating temperatures between 32 and 59 Applications Refrigerators, frozen food cabinets, frozen-food display cases, display windows, etc. Fresh-food cabinets, drink coolers, ice makers, walk-in coolers and freezers, etc. Coolers, merchandisers, etc. Fresh-food cabinets, ice makers, dehumidifiers, dryers, etc. Test Conditions (Rating Point) AHRI 540 ASHRAE 32 ASHRAE 46 Application Evaporating Condensing Suction Liquid Ambient LPB -10 120 40 95 No Subcooling MPB 20 120 40 120 HPB 45 130 65 47 130 LPB -10 130 90 90 90 M/HPB 20 130 90 90 90 HPB 45 130 95 115 95 Figure 1 These tables show AHRI and ASHRAE applications and test-condition guidelines. Checking superheat for systems with a capillary tube is also recommended to ensure adequate charge and prevent liquid floodback. Systems equipped with a TXV will require a refrigerant subcooling check. 5. Select the right compressor: This is an obvious but critical step because a compressor that is too small will not be able to handle the heat load of the system. This will result in long run cycles and an inability to achieve desired temperatures in the refrigerated space. On the other hand, a compressor that is oversized will consume excessive energy and result in superfluous cycling, which would shorten the life of the compressor and increase the risk of liquid refrigeration floodback. The standard compressor capacity match should be within a ±10% range. This will prevent short cycling or oversizing the compressor and make sure the system is performing properly and efficiently. 6. Lubricants: One of the most important aspects of the retrofit process is to correctly match the type and amount of lubricant within the refrigeration system. Be sure to check the manufacturer s specifications prior to installation. Industrial lubricants commonly used today are mineral and POE for R-22 and POE for R-134a and R-404A. Lubricants can vary based on a variety of characteristics, including its miscibility, viscosity and hydroscopicity. The proper type and amount of oil to be used in the compressor should be based on data provided by the compressor manufacturer, making 14 RSES Journal AUGUST 2013 The standard compressor capacity match should be within a ±10% range. This will prevent short cycling or oversizing the compressor and make sure the system is performing properly and efficiently. it imperative to check with the manufacturer s specifications before moving forward with the retrofit process. Miscibility (proper mixing of lubricant and refrigerant) is why manufacturers specify this information. Pay close attention to these specifications, as some manufacturers indicate an initial oil charge. Most replacement compressors will come pre-charged with the correct oil type and charge of oil. Always double

A compressor rated on AHRI standards will have a different capacity and efficiency rating when using the ASHRAE rating system. check that the oil that is in the compressor is compatible with the refrigerant that is used by the system. It is a good idea to measure the oil volume being replaced in the compressor to ensure that there is no additional oil trapped in the system. If oil is trapped in the system, remove it because this can impact the operation of the system. Ratings Sometimes compressors are rated under different rating agencies. The two most common are ASHRAE and AHRI. Each has different rating systems for various standard operating points. Therefore, a compressor rated on AHRI standards will have a different capacity and efficiency rating Circle Reader Service No. 87 AUGUST 2013 RSES Journal 15

Following these guidelines will ensure that the compressor replacement process goes smoothly and the new compressor will run efficiently for the long term. Replacing a start relay. when using the ASHRAE rating system. Unfortunately, there is not a good method to convert one to the other without testing a compressor in both conditions. If in doubt, contact the compressor manufacturer. See Figure 1 for AHRI and ASHRAE applications and test-condition guidelines. Compressor electricals & accessories One of the final items to take a look at when replacing a compressor is the electrical components. Be sure to check that the run and start capacitors are still within the specifications written on their product labels. If they are not, then replace them. Double check the relay to make sure that there are no shorts in the relay. And finally, check the overload. If any of the above components are not operating to specification, all this hard work will be in vain. Take care not to over-tighten the bolts for the rubber grommets the grommets should not bulge beyond their diameter. Overtightening causes excess vibration. 16 RSES Journal AUGUST 2013 Always minimize the time between pulling out the compressor plugs and the brazing of the compressor. Connecting to the process tube. Following these guidelines will ensure that the compressor replacement process goes smoothly and the new compressor will run efficiently for the long term. Denny Martin is the Aftermarket Distribution Technical Support Specialist/Product Line Manager for Embraco North America in Suwanee, GA. In addition to supplying technical support to HVACR contractors and wholesale customers, he is responsible for product management of the aftermarket product line. Martin has 18 years of experience in the HVACR field. John Prall is the Technical Support Engineer for Embraco North America in Suwanee, GA, where he provides engineering and technical support for refrigeration OEMs. Prall has more than 10 years of experience in the refrigeration industry ranging from product design and development to product management. Embraco North America is a supplier of hermetic compressors for refrigeration systems. For more information, visit www. embraco.com.