Cambrian North Basin, Llanelli

Similar documents
Stebonheath Primary School, Llanelli

Howard Street, Salford, Manchester

Heron Court Rain Garden, London

Priors Farm Estate SuDS Retrofitting Project, Cheltenham

Greening streets, retrofit rain gardens, Nottingham

Green Streets and Water

Alma Road Rain Gardens, London

SUDS: Innovation or a Tried and Tested Practice?

Queen Caroline Estate, London

Renfrew Close, London

Green Roofs and Stormwater Management Virginia Stovin

Rainwise. Sustainable Drainage Solutions. Working with communities to manage rainwater. Wuppertal Court, Jarrow

Retrofitting SuDS. Virginia Stovin. Department of Civil and Structural Engineering Pennine Water Group University of Sheffield.

Hollickwood Primary School, London

Manor Ponds, Sheffield

Clandeboye Primary School Raingarden, Bangor

Northumbrian Water is required to provide investment to reduce spills at Whitburn and St Peter s, Sunderland in

An Introduction to Sustainable Drainage

Springhill Cohousing Development, Springfield Road, Stroud, Gloucestershire

The Development of Urban Planning and Landscaping for Sustainable Drainage Systems

St Andrews Park, Uxbridge

10,000 Rain Gardens Project

Citywide Integrated Stormwater Management Plan (ISMP) DRAFT ACTION PLAN REVIEW Public Consultation November 16 th, 2016

Implementing sustainable water strategy through development industry engagement

Junction of Bispham Road and Bristol Avenue, north of Blackpool town centre, Lancashire, next to the former TVR car factory.

Promoting SuDS & Green Infrastructure

RAIN GARDEN ILLINOIS URBAN MANUAL PRACTICE STANDARD. (feet) CODE 897 DEFINITION

Lead Local Flood Authority SuDS Policy Statement

Grey to Green Phase 1, Sheffield

Melton, School SuDS scheme, Mowbray

LANDMARK HOUSE SUDS NOT DUDS Image Credit: RSH

Sustainable Urban Drainage Systems (SuDs)

Forest Way School Coalville, Leicestershire

Springhill Cohousing Development, Springfield Road, Stroud, Gloucestershire

Green Infrastructure Design for Multiple Benefits

Wessex Water Operations Centre, Claverton Down

Sewer Flooding Alleviation in the Counters Creek Catchment

NON-TECHNICAL SUMMARY

Manywells, Cullingworth

Stormwater Management Plan (SWMP) Revision Date: 11/05

Kittson Parkway / Watershed Park Parking Lot

WELCOME. Land North of STEVENAGE. We would like to thank you for attending our public exhibition today.

EXTENSIVE INTENSIVE SIMPLE INTENSIVE. We specialise in producing and installing our Extensive Green Roof System, using our sedum mats.

Sewer Flooding Alleviation in the Counters Creek Catchment

STORMWATER MANAGEMENT FACILITIES/STORMWATER PONDS - What Are They?

Promoting Sustainable Drainage Systems

Technical note. Option 3a (cyan route) Project: To: A428 Bus Enhancement Scheme. Rid Hollands, Colin Young

Fellgate Estate, Jarrow Surface Water Management Plan 2015

Christchurch City Council Civic Offices 53 Hereford Street Christchurch. Submission on: The Draft Annual Plan 2014/15

Rainwater Harvesting: Soil Storage and Infiltration Systems

Opportunistic approaches to incorporating multi-functioning SuDS into housing redevelopments

Sustainable Stormwater Retrofit Best Practices

Olympic Park, London. SuDS used. 1. Location. 2. Description. Case study

Why we need the Counters Creek storm relief sewer

Design Assessment Checklists for Ponds/ Wetlands

Artful Rainwater Design

Victoria Park Health Centre, Leicester

Water Cycle ARC-452 DESIGN VI: INTEGRATION A5 ENVIRONMENTAL SYSTEM BURGENER SIMON YANGCHUAN SUN

Grantham Southern Quadrant Link Road Environmental Statement

Rainwater Management an issue for the 21 st Century. Hydrological Cycle

SOUTH CAMBRIDGESHIRE DISTRICT COUNCIL. Planning and New Communities Director

Rainwater Management

Sustainable Storm Water Management

Rain Gardens. A Welcome Addition to Your Landscape

Tree Pits Construction Guide

ESSENTIAL ENGINEERING FOR PLANNERS

A. Install all temporary erosion control measures (in accordance with MNDOT General Conditions 2573) prior to site disturbance.

Blythe Valley Park, Solihull, West Midlands

Design Review Report Llanfoist to Abergavenny Footbridge DCFW Ref: 118 Meeting of 10th August 2016

Attachment 2: Permeable Pavement Design Guidelines

STORMWATER MANAGEMENT PLAN: ERAND GARDENS X70

Sustainable Drainage Applied Research Group, Coventry University Priory Street, Coventry, CV1 5FB, United Kingdom 3

The Benefits and Challenges Associated with Green Infrastructure Practices

Ruislip green roof retrofit on a tube depot, London

Green Street Maintenance Program & Lessons Learned

Taking control of SuDS - with permeable paving

Chapter 1 Introduction

GREATER CAMBRIDGE CITY DEAL. Urban Design Guidance for Transport Infrastructure Projects

Green Infrastructure Recommendations For Parks and Public Spaces

paving case study GREAT WESTERN PARK DIDCOT OXFORDSHIRE

Sustainable Stormwater Management through Green Infrastructure. Jersey City Public School #5

Consultation: Submitted to Deadline: Introduction 24,000 members 200 nature reserves 8,000 hectares or retrofitted

rainwise Working with communities to manage rainwater

Part 4: CRS Stormwater Management Activity (450) and Urban Flooding Best Practices

Hopwood Motorway Service Area, Worcestershire

HS2 Interchange Station Design

BRE Strategic Ecological Framework LI Technical Information Note 03/2016

MANUAL OF DESIGN, INSTALLATION, AND MAINTENANCE REQUIREMENTS FOR STORMWATER MANAGEMENT PLANS

Green City, Clean Waters

HARDWICK GREEN, King s Lynn. Welcome to our Exhibition. What are your views? Introduction to the site and proposals. About us

Post - Construction Hydromodification Development Requirements

DC Clean Rivers Project - Green Infrastructure Program. ACEC What s New at DC Water?

CALA HO ME S WELCOME

When planning stormwater management facilities, the following principles shall be applied where possible.

Selecting Appropriate Stormwater Control Measures for Your Development Project

Just The Basics: Illicit Discharge. What does it mean to me?

Shelbyville, KY Stormwater Best Management Practices. Section 2 EROSION PREVENTION AND SEDIMENT CONTROL PLAN

PEOPLE, WATER, AND WILDLIFE: BLUE PRINCIPLES FOR RIVER DESIGN

Site ref: AS06 Site Name or Address: Murreys Court, Agates Lane

Sustainable Urban Drainage Systems. Diederik Rousseau Tineke Hooijmans

Transcription:

Cambrian North Basin, Llanelli SuDS used Detention Basin Benefits Reducing combined sewer overflow pollution events. Biodiversity and habitat creation. Amenity value through benches and linking cycle paths. 1. Location People s Park, Park View Terrace, Llanelli, SA15 3HA 2. Description Cambrian North Basin and its associated landscape features has transformed 3600m2 of an unused historic landfill site into a landscaped area with amenity value. The purpose of the 2100m2 basin is to attenuate 1ha of newly separated highway, private car park and roof drainage to reduce peak flows in the combined sewer. It is part of a wider 8m project aiming to reduce Combined Sewer Overflow (CSO) pollution events to Shellfish Waters at Cambrian Sewage Pumping Station (SPS) from 52 to 10 per year to meet National Environment Programme (NEP) targets. The Cambrian North Basin will contribute by reducing CSO pollution events by five per year. 1

Fig 1 Cambrian North Basin before construction (February 2016) Fig 2 Cambrian North Basin artists impression Fig 3 Cambrian North Basin after construction (August 2017) susdrain SuDS Awards

3. Main SuDS components used The detention basin is 2m deep and attenuates 200m3 of rain water from the upstream catchment. A gabion wall, landscaped mound, sediment forebay and boulders form part of the hard landscaping. Fig 4 Fig 5 Sediment forebay Fig 6 Gabion wall and fencing Fig 7 Landscaping boulders 4. How it works In approaching the design the SuDS train was considered to make the most of evapotranspiration and water quality benefits. However, due to the low ground levels and 350m distance to the nearest river the 1ha surface water runoff could not be taken by gravity to a watercourse, therefore it had to be managed locally. During optioneering four solutions were considered 1. Surface water pumping station 2. Traditional below ground storage tank 3. Geocellular storage and 4. Above ground detention basin. The whole life cost analysis showed options 1 and 2 to be significantly more expensive. The geocellular storage was 10% cheaper than the basin but a basin was selected due to the added value it would bring to the community and environment; based on previous basins in Llanelli managing water on the surface could reduce runoff volumes by up to 60%. Several design challenges were encountered due to site constraints. The glacial till, historic landfill, proximity to a deep pond and high groundwater meant a soakaway design was not feasible. To address this a lined basin was proposed with a clay stank and fin drain. The basin is designed to attenuate the first 20mm of rainfall and will not flood in a 1 in 100 year + climate change event. The underdrain slowly releases water to the combined sewer at 1l/s, when the water exceeds 300mm depth the emergency overflow takes the runoff to a local waterbody. There are more than 17 different species of plants as well as numerous species of native grasses and wildflowers which improve biodiversity and are good for pollinators, providing microhabitats for 3

insects, invertebrates and amphibians. Although water quality is not a driver, as the water remains in the combined sewer, the plants will provide filtering, sedimentation and treatment benefits. Amenity value has been added through promoting sustainable travel and health and wellbeing through the design. A new footpath provides important connections for the existing desire lines between the Llanelli Town Centre and the Wales Coast Path, previously linked by highway. Furthermore, the project has created three seating areas encouraging socialising and managing water on the surface has increased awareness of sustainable water management within the community. Fig 8: Bench and path linking footpaths 5. Specific project details Fig 9 Bench The project brought together Arup landscape architects, geotechnical and civil engineers and environmental consultants who developed the design with Morgan Sindall, considering buildability from the outset. A 3D model was created to manage the reuse of the 3000m3 basin excavations. Fig 10 Cambrian North Basin excavations Early stakeholder engagement was key as the basin is directly outside 11 properties and adjacent to a Community Centre. A public engagement event was held in the Community Centre with 30 residents attending. The team responded to concerns about parking disruption by creating an additional resident parking area at the end of the street and a new access track for construction vehicles avoiding the residential area. Due to the extent of work across Llanelli a dedicated drop in centre and communications officer was available. Many written compliments were received during construction praising the friendly and considerate workforce. Upon completion a public opening day susdrain SuDS Awards

encouraged community spirit and celebrated the success of the project, with local councillors attending. Fig 11: Additional parking area and construction specific access track Fig 12 Community opening day (August 2017) 6. Maintenance & operation Cambrian North Basin is part of a pilot with Carmarthenshire County Council, Welsh Water and Morgan Sindall regarding the long-term operation and maintenance of SuDS. Morgan Sindall are maintaining the basin for one year post-construction, then handing the maintenance to Welsh Water. The basin will be maintained by Welsh Water, as a critical asset communicating with their 5

sewer system, but the surrounding landscape features will be maintained by Carmarthenshire County Council. A review of the pilot period is scheduled for May 2018. 7. Monitoring and evaluation Monitoring of the flow reduction in the combined sewer will occur once the wider 8m pollution reduction work is completed in June 2018. The peak flow removal of the basin is predicted to be 146l/s. 8. Benefits and achievements Cambrian North Basin is industry best practice, following on from the extensive SuDS implemented in the town over the past 5 years. Many external parties have visited the basin including Welsh Government, Swansea Council, Natural Resources Wales, ITV and other water companies. The project won the Best Overall Project within the Welsh Water Capital Delivery Alliance in March 2018. 9. Lessons learnt Key challenges and lessons learnt include Site constraints: The constraints of the narrow streets and limited parking required a bespoke traffic management plan. Planting: Early engagement with the nursery supplier is recommended to accommodate potential stock shortages and planting outside season. Providing sufficient watering to plants in the first months during establishment is critical to the long-term success of the planting. Benefits: Monitoring water quality benefits as well as flow impact will bolster the case for SuDS and enhance the case study and industry knowledge. 10. Interaction with local authority Carmarthenshire Council were involved early in the project through the quarterly Facilitation Meetings that exist as part of the wider town programme. This aided the planning application programme as the council had visibility of the project and understood the philosophy behind the basin. The Parks, Environmental, Flooding and Highways officers provided their input into the project through site visits and technical meetings, being particularly important as they have adopted the hard landscaping around the basin. 11. Project details Construction Dates: July 2016 - July 2017 Cost overall project outturn: 2,678,918 (Solution Target Price 3,800,000) Cost SuDS part (basin): 800,000 Cost design overall project: 130,000 Cost design SuDS part (basin): unable to extract from 130,000 Comparison with geocellular storage: 700,000 Comparison with traditional below ground storage tank: 1,300,000 Comparison with surface water pumping station: 1,200,000 Extent overall project: 1.6ha of impermeable area Extent SuDS: 1ha of impermeable area susdrain SuDS Awards

12. Project team Funders Welsh Water Clients Welsh Water Designers Arup Contractors Morgan Sindall T&M Landscapes 7