Date and Time of Incident. Feb. 13, 1964 Breakout at15:33 (approx.) Noticed at 15:27 Notified by emergency call. Extinguished by 21:07

Similar documents
Date and Time of Incident. Jan 28, Breakout at 00:55 (approx) Detected at 00:55 Notified by a call to the police station Extinguished by 01:50

Date and Time of Incident. March 10, 1975

Date and Time of Incident. May 13, Breakout at 22:27 (approx) Noticed at 22:40 Notified by emergency call Extinguished at 17:30 on May 15th

Amagasaki, Hyogo Prefecture: Nagasakiya Department Store

Fire Safety Checklist

DCN: ENGINE COMPANY OPERATIONS CHAPTER 4 March 15, 1997 FIRE SCENE OPERATIONS

2010 Fire Log Fire Log. Annual Fire Safety Report

INITIAL FIRE ASSESSMENT REPORT (FAR)

Family Foster Home Fire Safety Evaluation Checklist Instructions

FIRE EVACUATION PLAN PRATT STREET PARKING GARAGE AND ATHLETIC CENTER POLICE FIRE MEDICAL EMERGENCY

RAMBLER PARK FIRE SAFETY INFORMATION

High Rise Floor Wardens

Agency for Health Care Administration

Agency for Health Care Administration

September 1, Sincerely, Mike Montgomery Fire Marshal. M.S. Montgomery Fire Marshal

University of Maryland FIRE EVACUATION PLAN Columbus Center POLICE FIRE MEDICAL EMERGENCY - 911

Mulch fires, trash can fires, or other fire outside a building should be reported by the following methods:

University of Maryland FIRE EVACUATION PLAN NATIONAL DENTAL MUSEUM POLICE FIRE MEDICAL EMERGENCY Anyone discovering excessive heat,

Exit Routes. Introduction/Overview. OSHA Regulations. Exit Route

Hot Work Policy. Department of Risk Management. 1. Purpose. 2. Authority. 3. Scope

Iroquois theatre, Chicago, The fire in this newly opened but badly planned theatre in Chicago in January 1904 caused 572 deaths

RE: BASIC FIRE SAFETY PROCEDURES AND OPERATION OF FIRE EQUIPMENT

FIRE SAFETY PLAN PART 1 BUILDING INFORMATION SECTION. Type of Construction: Combustible Non-Combustible

NYU RESIDENTIAL FIRE SAFETY PLAN PART I - BUILDING INFORMATION SECTION

"EVACUATION PROCEDURES"

Steven Craft, PhD, P.Eng. FIRE SAFETY DURING THE COURSE OF CONSTRUCTION

THE REGULATORY REFORM (FIRE SAFETY) ORDER 2005 FIRE RISK ASSESSMENT SPORTS CENTRE

Element C3.5 Means of Escape

Japanese Case Study: How to maintain the fire safety in subway station and tunnel

Fire Safety Guide. Emergency Numbers:

MISSION To prevent the loss of life and property and to reduce injury by providing emergency response, education and prevention services.

UNIVERSITY OF ROCHESTER ENVIRONMENTAL HEALTH & SAFETY

INITIAL FIRE SAFETY ASSESSMENT

Beau s Emergency Response Plan

5 Key Stages to Risk Assessment

THE REGULATORY REFORM (FIRE SAFETY) ORDER 2005 FIRE RISK ASSESSMENT NO 68 (ENGLISH AND PHILOSOPHY)

FIRE EMERGENCY POLICY

A GUIDE FOR CONDUCTING FACILITY PRE-FIRE PLANS

Fire Safety Guide. Emergency Number:

FIRE SAFETY AND PREVENTION POLICY

THE REGULATORY REFORM (FIRE SAFETY) ORDER 2005 FIRE RISK ASSESSMENT HORSEFAIR HOUSE

Emergency Action and Fire Prevention

THE REGULATORY REFORM (FIRE SAFETY) ORDER 2005 FIRE RISK ASSESSMENT NEW BUILDINGS

- CONSTRUCTION FIRE SAFETY STANDARDS

FIRE PLAN. In order to assure the safety of patients, visitors and staff, a standard response to fire or the potential of fire is required.

FIRE SAFETY MAINTENANCE INFORMATION for Agricultural Livestock Structures

Fire Evacuation Plan Health Sciences & Human Services Library. UMB POLICE or

Bloomsburg University of Pennsylvania Hot Work Safety Program Effective Date: July 1, 2015

Agency for Health Care Administration

Fire Safety Guide. Emergency Number:

UNIVERSITY OF ROCHESTER ENVIRONMENTAL HEALTH & SAFETY

FIRE SAFETY PRACTICES AND PROCEDURES

UCSF Campus Floor Warden Training. Created by Herbert Cole, CEM

FIRE PREVENTION STRATEGY FOR BUILDINGS IN CONSTRUCTION. Fire Department, Taipei City Government, Taipei, Taiwan, ROC 2

Fire Safety Audit: Part B - Questionnaire (Questionnaire Devised By Mr.R.R.Nair) Yes No x

SCALES NW EMERGENCY ACTION PLAN

Fire Safety Plan (FSP) Review Checklist 1

Dutchess Community College. Emergency Action Plan. Conklin Hall College Residence

Fire Safety Plan (FSP) Review Checklist 1

Fire Evacuation Plan Bressler Research Building. UMB POLICE or

FIRE SAFETY PLAN For Commercial Use

CHALLENGES IN THE FIELD OF FIRE DEFENSE

EQUIVALENT INITIAL FIRE SAFETY ASSESSMENT

Truro Police Department. Fire Emergencies. Policy Number: OPS-9.02 Effective Date: June 1, 2000 REFERENCE:

- CONSTRUCTION FIRE SAFETY STANDARDS

The Physical Environment Portal: Module 5, LS Leadership

Guidelines for Fire Safety Plans at Construction or Demolition Sites

SEPTEMBER-NEWSLETTER-ELEVATOR DANGERS

CLARK COUNTY FIRE DEPARTMENT Fire Prevention Bureau

1303 Trans Canada Way SE Medicine Hat, AB T1B 3Z9 Phone

Occupational Health & Safety Practitioner. Reading BUILDING FIRE SAFETY

RESIDENCE HALL EMERGENCY EVACUATION PLAN

Today, we re going to talk about emergency action and fire prevention. We hope we never have to face an emergency situation like a fire in our

FIRE SAFETY PLAN FIRST & JASPER JASPER AVENUE

FIRE SAFETY PLAN. Ceramics/Sculpture Building 47 Service Rd 1 S Winnipeg, MANITOBA. May / Prepared by: Chris Pancoe

FIRE SAFETY PLAN FOR CONSTRUCTION, RENOVATION AND DEMOLITION SITES

"FIRE PREVENTION IN HEALTHCARE FACILITIES"

Fire Safety. A TUC guide for trade union activists

Leader s Guide Marcom Group Ltd.

Proposed Commercial Project at Plot No. C3A, Sector-16B, Greater Noida West (U.P)

Date Issued: December 14, 2017 Revision: 2.1

First Aspen Federal Regulation Set: K LSC 2000 Health Existing

Requirements specification physical protection, in order to receive a National Indemnity

Fire/Life Safety Policy

Fire Prevention Program

John Jay College of Criminal Justice HOT WORK PERMIT STANDARD OPERATING PROCEDURES

SURREY FIRE SERVICE. Construction Fire Safety Plan Bulletin

UCL PRINCIPAL CONTRACTOR SITE FIRE SAFETY RISK REVIEW & MITIGATION MEASURES

University of Maryland FIRE EVACUATION PLAN

Action plan in case of a fire Nooruse 1, Tartu

Fire and Evacuation Guide

School Fire Safety Checklist

Sample Content for the. FlipChart. Example: Medical Facility Emergency Preparedness Guide

EMERGENCY PROCEDURES FLIP CHART

[Name/title] is the Alternate Safety Officer/ Alternate Emergency Coordinator.

Savard Labor & Marine Staffing, Inc. Fire Prevention Program Rev3/14

To: All SAAS Accredited Certification Bodies Subject: Clarification to Emergency and Health & Safety Requirements in the SA8000 Standard

INITIAL FIRE SAFETY ASSESSMENT

Safety Manual: Emergency Response

For additional information regarding R-3.1 residential care facilities please contact (951)

Transcription:

Building Name Address Matsuya Ginza Department Store 3-1 Ginza, Chuo-ku, TOKYO I. Summary of Fire Incident Use (as per FSA Annexed Table 1) Department Store (4) Date and Time of Incident Feb. 13, 1964 Breakout at15:33 (approx.) Noticed at 15:27 Notified by emergency call Extinguished by 21:07 Structure and Stories Area Extent of Damage (Damaged Area/ Total Area) Fire resistive 8 stories above ground and 3 below All Half Partial Small Building Area 4,739 m 2 Gross Floor Area 45,659 m 2 3,862 m 2 (8% ) No. of Casualties Fatalities 0 Injured 24 (22) (1) Summary (2) Conditions per Floor Within 6 months of the Seibu Department Store Fire, another department fire occurred in the Ginza area. The fire emerged from the vicinity of the shutter between the ongoing construction area and the existing sales floor on the 5th floor. There are many similarities between this fire and the Seibu Department Store Fire: for example, it started in the upper part of the building, spread to the upper floors, occurred during off-business hours, and there was ongoing construction occurring. The result of this fire brought the entire nation s attention to the fact that even a fire resistive building can in fact burn well. FL Gross Damaged Use No. of No. of Fire escape Firefighting area area (Purpose) persons fatalities equipment equipment m 2 m 2 8 units of Fire extinguishers R3 246.35 Observation deck R2 294.27 Observation deck R1 535.42 Recreation space 8 4,169.62 Special sales, 8 Restaurant 7 4,287.88 769 Sales 42 6 4,458.90 1,020 Sales 2 5 4,512.97 2,073 Sales 4 4,594.49 Sales 4 3 4,674.17 Sales 5 2 4,565.38 Sales 11 1 4,739.25 Sales 29 B1 5,006.96 B2 2,151.64 B3 1,422.18 Total 45,659.48 3,862 101 0 inside stairs 1 escape chute per floor (3rd to 8th) Indoor fire hydrants Sprinkler system (inactive due to ongoing construction) Automatic fire detection system 2 units of MM-type fire alarm (automated fire transmitter) Water pipe connections (3) Origin of Fire (Floor, Room, Part, Combustibles, Habitable/Non-habitable Rooms, Present/Absent Near the office supplies section on the 5th floor that was located next to the construction site for the additional building. (4) Cause of Fire Unknown The cause of fire could not be determined, but was believed to be from sparks scattered by ongoing oxygen welding work on the 6th floor for the construction project. From around 13:00, the contractors were cutting through existing steel pipes that were embedded on the floor, which was right above the office supplies section of the 5th floor, and sparks may had landed on the ceiling that was made of plywood and hardboard.

(5) Fire Propagation Path (Location of Fire Source) Near the office supplies section (Propagation from Source) To the sales goods (Propagation to Adjacent Zones) Through the accidentally opened D-type fire shutter (Propagation to Upper Floors) Via the stairway of the 5th floor on the south-west side of the building To the sales goods near the stairwell shutters on the 6th and 7th floors The fire emerged near the office supplies section on the 5th floor. The partition walls in the construction site area prevented the flames from spreading, but instead, the flames moved toward the toy section where the fire shutters close in the direction of south to north. However, the other shutter on the west side opened by itself (about 3/4 open) and therefore the flames reached the sporting goods section and then spread across the open ceiling area. Meanwhile, the heat from the fire was transferred upward along stairwell No.5 (on the south-west side of the building) because the west-side wall had been wide open for construction and to let fresh air in. This heat made the shutters on the 6th and 7th floor hot enough to ignite nearby combustibles, and resulted in the fire spreading to the 6th and 7th floors. Main Reasons for the Propagation of the Fire The store was closed for the day so all the shutters and doors were closed on each floor. Firefighters struggled to enter the building because the exterior walls were concealed by construction sheets and steel wire nets and the building was filled with heavy smoke and heat, as is common in a fire in a fire-resistive structure. On the 5th floor, one of the stairwell shutters remained open and combustible materials were piled up near the stairway. Smoke Propagation Path The smoke penetrated to the upper floors through the unclosed shutter of the stairwell on the 5th floor. II. Summary of the Building Construction, Completion and Major Renovations (1) Built (Completion) 1924 (Request for additional construction permit) Jan. 12, 1963 (Planned Completion) May 1964 ( 80% completed when the fire broke out) Fire Prevention Management (2) Vertical Shafts (3) Fire Prevention Stairs [X] Duct Spaces [X] The store had appointed a fire-prevention manager, a Elevator [X] Pipe Shafts [X] fire-prevention supervisor and in-house firefighting team and Escalators [X] Other ( ) [X] had submitted a fire defense plan to the fire station. From the 1st to 8th floors, there was an open ceiling at the center of the sales floor and all 4 sides of the opening were partitioned by fire shutters. Each stairwell was partitioned by fire doors or the fire shutters. The store received multiple inspections annually, and the inspector recommended clearing the fire shutter path a number of times. The store maintained good daily fire-prevention management, voluntary inspections and night patrols. Although the store was closed, 23 people were working, but no-one was present on the 5th and 6th floors. They were supposed to patrol 3 times that day; however, no-one went on patrol after 14:00 due to scheduling conflicts. (4) Fire Compartments (5) Firefighting Equipment On the sales section of each floor, a fire shutter closes in the direction of north to south. The construction site and the existing section were partitioned by corrugated metal walls and hardboard walls. A sprinkler system was being installed (on the 3rd to 5th floor portions of the current building).

III. Actions Taken after the Fire was Detected (1) First Detected Detected by How and why Action taken ( Store staff, contractor, security personnel ) ( Presence of smoke ) ( Alerted the store s security and administration offices ) The following people noticed the fire relatively earlier: Electrical technician H of Matsuya (age 45) --- A little after 15:00, near the wicket door of a shutter that was located in the furniture section on the 7th floor, H was looking for the desk he had purchased the day before and noticed slight smoke coming out from the escalator area. Therefore, he instructed to store staff D to call the security office on the 1st floor and the electrical room. Construction worker I (age 22) --- While in the temporary office for the construction site that was next to the sales section on the 5th floor, he noticed smoke gathering around the ceiling from the upper part of the partition wall to the sales section. He made a call to the administrative office of the store. Security personnel T (age 36) --- When he was observing the wiring work for the fire alarm system, he noticed the smoke gathering around the upper part of the shutter. (2) Emergency Call (3) Initial Firefighting Activities (4) Summary of Firefighting Activities Emergency Call Yes [ X } ( Security personnel ) No Time elapsed since the discovery ( 4 ) minutes Store staff D made an internal call to the security office and alerted them of the smoke around the escalator on the 7th floor. Security guard M made a 119 call and reported that a fire had broken out on the 6th and 7th floors of Matsuya Department Store. The head of the store staff announced detection of a fire over the PA system and directed no-one to panic. Successful Failed [ X ] (Reasons or Conditions) Initiated Not Initiated Extinguished time Firefighting difficulties Firefighting method Extinguished time Firefighting difficulties Firefighting method Other (Obstacles or Difficulties in Fire Control) [ X ] [ X ] The store staff and contractors who were on the 1st to 3rd floors and 12 of the security guards who were in the main building grabbed fire extinguishers and ran up the stairs. From the construction site, 10 of the construction workers also rushed with fire extinguishers to the location of the fire, but they could not extinguish it. On the open ceiling area, a few security guards extended some hoses from 2 outdoor fire hydrants and sprayed water onto the fire shutters that were becoming hot. However, they all had to evacuate because, for some reason, the D-type shutter for the sales section opened by itself and smoke poured through. The other store staff also fought the fire with indoor fire hydrants on the 6th and 7th floors. Firefighters struggled to understand the conditions inside the building because the exterior was swathed in protective sheets and wire netting for the construction, which became unusual obstacles for the set up of their ladders to enter the building. The firefighters who entered via the stairs also struggled with the closed fire shutters and doors that were difficult to open. Moreover, the fire broke out in an area between the construction site and the existing floor, which was partitioned by corrugated metal walls and hardboard walls and some areas even had a big hole on the floor. Under such conditions, although the firefighters were able to enter the building, they could not use water effectively. The fire-resistive building created large amounts of smoke and heat as usual, which created a difficult environment for the firefighters and many of the 22 injured suffered corneal flash burns.

(5) Evacuation Means of Escape (No. of Persons) Stairs ( ) Elevators/Escalators ( ) Escape equipment ( ) Directly to the ground from windows or openings ( ) Rescued [ X ] ( 1 ) Other ( ) Obstacles to Evacuation No windows Barred openings Locked emergency doors (Exits) Alarm System (Poorly controlled, Malfunctioned, Not installed) Power outage Other Firefighters set up the ladder and rescued 1 person trapped on the 6th floor. When the fire broke out, there were 101 store staff and contractors in the building, who were all familiar with their way around the building. Therefore, instead of being guiding in a systematic evacuation, most of the people evacuated by themselves following instructions delivered over a loudspeaker, and some of them helped to extinguish the fire at the early stage. (2 injured, 1 rescued) (6) Causalities Healthy individuals (Drunk persons ) Individuals in need of assistance Infants Elderly Handicapped Patients/ill persons None Obstacles to Evacuation No windows Barred openings Locked emergency doors (Exits) Alarm System (Poorly controlled, Malfunctioned, Not installed) Power outage Other IV. Issues and Lessons Learned The risk of disaster doubled in the Matsuya Ginza Department Store Fire when management decided to keep the store open for the period of construction (remodeling and addition of new building). The most notable issue was that store management and the contractors failed to communicate effectively in order to prevent a fire from occurring during the construction period.