Guidelines for the Sanitary Sewer Evaluation Survey (SSES) Report PLAN A

Similar documents
Village of Sloan Smoke Testing September 2017

September 30, Dear Fire Suppression System Contractor/Designer:

Site Plan Review Residential Accessory Building

Bold items are particular to the City of Euless

RULES OF DEPARTMENT OF COMMERCE AND INSURANCE DIVISION OF FIRE PREVENTION CHAPTER FIRE PROTECTION SPRINKLER SYSTEM CONTRACTORS

Medical Gas and Vacuum Systems

Broward County Utility Connection Permit Part One Application for Plan Review

RULES OF DEPARTMENT OF COMMERCE AND INSURANCE DIVISION OF FIRE PREVENTION CHAPTER FIRE EXTINGUISHERS TABLE OF CONTENTS

May 1, Dear Fire Suppression System Contractor/Designer:

CIVIL ENGINEERING PERMIT APPLICATION

INTENSIVE SMOKE TESTING SPECIFICATIONS & PROCEDURES

Fire Protection Systems Plan Review

Project phasing plan (if applicable) 12 copies of site plan

THIS ORDINANCE ONLY AFFECTS EXISTING FIRE ALARM SYSTEMS.

SUBMITTAL REQUIREMENTS

Commercial Remodel/ Add On Rules and Regulations

Program Introduction and Policy 1. Frequently Asked Questions 2. Device Maintenance..3. Best Management Practices...4

Commercial Rules and Regulations

City of Miami MIAMI RIVER BASIN WATER QUALITY IMPROVEMENT REPORT FOR FIRST AND SECOND QUARTER 2010

EXISTING FIRE SPRINKLER SYSTEMS ARE THEY HAZARDS? HOW CAN WE APPROACH THEM?

Agenda Item # 1. Meeting Date September 21, Prepared By. Approved By

STATUS OF REVIEW: ENGINEER WILL COMPLY

City of Miami MIAMI RIVER BASIN WATER QUALITY IMPROVEMENT REPORT FOR FOURTH QUARTER 2010

APPENDIX H (DESIGN SUBMISSION CRITERIA)

Mayor Leon Skip Beeler and Members of the City Commission. Anthony Caravella, AICP, Director of Development Services

Coco Palms Community Development District. Engineer s Report Infrastructure Improvements

Departure from the Development Plan. Town Council objection to a major application. DETERMINE

City of Calabasas Building and Safety Division Fee Schedule

4. CONCEPT PLAN DEVELOPMENT

WEST VIRGINIA UNIVERSITY

Fire Sprinkler Submittal Requirements and Acceptance Testing

TOWNSHIP OF LOGAN SOIL & FILL IMPORTATION AND PLACEMENT APPLICATION SUBMITTAL CHECKLIST

PRELIMINARY STAFF PLANNING REPORT TO THE WALWORTH COUNTY ZONING AGENCY X CONDITIONAL USE

OHIO UNIVERSITY RADIATION SAFETY REVIEW

Telecom Applications Management

Project Name: MELWOOD HOTEL. Date Accepted: 1/12/04. Waived. Planning Board Action Limit: Plan Acreage: 1.7 Zone: Dwelling Units:

CRESCENT RESOURCES INC.

D. The work addressed in this section consists of a fire protection system, which may include coordination with one or more of the following:

Design & Construction Standards, Revised January

ARKANSAS FIRE PROTECTION LICENSING BOARD ACT 743 OF 1977

1.3 REFERENCE STANDARDS

Grease Interceptors and Oil Separators

PERFORMANCE SPECIFICATION GUIDELINE SMOKE TESTING

Rancho Cucamonga Fire Protection District Prevention Bureau Standard

NFPA Fire Inspector I Study Guide

NFPA 72 Code Changes vs 2013

Gloucester County PLAN SUBMITTER'S CHECKLIST

Minimum Standards for Engineers Practicing Fire Protection Engineering in the State of Oklahoma September 14, 2016

UNIVERSITY OF ROCHESTER ENVIRONMENTAL HEALTH & SAFETY

Community Development Department Commercial Permit Application

Glenborough at Easton Land Use Master Plan

FIRST COCONUT GROVE SCHOOLHOUSE

CITY OF SIGNAL HILL Cherry Avenue Signal Hill, CA PROCEDURES RELATIVE TO CITY COUNCIL PUBLIC HEARINGS

APPLICATION FOR MINOR SITE PLAN REVIEW

Type of Fire Alarm Control Panel: System is: Existing OR New If new, provide Electrical Permit Number:

El Segundo Fire Department. Unified Program (UP) Form CONSOLIDATED CONTINGENCY PLAN I. FACILITY IDENTIFICATION

Highway Oriented Commercial Development Criteria

Chapter LANDMARKS AND HISTORIC SPECIAL REVIEW DISTRICTS A.120 Enforcement A.130 Severability. Tacoma Municipal Code

Urban Planning and Land Use

Mayor Leon Skip Beeler and Members of the City Commission. Anthony Caravella, AICP, Director of Development Services

Applicant Name Phone / Fax / Address City State Zip Code . Property Owner Phone / Fax / Address City State Zip Code

Tree Removal Review Process for Larger Diameter Trees in Ashborough East

Moreno Valley Fire Department Fire Prevention Bureau. New and Existing Fire Alarm & Signaling Systems Guideline

PLANNED UNIT DEVELOPMENT APPLICATION

NORTHWESTERN UNIVERSITY PROJECT NAME JOB # ISSUED: 03/29/2017

**THIS DOCUMENT IS EXEMPT FROM FOIA** **DO NOT SHARE UNDER FOIA OR ANY OTHER REQUEST**

Boston Water and Sewer Commission

2.07 Permit Application Checklist for Diesel Generators, Diesel Fire Pumps, and Fuel Tanks Serving Generators and Fire Pumps (2016)

**THIS DOCUMENT IS EXEMPT FROM FOIA** **DO NOT SHARE UNDER FOIA OR ANY OTHER REQUEST**

Phase II Storm Water Permit Program MS4 Permit

America s Walk-In Tub. Installation & Instructions. Manufactured by. A Division of Spa World Corp NW 35th Avenue ANSI-Z124.1

SITE PLAN REVIEW APPLICATION

CITY OF DEERFIELD BEACH Request for City Commission Agenda

Fats, Oils and Grease Program (FOG)

Summary of BBS Proposed Ohio Plumbing Code Rule Changes October 2016

SUWANNEE RIVER WATER MANAGEMENT DISTRICT REQUEST FOR BID NO. 15/16-003AO FIRE ALARM SYSTEM INSTALLATION AND MONITORING.

HISTORIC SITE AND MONUMENT COMMISSION (HSMC) Instructions for Historical Markers, Monuments, and Public Art Application

CALIFORNIA DEPARTMENT of FORESTRY and FIRE PROTECTION OFFICE OF THE STATE FIRE MARSHAL UL 300

PLANNING AND DEVELOPMENT DEPARTMENT SITE PLAN REVIEW SECTION / CURRENT PLANNING APPLICATION FOR PRELIMINARY SITE DEVELOPMENT PLAN APPROVAL

TECHNICAL COMMITTEE ON FIRE PUMPS

Water Heater Innovations Marathon Water Heater Limited Warranty Policies & Procedures

The Development Review Process. Presentation to the GSSC IAC

ANNUAL / Renewable TOTAL: $

ROGUE VALLEY SEWER SERVICES STORMWATER MANAGEMENT PROGRAM (SWMP)

SEWER SYSTEM MANAGEMENT PLAN

Department of Planning & Development Planning Unit

Draft Rhode Island Stormwater Design and Installation Standards Manual

City of Richland Stormwater Management Plan

CITY OF LOS BANOS LANDSCAPE PLAN REVIEW PROCEDURE. Public Works Department 411 Madison Avenue, Los Banos, CA FOR ALL PROJECTS:

CLARK COUNTY FIRE DEPARTMENT Fire Prevention Bureau

BULLETIN #1 Summerfield/Riverwalk Fencing Criteria

CITY PLANNING COMMISSION AGENDA. ITEM NO: 6.a 6.b STAFF: LONNA THELEN

ARTICLE 17 SITE PLAN REVIEW

City of Concord, NH Site Plan Regulations

The Maryland-National Capital Park and Planning Commission Prince George s County Planning Department Development Review Division

Evacuation Fire Safety Program

MOBILE CITY PLANNING COMMISSION LETTER OF DECISION. October 22, 2010

SERVICE BULLETIN Carrier Corporation 2014

HIGHLAND HILLS MAINTENANCE COMMISSION. Board of Trustees. BOARD POLICY NO: 3-9 Dated: 28 Sep 2001 Revised: 2 Feb 2005

FIRE & LIFE SAFTEY STANDARD

Transcription:

Guidelines for the Sanitary Sewer Evaluation Survey (SSES) Report PLAN A 2 nd Cycle Report Due November 12, 2012 Revision 11/05/2015 wps-pa

Report Cover Letter Requirements - Sample SSES PLAN A 2nd CYCLE REPORT PSO-00108 1st, 2nd, etc. Submittal Date: Facility name /address: SUNSET ROYAL APARTMENTS 7399 SW 119 Avenue Miami, Florida 33173 Engineering Co. name/ address: John Smith Engineering, Inc. 2022 SW 122 Avenue Miami, Fl. 33174 Ph: (305) 230-2240 email: js@jseng.com Service Contractor Company Name 1200 NE 96 ST North Miami, Fl. 33124 Contact Name: Emergency-Phone Number: Email: Prepared By: name & title seal of the Florida Professional Engineer signing the manual signature

WATER & WASTEWATER ENGINEERING SECTION Guidelines for the Second Cycle SSES Submittals (PLAN A) Table of Contents Page No. GENERAL COMMENTS. 1 Purpose of SSES. 1 County Code Requirement for SSES.. 1 Description of SSES Due November 12, 2012... 1 GUIDELINES FOR THE SSES 2 ND CYCLE REPORT PLAN-A... 2 System Type. 2 Exempt Facilities.. 2 REPORT GUIDELINES FOR A SMALL COLLECTION SYSTEM PLAN-A 3 SSES REPORT SAMPLE FOR A SMALL COLLECTION SYSTEM-PLAN-A.. 5 Sample Site Plan Drawing 7 Sample Manhole Visual Inspection form. 8 Sample Diagram... 9 GUIDELINES FOR THE MANHOLE VISUAL INSPECTION.. 10 GUIDELINES FOR THE SUBMITTAL OF DRAWINGS.. 11 SSES REPORT CHECK LIST 12

Report Cover Letter Requirements - Sample SSES PLAN A 2nd CYCLE... PSO-00108 SUNSET ROYAL APARTMENTS 7399 SW 119 Avenue Miami, Florida 33173 John Smith Engineering, Inc. 2022 SW 122 Avenue Miami, Fl. 33174 Ph: (305) 230-2240 email: js@jseng.com Service Contractor Company Name 1200 NE 96 ST North Miami, Fl. 33124 Contact Name: Emergency-Phone Number: Email: June 10, 2009 Prepared By: name & title signature seal of the Florida Professional Engineer signing the manual

GENERAL COMMENTS PLAN A Sanitary Sewer Evaluation Survey (SSES) 2nd Cycle Report Due November 12, 2012 Purpose of the SSES The sanitary sewer evaluation survey is intended to locate and correct excessive infiltration and inflow (I/I) into the sewer lines in Miami-Dade County. Excessive I/I flow cause sewer overflows leading to public health threats. This survey is one of several actions required by Chapter 24 of the Miami-Dade County Code to prevent these problems. County Code Requirement for SSES: Section 24-42.2 (1) (a) of the Miami-Dade County Code provides that: Each publicly or privately-owned or operated sanitary sewer collection system shall be evaluated in order to identify and reduce infiltration and inflow into the sanitary sewer collection system The person responsible for the sewer system s operation shall implement a sewer system evaluation survey (SSES) and, if required, a rehabilitation program, incorporating the provisions and requirements set forth in the U.S. EPA's Sewer System Infrastructure Analysis and Rehabilitation Handbook The deadline for the completion of this survey, as set by the Miami-Dade County Code, requires that it be completed and submitted on or before November 12, 2012. Note: From the experience gained during the first SSES cycle, it is highly recommended that you start scheduling with your contractor or consultant of choice, the work required under the SSES, as early as possible. Contact DERM - PSO program if you need a copy of the list of contractors and consultants from the first cycle. Description of SSES: Due November 12, 2012 There are two types of facilities. The type of facility depends on the quantity of gravity pipe and the existence of a Pump Station. Facilities with a Pump Station and less than 1000 feet of gravity pipe may use the abbreviated survey described below as Plan A. Facilities with equal or greater than 1000 feet of qualifying pipe, with or without a private sanitary pump station, will be required to complete a different survey under Plan B. If you are unsure which category your facility falls into, please contact: DERM PSO Program Coordinator Phone Number: (305) 372-6600 Fax: (305) 372-6410 E-mail Address: aguiro@miamidade.gov pablo.asencio@miamidade.gov elsa.cabrejo@miamidade.gov for Oscar Aguirre, Eng.3 for Pablo Asencio, Eng.1 for Elsa Cabrejo, Eng.1

Guidelines for the Sanitary Sewer Evaluation Survey (SSES) 2 nd Cycle Report - PLAN A These guidelines are supplied as an aide guide for the preparation of the SSES for your facility and it does not include all the possible requirements according to the specific SSCS system. Since each system is different, the guidelines are rather general in nature. An SSES sample report is available. The guidelines are designed to be used with the sample SSES report provided. They reflect the same criteria used in the evaluation forms that are used by DERM to review SSES report submittals for acceptance. Failure to meet these guidelines will result in the report being disapproved. SYSTEM TYPE Systems that have a private pump station and a gravity collection system with less than 1000 feet of pipe, six inches or larger in nominal diameter, will follow PLAN A. These systems will normally only need to submit a single report following the report guidelines for small collection system PLAN A. Exempt Facilities All Properties/Facilities with sanitary sewer collection systems built after November 12, 2007 will be granted a grandfather exemption from submitting the SSES for the Second Cycle only, which ends on November 12, 2012. Proof of Inspection and testing must be provided. Be advised that said exempt properties/facilities will have to submit the next third cycle SSES report, which runs from November 12, 2012, through November 12, 2022, and thereafter. DERM will send reminders of the SSES requirements for the third cycle to all facilities when appropriate. Contact DERM Water and Wastewater - Engineering Section if you have any questions about exemptions. Please also note that you are required to notify DERM at least three (3) working days in advance of the day of any smoke testing, in order for DERM s personnel to be present to monitor each test, if desired. Submit test notification via email to pso@miamidade.gov or call DERM-PSO Program at (305) 372-6600 or via fax at (305) 372-6410. The Department reserves the righ to request a change of the test date and time as per the Department's discretion. FAILURE TO PROVIDE THIS ADVANCE NOTIFICATION OF THE TESTING MAY RESULT IN NON-ACCEPTANCE OF THE TESTS, REQUIRING THAT THEY BE REPEATED. YOU MAY ALSO NOTIFIED DERM VIA E-MAIL AT PSO@MIAMIDADE.GOV

Report Guidelines for a Small Collection System - PLAN A According to our records, your facility / property does have a private pump station and a gravity collection system with less than 1000 feet of pipe, six inches or larger in nominal diameter. Therefore you must follow these guidelines. 1.0 Facility Name and Location Provide facility/property name and street address. Provide PSO # 2.0 System Description Provide a description of the system. Include characteristics of the pump station and the collection system. Provide information about the components of the system and provide dimensions of piping. 3.0 Evaluation Survey Information Provide detail information about the survey of the facility s Sanitary Sewer Collection System. Indicate the exact dates of the survey. Provide name of the company that conducted the Survey and names of persons doing specific parts of the work. Indicate if any repairs were completed. If repairs were completed, provide exact date for re-testing of the system. Final approval will not be provided until all problems are repaired and retested. 4.0 Visual Inspection of System Provide results of the visual inspection. Indicate the exact date of the inspection and name of person and company name conducting inspection. Note conditions at each MH on DERM Manhole Visual Inspection Form. See Form attached. If the Sanitary Sewer Collection System does not have MH, a visual inspection of the clean-outs must be included. Report their status in a table, if appropriate. 5.0 Smoke Test The local fire Marshall / Department shall be notified before starting smoke tests. Provide date of testing. 3

Describe method and equipment used for testing. Give results found in testing. Note weather or other conditions that may have affected testing. Note whether or not testing was monitored by DERM. Note in the report if smoke passes thru all parts of the system. Smoke shall pass through entire system, between all manholes, and through laterals into building systems, as indicated by smoke from roof vent stacks. Surcharged conditions blocking smoke flow will be cause for disapproval. Smoke shall be introduced into system in as many places as necessary to force smoke through all parts of system. All problems discovered by smoke testing shall be corrected and retested. DERM shall be notified within one week of any interconnection between sanitary and storm sewers located by the smoke testing. These problems shall be corrected within 30 days of their discovery. Be advised that you are required to notify DERM at least three working days for all smoke testing, in case that DERM elect to send an observer to monitor the test. 6.0 System Repairs All problems located in the inspection and smoke testing shall be corrected. Describe the actions and methods employed in correcting problems discovered in the system. Provide date when repairs were completed. Provide information on who completed the repairs. 7.0 Re-testing Provide date of re-testing. Describe method and equipment used for re-testing. Give results found in re-testing. Note weather or other conditions, which may have affected re-testing. Note whether or not re-testing was monitored by DERM. DERM shall be given three days advance notice of all testing. If problems were found only on a part of the system, only those parts need to be retested. 8.0 Updated Sanitary Collection System Drawing Identify any modifications to the system. Mark/Show new or existing items not identified in previous drawing. You must provide a drawing of the system. Refer to the Guidelines of the submittal of drawings. Identified (MH #) each manhole. Submit the Manhole Visual Inspection Form. Refer to the Guidelines for the Submittal of Drawings at the end of this package. 9.0 SSES Final Results. Confirm if the system now meets required standards. 4

SSES Report Sample for a Small Collection System Plan A This sample is supplied, as a guide to meet the requirements for providing an SSES report for your property/facility. This sample reflects the level of thoroughness and clarity expected in the submittals. The sample should be reviewed carefully by whoever prepares the SSES for your facility. 1.0 Facility Name and Location Address-Acme Tool and Widgit 5522 SE Miami Drive Miami, FL. 33333 2.0 System Description: This system includes a wet well type pump station, with two, five-horsepower submersible pumps, a run of four-inch force main, and a gravity collection system. The gravity collection system has 680 feet of 8-inch gravity main, with three manholes. There are five cleanouts on the laterals to this main. Pipe Length (Ft) Pipe Diameter (in) Material 200 8 CLAY 480 8 CIP 85 4 PVC 3.0 Evaluation Survey Information: Underground Investigations Engineers, Inc conducted the sanitary sewer evaluation survey for this facility on May 14-19, 2009. Repair work was done on the system on May 22, 2009. The system was re-tested on May 29, 2009. 4.0 Visual Inspection of System: Mr. W. E. Coyote of U.I.E, carried out the visual inspection of the system on May 14, 2009. The manhole number one, about twenty feet west of the pump station, was in satisfactory condition. There was normal flow through the manhole, and physical condition was satisfactory. The invert of the manhole was 9.2 feet below grade. Inspection of the manhole number two showed that there was an uncapped opening leading to the south. This opening is allowing infiltration of groundwater into the manhole. Flow through the manhole is normal. The physical condition of the manhole and cover is satisfactory. The invert elevation of the manhole is 6.7 feet. Manhole number three was found to be in satisfactory condition. This is the terminal manhole for this system. There is no flow through this manhole. Invert elevation of the number three manhole is 4.1 feet below grade. See Manhole Visual Inspection Form attached. Visual examination of the rest of the system found five cleanouts in laterals leading to the main. All of these laterals were properly capped. 5

5.0 Smoke Test: The gravity collection system was smoke tested on May 19, 2009. DERM was notified of the test on May 14, but elected not to attend. A 10,000 cubic foot smoke charge was set off in the wet well of the pump station and an Acme model AIR-100 blower was used to force the smoke into the system. Smoke was observed coming from the ground near the southeast corner of building C. After investigation, it was found that there was a previously unknown clean-out at this location. No other problems were located during the smoke testing. Smoke was observed coming out of all roof vents (sewer stacks) during smoke test. 6.0 System Repairs: The unsealed opening in manhole number two was cemented closed. A new cover and lid were installed on the incomplete clean-out. Repairs were completed by Sewer Specialist Inc. on May 22, 2009. 7.0 Re-testing: A second smoke testing was carried out on May 29, 2009, was following the same procedures as the first test. DERM was notified on May 25 and sent an inspector to monitor the test. No problems were discovered as a result of the second smoke test. 8.0 Updated Sanitary Sewer Collection System Drawing: Insert / Attach Sewer Collection System Drawing. For sample see Drawing Plan A at the end of this package. 9.0 SSES/ Final Results: The results of the survey showed that the facility is in compliance with the regulations under chapter 24 of the Miami-Dade Code. Signed Note: Mr. W. E. Coyote President, Underground Investigations Engineers, Inc. This sample SSES is correct only for the imaginary facility that it describes. Since your facility is different, Your SSES Will be Different. Please be reminded that you are required to notify DERM at least three working days in advance of all smoke testing, in order that DERM may monitor these tests, if desired. Failure to provide this advance notification of the tests may result in non-acceptance of the tests, requiring that they be repeated. 6

Sample Drawing Plan A PSO-108 Acme Tool & Widgit 5522 Southeast Miami Drive Miami, FL. 33333 N NOT TO SCALE Building 2 MH 3 25 ft.; 4 in Building 3 15 ft.; 4 in CO 4; 15 ft. C 10 ft.; 4 in CO 5 100 ft.; 8 in Clay CO 4 240 ft.; 8 in CIP CO 3 20 ft.; 4 in MH 2 180 ft.; 8 in Clay Building 1 CO 1 CO 2 SW 56 AVE. CO 1; 20 ft. 15 ft.; 4 in MH 1 140 ft.; 8 in CIP 20 ft.; 8 in CLAY SW 55 AVE. Pump Station 4-inch Force Main Southeast Miami Drive Property Line Force Main Title Block with Consultant or Contractor Name, Address, Phone, Issued Date, and Dwg(s)/Sheet(s) No. 7

Manhole Visual Inspection Form SAMPLE M Make copies of this form as required or necessary for your SSES report. Use arrows to show all mains (lines) connected to MH and flow direction. See sample on the back of this form. Indicate pipe of material (if possible), and pipe sizes. Cross check this form information with the system (SSCS) site plan submitted and the O & M Manual in permittee records. A copy of this form shall be submitted with the SSES-Site Plan. PSO- 108 Manhole #: 1 Manhole #: 2 8 CIP 8 CLAY N 8 CIP 8 CLAY N Extra Pipe 8 CIP Surcharged: NO WW Flow: YES Infiltration: NO MH Inserts: NO MH Cover Damaged: NO Grease: NO Comments: Normal Flow Physical Condition OK Surcharged: NO WW Flow: YES Infiltration: YES MH Inserts: NO MH Cover Damaged: NO Grease: NO Comments: Extra Pipe is source of infiltration Physical Condition OK Normal Flow Manhole #: 3 Manhole #: N N 8 CIP Surcharged: NO WW Flow: NO Infiltration: NO MH Inserts: NO MH Cover Damaged: NO Grease: NO Comments: Physical Condition OK Terminal Manhole- No flow at the moment Surcharged: WW Flow: Infiltration: MH Inserts: MH Cover Damaged: Grease: Comments: Completed by (print name): Mr. W. E. Coyote Date: 5/14/2009 8

SAMPLE DIAGRAM Manhole #: 01 6 PVC P2 P1 6 PVC N P3 8 PVC Surcharged: No WW Flow: Yes Infiltration: Yes MH Inserts: Yes MH Cover Damaged: No Grease: No Comments: Normal sanitary Flow observed. No stains on walls from surcharging. Good Condition. NOTE: When completing the Manhole Inspection Form, please follow the Guidelines for the Manhole Visual Inspection in this package. 9

Guidelines for the Manhole Visual Inspection General Observations: Manhole Inspection: Open manhole. Note if there is an insert and if there are holes in the cover. Check for surcharge and grease buildup. Note on Manhole diagram the openings into and out of the manhole. Check if manhole is noted on the sanitary sewer drawing submitted. If manhole is surcharged, determine level below rim of manhole and extent of surcharge, if possible. New Installation: Mark new piping and/or manholes on system diagram. Advise permittee that the Operations and Maintenance (O&M) manual, previously submitted to DERM, must be updated accordingly. Surcharged Condition: If surcharged condition found, determine extent of surcharge in system and initiate corrective actions. If the final manhole in the system leading to public utility is surcharged, determine, if possible, if utility system is surcharged also. If system has a pump station, determine if surcharge exists in pump station wet well. If this is the case, determine if condition is caused by pump failure, incorrect control settings, or any other cause. Notify DERM at (305) 372-6600, if surcharge conditions exist in the public sanitary sewer lines (utility mains). Clean-outs: If collection system does not have sanitary sewer manholes, but Clean-outs, then provide general observations regarding status at the time of the inspection. Indicate if damaged or missing and/or type of corrective actions taken or to be taken. 10

PRIVATE SANITARY SEWER SYSTEMS Guidelines for the Submittal of Drawings In order to assure that the drawings submitted to this Department contain the required information, please read carefully the following guidelines: The drawings accepted are Construction, As-Built or Survey Drawings, showing the property boundaries and adjacent main streets. Also, it must show the building footprints and the location, length and diameter of all underground sanitary sewer pipes, outside of the building structures, including the laterals, manholes and cleanouts. Also accepted are Certified Microfilm Copies, if they exist, of the Sanitary Sewer Layout within the subject property, from the corresponding Building and Zoning Department, and/or Plumbing Department files. The drawing must show the property boundaries and adjacent main streets, the location, length and diameter of all underground sanitary sewer pipes, outside of the building structures, including the laterals. Contact your Building Department for more information on how to obtain such copies. The Drawing may be submitted in an 8-1/2 X 11 paper sheet or larger. The scale of the drawing must be proportional and readable. If none of these documents are currently available, you may employ the services of a competent professional in the field to collect and provide the required information. The information requested is necessary in order to determine to what extent your property has to comply with the requirements of the ordinance. If you fail to submit such information, the SSES report will be considered INCOMPLETE and be subject to enforcement actions by DERM. ELECTRONIC SUBMITTALS THAT M EET THE ABOVE GUIDELINES ARE ALSO ACCEPTED. If you have additional questions, contact DERM - PSO Program (305) 372-6600 11

SSES Plan A Report Check List Item Number Description Check if Completed 1.0 Facility Name and Location 2.0 System Description 3.0 Evaluation Survey Information 4.0 Visual Inspection of System 5.0 Smoke Test 6.0 System Repairs 7.0 Re-testing 8.0 Updated Sanitary Collection System Drawing 9.0 SSES Final Results. Enter N/A if Not-Applicable 12