Page 1 of 6. Machine Serial No. Model Pump Size PRELIMINARY INSPECTION. Service and Connections

Similar documents
Field Inspection: MART Parts Washer


Natural Gas & Propane Burners

Maintenance 5-1. Good maintenance is essential for cleaning results, and long economical life of the washer.

Field Start-Up Sheet Direct Fired Gas Equipment

Power Washer Maintenance

ClearFire - Hydronic Startup Report

CELDEK Evaporative Cooler Module Installation, Operation, and Maintenance Manual. CELDEK Evaporative Cooler

Installation & Service Instructions for Jackson & Church Flexaire Packaged Furnaces SDF-125 thru SDF-400 Gas Firing

K Tronic Series Installation and Start Up Checkout Procedure.

Weil-McLain part numbers are found in Weil-McLain Boilers and Controls Repair Parts Lists.

Standard and CELDEK Evaporative Cooler Modules Installation, Operation, and Maintenance Manual

DewPoint 6210 Start-Up Checklist

WD7664 / WD7663 Maxon Burner. Ellis Whisper Dryer Installation & Start UP

WD7664 / WD7663 Maxon Burner Ellis Whisper Dryer Installation & Start UP

Standard Features. Performance/Capacities

SECTION STEAM CONDENSATE PUMPS

Home Stacked Washer/Dryer

CLe-series Dishwashers

Standard and CELDEK Evaporative Cooler Modules Installation, Operation, and Maintenance Manual

Instruction Manual HWR MODEL RESISTO-FLO ELECTRIC BOILER

Instruction Manual STR MODEL RESISTO-FLO ELECTRIC BOILER

LATTNER BOILER COMPANY 9.5 HP Low-NOx Installation and Start-Up Checklist for Dry Cleaners

M2 Series Startup Form

Homestyle Stacked Washer/Dryer

B.C.S. Shop Heaters 26, 30 & 36 (36 shown)

Union County Vocational - Technical Schools Scotch Plains, New Jersey

Vent-Rite. Cast Iron And Steel Receivers. Simplex, Duplex, Triplex And Quadruplex Units. Pump Capacities To 150 GPM. Discharge Pressure To 75 PSI

MIST MAX MODEL MM2400. Important: Installation and Operation Manual

SA Series Start up Report

DLCLRA. INSTALLATION INSTRUCTIONS Outdoor Unit Single Zone Ductless System Sizes 36 to 58 TABLE OF CONTENTS

Weil-McLain part numbers are found in Weil-McLain Boilers and Controls Repair Parts Lists.

City of Duluth Festival Center 04/25

SECTION STEAM CONDENSATE PUMPS

Direct Fired Heater Model AD Specification

LABORATORY AIR COMPRESSORS AND VACUUM PUMPING SYSTEMS

BASIL 6000 TUNNEL CAGE WASHER

MASTER JOCKEY PUMP CONTROLLER. Model JPCE INSTRUCTION MANUAL. C 2018 Master Control Systems, Inc

PROAIR Air Conditioner. CR23 Model INSTRUCTION MANUAL nvent Rev. D P/N

QHT Manual for: SU-2A Gas Burner

BESB Box Ventilator USA CAN. Product Information. Mechanical Installation. ... Chapter 3. Electrical Installation. ... Chapter 4

Cambridge Engineering, Inc. 24 S-Series Technical Manual

Owner s Manual. Keep with machine for reference PKC24 INSTALLATION & OPERATION REV Perlick Corporation 8300 W Good Hope Rd Milwaukee, WI 53223

M2 Series Startup Form

Reliability is a beautiful thing TM CUBELET ICE DISPENSER DCM-500BAF DCM-500BWF DCM-750BAF DCM-750BWF INSTRUCTION MANUAL

GLC/GW-100 MANUAL INSTALLATION SERVICE PARTS REV.1.01

THE CLEAR CHOICE FOR CLEANING

FT1000e ENERGY RECOVERY STEAM WITH BLOWER DRYER Flight-Type Dishwashing Machine. FT SERIES FT1000e ENERGY RECOVERY STEAM WITH BLOWER DRYER

PROAIR Air Conditioner. CR29 Model INSTRUCTION MANUAL nvent Rev. I P/N

CxA to Answer this Section

Installation Manual PS-225 & PS-275

an ISO 9001:2015 Registered Company

GIRTON CABINET WASHER MODEL 794A

Next Generation Corona Discharge Installation & Operation Manual

SA Series Startup Form

Home Stack Washer/Dryers

SCN60 Residential Nugget Ice Machine

MASTER PRESSRE MAINTANENCE CONTROLLER. Models PMCE INSTRUCTION MANUAL. C 2018 Master Control Systems, Inc

Washer-Extractor Cabinet Freestanding

Evaporative Cooling Equipment Installer / Contractor Pre Start-Up Checklist

INSTALLATION GUIDE Dual Fuel Ranges

TURBOWASH TM... Pot and Pan Sink

USER'S MANUAL PGE Single Package Rooftop

EQUIPMENT PRE-STARTUP AND STARTUP CHECKLIST TEL NO: ORDER NO: CONTRACT NO:

Owner s Manual GLC MANUAL INSTALLATION SERVICE PARTS REV.1.00

Homestyle Stacked Washer/ Dryer

1025, BOUL. MARCEL-LAURIN INSTRUCTION MANUAL FOR WATER COOLED ENVIROCHILL CHILLER. Prepared par Claude Gadoury, P. Eng MTL TECHNOLOGIES INC.

Effective october 14, 2014

HORIZONTAL FIRE TUBE BOILERS Piping (HVAC) Pumping Equipment (HVAC).

Ultra Boiler Series 1 & 2 Jacket Parts

MIST MAX MODEL MM800. Important: Installation and Operation Manual

MINI SLIMLINE COOL VUY-A VUY-A

L A signature series TA T N E RE O, A L L A T S IN

Control Panel For Water Wash Hoods AM2

FT1000 ENERGY RECOVERY WITH BLOWER DRYER FLIGHT-TYPE DISHWASHER

hinged tops or hinged doors.

SECTION STEAM CONDENSATE PUMPS

Hoshizaki America, Inc.

Home Stack Washer/Dryers

SPECTRACOOL Air Conditioner. N21 Model INSTRUCTION MANUAL nvent Rev. G P/N

PowerVac G Single to Twin Conversion Kit [ ]

BCX-14 & BX-14 COMBINATION OVEN STEAMER CNVX-14 CONVECTION OVEN REPLACEMENT PARTS LIST

OWNER S MANUAL. Models: AC110, AC125, AC150 made from 2003 through Proudly Made in the USA

Liebert InteleCool Warranty Inspection Check Sheet

FOR PRODUCT/WARRANTY REGISTRATION Go to Click on SUPPORT at the top of homepage Click on PRODUCT REGISTRATION

Liebert Fin/Tube Condenser Warranty Inspection Check Sheet

an ISO 9001:2008 Registered Company GOLL ST. - SAN ANTONIO, TX ph fax MINI SPACE SAVER HEAT /COOL

Internet Version for Reference Only INDUCED DRAFT COMMERCIAL WATER HEATERS SUPPLEMENT INSTRUCTIONS TO PART #

MODEL YVAA EQUIPMENT PRE-STARTUP AND STARTUP CHECKLIST CUSTOMER: LOCATION: ADDRESS: CUSTOMER ORDER NO: PHONE: JCI CONTRACT NO: JOB NAME:

TRI-STAR INC SOUTH STANDARD AVENUE, SANTA ANA, CA Ph: Fax: MODEL #. OWNER S MANUAL

LVO Manufacturing, Inc. FL36 Pan-Washer Owner s Manual

Homestyle Stacked Washer/Dryer

FT1000 ENERGY RECOVERY STEAM WITH BLOWER DRYER Flight-Type Dishwashing Machine FT SERIES FT1000 ENERGY RECOVERY STEAM WITH BLOWER DRYER

Our Purifier systems

RSV Chimney Fan USA CAN. Start Up and Configuration. ... Chapter 5. Maintenance and Troubleshooting... Chapter 6. Job Name: Installer:

HydroCycle Vertical Aeroponic Systems

INSTALLATION, OPERATION & MAINTENANCE MANUAL BERG TEMPERATURE CONTROL UNIT

R O T O - J E T O F A M E R I C A C O M P A N Y, I N C.

Hoshizaki America, Inc.

AM-14/AM-14C DISHWASHERS

Transcription:

STINGRAY Parts Washer: FIELD STARTUP FORM Page 1 of 6 Field Start-uor Company Authorized Individual. This completed form must be returned to initiate to be completed by StingRay Tech Services Field Service Technician Owner Warranty. Machine Serial No. Model Pump Size Company Contact Address City State Zip Country Phone Fax E-Mail Date: PRELIMINARY INSPECTION Inspect Parts Washer for shipping or installation damage. Note damages, if any Is machine leveled properly so that when the door is open 45 the door does not move? [ ] Yes [ ] No Is machine anchor bolted to floor? [ ] Yes [ ] No Are shims under the frame vertical angle legs and not just machine feet for support? [ ] Yes [ ] No Are shims under the door frame for support? [ ] Yes [ ] No Are all shims snug and cannot be moved? [ ] Yes [ ] No Are rubber grommets & tie-wrap removed from float rod? [ ] Yes [ ] No Is machine grouted to floor? [ ] Yes [ ] No Service and Connections Water Supply Supply pipe diameter in/mm Material type Distance to next larger supply line ft/m Is water strainer in-line with system? [ ] Yes [ ] No Incoming Water pressure psi/bar Is a shut off valve installed? [ ] Yes [ ] No Compressed Air Supply (If applicable) Diameter in/mm Material type Are quick disconnects used in the supply line? [ ] Yes [ ] No Pressure psi/bar Distance to next larger supply line ft/m Is an inline filter installed? [ ] Yes [ ] No Is a regulator installed? [ ] Yes [ ] No

Electrical STINGRAY Parts Washer: FIELD STARTUP FORM Page 2 of 6 IMPORANT: ALL electrical connections checked for tightness? [ ] Yes [ ] No Feeder wire size of incoming supply Is washer electrically ground? [ ] Yes [ ] No To where/what? Is ground wire the same size as the supply feeder wires? [ ] Yes [ ] No Incoming 3 phase voltage L1 L2 L3 Is a Master disconnect installed? [ ] Yes [ ] No Supply fuse or circuit breaker size: amps Supply run length ft/m Is supply properly installed in conduit and with sealed electrical connections to electrical panel? [ ] Yes [ ] No Does supply enter the top of the electrical panel? [ ] Yes [ ] No Are all edges for incoming wires smooth and protected to prevent damage to insulation? [ ] Yes [ ] No Steam Exhaust Does washer have a Hot Air Blow Off? [ ] Yes [ ] No Stack Material Diameter in/mm Number & type of elbows Vertical length ft/m Horizontal length ft/m Is a rain cap installed? [ ] Yes [ ] No ASE unit installed ft/m from Power Washer. ASE unit Mounted: Vertical Horizontal Is ASE exhaust point above highest point of roofline? [ ] Yes [ ] No If no, explain If the Steam Exhaust Venturi is installed horizontal is the FAN mounted so that it is 45º from the vertical as shown in the operating manual? [ ] Yes [ ] No Is power supply to ASE unit in conduit? [ ] Yes [ ] No Have connections to the ASE unit been made per the operating manual? [ ] Yes [ ] No Heat Inputs Source: [ ] Gas Burner Fill out Applicable Section: Gas Burner (if applicable) [ ] Electric [ ] Steam [ ] Natural Gas [ ] Propane System [ ] Butane Gas Supply Line (if applicable) Diameter in/mm (Note: Supply pipe size affects maximum burner firing rate) Material Approximate distance to next larger size line or fuel tank ft/m Gas Pressure water column inches (wci)/bar Eclipse Burner

STINGRAY Parts Washer: FIELD STARTUP FORM Page 3 of 6 Gas Flue Pipe (if applicable) Material Diameter in/mm Number & type of elbows Vertical length ft/m Horizontal length ft/m Make a sketch of the flue pipe run in the space to the right. >>>> Is rain cap installed? [ ] Yes [ ] No Is flue vent above highest point of roofline? [ ] Yes [ ] No If no, explain Gas Burner Electrical Connection (if applicable) Is the burner connected per the operating manual? [ ] Yes [ ] No Is the connection made via conduit provided? [ ] Yes [ ] No Steam Heat System (if applicable) Steam Pressure psi/bar Riello Burner Supply pipe diameter in/mm Is supply pipe insulated? [ ] Yes [ ] No Approximate distance to next larger size line ft/m Is there a strainer in front of the steam valve? [ ] Yes [ ] No Is there a steam pressure gage near the supply line? [ ] Yes [ ] No Does condensate return line drain via gravity? [ ] Yes [ ] No Is condensate drain line lower than steam trap? [ ] Yes [ ] No Electric Heating Elements (if applicable) Did you inspect the inside of the element enclosure and verify wire tightness? [ ] Yes [ ] No STARTUP PROCEDURE Read Safety Instructions and Warnings Section in STINGRAY Operating Manual & Services By Others Summary before Proceeding Follow the detail instructions in the STINGRAY Operating Manual under Start-Up Procedure Outline of Procedure: Lubricate machine if it is more than 6 months after shipment. Power-up Fill machine with water, verify operation of water management system. Check and verify operation of 7-day clock and other control settings. Measure control voltage: Transformer Secondary Voltage: Start heating system, record start time and initial water temperature. Start Time: Water temperature: ºF/ºC

STINGRAY Parts Washer: FIELD STARTUP FORM Page 4 of 6 Gas Burner Start-up (if applicable) To be performed by qualified gas burner/boiler technician: Measure & Record: Measure and record incoming gas pressure (burner unfired) w.c.i./bar Measure and record gas pressure (burner fired) Incoming w.c.i./ bar Manifold w.c.i./bar (Eclipse) measure and record gas pressure differential at the burner head: Low fire High fire (Eclipse) record final air damper setting: Low fire High fire Measure and record exhaust stack temperature with burner fired and water at high temperature ºF/ºC Measure and record exhaust emissions: CO ppm Oxygen % CO 2 % excess air Test measurements taken by: PRINT NAME Company Phone # Measure and record time to reach operating temperature of 185-190 F (85-88º C). Time of day: Total Heat-up time min (Duplex Pumps Only) Is the wash delay timer set to a minimum of 20 seconds? [ ] Yes [ ] No [ ] N/A Bump start pumps to verify direction of rotation matches arrow on pumps. Check rotation direction on each of the pumps and the sludge scraper if the machine is so equipped. Swap phases if required. Do all the pumps run in the correct direction? [ ] Yes [ ] No Check Pumps. Do pumps start, run, and stop smoothly with no vibrations? [ ] Yes [ ] No Start pumps and record voltage between each power leg (phase to phase) and amp readings: Record Amp readings on label inside electrical panel door? [ ] Yes [ ] No Compared nameplate amp draw to actual amp draw on pump motors? [ ] Yes [ ] No PUMP 1 PUMP 2 Nameplate FL Amps: SF: Nameplate FL Amps: SF: Leg 1 Leg 2 Leg 3 Leg 1 Leg 2 Leg 3 Main Pump: Voltage running volts volts volts volts volts volts Hp: Amp Draw amps amps amps amps amps amps Nameplate FL Amps: SF: Nameplate FL Amps: SF: Leg 1 Leg 2 Leg 3 Leg 1 Leg 2 Leg 3 Suction Pump: Voltage running volts volts volts volts volts volts Hp: Amp Draw amps amps amps amps amps amps Amp Draws: Options if Applicable: Turntable Drive: Transformer Secondary all systems ON Skimmer: HABO/CABO: PBM Drive: Mini Scraper: Center Probe: ASE Blower 1ph: Sludge Scraper: ASE Blower 3ph: Eclipse Blower Electric Heat if Applicable: Leg 1 Leg 2 Leg 3 Leg 1 Leg 2 Leg 3 Leg 1 Leg 2 Leg 3 Element 1 Element 2 Element 3 Element 4 Element 5 Element 6 Element 7 Element 8 Element 9 Element 10 Element 11 Element 12 Cycle Test Adjust Wash Delay Timer (Duplex Pump) or Soft Start Control (Simplex Pump) to prevent water hammer (if applicable): Do not allow anyone to stand in front of Parts Washer when performing this test. With washer at full operating temperature, after allowing ambient air to enter cabinet for at least 30 seconds, close the door

STINGRAY Parts Washer: FIELD STARTUP FORM Page 5 of 6 and Start wash cycle. If water blows out of the front reservoir or under the door adjust the appropriate control per StingRay Operating Manual. Wash delay / Soft Start is adjusted to prevent Water Hammer? [ ] Yes [ ] No Operational/Safety Checks Do pump/s and heat systems shut down when the float rod is pushed down? [ ] Yes [ ] No Wash cycle aborts when Door Close limit switch senses door not closed properly? [ ] Yes [ ] No Turntable drive system aligned with turntable? [ ] Yes [ ] No PBM operates smoothly, yellow flag on top of PBM shaft is moving properly? [ ] Yes [ ] No All operator controls function as expected & as designed? [ ] Yes [ ] No Rinse system functioning properly? Jumper solenoid with door open and inspect? [ ] Yes [ ] No [ ] N/A Verified outside of the cabinet and all connections are water tight and sealed after wash cycle? [ ] Yes [ ] No Auto Steam Exhaust (ASE) system operates and prevents steam appearing around door seals or front covers during wash cycle? [ ] Yes [ ] No If No, explain ASE blower running correct direction? [ ] Yes [ ] No If ASE has adjustable speed control is speed set so steam just stays in cabinet? [ ] Yes [ ] No [ ] N/A Detergent Charging: Incoming Water Record Water Hardness (ppm) ph Level Machine Reservoir volume gal/l Chemical Brand/Name (Provide a copy of the Chemical s SDS and Specification Sheet with this form) Manufacturer s recommended Detergent concentration [ ] oz(ml) / gal(l) [ ] % of reservoir Chemical amount added: Initial Amount [ ] gal/l [ ] lb/kg Total Amount [ ] gal/l [ ] lb/kg Method Concentration Monitoring: Titration Refractometer Other Titration Concentration: Test ml Drops Results [ ] oz(ml) / gal(l) [ ] % of reservoir Solution (Water & Detergent) ph Level Rust Inhibitor Injector Pump Setting: Small Dial (Set 100%) Large Dial (Adjustable %) OPERATING PARAMETERS Program 7-Day Clock: Clock is programmed : [ ] Yes [ ] No Heat - Program Time - Days S M T W TH F S (Circle Appropriate Days) Skimmer - Program Time - Days S M T W TH F S (Circle Appropriate Days) Rinse timer Set time to minutes ASE timer Set time to minutes Set ASE Speed Control (if applicable) Frequency Set Sludge Scraper timer (if applicable) Set time to minutes Set Air Lift (if applicable) psi, Air Pressure (5-10 PSI recommended) Wash Delay timer / Soft Start set time to seconds Wash cycle time: minutes Operating Temperature: F / C Operating hours upon completion of Start-up (Hour Meter)

STINGRAY Parts Washer: FIELD STARTUP FORM Page 6 of 6 TEST WASH OF ACTUAL PARTS Test wash actual parts and record results. Type Parts planning to Clean: Soil Types to be Removed: Next Step after Wash/Rinse/Dry: Cleanliness (Soils) : Excellent (all) Good (most) Fair (some) Poor (none) Rinse Results (Residue): Excellent (none) Good (mild) Fair (some) Poor (heavy) Drying Results (Water/Rust): Excellent (none) Good (mild) Fair (some) Poor (heavy) Comments: Factory Service Technician (Print name): Date: Thank you for taking the time to compete your start-up. A properly installed and operating parts washer is your first step in assuring excellent cleaning results and a long operating life. Should you have any questions about your Parts Washer, this start-up, or anything about parts cleaning please contact: StingRay Tech Services Phone 1-314-567-3705 Fax 314-567-6318 24/7 User Support website at www.stingrayservice.com & www.stingwash.com Customer Point of Contacts (POC) for StingRay Washer Title Name (Printed) Phone Number: E-mail Washer Operator 1 Washer Operator 2 Maintenance Washer Supervisor To begin your Warranty, please sign and return your Start-up Form to StingRay Tech Services. Overall Performance and Satisfaction: Excellent Good Fair Poor Authorized Signature: Printed Name: Title: Email: Phone: Date: