Allisonville Elementary School Facilities Highlights Built: 1960 Last Major Renovation: 28 years ago Capacity: 650 Current Enrollment: 767

Similar documents
Master Facility Planning Update School Board Meeting May 26, 2016

Sagebrush Elementary School East Temple Place Aurora, Colorado 80015

Forest Hills Facilities Plan

Greenwood Elementary School 5550 South Holly Street Greenwood Village, Colorado 80111

VOTER BOND REFERENDUM 2018 SUMMARY OF WORK PROPOSED

Briar Crest Elementary

Rockwell/Johnson School Renovations Project. Existing Conditions September, 2016

Meadow Point Elementary School East Grand Avenue Aurora, Colorado 80015

Chariho Regional School District Five-Year Capital Facilities Improvement Plan (2/10/15)

Master Project List Report

2014 Bond Project Guide

CAPITAL OUTLAY REQUEST - IDENTIFIED AND EMERGING PROJECTS - RANKED 3-Jun-14

NYACK PUBLIC SCHOOLS CAPITAL IMPROVEMENT PLANNING PROCESS

TALLEY STREET ELEMENTARY SCHOOL CITY SCHOOLS OF DECATUR COMMUNITY PRESENTATION DECEMBER 6, 2017

TIFT COUNTY SCHOOLS E-SPLOST HISTORY

REPORT CARD TO THE COMMUNITY MAY 15, 2018

3. 21st Century Learning A. Districtwide Flexible Learning - Allowance for Flexible Furniture $600,000 Subtotal $600,000

Emergency Management Resource Guide. Appendix A: Crime Prevention Through Environmental Design CPTED Principles Checklist for Kentucky Public Schools

Number of persons with a disability that live with a disability in your community?

Tillamook High School Bond Projects

Design Presentation. Chief Operations Officer Willie Burroughs

Campus Middle School 4785 South Dayton Street Greenwood Village, Colorado 80111

MARY CRAPO CENTER Miller Road, Swartz Creek, Michigan

PROCTOR TERRACE ELEMENTARY SCHOOL

Kerrville ISD has called for a bond election in the amount of $88,960,000 for November 6, 2018

MUKWONAGO AREA SCHOOL DISTRICT CAPITAL IMPROVEMENT / MAINTENANCE STUDY

HOLUM EDUCATION CENTER. Architectural. January 13, 2014 DeForest Area School District

Mechanical Inspection Plumbing

New High School Concept

DEERFIELD SCHOOL DISTRICT REFERENDUM Committed to Excellence and Equity in Educating Our Students

Design Review of Facility Improvement Projects

e. Potential sources of air contaminants do not exist near the building. (e.g. chimneys, stacks, industrial plants, exhaust from nearby buildings)

Riverview West Side Elementary 160 Isabel Avenue East

Wold Architects and Engineers. 332 Minnesota Street Suite W2000 Saint Paul, MN

Calmeca Academy of Fine Arts and Dual Language

MASTER PLAN DIAGRAMS DISTRICT CAMPUS OVERVIEW

Food needs to be in sealed containers 03. FOOD: Unsealed, left in

Existing Facilities Assessment

Chabot College: Plan Kickoff and Visioning Session with Student Senate

Columns REF, RESPONSIBLE and COMPL TD are provided for your numbering, assignments and control. REF ISSUE RESPONSIBLE COMPL TD

Ichabod Crane Central School District 2018 Capital Project Preliminary Estimate

Updated: 8/16/ Facilities Profile

SCHOOLS + COMMUNITY rehabs, renovations, new construction

e. Potential sources of air contaminants do not exist near the building. (e.g. chimneys, stacks, industrial plants, exhaust from nearby buildings)

MUKWONAGO SCHOOL DISTRICT CAPITAL IMPROVEMENT / MAINTENANCE STUDY

Oxford Hills School District Capital Renewal Plan Updated March 2017

30% Design Community Meeting

Cleaning Service Levels

ALLISON ELEMENTARY SCHOOL 4315 Don Julio Blvd., North Highlands, CA 95660

EDUCATIONAL SPECIFICATIONS NEW CONSTRUCTION TO: Oxford Middle School Location to be determined November 4, 2016 Approved by BOE on November 29, 2016

School District of Milton 5- Year Capital Maintenance and Improvement Plan

2015 Building Condition Survey Summary Mosaic Associates Architects 02/19/16

LINCOLN HIGH SCHOOL MODERNIZATION BEX IV COMMUNITY MEETING JUNE 23, 2016

IEQ SCHOOL DATA BASE. School Name: Reservoir High School Principal: Patrick Saunderson DATE: 1/23/2017. WORK ORDER NUMBER of POTENTIAL IEQ

AGENDA. 1. Call to Order. 2. Approval of Minutes. 3. Approval of Invoices and Commitments. 4. Review Updated Site Analysis and Permitting

ALLEGHANY COUNTY PUBLIC SCHOOLS Maintenance Work Request Completion Analysis

WILLIAM & MARY CUSTODIAL TASK & FREQUENCY LIST. PUBLIC SPACE: ENTRANCES, LOBBIES, AND CORRIDORS Daily Weekly Monthly Quarterly Yearly

Proposed Bond Construction Projects

Edward Jenner Elementary Academy of the Arts

400 Park Road, Watertown, CT

Agustin Lara Elementary Academy

SPLOST I, II, III,IV

LKA Partners. A Professional Corporation for Architecture/Planning. 430 North Tejon Street Colorado Springs, CO /

NEIGHBORS SOUTHWEST NEIGHBORHOOD MEETING December 17, 2014 BEAVERTON SCHOOL DISTRICT SOUTH COOPER MOUNTAIN HIGH SCHOOL

5 Year Capital Improvement Plan Update

Service Description Service Shop Customer Charge Comments. Electronic Shop. Electric Shop Yes additional circuits for equipment

MAINE. Downloaded g. Maintain an effective pest control program so that the facility is free of pests and rodents;

bold/italic items are revisions to the previous program notes

NJASA SCHOOL SECURITY CONFERENCE

2012 Exhibition of School Planning and Architecture. Crockett Elementary School. Houston Renovation Lee J Brockway Award

MEASURE A. Completed Bond Projects

H107 Video Conference Room

e. Potential sources of air contaminants do not exist near the building. (e.g. chimneys, stacks, industrial plants, exhaust from nearby buildings)

HVAC / Boilers / Hot Water. Expected Life Span. very rough estimates Condition/Issue Age. Athletics / Gyms

IEQ SCHOOL DATA BASE

SCHEMATIC DESIGN PRESENTATION

Beaufort County Community College. Maintenance and House Keeping Plan

Unit # E ± 1,200 SF Width ± 20' Depth ± 60'

MADISON ELEMENTARY SCHOOL

State College Area School District High School South Building EXISTING CONDITIONS ASSESSMENT

CUSTODIAL SERVICES CUSTOMER SERVICE GUIDE

Encumbered Balance (E-D) Branham HVAC Implementation Complete 100% 03/04/19 07/19/19 $765, $635, $635, $130, $0.

Imagine RBC 2010 The Plan

State College Area School District High School North Building EXISTING CONDITIONS ASSESSMENT

Washington Irving Elementary School

DOUGLAS INTEREMDIATE / ELEMENTARY SCHOOL MASSACHUSETTS SCHOOL BUILDING AUTHORITY FINAL DESIGN PROGRAM / ADVANCED SCHEMATIC DESIGN SUBMISSION

Unit # 1038 ± 900 SF Width ± 15' Depth ± 60'

Custodial Guide

Edith Wolford Elementary School Site Improvement Committee

MOUNT PLEASANT MIDDLE SCHOOL HVAC. M-01 Heating Plant: M-02 Heating & Ventilating Systems: Livingston School District Mount Pleasant Middle School

School District of New London. Community Listening Session & Referendum Consideration

FOR SALE OR LEASE OVERVIEW GREENCASTLE PIKE HAGERSTOWN, MD 21740

Windows Walls Floors Tile Grout. 16"x16" microfiber cloths. 9 wall wash pads. microfiber. pads. Windows Showcases Plexiglass Windshields

CLEVELAND HEIGHTS UNIVERSITY HEIGHTS CITY SCHOOL DISTRICT MONTICELLO & ROXBORO MIDDLE SCHOOLS INTERIOR DESIGN

January 11, New benches installed. Paving of parking lot adjacent to piers and the canoe put-in. Near complete with clean up remaining.

2014 Bond District-wide Facility Repairs

NYC Department of Education

IEQ SCHOOL DATA BASE

Garfield Elementary School Feasibility Study for New Library Building Project Number A C

NYC Department of Education

Transcription:

Allisonville Elementary School Built: 1960 Last Major Renovation: 28 years ago Capacity: 650 Current Enrollment: 767 ADA improvements are Fire alarms need to be updated Playground equipment needs to be updated/ No fence around upper playground Restroom renovations are Replace wall coverings Parking lot improvements are Designed as typical double loaded corridor classroom building for 650 students No flexible small tutoring areas; no LGI or project space Special Ed and ENL departments are in cramped quarters that were originally intended for small group work Kiln is in the boy s shower room off of the gym Moveable wall between gym and cafeteria needs to be Only one conference room in the building Clinic is small with two beds and one toilet Cafeteria is not adequate for the population are

Crooked Creek Elementary School Built: 1964 Last Major Renovation: 31 years ago Capacity: 550 Current Enrollment: 719 Only two internal cameras for blind spots Classroom doors do not lock from the inside Storage for outdoor equipment is as well as storage for AYS as it is currently being kept in the hallways Make ADA improvements (Special Ed classrooms/playground) Need light switches inside classrooms some are on the outside of the classroom HVAC Needs - Replace air handlers and VAV boxes Replace membrane roofing system Replace gym and cafeteria light fixtures Replace plumbing fixtures Acoustical needs many classrooms have temporary walls Replace floor and wall finishes in corridors Building was open concept and rooms were created with portable wall structures, some of which bleed noise directly to the adjacent classroom There is no LGI or project space. Limited small group space Special Ed Resource has three teachers in one room. Essential Skills is on the lower level. It does not have a bathroom or time out area. The bathroom adjacent is not handicapped accessible. Sensory room is in the hallway under stairwell In-school-suspension is in the entryway to the principal s office The kiln is accessed through the Essential Skills classroom Gym has a linoleum floor, slippery Insufficient number of restrooms, sinks and hand dryers Severe lack of storage in this building There is no adult restroom in the office Front office work area is cramped. Layout of the office space is not efficient and only has one conference room The lower playground is fenced, but the upper playground is not (adjacent to parking lot) are

Fox Hill Elementary School Built: 1991 Last Major Renovation: Original Construction Capacity: 650 Current Enrollment: 775 Buzzer system entry not secured Access control on additional doors Parents have to park and come into school to get their students as pick up is too long and too congested Fire alarm replacement ADA improvements are Playground equipment needs to be Exterior perimeter of grounds are not completely fenced Needs new roof and gutters HVAC needs to be Hot water valves need to be Parking lot repairs are Insufficient number of restrooms, sinks and hand dryers Rooms that had been used for support services have been converted to classrooms Acoustic improvements - The building is very noisy No LGI as it has been turned into space for Title I Limited small group area Stage is too small Offices and clinic are small with only one conference room Cafeteria too small for 800 students with are

Greenbriar Elementary School Built: 1968 Last Major Renovation: 1996 Capacity: 550 Current Enrollment: 808 Traffic redesign drop-off and pick-up location is too congested Upgrade fire alarm system ADA improvements Cafeteria serving line is in the kitchen (no safety barrier) Space is limited inside the building for students in trailers for tornado safety Replace chillers, boilers and rooftop air handlers Replace gym and cafeteria lighting Upgrade parking lot lighting Replace corridor floor and wall finishes Replace flooring in classrooms Cafeteria/Gym moveable wall has to be manually opened and closed by folding in/out each panel one at a time (not efficient and damage risk) There are currently six trailers to accommodate enrollment No LGI room ENL classroom houses five adults with an average of 300 students per day Special Ed held in Media Center s computer lab Music in old Special Ed room with low ceiling Art room is carpeted Only one conference room Small clinic two beds (nurse sees 80 students per day) Restrooms are limited for 800 students boys 7 stalls and girls 11 stalls. Not all trailers have restrooms Cafeteria is too small for 800 students with (lunch has to be served from 10:25 AM -2:00 PM in order to accommodate all students) Cafeteria opens to the parking lot Stage is small with Title I storage on the back and risers stored near the ramp are

John Strange Elementary School Built: 1977 Last Major Renovation: 1988 Capacity: 500 Current Enrollment: 633 Buzzer system entry not secured Configuration of cubby areas outside classrooms limits visibility for supervision Traffic flow is a huge problem as is having a safe place for students waiting to be picked up (car rider line safety in parking lot) ADA Improvements are Cafeteria No separation between serving lines and kitchen Security cameras are Temperatures are uneven throughout the building Boxes and air handlers need to be Carpet and vinyl wall covering needs to be Roof needs to be The Clinic is too small only two beds, one toilet and no privacy areas There are currently six trailers to accommodate enrollment Rooms once used for support services have been converted to classrooms No LGI room Limited small group space in cubby area Walls between rooms are not permanent, causing many acoustical issues Stage is adequate, but there is no handicapped accessibility to stage Most furniture is standard with little flexibility Two small conference rooms. Neither will accommodate a large case conference No individual timeout space for students Cafeteria too small for enrollment with One counseling office in the back of the stage with no handicapped access There is a fairly consistent mechanical hum throughout the building are

Nora Elementary School Built: 1966 Last Major Renovation: 1988 Capacity: 650 Current Enrollment: 671 Cars have to circle through the parking lot. It is congested at pick-up and dropoff ADA improvements Upgrade fire alarm system Access control on additional doors New boilers and chillers are. Temperatures vary throughout the building Wall and floor finishes need to be Building needs outdoor storage Plumbing fixtures need to be. Restrooms need to be renovated Rooms that had been used for support services have been converted to classrooms No LGI or small group space Cubbies are crowded in closets Some classrooms still have blackboards Special Education space is in small areas Changing tables are in restrooms One conference room Small clinic with only two beds and one toilet Offices are small No timeout space Cafeteria too small for enrollment with are

Spring Mill Elementary School Built: 1959 Last Major Renovation: 1985 Capacity: 625 Current Enrollment: 703 Additional security cameras are Traffic flow needs to be reconfigured ADA improvements Upgrade fire alarm system Fencing along west and south property line is New roof is New chillers, boilers, air handlers and boxes are New plumbing fixtures are Floor and wall coverings need to be Rooms that had been used for support services have been converted to classrooms No LGI or small group space Special Education space is in small areas Changing tables are in restrooms Clinic offices are small Insufficient number of restrooms, sinks and hand dryers Cafeteria is too small for enrollment with are