NOTICE OF INTENT. Submitted To: Bremo Power Station 1038 Bremo Bluff Road Bremo Bluff, VA 23022

Similar documents
Chesapeake Energy Center. Submitted To: Chesapeake Energy Center 2701 Vepco Street Chesapeake, VA 23323

ENVIRONMENTAL ENGINEERING LAND SURVEYING

Consulting Engineers and Scientists. Closure Plan. Submitted by: GEI Consultants, Inc Voyager Drive Green Bay, Wisconsin

Selecting the Right Closure Cap Option for Your Surface Impoundment or CCR Landfill

CLOSURE PLAN. CCR (b) GERS Little Broad Run Landfill. Mountaineer Plant New Haven, West Virginia. October, 2016

2016 Annual Inspection Report

CLOSURE PLAN. CCR (b) GERS Landfill Area. Pirkey Power Plant Hallsville, Texas. October, 2016

CLOSURE PLAN. CFR (b) Fly Ash Reservoir II. Cardinal Plant Brilliant, Ohio. August, 2016

2018 Annual Landfill Inspection Report

Exposed Geomembrane Cover Systems for Coal Ash Facilities

HIGH PERFORMANCE COAL COMBUSTION RESIDUAL (CCR) SOLUTIONS

Analyzing the Bioretention Construction Sequence

Geosynthetics for the Management, Containment and Closure of Coal Combustion Residual Disposal Facilities

A Collection and Removal System for Water in the Final Cover Drainage Layer

Case Study Bioretention Installation and Maintenance

We Don t Have No Stinkin Dirt! Coal Ash Pond Closures (Traditional and an Alternative Method)

Key Topics. Bioretention Crime Scene Investigation The Bioretention Construction and Maintenance Sequence

SUPPORTING DOCUMENT STORMWATER POLLUTION PREVENTION PLAN (SWPPP) NARRATIVE

Geosynthetics. Work platforms built with geotextile tubes at the Lach Huyen Bridge. GMA TECHLINE Exposed GM? Deformations?

Section Specification for Geotextile Used in Permanent Erosion Control Application

VIA Re: Liner Design Criteria for Existing CCR Surface Impoundments Interstate Power and Light Company (IPL) Prairie Creek Generating Station

Vegetated Filter Strips and Buffers

Structural Storm Water Best Management Practices (BMPs)

Shelbyville, KY Stormwater Best Management Practices. Section 2 EROSION PREVENTION AND SEDIMENT CONTROL PLAN

Vegetated Filter Strips and Buffers

Alternative Names: Erosion Control Matting, Erosion Control Netting, Rolled Erosion Control Products (RECP)

A. Install all temporary erosion control measures (in accordance with MNDOT General Conditions 2573) prior to site disturbance.

5. LOW IMPACT DEVELOPMENT DESIGN STANDARDS

Green City, Clean Waters

Alternative Cover Systems

2018 Annual Landfill Inspection Report

Florence County Small Commercial Land Disturbance Permit Application

Table 4.7.1: Swales Potential Application and Storm Water Regulation

SWANA/A&WMA s. Third Annual Landfill Operator s Training Geosynthetics in Landfills. February 13, 2013

STORM WATER MANAGEMENT PLAN APPLICATION Manheim Borough

Part IV(a): BMPs for Erosion, Sediment, Velocity Control

Urban Conservation Practice Physical Effects ESTABLISHMENT, GROWTH, AND HARVEST NUTRIENT MANAGEMENT

Soil Erosion and Sediment Control

SOIL EROSION AND SEDIMENT CONTROL

Information for File # JTF

Erosion Control for Home Builders in the. City of Jacksonville

Subsurface Infiltration Bed

City of Stoughton Erosion Control Permit Application (effective 2/6/2018)

WQ-07 INFILTRATION TRENCH

Huntington Stormwater Utility

Super Gripnet INTEGRATED DRAINAGE SYSTEM (IDS) GEOMEMBRANE

CHAPTER 9 STORM DRAINAGE. Minimum Requirements for New Development and Redevelopment

Low Density Projects. Design Objective

GEOMEMBRANE FIELD INSTALLATION

GEOWEB slope & shoreline protection OVERVIEW

SECTION 900 TURF ESTABLISHMENT

Tree Pits Construction Guide

Geomembranes and Geosynthetic Clay Liners (GCLs)

EROSION & SEDIMENT CONTROL

ACTIVITY: Geotextiles ES 12

ATTACHMENT 1 WILSON MINE LECROY AREA SEMIPERMANENT DEWATERING SYSTEM

SMALL PROJECTS SIMPLIFIED APPROACH

GEOSYNTHETIC-STABILIZED VEGETATED EARTH SURFACES FOR ENVIRONMENTAL SUSTAINABILITY IN CIVIL ENGINEERING JIE HAN PH.D.

Acronyms. TRI TRI Environmental, Inc. Table of Contents. iii

HYDRAULIC DESIGN involves several basic

SPECIAL SPECIFICATION 3687 Impermeable Liner

SECTION TURF AND GRASSES

A. Install all temporary erosion control measures (in accordance with MNDOT General Conditions 2573) prior to site disturbance.

Site Formation Excavation - 6' depth square yard $8.00 $0.00 Grading square yard $1.50 $0.00 Hauling off-site - 6' depth square yard $10.00 $0.

Section 9 Landscaping and Street Trees

Capillary Action Subsurface Irrigation

Geosynthetics for Erosion Control and Reinforcement

Vegetation. Fe=0.90 (When fully established; lower while vegetation is first growing)

Please make the following changes in your copy of the bid proposal for the captioned project:

INSTALLATION GUIDELINES FOR GEOTEXTILES USED IN FILTRATION AND DRAINAGE APPLICATIONS

Table of Contents. Attachments Attachment A Photos Attachment B Site Map. Pages 3 of 9

Department of Agriculture. Conservation Service. United States. Natural Resources REVISED 8/26/16

RAIN GARDEN ILLINOIS URBAN MANUAL PRACTICE STANDARD. (feet) CODE 897 DEFINITION

Feet. Overland. Drainage Area Boundary. To Swale. Swale. To Catch Basin. Culvert Pipe. To Drain Outfall. NRCS Soil Area Boundary

4.6. Low Impact and Retentive Grading

Section Seeding

ABBREVIATIONS: TABLE OF CONTENTS: REFERENCE MATERIALS: CITY OF SEATTLE COMBINED SEWER OVERFLOW GALLONS PER MINUTE POLYVINYL CHLORIDE SQUARE FEET

UNIFIED FACILITIES GUIDE SPECIFICATIONS


WQ-23 MOUNTAINOUS AND STEEP SLOPE SITES

REHABILITATION OF SAIDA DUMPSITE

The Low Risk Site Handbook

Example Stormwater Control Plan For a Residential Subdivision Project. Whispering Pines Lane Anytown, USA. February 21, 2018

VA DCR STORMWATER DESIGN SPECIFICATION NO. 11 WET SWALE. VERSION 2.0 January 1, 2013 SECTION 1: DESCRIPTION

PLAN SUBMITTER'S CHECKLIST

Key elements : Filter Strips must be designed within parameters required by the Fort Wayne s Development Standards/Criteria Manual.

CAPPING OF A GOLD MINE IN ROSIA MONTANA, ROMANIA

GEOSYNTHETICS ENGINEERING: IN THEORY AND PRACTICE

Gloucester County PLAN SUBMITTER'S CHECKLIST

Drop-In Specifications INTEGRATED DRAINAGE SYSTEM GEOMEMBRANE

New Development Stormwater Guidelines

Leak Location Geosynthetic Materials in Base Liner Systems. NY Federation SWANA. May, 2014

The following general requirements will be met for all planter box installations:

Wisconsin Contractors Institute Continuing Education

!!!!!!!!!!!!!!!! INSTALLATION!GUIDELINES!MANUAL! January!2018,!Revision!3.0! Advanced!Revetment!Technology!

Stormwater Standards. Clackamas County Service District No. 1. Planting Guide for Buffers

Technical Specification Guidelines

Liner Construction & Testing Guidance Overview

Example Stormwater Control Plan For a Residential Subdivision Project. Whispering Pines Lane Anytown, USA

Final Report: Appendix G. LID Driveway Retrofit and Teaching Tool at Bristol County Agricultural High School, Dighton - Supporting Information

Transcription:

NOTICE OF INTENT TO CLOSE INACTIVE CCR SURFACE IMPOUNDMENTS NOTICE OF INTENT Bremo Power Station Submitted To: Bremo Power Station 1038 Bremo Bluff Road Bremo Bluff, VA 23022 Submitted By: Golder Associates Inc. 2108 W. Laburnum Avenue, Suite 200 Richmond, VA 23227 December 2015 Project No. 15-20347 Golder, Golder Associates and the GA globe design are trademarks of Golder Associates Corporation

December 2015 i Project No. 15-20347 Table of Contents 1.0 INTRODUCTION... 1 2.0 SITE DESCRIPTION... 2 3.0 SURFACE IMPOUNDMENT CLOSURE... 3 3.1 Material Removal (West Ash Pond)...3 3.2 Stabilization (North and East Ash Ponds)... 3 3.3 Final Cover (North and East Ash Ponds)... 3 3.3.1 Liner Subgrade... 4 3.3.2 Geomembrane Liner... 4 3.3.3 Drainage Layer... 4 3.3.4 Cap Drainage... 5 3.3.5 Protective Cover Layer... 5 3.3.6 Vegetative Support Layer... 5 3.3.7 Final Grades... 6 4.0 CLOSURE SCHEDULE... 7 5.0 CERTIFICATIONS... 8 List of Tables Table 1 Tentative Closure Construction Time Table

December 2015 1 Project No. 15-20347 1.0 INTRODUCTION The Bremo Power Station (Station) is located in Fluvanna County, Virginia at 1038 Bremo Bluff Road, Bremo Bluff, Virginia. The Station contains three Inactive Coal Combustion Residuals (CCR) Surface Impoundments as defined by the Federal Hazardous and Solid Waste Management System; Disposal of Coal Combustion Residuals From Electric Utilities; Final Rule (40 C.F.R. 257; the CCR rule): the North Ash Pond, East Ash Pond, and West Ash Pond. Dominion intends to initiate closure of these inactive surface impoundments under the requirements of 257.100(b) of the CCR rule. This Notice of Intent to Close Inactive Surface Impoundments (NOI) has been prepared pursuant to 257.100(c)(1) of the CCR rule. The West Ash Pond is currently completing closure by removal of CCR in accordance with 257.100(b)(5) of the CCR rule, which will be accomplished by April 17, 2018. The North and East Ash Ponds will achieve closure in accordance with 257.100(b)(1) through (4) of the CCR rule by leaving CCR in place, removing free liquids, and installing an engineered final cover system, which will also be completed by April 17, 2018.

December 2015 2 Project No. 15-20347 2.0 SITE DESCRIPTION The Bremo Power Station, owned and operated by Virginia Electric and Power Company d/b/a Dominion Virginia Power (Dominion), is located in Fluvanna County at 1038 Bremo Road, east of Route 15 (James Madison Highway) and north of the James River. The Station converted from a coal-fired power plant to a natural gas-fired power plant in 2014. CCR from past operations is stored in the three on-site CCR surface impoundments (North Ash Pond, West Ash Pond, and East Ash Pond). The site consists of wooded, open, and developed land just north of the James River. The Station s northern, eastern, and western boundaries are bordered by primarily undeveloped parcels, and the Station is bordered to the south by a CSX rail line and the James River.

December 2015 3 Project No. 15-20347 3.0 SURFACE IMPOUNDMENT CLOSURE The North, East, and West Ash Ponds will be closed as inactive CCR surface impoundments pursuant to 257.100(b) of the CCR rule. The West Ash Pond will be closed through the removal of CCR from the impoundment pursuant to 257.100(b)(5) of the CCR rule. After completing removal of the CCR from the West Ash Pond, the eastern portion of the impoundment will be re-purposed as a treatment pond to manage the Station s process wastewaters. The remaining western portion of the West Ash Pond will be graded and stabilized. The North and East Ash Ponds will be closed in place with a final cover system in accordance with 257.100(b)(1) through (4) of the CCR rule. Closure of the North and East Ash Ponds will involve preparing a suitable subgrade to support the final cover system. After completing the subgrade, the final cover system and drainage structures will be constructed, and disturbed areas will be seeded and mulched. Specific aspects of the inactive surface impoundment closures are described in the following sections. 3.1 Material Removal (West Ash Pond) Prior to October 19, 2015, Dominion hydraulically dredged CCR from the West Ash Pond to the North Ash Pond Station s in accordance with the Station s Virginia Pollutant Discharge Elimination System (VPDES) Permit No. VA0004138. CCR remaining in West Ash Pond after October 19, 2015 will be excavated and properly disposed off-site. After removal of all CCR from the West Ash Pond, a registered professional engineer will visually examine the bottom of the impoundment for the purpose of verifying that all CCR in has been effectively removed per regulatory requirements. 3.2 Stabilization (North and East Ash Ponds) The North and East Ash Ponds will be decanted and dewatered to remove free liquids prior to installing the engineered final cover system [40 C.F.R. 257.100(b)(2)(i)]. The CCR material will be re-graded and compacted prior to placing the final cover system to promote drainage and prevent the future impounding of water after closure [40 C.F.R. 257.100(b)(2)(ii)]. 3.3 Final Cover (North and East Ash Ponds) The final cover systems for the North and East Ash Ponds are designed in accordance with the CCR rule [ 257.100(b)(3)(ii)], including the use of a geomembrane liner to minimize the infiltration of liquids into the CCR. The final cover systems are designed to prevent the future impoundment of water, and include measures to prevent sloughing, minimize erosion, and prevent excessive hydraulic head [40 C.F.R. 257.100(b)(1)(i) through (iii)].

December 2015 4 Project No. 15-20347 The final cover systems are designed to minimize the need for maintenance after closure [40 C.F.R. 257.100(b)(1)(iv)]. The engineered final cover system design consists of the following minimum components, listed from top to bottom, and described below. 6-inch vegetative support layer 18-inch protective cover layer 250-mil geocomposite drainage layer 40-mil geomembrane liner Liner subgrade 3.3.1 Liner Subgrade Stabilization of CCR in the North and East Ash Ponds will commence with decanting and dewatering of the upper layers of CCR [40 C.F.R. 257.100(b)(2)(i)]. After dewatering, the subgrade will be graded and compacted to create a suitable liner base [40 C.F.R. 257.100(b)(2)(ii)]. The liner subgrade consists of the top 6 inches of material underlying the geomembrane liner, and will contain no particles with a particle size of > ½ inch. The liner subgrade will consist of the dewatered and compacted CCR contained in each impoundment. No deleterious material will be allowed in the liner subgrade. Liner subgrade fill will be placed in lifts no greater than 9 inches (compacted depth), and will be wetted or dried as necessary to reach acceptable moisture content. The subgrade fill will be compacted to at least 90% of its maximum dry density, and smooth-rolled for additional compaction. 3.3.2 Geomembrane Liner The primary barrier component of the final cover system (infiltration layer) is the geomembrane liner [40 C.F.R. 257.100(b)(3)(ii); 257.100(b)(3)(i)(A)]. The geomembrane liner will consist of 40-mil, dualtextured, High Density Polyethylene (HDPE) geomembrane, or equivalent, with a maximum hydraulic conductivity of 1x10-12 centimeter per second (cm/s). The geomembrane liner will be placed directly on the prepared CCR subgrade, and will generally be placed parallel to the slope. The liner will be secured over the CCR subgrade with a perimeter anchor trench, and will be seamed using heat-fusion and extrusion welding techniques. 3.3.3 Drainage Layer A minimum 8-oz/yd 3, 250-mil geocomposite drainage layer, or equivalent, will be placed on top of the 40-mil geomembrane liner to prevent excessive hydraulic head on the liner [40 C.F.R. 257.100(b)(3)(ii); 257.100(b)(3)(i)(B)]. The geonet portions of each geocomposite panel will be attached to one another by approved fasteners spaced at a maximum of 5-foot intervals along downslope overlaps and 2-foot

December 2015 5 Project No. 15-20347 intervals on cross-slope overlaps. The upper geotextile layers of adjacent geocomposite panels will be either heat-fused or sewn to adjacent panels. 3.3.4 Cap Drainage A drainage system will be installed over the geocomposite to remove excessive hydraulic head accumulation on the liner [40 C.F.R. 257.100(b)(1)(i)]. The drainage system will be comprised of 6-inch SDR-17 perforated HDPE pipes surrounded by VDOT #57 stone. The pipes will be placed directly on the geocomposite in drainage ditches and cross slopes. The surrounding stone will be covered with a nonwoven geotextile heat-fused to the top layer of the geocomposite. The maximum cap drain spacing was calculated to be approximately 440 feet on the flatter sloped areas; the design provides a cap drain spacing of approximately 250 feet, which is intended to prevent flatter areas from becoming overly saturated. The geocomposite is sufficient to maintain final cover soil drainage on the steeper slopes. 3.3.5 Protective Cover Layer An 18-inch protective cover soil layer (erosion layer) will be placed over the geocomposite drainage layer [40 C.F.R. 257.100(b)(3)(ii); 257.100(b)(3)(i)(B)]. The protective cover soil will consist of soil with an average maximum particle size of 2 inches. No deleterious material will be allowed in the protective cover layer. The protective cover layer will be placed in lifts no greater than 9 inches (compacted depth), and will be wetted or dried as necessary to reach acceptable moisture content. The protective cover layer will be compacted to at least 90% of its maximum dry density. 3.3.6 Vegetative Support Layer A 6-inch vegetative support layer will be placed over the protective cover layer to promote grass growth and reduce erosion [40 C.F.R. 257.100(b)(3)(ii); 257.100(b)(3)(ii)(B); 257.100(b)(3)(i)(C)]. The vegetative soil layer will consist of soil with an average maximum particle size of 1 inch that is capable of supporting vegetation. Organic material may contribute up to 1.5% of the vegetative support layer (by weight). The vegetative support layer will be seeded, fertilized, and mulched to prevent erosion. Temporary and permanent soil stabilization matting will be used on side slopes to reduce the effects of erosion during final cover stabilization. The selected plant species will be native vegetation, and include Kentucky 31 Fescue, Annual Ryegrass, and German Millet. Sodding is proposed as an alternative to seeding/mulching in selected areas of the North and East Ash Ponds to expedite stabilization. If used, sod will conform to the same quality standards as seeding and mulching.

December 2015 6 Project No. 15-20347 The established vegetation will be maintained through periodic mowing to prevent the growth of large brush or trees that could damage the final cover system and to maintain healthy coverage. Maintenance will be performed as necessary to maintain the covered areas. 3.3.7 Final Grades The final grades for the North and East Ash Ponds have been developed to control stormwater and erosion, as well as to reduce hydraulic head accumulation on the geomembrane liner [ 257.100(b)(1)(i)]. The minimum post-settlement slope for the final cover system is 2% to ensure positive drainage of the surface and subsurface (interflow) stormwater. The maximum pre-settlement slope for the final cover system is 3:1 (33.3%) to minimize erosion and promote long-term stability of the cover. Drainage channels will be installed as part of the final cover system to control run-off from the cover. Each drainage channel will have an underdrain to prevent water build-up on the liner. The underdrains will consist of a 10-inch SDR-17 half-perforated HDPE pipe placed in the same manner as the cap drains (see Section 3.3.4). Each underdrain will connect the cap drains and discharge into the final cover s stormwater run-off control system.

December 2015 7 Project No. 15-20347 4.0 CLOSURE SCHEDULE Construction activities related to the closure of the surface impoundments will be completed by April 17, 2018 in accordance with 40 CFR 257.100(b). The West, North, and East Ash Ponds no longer receive CCR. Closure of the North and East Ash Ponds will begin in March 2016 when materials will be re-graded to establish the proposed subgrade required for the final cover systems. Closure of the West Ash Pond is anticipated to begin in December 2015 after decanting is completed. Closure activities for each impoundment are expected to occur as outlined in the tentative time table below. Table 1: Tentative Closure Construction Time Table Surface Impoundment North Ash Pond East Ash Pond West Ash Pond End CCR Active Period Begin Decanting Begin Closure Activities End Closure Activities October 2015 January 2016 March 2016 April 17, 2018 Inactive (>20 years) January 2016 March 2016 April 17, 2018 June 2014 November 2015 December 2015 April 17, 2018

December 2015 8 Project No. 15-20347 5.0 CERTIFICATIONS The following Professional Engineer s certifications are provided in accordance with 257.100(b)(4) and (6). I, the undersigned Virginia Professional Engineer, hereby certify that I am familiar with the technical requirements of 40 CFR 257.100. I also certify that it is my professional opinion that, to the best of my knowledge, information, and belief, the final cover system for the North and East Ash Ponds at the Bremo Power Station has been designed in accordance with current good and accepted engineering practice(s) and standard(s) appropriate to the nature of the project and the technical requirements of 40 CFR 257.100(b)(3)(i) or (ii). In addition, I do hereby certify that it is my professional opinion that, to the best of my present knowledge, information, and belief, the closure activities associated with the East, North, and West Ash Pond at the Bremo Power Station as described in this NOI are technically feasible to be completed by no later than April 17, 2018. For purposes of this document, certify and certification shall be interpreted and construed to be a statement of professional opinion. The certification is understood and intended to be an expression of my professional opinion as a Virginia Licensed Professional Engineer, based upon knowledge, information, and belief. The statement(s) of professional opinion are not and shall not be interpreted or construed to be a guarantee or a warranty of the closure activities. James R. DiFrancesco, Jr., P. E. 025260 Printed Name of Professional Engineer Commonwealth of Virginia License Number

Golder Associates Inc. 2108 W. Laburnum Avenue, Suite 200 Richmond, VA 23227 USA Tel: (804) 358-7900 Fax: (804) 358-2900 Golder, Golder Associates and the GA globe design are trademarks of Golder Associates Corporation