GREENWICH PENINSULA CABLE CAR AREA MASTERPLAN ENVIRONMENTAL STATEMENT NON-TECHNICAL SUMMARY. 24 December 2010

Similar documents
Longbridge Town Centre Phase 2 Planning Application

17A. Wind Microclimate

Armourers Court, Woolwich

Departure from the Development Plan. Town Council objection to a major application. DETERMINE

PHASE III: Reserved Matters Submission

Environmental Statement Non-Techncial Summary Anthology Hale Works xx.xx.xx Document title 1

Barvills Solar Farm Environmental Statement Non-Technical Summary

RE: THE MALL, WALTHAMSTOW PLANNING APPLICATION REF: 17/1355 RESPONSE TO LBWF NEIGHBOUR CONSULTATION

Newcourt Masterplan. November Exeter Local Development Framework

Replacement Golf Course Facilities and Residential Development, Churston. Environmental Statement Non-Technical Summary

Chapter 2: OUTLINE PLANNING APPLICATION PROPOSALS. A New Garden Neighbourhood Matford Barton 17

Cardiff International Sports Village Waterfront Development Volume IV : Non-Technical Summary of the Environmental Statement

Non-Technical Summary

1. Welcome. Background

Harrow Lane, St Leonards-on-Sea, East Sussex, TN37 7JZ ERECTION OF 113 DWELLINGS TOGETHER WITH ESTATE ROADS (DETAILED SUBMISSION)

Meridian Water Phase 1 Application

Case Officer: Sarah Kay File No: CHE/14/00515/REM Tel. No: (01246) Plot No: 2/6132 Ctte Date: 15 th September 2014 ITEM 1

Interim Advice Note 76 / 06 ASSESSMENT PART 1 AIMS AND OBJECTIVES OF ENVIRONMENTAL ASSESSMENT. Contents

Chapter 4. Route Window C12: Mile End Park and Eleanor Street Shafts

Description Details submitted pursuant to discharge of condition 5 (Design Code) attached to planning permission 13/01729/OUT.

Derry City and Strabane District Council Planning Committee Report. Amended layout from approval A/2004/0462/F with reduction from 166 units

The term 'development' in the conditions below means the development permitted by this consent.

17A. Wind Microclimate

DEFGH. Crystal Place Park. Environmental Impact Assessment (EIA) Elin Thomas and Emily Low Waterman Environmental

INTRODUCTION. Welcome to the third round of information events on the emerging Yorkshire Energy Park proposals. THE CONSULTANT TEAM WHERE IS THE SITE?

University Park, Worcester Non Technical Summary December 2011

ROCHFORD LOCAL DEVELOPMENT FRAMEWORK: Sustainability Appraisal/ Strategic Environmental Assessment. Rochford Core Strategy Preferred Options Document

Peter Brett Associates LLP (PBA) act on behalf of db symmetry ltd in respect of the proposed symmetry park, Kettering development (the Site).

The Place Solar Farm

Former North Works, Lickey Road, Longbridge, Birmingham

I615. Westgate Precinct

HS2 Interchange Station Design

Public Consultation. Land at Monks Farm, North Grove. Welcome

Schedule of Planning Applications Committee Date: 23 May Reference: 06/17/0726/F Parish: Hemsby Officer: Mr J Beck Expiry Date:

Date: TOWN AND COUNTRY PLANNING (ENVIRONMENTAL IMPACT ASSESSMENT) REGULATIONS 2011: REGULATION 13 SCOPING OPINION

Application Recommended for Approval Hapton with Park Ward

edge of gas line corridor setback edge of gas line corridor aligned with Schlumberger building 37.0 m AOD 33.0 m AOD max

LAND AT HOWES LANE, BICESTER ENVIRONMENTAL STATEMENT NON-TECHNICAL SUMMARY. March 2017 Our Ref: Q70433

4 RESIDENTIAL ZONE. 4.1 Background

Garden Bridge Planning Application

Site Location Plan. Land on the North West of Epsom Road Waddon Croydon. 1 : A4 September The. Waddon. Waddon.

1. Local Plan Context

REFERENCE: 15/01661/FUL Registered: 16 March 2015 Expiry date: 25 October 2016

SOUTH CAMBRIDGESHIRE DISTRICT COUNCIL. Executive Director (Operational Services) Corporate Manager (Planning and New Communities)

Sustainability Statement. Whitby Business Park Area Action Plan

4.00 STAKEHOLDERS. urbanprojects

Development of land adjacent to Braggs Farm Lane and Rumbush Lane, Dickens Heath. Welcome. Today s exhibition. The proposal site

BLACKHEATH SQUASH CLUB Blackheath Sports Club, Rectory Field, Charlton Road, London, SE7 7EY. Planning, Design and Access Statement

Proposed Student Accommodation Development

4 Residential and Urban Living Zones

Environmental Impact Assessment

I539. Smales 2 Precinct

Planning Committee 04/02/2015 Schedule Item 6. Smith Farm Estate, Old Bridge Close, Northolt, UB5 6UA.

Chapter 13 Residential Areas: Appendices APPENDIX 1 Residential Areas

Land Adj. 63 Sunny Bank Road, Sutton Coldfield, Birmingham, B73 5RJ

Site north of Hattersley Road West (east of Fields Farm Road), Hattersley

Derry City and Strabane District Council Planning Committee Report

Land at Rampton Road. Cottenham

11. ISLINGTON ROUTE SECTION ENVIRONMENTAL BASELINE AND ASSESSMENT OF IMPACTS OVERVIEW OF ISLINGTON ROUTE SECTION... 2

AOTEA SUPERMARKET ZONE. Zone Introduction

Persimmon Homes Thames Valley Date received: 2 nd April week date(major): 2 nd July 2014 Ward: Nascot

GREENFORD HALL & ADJOINING LAND

Plots 4 & 6, Prologis Park, Midpoint Way, Sutton Coldfield, Birmingham, B76 9EH

Kibworth Harcourt. Introduction. Introduction

Planning Statement. November On behalf of Barton Oxford LLP

TRANSPORT AND WORKS ACT 1992 TRANSPORT AND WORKS (APPLICATIONS AND OBJECTIONS PROCEDURE)(ENGLAND AND WALES) RULES 2006

Former Temple Cowley Pools, Oxford TEMPLE COWLEY LIBRARY * ELEVATION SHOWN IS INDICATIVE AND SUBJECT TO FINAL DESIGN AND AGREEMENT.

Rotherhithe Rotherhithe Area Vision Map

Unity Square, Nottingham Environmental Statement Non Technical Summary December 2013

Kier Infrastructure and Overseas Limited Greenburn Surface Mine, Dalgig Farm Site

Report Author/Case Officer: Joanne Horner Contact Details:

Ebbsfleet Development Corporation

Reference: 16/1447/FUL Received: 7th March 2016 Accepted: 7th March 2016 Ward: East Finchley Expiry 2nd May 2016

WELCOME GYPSY LANE. Wider Site Location plan. Proposals for the development of LAND OFF FOXLYDIATE LANE WEBHEATH. Proposals for the development of

Application Guide. Should you have any questions on the Outline Application please contact:

Site off Hattersley Road West (bound by Hattersley Road West to the north west and Sandy Bank Avenue to the south and west), Hattersley

LONDON BRIDGE STATION ENVIRONMENTAL STATEMENT NON-TECHNICAL SUMMARY

Longbridge East : Site Wide and Phase One Development

South Worcestershire Development Plan. South Worcestershire Design Guide Supplementary Planning Document

It is recommended that the Committee resolve to APPROVE the application and grant planning permission subject to the following conditions:

Environmental Statement Non-Technical Summary

Planning Area Committee 25 June 2018 Addendum to Officers Report RESTRICTION OF PERMITTED DEVELOPMENT RIGHTS - EXTENSIONS

BRIDGE OF DON MASTERPLAN & PLANNING SUMMARY

Chapter 5 Urban Design and Public Realm

3.1 The hybrid planning application proposes the following description of development:

INTRODUCTION NORTH HEYBRIDGE GARDEN SUBURB

Grantham Southern Quadrant Link Road Environmental Statement

Statement of Community Involvement LAND OFF SOUTHDOWN ROAD HORNDEAN, HAMPSHIRE

LAND AT WEST YELLAND. Environmental Statement Non-Technical Summary Welbeck Strategic Land LLP

Site Address: Site Accessed off Bondfield Close, Bondfield Crescent, Wombwell, Barnsley, S73 8TX

Place Brief. National Collections Facility (NCF site)

Tall Buildings Strategy

NON - TECHNICAL SUMMARY

REFERENCE: B/03745/12 Received: 02 October 2012 Accepted: 05 October 2012 WARD(S): Totteridge Expiry: 30 November 2012.

ABBEY MANOR GROUP/SAINSBURY S SUPERMARKETS LTD

Wyvern Park Skipton Environmental Statement. Non-technical Summary - April 2015

Plumstead Temporary Railway Sidings and Associated Permanent Works

intu Bromley Planning Summary Bringing more to Bromley February 2014

8.0 Design and Form of Development 43/

Reserved Matters application for a site that straddles the boundary between CBC and BBC

Transcription:

GREENWICH PENINSULA CABLE CAR AREA MASTERPLAN ENVIRONMENTAL STATEMENT NON-TECHNICAL SUMMARY 24 December 2010 Our Ref: DT/JLL0509 Appeal Ref (optional): RPS 1 st Floor West Cottons Centre Cottons Lane London SE1 2QG Tel: 020 7939 8000 Fax: 020 7939 8098 Email: rpslp@rpsgroup.com rpsgroup.com/london

CONTENTS 1 INTRODUCTION... 1 2 THE PROPOSED DEVELOPMENT... 2 3 THE ENVIRONMENTAL IMPACT ASSESSMENT (EIA) AND THE ENVIRONMENTAL STATEMENT (ES) 6 4 ISSUES COVERED IN THE EIA... 7 5 SUSTAINABILITY... 10 6 SUPPORTING INFORMATION... 11 7 FURTHER INFORMATION... 12 APPENDIX 1 Illustrative Design Response: Drawing 1229-D-1006 (Rev C) S:\Job Nos\JLL (10)\JLL0509 - Greenwich Peninsula EIA\ES\Non-Technical Summary\GPCCAM FINAL ES NTS 24122010.doc

1 INTRODUCTION 1.1 An Environmental Statement (ES) has been prepared by RPS Planning and Development Ltd on behalf of Meridian Delta Limited (MDL) (the Applicant) in support of an application to the London Borough of Greenwich for outline planning permission for the remasterplanning of a 9 plot site in the north-east of the Greenwich Peninsula to the south of the O2 Arena. This document presents the non-technical summary of the Environmental statement. 1.2 The Greenwich Peninsula Cable Car Area Masterplan (CCAM) (the Scheme) is founded on the need to accommodate the southern landing point, passenger station, compression tower and associated facilities of the London Cable Car which will run from the Royal Victoria Dock in Newham across the River Thames to Greenwich Peninsula. The proposed London Cable Car is the subject of a separate full planning application, submitted by Transport for London (TfL) to Greenwich and Newham Councils on 28th October 2010 (LBG application reference number 10/3022/F). 1.3 If the London Cable Car scheme is implemented, the proposals set out in this outline planning application will replace the previously approved scheme for this area which formed part of the Greenwich Peninsula Masterplan outline planning permission of 23rd February 2004 (application reference number 02/2903/O) (the 2004 Masterplan). 1.4 This redesign process has been informed by a Cable Car Impact Study completed by MDL between July and October 2010 in conjunction with TfL and its advisors and LBG. 1.5 The key elements of development proposed by this application are as follows: Creation of a new riverside public square within the building frontages of adjacent plots aligned to match and reinforce the axis of the cable car route; Incorporation of two sentinel towers centred on the cable car axis, creating a gateway to Greenwich Peninsula along the east riverside edge; Incorporation of a landmark tower on axis with the cable and adjacent Peninsula Park which, in combination with the two gateway towers, acts as a visual marker for the Cable Car; Amendment of the road and pedestrian network to provide better pedestrian permeability and legibility in and around the Cable Car; and Retail uses (A1-A5) distributed to ground/first floor levels on plots fronting the Cable Car and station S:\Job Nos\JLL (10)\JLL0509 - Greenwich Peninsula EIA\ES\Non-Technical Summary\GPCCAM FINAL ES NTS 24122010.doc 1

2 THE PROPOSED DEVELOPMENT a) Introduction 2.1 The description of development for this Planning Application, as described on the Application Form, is as follows: The development of up to 157,300m² of floorspace on Plots NO404, NO405, NO207, MO106, MO107, MO109, MO110 and MO118 of the Greenwich Peninsula consisting of the following 1. Class AI - A5 (Retail) up to 7,717m² 2. Class B1(a) and B1(b) (Business) up to 38,024m² 3. Class C3 (dwellings) up to 1,505 dwellings (111,389m²) 4. Open space including for amenity and entertainment purposes 5. Hard and soft landscaping 6. Associated car parking 7. Highways and transport works; and 8. Associated and ancillary works. 2.2 The application is submitted in outline with all matters (layout, scale, appearance, access and landscaping) reserved for future consideration. Notwithstanding this and the fact that the detailed design process is to follow, the proposals presented in the application have regard to the approved Greenwich Peninsula Masterplan Design Code which sets out the vision and objectives for development of the Greenwich Peninsula in relation to individual buildings, including: The need to provide a range and balance of uses consistent with the Greenwich Peninsula Masterplan and the 2004 outline planning permission; The establishment of high quality, attractive and distinctive buildings and environment; The preservation of the integrity of the wider Masterplan setting; The provision of high quality living accommodation; The creation of high quality architectural design and form which will reinforce the benchmark for future reserved Matters Applications on the Greenwich Peninsula. b) Comparison of the proposed scheme against the consented 2004 Masterplan 2.3 Plot M0108 would be lost to facilitate the introduction of the cable car station and gondola storage and Plot M0107 would be affected by the oversailing of the cable car and associated visual privacy zone. There are also implications for plots to the north of Edmund Halley Way (N0405, N0404 and N0207) primarily resulting from the proposed Silvertown tunnel realignment. 2.4 When compared to the 2004 Masterplan, the CCAM proposals reveal a loss of 7,622sqm of plot site areas from the total of 29,907sqm in the original 9 plots (or 25.4%). However 1,733sqm of plot site areas is regained by combining the truncated central and southern plots over the alignment of Rivermill Lane (located between MO109/110 and MO106/107). This results in the net loss being reduced to 5,890sqm (or 19.7%). 2.5 Plot footprints and boundaries have needed to be redefined with some merging of plots as follows: M0106 and M0107: redefined and merged as M0106/7 M0108: lost to cable car southern station site M0109 and M0110: redefined and merged as M0109/10 S:\Job Nos\JLL (10)\JLL0509 - Greenwich Peninsula EIA\ES\Non-Technical Summary\GPCCAM FINAL ES NTS 24122010.doc 2

M0118: redefined N0207: redefined N0404: redefined N0405: redefined 2.6 The Applicant s illustrative urban design response to these changes is presented in GSA drawing 1229-D-1006 which is provided in Figure 1. 2.7 Whilst the impact of the proposed cable car and tunnel on plot site areas is significant, the application scheme provides for the same overall volume of development floorspace permitted by the 2004 Masterplan, within a townscape model that responds positively to the new constraints and opportunities provided by the introduction of the London Cable Car. c) Land use 2.8 There is a continuation in the theme of providing predominantly commercial development in the plots north of Edmund Halley Way except for Plot N0207 which will provide riverside-fronted residential development. Retail uses (Class A1-A5) continue to be proposed at ground floor level. To the south of Edmund Halley Way, the predominant use continues to be residential with ground floor retail uses except for Plot M0118 which is proposed as a wholly retail plot. The proposed uses are therefore reflective of the 2004 Masterplan and specific proposals for the site as set out in the adopted Greenwich Unitary Development Plan (UDP). 2.9 However, the distribution of uses has been modified in response to the opportunities presented by the addition of the cable car and its associated public realm. The A1-A5 uses at ground floor level adjacent to the new Riverside Square and cable car station will enhance the relationship of these plots with the new public realm. 2.10 Redefining the plot boundaries has further resulted in more public realm and open space to the benefit of all site users. d) Amount of development 2.11 The table below summaries uses and associated gross areas achievable within the 2004 Masterplan parameters, compared to the CCAM proposals. This shows that the total gross floorspace approved in 2004 can be provided in the reconfigured Masterplan. Table 1.1: Uses and Associated Gross Areas Land use Approved Masterplan MDL proposals GSA Illustrative Scheme Residential - floorspace - units 111,389sqm 1,505 111,389sqm 1,505 A1-A5 7,717 sqm 7,717 sqm 7,550 Commercial 38,024sqm 38,024sqm 37,774 Total floorspace 157,130sqm 157,130sqm 155,766 Nb. All figures exclude car parking and plant areas 37,774sq.m 1,492 2.12 The amount of development proposed by the CCAM is therefore unchanged from that approved by the 2004 Masterplan. The floorspace provided within the GSA illustrative scheme is also shown in the table above to demonstrate the level of floorspace that could be developed if this S:\Job Nos\JLL (10)\JLL0509 - Greenwich Peninsula EIA\ES\Non-Technical Summary\GPCCAM FINAL ES NTS 24122010.doc 3

scheme came forward for reserved matters approval. As can be seen, the floorspace figures are all within the applied for figures. e) Scaled parameters 2.13 Information is submitted with the outline planning application to provide an indication of the upper and lower limits for building heights within the six reconfigured plots. There are differences in the height parameters proposed by this application when compared to that approved by the 2004 Masterplan. This is largely as a result of the need to match the amount of development permitted by the 2004 Masterplan within a smaller developable plot area. Maximum building heights proposed in plots N0405 and N0404 remain reflective of that approved by the 2004 Masterplan. The areas of notable change are in Plots N0207, M0106, M0107, M0109 and M0110 where maximum building heights have increased from that consented by the 2004 Masterplan. This change will accommodate three towers that are proposed on these plots. In contrast, the proposed maximum building heights for Plot M0118 has reduced from 41m to 17.5m to reflect the scale of the Cable Car station. 2.14 All plots except for Plot M0118 will have a minimum building height of 15m AOD. In Plot M0118, the minimum height will be 9m AOD. 2.15 Approval is not sought at this stage for the layout, scale or appearance of any new building. This will be the subject of reserved matters applications pursuant to conditions that will be attached to any outline planning permission granted. f) Indicative layout 2.16 The indicative layout for the CCAM (Figure 1) is strongly influenced by the 2004 Masterplan and by the constraints and opportunities created by it. The illustrative design for the Scheme includes the introduction of two tall buildings to act as a gateway for the London Cable Car landing, and a third focal point tall building to the west of the station building (north-western corner of Plot M0109/10) on an axis with the cable car. The illustrative scheme represents a workable design solution and has been assessed as the likely development scheme for the purpose of the Environmental Impact Assessment (EIA) that has been carried out in support of the proposals. However, detailed approval is not being sought for this scheme at this time. 2.17 The residential plots demonstrate a design theme which locates the built development on the edges of the plot with taller tower buildings in the plot corners and courtyards/open space in the centre of the plots. 2.18 Reconfiguration of the Masterplan to accommodate the London Cable Car proposals has resulted in the opportunity to secure additional areas of public realm/open space, especially in the new Riverside Square area to the east of the cable car station, fronting the river. 2.19 In order to allow for some flexibility, but principally to maintain adequate corridors for key vehicular and pedestrian routes, masterplan plot boundaries (excluding projections and balconies beyond plot boundary above ground level) have been defined with prescribed deviations in the building lines at the plot boundaries. S:\Job Nos\JLL (10)\JLL0509 - Greenwich Peninsula EIA\ES\Non-Technical Summary\GPCCAM FINAL ES NTS 24122010.doc 4

g) Indicative access 2.20 Whilst access is not applied for within the CCAM application, the access routes are shown on the submitted plans and are defined through the plot boundaries. The main changes to access, from the 2004 Masterplan, s the loss of the access road between Plots MO106 and MO107 and MO109 and MO110 (known as Rivermill Lane). The primary vehicular access through the CCAM site is retained along Chandlers Avenue, to the east of MO109 and MO110, whilst the main pedestrian access is provided by Redpath Way, to the west of MO106 and MO107. 2.21 Vehicular entrances to the plots are not indicated on the plans submitted with this application. This detail will come forward as part of the reserved matters submissions. h) Design standards and principles 2.22 The development parameters proposed in this application and the illustrative scheme that has been prepared reflect the design principles established by the approved 2004 Masterplan and supporting documents (Masterplan Design Statement and Masterplan Design Code) insofar as it relates to the CCAM. When progressing the detailed design and through the submission of reserved matters applications, the various standards, targets and obligations established by the 2004 Masterplan will be further realised in the interests of delivering the vision for the Greenwich Peninsula. S:\Job Nos\JLL (10)\JLL0509 - Greenwich Peninsula EIA\ES\Non-Technical Summary\GPCCAM FINAL ES NTS 24122010.doc 5

3 THE ENVIRONMENTAL IMPACT ASSESSMENT (EIA) AND THE ENVIRONMENTAL STATEMENT (ES) 3.1 An EIA involves the collection of extensive environmental information to ensure that the likely environmental effects arising from the new development are fully understood and taken into account before the development is allowed to go ahead. It comprises a series of studies, surveys and consultations in order to gain an understanding of the range of local environmental conditions. 3.2 The ES Reports on the likely significant environmental effects of a new development. It includes: Any significant environmental effects that the development may have. The methods of avoiding, reducing or offsetting significant adverse effects ( mitigation measures ) and methods to enhance any beneficial effects that have been applied. Any remaining ( residual ) effects 3.3 To evaluate the likely environmental effects and their significance, current knowledge of the site and the surrounding environment has been utilised. In particular, the EIA draws upon information contained within the 2002 ES of the Greenwich Peninsula Masterplan, subsequent environmental reports and surveys, as well as the ES recently prepared for TfL the London Cable Car scheme (Mott MacDonald, October 2010). A significant effect is one that, according to EIA specialists, needs to be brought to the attention of the decision-making authorities. It can be beneficial or adverse and temporary or permanent. 3.4 The EIA process and resulting Environmental Statement (ES) have been informed by a scoping exercise undertaken with LBG and relevant consultees. The outcome of this exercise and the responses received are summarised in the ES. 3.5 Relevant environmental standards and guidelines as well as various planning conditions and obligations which were attached to the 2004 outline planning permission are likely to remain applicable to the CCAM scheme. For example, the existing Integrated Management System (IMS) and Environmental Method Statement (EMS) will be adopted to mitigate the effects of construction of the development. The IMS deals with: noise and vibration; air quality and dust; traffic management and the protection of roads and footpaths; storage of materials; site drainage and protection of watercourses; archaeological deposits; protection of Listed Buildings and other structures; ecological protection; hoardings; and transport. S:\Job Nos\JLL (10)\JLL0509 - Greenwich Peninsula EIA\ES\Non-Technical Summary\GPCCAM FINAL ES NTS 24122010.doc 6

4 ISSUES COVERED IN THE EIA a) Introduction 4.1 In advance of submitting the application, MDL informally agreed with LB Greenwich that the EIA would include an assessment of the following topics: Noise and Vibration Water Resources and Flood Risk Wind Microclimate Daylight, Sunlight and Overshadowing Townscape, Visual and Built Heritage b) Noise and Vibration 4.2 A full assessment of noise and vibration was undertaken for the Greenwich Peninsula Masterplan, in 2002. It identified the likely effects of the proposed development in terms of noise and vibration from construction activities and upon completions and occupation of the CCAM scheme. There are already a number of agreed strategies in place to control any noise and vibration effects caused by the wider Peninsula development. 4.3 The Noise and Vibration assessment for this application focussed on looking at how the introduction of the Cable Car would change the noise and vibration levels within the residential units of the CCAM. The findings show that if the proposed Cable Car development receives planning permission, the surrounding area would still be suitable for residential development. 4.4 Based on the predicted noise levels for the Cable Car, acceptable internal noise levels can still be achieved within the CCAM with design features to minimise noise, although the acoustic specification of some building facades may need to be higher than would otherwise be the case if the Cable Car were not present.). 4.5 As such, it is recommended that LB Greenwich attach appropriately worded planning conditions to any consent granted for the Cable Car scheme, to ensure that no adverse impacts upon the adjacent residential properties within the CCAM scheme would arise. c) Water Resources and Flood Risk 4.6 The Water Resources and Flood Risk chapter assessed the effects of the CCAM on drainage patterns and flooding risk. The assessment considers the likely effects on water resources and flood risk from construction works and from the completed development. 4.7 Construction works could result in surface water or sewer flooding, where mud or solid wastes enter the drainage system. This would reduce the capacity of the system to accommodate runoff, and increase the potential for flooding. Such activities within the approved Greenwich Peninsula Masterplan are already controlled by environmental strategies and planning conditions to minimise the potential for this type of impact. It is proposed that the same approach is applied to future construction works within the CCAM. 4.8 Once all of the plots within the CCAM are constructed, surface water will run off built surfaces within the development, such as roofs and hard standing, which has the potential to affect water S:\Job Nos\JLL (10)\JLL0509 - Greenwich Peninsula EIA\ES\Non-Technical Summary\GPCCAM FINAL ES NTS 24122010.doc 7

quality and increase the likelihood of different sources of flooding. The assessment concludes that, with the adoption of measures such as rainwater harvesting, attenuation and water efficiency measures, the proposed development will ultimately have a beneficial effect in terms of water resources and flood risk. This is consistent with the findings of the 2002 ES. d) Wind Microclimate 4.9 This chapter assesses the potential effect on the wind microclimate within and around the application site. This is particularly important as the proposed development is intended as mixed use which will include a series of footpaths and open spaces. 4.10 It is found that in the context of the completed CCAM scheme, wind conditions within the proposed development and surrounding area are largely acceptable for the expected pedestrian uses. However, areas do exist within the site where conditions would be expected (with no specific development of mitigation measures) to be too windy for some potential recreational uses. Where potential adverse conditions are predicted, it is likely that these windier areas can be mitigated through a landscaping features and other measures which would be defined at the detailed design stage. e) Daylight, Sunlight and Overshadowing 4.11 An assessment was undertaken of likely effects of the proposed Greenwich Peninsula Cable CCMA scheme on the daylight, sunlight and overshadowing conditions experienced by neighbouring properties and the future residents and occupants of the site. 4.12 Overall the daylight, sunlight and overshadowing tests undertaken showed that good levels of daylight and sunlight will be enjoyed to the vast majority of the habitable rooms within the future development. Careful consideration at the detailed design stages can ensure that the number of habitable rooms that receive good levels of daylight and sunlight can be maximised. 4.13 The overshadowing assessment indicates that each amenity space will be able to enjoy a good level of sunlight. 4.14 Overall the daylight, sunlight and overshadowing effects to the surrounding properties are considered acceptable and likely to be acceptable to the occupants given the location of the development close to the City. Furthermore, whilst the plots approved under the original 2004 Greenwich Peninsula Masterplan have not been reassessed, it is considered that the new proposals will overall lead to an improvement to the sunlight and daylight conditions when compared to the original outline permission. This is because the new development will includes higher, more slender elements, and is a less dense development at lower levels f) Townscape, Visual and Built Heritage 4.15 This assessment looked at the potential townscape and visual impacts of both the maximum parameters for which outline planning permission is being sought and of an illustrative scheme prepared by Gardner Stewart Architects (GSA) within those parameters. The assessment was based on the review of a set of visually verified wire frames that show the development and how it would look within its existing environment from 11 key views. S:\Job Nos\JLL (10)\JLL0509 - Greenwich Peninsula EIA\ES\Non-Technical Summary\GPCCAM FINAL ES NTS 24122010.doc 8

4.16 The revised proposals for the site are not considered to represent a significant departure from the townscape and visual effects presented by the 2004 Masterplan. The new tall elements will add visual interest to the skyline of the peninsula and create a landmark for the cable car station. The height of the proposed development will be appropriate in scale to its surroundings. The assessment concludes that the data on which the original assessment was based has not significantly changed and the statements made regarding the townscape and visual impacts of the masterplan remain valid in that the development will present an overall positive impact on the appearance of the site. S:\Job Nos\JLL (10)\JLL0509 - Greenwich Peninsula EIA\ES\Non-Technical Summary\GPCCAM FINAL ES NTS 24122010.doc 9

5 SUSTAINABILITY 5.1 A wide range of sustainable commitments and design measures have been incorporated into the scheme which are consistent with national, regional and local planning policy, as well as GPRL s Sustainability Vision for the Greenwich Peninsula development as a whole. The measures include objectives for: land use; water and resource conservation; climate change adaption and mitigation; pollution; microclimate; community needs; the natural environment and biodiversity; waste management; sustainable construction; and, transport. 5.2 The sustainability of the CCAM will be secured through supplementary S106 agreements and other planning conditions. Further consideration will be given towards more specific sustainability initiatives at subsequent design stages. S:\Job Nos\JLL (10)\JLL0509 - Greenwich Peninsula EIA\ES\Non-Technical Summary\GPCCAM FINAL ES NTS 24122010.doc 10

6 SUPPORTING INFORMATION a) Introduction 6.1 In addition to the ES, the CCAM planning application is also accompanied by the following documentation: i. Planning Statement 6.2 This document provides the context for the CCAM planning application in relation to relevant national, regional and local planning policy ii. Design and Access Statement 6.3 This statement incorporates the illustrative design proposals prepared by Gardener Stewart Architects. It principally explains the design principles and concepts that have been applied to the proposed development and discusses how issues relating to access have been addressed. iii. Sustainability Statement 6.4 This statement provides a summary of the sustainability initiatives proposed for the scheme and further information on how sustainability will be implemented through detailed design, construction, and operation. iv. Transport Assessment 6.5 This document considers the traffic of the proposed development and considers how it will integrate into the existing transport network. It also considers how construction traffic will be managed and the proposed approach to Travel Planning. v. Statement of Community Engagement 6.6 This statement sets out the various consultations that have been carried out to inform others of the scheme (including the public). It discusses the methods used to consult and summarises the key issues raised. vi. Technical Memo by QinetiQ 6.7 This note includes an assessment of the likely impact of the CCAM scheme on the operation of the Thames automatic identification system, vessel traffic services, radar and microwave links. It has been prepared to assist discussions on the application proposals with the Port of London Authority. S:\Job Nos\JLL (10)\JLL0509 - Greenwich Peninsula EIA\ES\Non-Technical Summary\GPCCAM FINAL ES NTS 24122010.doc 11

7 FURTHER INFORMATION 7.1 If you have any comments, queries or requests for further information regarding the Environmental Statement, please contact: RPS Planning and Development Limited 1st floor (west) Cottons Centre Cottons Lane London SE1 2QG 7.2 Hard copies of the complete Environmental Statement are available and a charge may be made to cover the cost of production. 7.3 A CD of the Environmental Statement can also be made available free of charge. S:\Job Nos\JLL (10)\JLL0509 - Greenwich Peninsula EIA\ES\Non-Technical Summary\GPCCAM FINAL ES NTS 24122010.doc 12

APPENDIX 1 Illustrative Design Response: Drawing 1229-D-1006 (Rev C) S:\Job Nos\JLL (10)\JLL0509 - Greenwich Peninsula EIA\ES\Non-Technical Summary\GPCCAM FINAL ES NTS 24122010.doc 13