Leadership This is currently a multi-disciplinary effort, led by the following students:

Similar documents
4/8/2015 Item #10D Page 1

UNIVERSITY OF NORTHERN IOWA

RESOLUTION NO. R Refining the route, profile and stations for the Downtown Redmond Link Extension

Request for Proposals: Architectural/Design Guidelines

Peoria has a tremendous opportunity to get sewer overflows under control and fight stormwater runoff head-on

City of Miami MIAMI RIVER BASIN WATER QUALITY IMPROVEMENT REPORT FOR FIRST AND SECOND QUARTER 2010

Are you submitting your individual application along with a group of other students? Yes No (check one)

MUNICIPAL SEPARATE STORM SEWER SYSTEM 2009 ANNUAL REPORT

HEALTH SCIENCES BUILDING REDEVELOPMENT PROJECT

ATTACHMENT A. Town of Lebanon Village Center Study Proposal Cover Sheet (to be included with Proposal) Contract shall not exceed $48,500.

Intelligence Community Campus- Bethesda (ICC-B)

UNIVERSITY OF NORTHERN IOWA

Ashbridges Bay Erosion and Sediment Control Project

INTRODUCTION. Strive to achieve excellence in all areas of operational sustainability.

TOWN OF NEW CASTLE - Master Plan Update

URBAN DESIGN ACTION PLAN. Community Design and Environmental Services Committee April 20, 2009

THE GEORGE WASHINGTON UNIVERSITY MOUNT VERNON CAMPUS

Western Pennsylvania Conservancy Clairton & Harrison Community Greening Assessment Projects Request for Proposals July 2018

Submitted by: Phillip L. Harrington, Director, Department of Public Works. Framework for Green Infrastructure Plan Development

Master Planning: Cuba, New York Phase II. Dr. John Anderson President Alfred State College. Alfred New York

PROJECT BACKGROUND. Preliminary Design Scope and Tasks

Scope of Services. River Oaks Boulevard (SH 183) Corridor Master Plan

City of Richland Stormwater Management Plan

SUBJECT: Waterfront Hotel Planning Study Update TO: Planning and Development Committee FROM: Department of City Building. Recommendation: Purpose:

CITY OF CHARLOTTESVILLE, VIRGINIA CITY COUNCIL AGENDA

Glencoe Elementary School Parking Lot Retrofit 825 SE 51 st Street

North Fair Oaks Community Plan Summary and Information

RFP REQUEST FOR PROPOSALS CITY OF PORTSMOUTH, NH. DESIGN ENGINEERING SERVICES North Mill Pond Trail and Greenway

Portland International Airport Storm Water Master Plan June 5, Susan Aha Water Quality Manager

1 Team Roles and lnvolvement; 2 - Phasing/Schedule;

Request for Statement of Interest in Implementation of the Roosevelt Road Redevelopment Plan

SMITHSONIAN INSTITUTION SOUTH MALL CAMPUS MASTER PLAN PUBLIC SCOPING REPORT. June Prepared by:

DRAFT SCOPE OF SERVICES PEER REVIEW OF BAKER PARK. Request for Qualifications (RFQ)

ROGUE VALLEY SEWER SERVICES STORMWATER MANAGEMENT PROGRAM (SWMP)

Posted by Calgary Public Library on November 1, 2012

PROCEEDINGS OF THE ST. CLOUD PLANNING COMMISSION. A meeting of the St. Cloud Planning Commission was held on June 12, 2012, at 6:00 p.m.

SMITHSONIAN INSTITUTION SOUTH MALL CAMPUS MASTER PLAN PUBLIC SCOPING REPORT. June Prepared by:

Request for Proposals

M E M O R A N D U M. DATE: July 19, Patrick D. O Keeffe, City Manager. Economic Development & Housing

DC Clean Rivers Project Green Infrastructure Program

Highlands Region Stormwater Management Program Guidance

Humber Bay Shores Precinct Plan Final Report

AR Wickes Elementary School (Cossatot River School District) 130 School Drive Wickes AR School Parent and Family Engagement Plan

TO: Mayor & Council DATE: April 12, The Planning and Development Department and the Engineering Department recommend that Council:

RESILIENCY, ADAPTATION, & SUSTAINABILITY AT THE CITY OF ST. AUGUSTINE

6. RECREATION AND OPEN SPACE ELEMENT

GUIDELINES FOR DONATING WORKS OF ART TO THE CITY OF NEW YORK/PARKS & RECREATION Periodically updated/last updated September 1999

Endorse the Alameda Point Conceptual Planning Guide

BURTON STATION STRATEGIC GROWTH AREA PLAN UPDATE JANUARY 25, 2018 PUBLIC MEETING

COLVER ROAD INDUSTRIAL CONCEPT PLAN

DC Clean Rivers Project - Green Infrastructure Program. ACEC What s New at DC Water?

Action Plan for Retrofitting Structural BMPs

UNIVERSITY OF NORTHERN IOWA

MUNICIPAL SEPARATE STORM SEWER SYSTEM 2008 ANNUAL REPORT

Winston-Salem State University Campus Master Plan 2016 Update

City Council Special Meeting AGENDA ITEM NO. C.

CHARLES COUNTY GOVERNMENT RFP NO PORT TOBACCO COURTHOUSE GREEN PRELIMINARY DESIGN

RFP DRAINAGE OUTFALL DESIGN AND PERMITTING. Mandatory Meeting for Proposers August 15, 2015

2012 Saginaw Bay Watershed Conference

A G E N D A Council Update Training Room September 26, :45 p.m.

NASSAU COMMUNITY COLLEGE. Garden City, New York Capital Committee Meeting January 12, :00 PM

FOUR MILE RUN VALLEY WORKING GROUP AND CHARGE

Landscape Architecture (LARC)

Request for Proposals (RFP) Consultant Services for the Muckleshoot Placemaking and Landscape Visual Design Services; Campus/Village Planning Project

master plan of highways bus rapid transit amendment

CITY OF VALPARAISO STORMWATER MASTER PLAN

2.6 Pawtucket. Pawtucket Impervious Cover Map (61.4% Impervious)

4-H SOIL & WATER PROJECT UPDATE. Indiana 4-H. Youth Education

City of La Palma Agenda Item No. 5

A. Project Description

DESIGN CRITERIA PACKAGE

UNIVERSITY OF WISCONSIN-PLATTEVILLE REQUEST FOR ARCHITECTURE & ENGINEERING PRE-PLANNING & DESIGN SERVICES. for. Williams Fieldhouse - Phase I

Port of Camas-Washougal Waterfront Trail Master Plan

Title: Project Lead: Abstract: Promoting Landscape Stewardship Through Interactive Interpretation.

MY BILL OF RIGHTS.ORG COMMISSIONING GUIDELINES & STANDARDS VISION AND PROCESS

City of Bonney Lake Allan Yorke Park. MASTER PLAN SUMMARY REPORT June 30, 2016

Phasing and Implementation

FOUR MILE RUN VALLEY WORKING GROUP AND CHARGE Adopted April 16, 2016 Amended July 19, 2016

COMMUNITY GARDEN 2020 PROPOSAL Proposed by ERIANA KONCELIK

implementation r expression in landscape

July 12, Columbus City Council City Hall 90 West Broad Street Columbus, OH RE: I-70/71 Columbus Crossroads Project

VIRGINIA KEY CONSENSUS MASTER PLAN

STORMWATER MANAGEMENT CODES ANALYSIS RICHLAND COUNTY, SC SITE PLANNING ROUNDTABLE

Phase Two Redevelopment Project South Park Blocks

c. DTAH Toronto Complete Streets Guidelines

Glenmont III Parking Garage: Approval of Supplemental Public Hearing Staff Report and Staff Recommendations

FAQ S about Restoration Planning FROM THE Department of Ecology WEBSITE:

Stormwater Management Guidance Manual: Customizing and optimizing stormwater requirements for port-specific land uses and customers.

Value Engineering Seminar & Design for the Woodroffe Avenue Pedestrian Bridge November 24, 2009

3/22/2011. City Council City Hall Wilmington, North Carolina Dear Mayor and Councilmembers:

Green Infrastructure and Adaptive Management

Glenborough at Easton Land Use Master Plan

ESSENTIAL PUBLIC FACILITIES

CITY OF BOCA RATON GOVERNMENTAL CAMPUS Master Plan Progress August 22, 2017

Penn Community Garden Final Report

Downtown Whitby Action Plan

Texas AgriLife Extension Service

Iowa s Statewide Urban Design Standards Promote Improved Access Management

REQUEST FOR QUALIFICATIONS

6.0 Recreation and Open Space

Transcription:

To: CSF Committee From: Patrick Green, HSS RE: Feasibility Report: Considerations for Stormwater Remediation Using the Campus Sustainability Fund Winter Quarter Draft Date: February 21, 2012 This report articulates the progression of the Campus Sustainability Fund bioswale project, Husky Sustainable Storms. This project will improve stormwater quality and educate the student population. This is a draft of the Feasibility Report that documents progress towards the bioswale after one quarter of implementation. A full feasibility report will be completed once the design of the bioswale has been completed. This draft of the feasibility report includes a project description, chronology, significant events, site selection process, and an explanation of a Gift in Place contract. Description of the Project A project to develop a stormwater remediation project on the University of Washington Seattle campus. It mobilizes students, staff, and faculty in an effort to develop a bio-retention/bioswale facility adjacent to the N-5 parking lot. Leadership This is currently a multi-disciplinary effort, led by the following students: Patrick Green, Evans School of Public Affairs, College of Built Environments Stefanie Young, College of Built Environments Matthew McNair, College of Civil and Environmental Engineering Erica Bush, College of Built Environments Sunni Wissemer, University of Washington undergraduate In coordination with Facilities Services, of note: Kristine Kenney, Office of Planning and Budgeting Peter Dewey, Transportation Services Jim Morin, Engineering Services Howard Nakase, Grounds Shop Given guidance by faculty members: Jan Whittington, College of Built Environments (Faculty Sponsor) Chronology Spring 2011: In Spring of 2011, Patrick Green solicits the help of several students in a course on science and policy in brainstorming opportunities for improving water quality infrastructure on the Seattle campus. They conduct research on best-management practices in stormwater treatment in the Puget Sound region as well as the University of Washington Comprehensive Plan. In June of that year, Patrick Green and Matthew McNair meet with Kristine Kenney and Jim Morin to talk about opportunities for a project. Potential sites are discussed. Matthew begins a multi-criteria analysis of potential sites. Analysis shows that the N-5 parking lot presents the

best opportunity to remediate stormwater. He conducts further research of City of Seattle best management practices in stormwater. Fall 2011: Patrick Green, Stefanie Young, and Matthew McNair prepare an application to the Campus Sustainability Fund. They request sponsorship from Peter Dewey, which allows them to conduct further research. They meet Peter Dewey and Jim Morin at N-5 parking lot and discuss potential stormwater treatment concepts as well as the as-built infrastructure adjacent to the parking lot. N-5 meets the needs of the project in terms of holding a real potential to improve stormwater quality, as per the grant application submitted by Husky Storms. Peter Dewey approves the use of N-5 for the project. The students apply to CSF and request $9,220 for to conduct a design study of a stormwater treatment project. The majority of that funding is reserved for paying for a potential engineering mentorship as well as navigating the University of Washington design-review process. Patrick meets with Megan Kogut, who manages the University of Washington NPDES permit. He receives her support in researching stormwater remediation alternatives. Stefanie Young and Sunni Wissemer research matching-fund opportunities. Winter 2012: The students begin preparing materials and coordinating further approval processes. Patrick conducts outreach to Kristine Kenney, requesting guidance on UW approval processes. Erica Bush documents the landscape site plan. Matthew McNair acquires as-built drawings from Jim Morin as well as Campus Engineering Records. Matthew conducts further research into best management practices and generates several conceptual designs. Sunni Wissemer begins educational outreach to student community. Stefanie Young enters as-built drawings from the site N-5 into AutoCad. Stefanie and Matthew assemble case studies of design alternatives. Patrick Green, Stefanie Young and Matthew McNair conduct outreach to engineering firms willing to donate services and assist the group in preparing appropriate documentation. They interview five firms, meeting four of them on the N-5 site. Due to the unique needs of a student group, interviewing firms is an imperative step to creating a mentorship opportunity. The students discuss the pros and cons of each firm. All firms offer severely reduced cost or pro bono services. One firm submits a scope of work and documents the value of their proposed donation at $15,000. Patrick works with Procurement Services, Peter Dewey, Jim Morin, and Kristine Kenney in reviewing the scope of work and the contract. All advisers state that the scope of work and contract are standard for the scale of a project. Throughout winter quarter, students meet with Jan Whittington four hours per week to discuss their progress. Additionally, they work individually between 7 to 15 hours per week preparing the appropriate documents, conducting research, and meeting with stakeholders. Key Events: January 27: Patrick Green, Matthew McNair, and Stefanie Young meet with Howard Nakase at the N-5 site to discuss potential designs and listen to Howard s maintenance concerns. He recommends the students prepare several designs so he can give proper advice on the site alternatives.

January 31: Jan Whittington and Peter Dewey conference about the project, identifying ways the students can expedite the project. Peter suggests working with Design Services and Howard Nakase in identifying ways the students can work with in-house construction crews and thus avoid going to bid for the construction of the project. February 3: Patrick connects with Howard regarding possible ways to use the Grounds and Maintenance construction team. Howard states that he will need more detail on the design alternatives. February 8: Patrick receives clarification from Kristine Kenney regarding UW approval processes. She suggests minor changes to the scope of work as well as designing the project in a way that does not require a City of Seattle permit. February 15: Patrick and Jan Whittington meet with Kristine Kenney about the site and the approval processes. Kristine Kenney assembles February 23: Kristine Kenney informs student team members that the N-5 site fails to pass University review, citing issues with parking stall removal and disruption to trees/vegetation. She suggests a new site that would remediate runoff from the Burke Museum parking lot. This site resides between William Gates Hall and the Burke Museum parking lot. Currently grass panels occupy the site. Stormwater pipes reside beneath the grass panels. Electronic drawings of the site are available through Facilities Services records, thus facilitating survey and construction document assembly. The current infrastructure, potential for education, and existing data make this a logical site for the bioswale. March 1: March 5: HSS visits new site that will remediate the N-1 parking lot. They find associated engineering documents and plan potential remediation alternatives. March 10: HSS team tours green streets in North Seattle, identifying swale design alternatives and plant species. March 17: HSS and members of its design approval committee (Kristine Kenney, Peter Dewey, Jim Morin, Howard Nakase). Notes from this meeting have been provided in Appendix A. April 2: Contract with consulting engineers and begin assembly of engineering baselines and alternatives. Complete case studies of design alternatives. Begin supplemental site surveys. April 18: Request additional funds from CSF for construction: $60,000, plus another $20,000 contingent on CSF s budget; requested that Phase One grant award be factored into Phase Two budget. Key Components Site Selection

Gift in Place Agreement Permit Site Selection A summary of the multi-criteria analysis of the sites is below, but a full analysis has been attached. N-5 Parking Lot: N-5 features high visibility to students, and provides a high opportunity for stormwater remediation and a lower cost. E-1 Parking Lot: This site features many opportunities for remediation, but it resides over a capped landfill and altering drainage to the site qualifies potential designs for cost-prohibitive permitting and design reviews. University Avenue: Sites in this public area scored the highest for water quality improvements and visibility; however, HSS preferred the site be located on-campus. Additionally, the permitting and review process for this site would be constrained by budget and timeframe. C-8 Parking Lot: Scored the lowest on visibility to students and potential remediation. The site is not visible to pedestrians and the parking lot area is small. 43 rd Street Entrance: The multi-criteria analysis did not examine this site, but it was suggested by Kristine Kenney in a phone conversation with Patrick on February 8. In speaking with the student team on February 10, they reference that this site does not fall within the combined sewer drainage basin and would fail in reducing the chance of overflow. The best site for the proposed project resides adjacent to the N-5 parking lot. N-5 provides the best opportunity for remediation of stormwater while educating the student-body in a limited timeframe. Moreover, the substantial pro-bono services are dependent on the current site. If the site were changed, the students and the University risk losing substantial funds. Factors that influenced this decision are as follows: Reduce Risk of Combined-Sewer Overflow (CSO): The N-5 site drains into the combined system via the sanitary sewer system, which increases the risk of a CSO event. While all separated stormwater collection systems on campus are designed for the City of Seattle s ten-year frequency storm, 1 storms that exceed the design storm will increase the risk of environmental degradation. Only 13% of the campus drains into this system. Improving the time-delay of stormwater into the combined system will reduce the chance of a CSO event. City of Seattle NPDES permit requires that CSOs do not exceed one overflow event per year. The attached Drainage System Zone Map demonstrates the type of system hosting the N-5 site as well as the zones of other potential sites. Existence of Stormwater Infrastructure: Cost constrains the project s location and design. HSS collaborated with Jim Morin in identifying as-built drawings for the site, demonstrating location 1 University of Washington Comprehensive Plan, Section III: Water: 63.

and access to inlets and stormwater pipes. Taking advantage of existing infrastructure will reduce the cost of materials in construction. Additionally, the site adjacent to the N-5 lot remains free of concrete, so building on the site will not require costly removal of hard surface. Visibility to Students: The site provides high-visibility to students, particularly undergraduates in transit to and from dormitories, Paccar Hall, off-campus housing, the main entrance to campus on 45 th St., and University Avenue. Gift in Place Agreement The following section describes the necessary steps to securing a Gift in Place agreement from the University of Washington. The steps described below reflect those followed by Husky Sustainable Storms (HSS) in 2012. HSS used a Gift in Place to secure donated services from Huitt- Zollars engineering firm to design a bioswale for stormwater remediation. What is a Gift in Place? A Gift in Place is a special contractual agreement between the University of Washington and a private firm that avoids a bid process. If an architectural, engineering, or construction firm wishes to donate services to UW, then UW can avoid the bid process and work with the firm directly. A Gift in Place is authored by the Attorney General s office at UW. Who is Involved? Sponsoring Agent: A sponsoring agent supports the project and works closely with its stakeholders. The sponsor could be a department director or a college dean. This agent must have clout. Office of Planning and Budgeting (OPB): OPB authorizes changes to campus infrastructure. Ultimately, OPB decides whether and when a project will proceed. Attorney General s Office: Reviews and drafts legal agreements. Determines whether contracts meet legal requirements set by regulatory and UW policies. Steps towards Securing a Gift in Place 1. Sponsoring agent approves project. 2. Sponsoring agent solicits a donation from a firm. 3. Firm drafts a Scope of Work for the project which the sponsoring agent must review. The Scope of Work will inform the expectations outlined in the Gift in Place agreement. 4. Sponsoring agent submits project for approval of OPB. The result of this work is a memorandum of support from OPB for the particular project. 5. A plan for development and review is developed by project managers and University authorizing stakeholders. For projects processed outside of CPO (< $90,000), OPB will advise project management and design review. 6. Scope of Work, letter from OPB, and the plan for development and review is submitted to Attorney General s office. The best person or agency to submit is the sponsoring agent. 7. Attorney General s office will process the agreement or they will request further information from the project stakeholders.

Permit Permits exponentially increase the timing and cost of a project. With the help of UW design committee stakeholders, HSS identified potential permits as well as suggested methods to avoid cost prohibitive permits through design. A full explanation of permits will be included in the second draft of the feasibility report. This will give HSS the time to fully explore potential permits.