Overview of Land Use Framework for Victoria Harbourfront. Planning Department February 2011

Similar documents
Task Force on Kai Tak Harbourfront Development

Harbour-front Enhancement Committee. Urban Design Study for the New Central Harbourfront Revised Planning and Urban Design Concepts

Kai Tak Development Proposal of Increasing Development Intensity and Findings of Technical Study. PlanD CEDD GPA IRD ArchSD

Task Force on Harbourfront Developments on Hong Kong Island. Hong Kong Island East Harbour-front Study

Sub-committee on Harbour Plan Review of Harbour-front Enhancement Committee. Ninth Meeting

URBAN DESIGN STUDY FOR THE WAN CHAI NORTH AND NORTH POINT HARBOURFRONT AREAS FEASIBILITY STUDY

Harbour-front Enhancement Committee. Wan Chai Development Phase II. Planning and Engineering Review

HBF Marine Study: Victoria Harbour: Water dependent and water related uses and associated land/water interface implications

Task Force on Kai Tak Harbourfront Development

Planning for Liveability in Hong Kong

Task Force on Harbourfront Developments in Kowloon, Tsuen Wan and Kwai Tsing

Harbour-front Enhancement Committee Sub-committee on Harbour Plan Review

Task Force on Water-land Interface

HARBOUR-FRONT ENHANCEMENT REVIEW WAN CHAI, CAUSEWAY BAY & ADJOINING AREAS REALIZATION STAGE

THE TOWN OF WASAGA BEACH

Task Force on Harbourfront Developments in Kowloon, Tsuen Wan and Kwai Tsing

Task Force on Harbourfront Developments on Hong Kong Island

Task Force on Kai Tak Harbourfront Development. Station Square at Kai Tak

Task Force on Harbourfront Developments on Hong Kong Island

Preliminary Land Use Proposal for the Western Part of Kennedy Town Task Force on Harbourfront Developments on Hong Kong Island

Minutes of Seventeenth Meeting

AMBLESIDE WATERFRONT

The Proposed Auckland Unitary Plan (notified 30 September 2013)

C O V E R S T O R Y Tamar Development

Welcome. Community Consultation Meeting November 28, Review and discuss the Bathurst Quay Neighbourhood Plan Framework

Final Master Plan and Development Control Regulations

CENTRAL HARBOURFRONT AND ME (CHarM) DESIGN BRIEF

SCARBOROUGH SUBWAY EXTENSION. Scarborough Subway Extension. Final Terms of Reference

Town of Cobourg Heritage Master Plan. Statutory Public Meeting

2.0 Urban Design Concepts

Strategic Planning in the Making: Legacy and Vision for Hong Kong. Mr. K. K. LING, JP, FHKIP, RPP Director of Planning

ELMVALE ACRES SHOPPING CENTRE MASTER PLAN

SUBJECT: Waterfront Hotel Planning Study Update TO: Planning and Development Committee FROM: Department of City Building. Recommendation: Purpose:

Hamilton Pier 7&8 Draft Urban Design Plan

The Master Plan Framework

City of Kingston. North King s Town Secondary Plan Open House + Workshop #1 February 28, 2018

10.0 Open Space and Public Realm

Welcome. Walk Around. Talk to Us. Write Down Your Comments

Official Plan Review: Draft Built Form Policies

Urban Design Manual PLANNING AROUND RAPID TRANSIT STATIONS (PARTS) Introduction. Station Study Areas

Summary of Public comments on Draft Harbour Planning Guidelines and Responses

3.5 Principle 5/Response

Task Force on Kai Tak Harbourfront Development. Update on Implementation of Public Creatives in Kai Tak Development

PHASE ONE. A summary report: What the community told Alcoa during Phase One of the community engagement program for Point Henry 575.

ARLINGTON COUNTY, VIRGINIA

Workshop 3. City of Burlington Waterfront Hotel Planning Study. September 14, The Planning Partnership

Chairman and Members of the Planning and Development Committee. Thomas S. Mokrzycki, Commissioner of Planning and Building

Task Force on Harbourfront Developments in Kowloon, Tsuen Wan and Kwai Tsing. Renovation of the Hong Kong Museum of Art

PART AOTEA PRECINCT

Edward R. Sajecki Commissioner of Planning and Building

The Chinese University of Hong Kong Campus Master Plan Stage 3 Stakeholders' Engagement Report

Notes. Schedule of Uses. Explanatory Statement

Tauranga City Centre Spatial Framework

Contents of Part 6. Part 6 Zones

ARTICLE 6: Special and Planned Development Districts

[PLANNING RATIONALE] For Site Plan Control and Lifting of Holding Zone By-Law 101 Champagne Avenue. May 23, 2014

New Westminster Downtown Parking Strategy Public Open House #1 September 13, 2012

Design Guidance. Introduction, Approach and Design Principles. Mauritius. November Ministry of Housing and Lands. .. a

burlington mobility hubs study Downtown Burlington Mobility Hub

3 Summary of Major Views and Responses

Oakridge Redevelopment: New Park Concept Overview and Phase 1 Engagement Results

1 October Dear Citizens of Charlotte and Mecklenburg County,

THAT the attached Terms of Reference for the Thornhill Centre Street Study be approved.

WELCOME and introduction

SECTION ONE: INTRODUCTION. introduction

CENTRAL ESTUARY PLAN AVISION FOR OAKLAND S WATERFRONT

Chapter 2: OUTLINE PLANNING APPLICATION PROPOSALS. A New Garden Neighbourhood Matford Barton 17

3. Urban Design in the Central Area

Colchester Northern Gateway Master Plan Vision Review Draft. July 2016

Vision for Irvine: a self-confident town where people aspire to live and work and which they are proud to call home

01 the vision NEW LYNN IS WAITING FOR THE GREAT LEAP FORWARD

1.0 Purpose of a Secondary Plan for the Masonville Transit Village

heuston gateway: sections heuston gateway: regeneration strategy and development framework plan

DOWNTOWN GEORGETOWN PLANNING STUDY

Alignment of Options 2 & 3. Lam Tin. Tseung Kwan O Town Centre South. Ocean Shores. Cemetery. Cross Bay Link. Alignment Option 1

Edmonton Design Committee Formal Submission: Rezoning October 16, ICE District Tower Lighting AED Zone Amendment

Minutes of Fourteenth Meeting

QUEEN S WHARF BRISBANE PRIORITY DEVELOPMENT AREA PROPOSED DEVELOPMENT SCHEME AILA COMMENTS

Shenzhen-Hong Kong International Center. Shenzhen, China

Wan Chai Development Phase II Planning and Engineering Review

Growing. Our masterplanning and urban design team is focused on addressing the complex issues affecting our towns, cities and neighbourhoods.

City Center Neighborhood Plan

SAN RAFAEL GENERAL PLAN 2040 INTRODUCTION AND OVERVIEW

Community Design Guidelines. Port Wallace DRAFT

Thank you! Events and Entertainment in Northeast False Creek. Tuesday, March 7, 2017

PUBLIC OPEN HOUSE HURONTARIO-MAIN CORRIDOR SECONDARY PLAN

GUIDING PRINCIPLES IN THIS CHAPTER

New Towns in Hong Kong: Planning for the Next Generation

3. Endorse the LRT vision in transforming Surrey into Connected-Complete-Livable communities, and more specifically, the official vision statement:

CDAC. Update: Downtown Dartmouth Update: CDAC July 25 th Motion

Extension of the CITIC Tower Footbridge to the Legislative Council Complex at Tamar

Public Open House. Overview of the Downtown Plan Official Plan Amendment April 23, 2018

PART 3 - RESOURCE MANAGEMENT

Prepared by: a for the of the. Waterspace Strategy Sustainable Development Liverpool South Docks

Moving from Vision to Action

Technical Appendix L, University Community Plan Town Center

Response to the London Bridge Area Vision and Site Allocations within the New Southwark Plan

Highest & Best Use Study Marina Park Lands

Downtown Streetscape Manual & Built Form Standards

St. Lawrence Neighbourhood Focused Area - Official Plan Amendment Status Report

Transcription:

Overview of Land Use Framework for Victoria Harbourfront Planning Department February 2011

Background TPB set out Vision Statement for the Victoria Harbour in 1999 To make Victoria Harbour attractive, vibrant, accessible and symbolic of Hong Kong a harbour for the people and a harbour of life. Planning Study on the Harbour and its Waterfront Areas commissioned to translate TPB s Vision Statement into a planning framework to guide the use of waterfront areas and the harbour

Planning Study on the Harbour and its Waterfront Areas A Harbour and Waterfront Plan (Harbour Plan) A set of urban design and landscape principles Recommended implementation framework

Planning Study on the Harbour and its Waterfront Areas Functional Zone

Planning Study on the Harbour and its Waterfront Areas Action Area Plans Hung Hom waterfront Action Area Quarry Bay Park Extension Action Area Sheung Wan Park Action Area Central Festive Market Action Area Causeway Bay Action Area

Planning Study on the Harbour and its Waterfront Areas Study completed in early 2003 Court ruling in 2004 Reclamation proposals either dropped or be critically reviewed. Harbour Plan to be reviewed to respond to changing community aspirations HEC Sub-committee on Harbour Plan Review set up to advise on the review of the Harbour Plan to guide future use of the harbourfront areas

Harbour Plan Review Overall Approach Strategic HPPs & HPGs District-based Studies/Reviews Revisit the land use and examine the scope for harbourfront enhancement by progressive undertaking of review studies for different harbourfront areas Statutory Framework OZP amendments to incorporate land use proposals of completed reviews / studies to guide on-going developments Completed In progress On-going

District-based Studies / Reviews

Kai Tak Planning Review SEKD Statement Study (1993) Reclamation - 300 ha No reclamation as a starting point Connecting and integrating adjacent neighbourhoods, stitching together existing communities Review completed in 2007 Feasibility Study for SEKD (1998) Reclamation - 299 ha Comprehensive Feasibility Study for the Revised Scheme of SEKD (2001) Reclamation - 133 ha

Kai Tak Planning Review Planning Concepts Kai Tak City Centre - commercial belt to meet strategic demand, clusters for residential neighbourhood, large public park (Station Square) with cafes and restaurant Sports Hub - with an iconic multi-purpose stadium complex Sports Hub Kai Tak City Centre Metro Park Mixed Use Corner Runway Precinct Metro Park - a sizeable park on a piled deck above a 600m wide opening (created to improve the water circulation) Runway Precinct - low-density residential and hotel developments and a shopping street to enhance vibrancy Tourism and Leisure Hub - cruise terminal as an anchor and heliport for cross-boundary services Mixed Use Corner - commercial and GIC uses to regenerate the surrounding areas Tourism & Leisure Hub

Kai Tak Planning Review Urban Design Master Plan Connecting the Neighbourhood easy access for vehicles and pedestrians Creating Nodes Multi-purpose Stadium, cruise terminal, Metro Park, office node Activating the Harbourfront active commercial and retail-oriented waterfront with restaurants, cafes and bars Creating a Pedestrian Friendly Environment podium free design, continuous waterfront promenade, heritage trail, environmentally friendly transport in future (if possible) Creating a Dynamic Skyline, Celebrating Views and Gateways

Kai Tak Planning Review Lower development intensity Private housing: PR of 3.5-5.0 Public housing: PR of 5.5 and 6.3 Office and hotel: PR of 3.5 9.5 98ha (about 1/3 of total site area) of interconnected greenery space to integrate key developments and link up surrounding areas Commercial (17ha) Comprehensive Development Area (5.6ha) Residential (36ha) Government, Institution or Community (36ha) Open Space (98ha) Other Specified Uses (53ha) Mixed use at the waterfront to ensure vibrancy Total population: 86,000 Total no. of new flats: 30,000 Total job opportunities: 83,000 Total office GFA: 911,000m 2 Total retail GFA: 430,000m 2 Total no. of hotel rooms: 6,400 Approved Kai Tak Outline Zoning Plan No. S/K22/2

Hung Hom District Study Commissioned in 2006 to formulate a comprehensive district plan for enhancement of the Hung Hom waterfront Study area : 52 ha

Hung Hom District Study Conventionally a residential area, with tourism related developments introduced recently Principal objective is to ensure that the remaining waterfront sites are developed with uses that are compatible with their environs developed at a volume and intensity that is complementary to existing development and to an extent and composition that is publicly acceptable; and comprised of development that is capable of activating the water s edge

Hung Hom District Study Urban Design & Landscape Framework Creation of a continuous waterfront promenade Promotion of a strong identity Improvement of connectivity and accessibility Creation of interesting and recognisable spaces, places and destinations Avoiding walled effect development, promoting visual permeability Developing an appropriate form, massing and scale of developments at the water s edge

Hung Hom District Study Proposals for Potential Sites Hung Luen Road R(A)2 Site: 2 residential blocks with podium incorporating retail (Plot ratio reduced from 9 to 4.5) Tai Wan Shan Park: public realm enhancements MTRC Freight Yard & International Mail Centre: Retail, hotel, waterfrontrelated leisure uses (Plot Ratio: 1.64) and a public waterfront promenade Waterfront CDA: Retail, office and hotel above a podium over PTI (Plot ratio of 4 and building heights descending towards harbour), with 20m wide open space in central, shopping streets and possible eating dining venues adjacent to promenade

Hung Hom District Study Hung Hom District Study completed in 2008 Hung Hom OZP amended in Feb 2008 to incorporate the land use proposals of the waterfront CDA site and Hung Luen Road R(A)2 site Long term proposal for the MTRC Freight Yard and IMC kept under review Beautification Works for Tai Wan Shan Park (Promenade) completed in April 2009

Wan Chai Development Phase II Planning & Engineering Review Commenced in 2004 Main objective of WDII : To provide land for completing the missing link of the strategic road network along the north shore of Hong Kong Island to alleviate traffic congestion Land formed for trunk road also provides opportunity for enhancement of harbourfront for public enjoyment

Wan Chai Development Phase II Planning & Engineering Review Public engagement project (Harbour-front Enhancement Review Wan Chai, Causeway Bay & Adjoining Areas (HER)) launched by HEC in parallel Review completed in mid 2007 Tunnel option adopted Reclamation reduced from 28.5 ha to 12.7 ha Original trunk road alignment & reclamation extent

Wan Chai Development Phase II Planning & Engineering Review Overall planning concept Create a waterfront with distinctive character and attractions, emphasising the relation between the harbour and the cultural and historical context of Wan Chai, Causeway Bay and adjoining areas Five Character Precincts 4km long waterfront promenade from Central to Oil Street in North Point

Wan Chai Development Phase II Planning & Engineering Review Wan Chai North and North Point OZPs amended in July 2007 to incorporate proposals of WDII Review (minimum reclamation, CWB in tunnel form, original harbour park scrapped) OZPs subsequently refined during statutory representation process and approved by CE in C in May 2009 Works for WDII and CWB commenced in December 2009 Extent of reclamation Approved Wan Chai North OZP No. S/H25/2 Approved North Point OZP No. S/H8/22 (part)

Urban Design Study for the New Central Harbourfront Commissioned in 2007 upon request of Town Planning Board To refine the existing urban design framework for the Central Reclamation To prepare planning and design briefs for key development sites

Urban Design Study for the New Central Harbourfront Master Layout Plan Transport & Utility Infrastructures Public Spaces Commercial & Leisure Uses

Urban Design Study for the New Central Harbourfront Planning & Urban Design Concepts for Key Sites Sites 1 & 2 : Waterfront civic node with extensive landscaped deck Site 8 : Queen s Pier and Ferry Plaza Site 7 : Waterfront promenade with recreational cycle track Site 5 : Hotel & office use Site 3 : CDA for retail & office development and landscaped deck with old Star Ferry Clock Tower Sites 4 & 6 : Waterfront related commercial & leisure uses in courtyard spaces (Site 4) and marine theme (Site 6)

Urban Design Study for the New Central Harbourfront Open Space Network Plan A 2 km long waterfront promenade and 11 ha of harbourside public open space to form a green edge with a diversity of uses and activities to provide different harbourfront experiences

Urban Design Study for the New Central Harbourfront Relevant OZPs to incorporate the land use proposals after completion of the Study Green Carpet within Tamar Development to be completed in 2011 Advance Promenade to be completed in early 2012

Hong Kong Island East Harbour-front Study Commissioned in 2009 to formulate a comprehensive enhancement plan for the Hong Kong Island East harbourfront focusing on connectivity

Hong Kong Island East Harbour-front Study Stage 3 Public Engagement to be launched shortly Boardwalk underneath IEC Hoi Yu Street waterfront: Tourism & entertainment with iconic footbridge Sky Trail near HK Museum of Coastal Defence North Point Ferry Piers: Vibrant entertainment waterfront with civic plaza Streetscape enhancement for 9 streets

Land Use Review of Yau Tong Bay CDA OZP amended in May 2008 to adjust the boundary of the CDA zone by excising water area Residential / Commercial uses with open space and GIC facilities (Plot ratio of 4.5; maximum building height ranging from 60mPD at western ends to 120mPD) Public waterfront promenade of not less than 15m wide and with a site area of not less than 24,700m 2

Land Use Framework for Victoria Harbourfront Development Plan for WKCD Land Use Review of Kennedy Town & Mount Davis Urban Design Study for the New Central Harbourfront HK Island East Harbour-front Study Review of CDA zoning of Yau Tong Industrial Area

Connectivity along Victoria Harbourfront Total length of coastline within the harbour : about 73.1 km Natural coastline : about 3.0 km (4.1%) Existing waterfront promenade : about 15.7 km (21.5%) Planned waterfront promenade : about 18.7 km (25.6%) Activity node : major park, cruise terminal, cultural facility, etc.

Conclusion Strategic HPPs & HPGs District-based Studies / Reviews Kai Tak Planning Review WDII Planning & Engineering Review Hung Hom District Study Review of Yau Tong Bay CDA Urban Design Study for the New Central Harbourfront Hong Kong Island East Harbour-front Study Land Use Review of Kennedy Town & Mount Davis Review of CDA zoning for Yau Tong Industrial Area Development Plan for WKCD (by WKCDA) Identification of Enhancement Opportunities Action Area proposals Current/Planned Uses & Major Projects Inventory on harbourfront sites Statutory Framework OZP amendments to incorporate land use proposals of completed reviews / studies to guide on-going developments Completed In progress On-going

Kwun Tong Promenade Stage I West Kowloon Waterfront Promenade Thank You Sun Yat Sen Memorial Park Central & Western District Promenade (Sheung Wan Section)