Venting Supplement. Direct Vent Through-Roof or Through-Unused-Chimney. Water Boiler Series 3 & 4

Similar documents
GWS. Venting Manual. Gas-Fired Water Boilers. Hazard definitions. Contents. Venting method definitions

GOLD. Venting Supplement. Water Boiler Series 3 & 4. for 3" venting

GOLD GV. Venting Supplement for 3 venting. Water Boiler Series 3 & 4

Venting Supplement Saf-T Vent 3" venting Special gas vent system vent and combustion air supplement for 3" diameter venting Hazard definitions

GOLD GV. Venting Supplement. Water boiler Series 3. Special gas vent system vent and combustion air supplement. Hazard definitions.

200i. Vent/air manual. Installation instructions for vent and air piping. Also read and follow: 200i Boiler manual 200i Control manual

Installation guide and material checklists

Vent and air piped through a side wall (concentric termination)

INSTALLATION AND SERVICE MANUAL

INSTALLATION AND SERVICE MANUAL

Direct Exhaust Venting Kit Instructions

Vent Supplement Ultra-80, -105, -155, -230 & -310

Aqua Balance. Direct Exhaust Venting Kit Instructions

ASX7-4-IOM-6 J

ASX7-5-IOM-3 J

Installation and Maintenance Instructions

INSTALLATION INSTRUCTIONS

GAS FIRED BOILERS FOR FORCED HOT WATER VENTING ADDENDUM. ECR International Ltd. - Olsen Division P.O. Box 900 Wallaceburg, Ont.

Manual Addendum. This Addendum needs to be used in conjunction with the Evergreen Boiler Manual P/N _0518

INSTALLATION INSTRUCTIONS

FLANGED CORR/GUARD CORR/GUARD INSTALLATION INSTRUCTIONS

Corr/Guard PRESSURE RATED VENTING SYSTEM IMPORTANT: DO NOT INSTALL WITHOUT FIRST READING THESE INSTRUCTIONS VERY CAREFULLY.

INSTALLATION AND SERVICE MANUAL

Detroit Radiant Products Co.

Installation Instructions

Prestige Gas Vent Stainless Termination Kit

Detroit Radiant Products Co.

CAST 92. Boilers. As an ENERGY STAR Partner, PB Heat, LLC has determined that this product meets the ENERGY STAR guidelines for energy efficiency.

Pellet Stove. Flex Pipe. Appliance Connector

Power-Fin 4:1 HOT WATER HEATING BOILERS DOMESTIC HOT WATER SUPPLY BOILERS 1,500,000, 1,700,000 and 2,000,000 Btu/hr MODELS

Do not use this vent pipe or fittings for venting incinerators of any kind.

SMALL DIAMETER CORR/GUARD & SLEEVED CORR/GUARD

CQS POWER VENT. General. Venting Requirements. Venting Instructions PREEVA Indoor, Power-Vented Heater Model PDH

BDM Direct Vent systems are for use with direct vent gas fired appliances.

PVC, CPVC, PP & SS Vent Supplement

POWER VENT. Standard Power Vent, Fan Type Unit Heaters: Standard Power Vent, Blower Type Unit Heaters: General WARNING WARNING. Model UDAP & Model APD

Installation and Maintenance Instructions

By Bernard Dalsin Mfg. Co. Installation and Operating Instructions Read these instructions and keep them for future reference

Installation & Maintenance Instructions

Installation and Maintenance Instructions

Installation and Maintenance Instructions

Z-VENT MODEL SVE SERIES III INSTALLATION AND MAINTENANCE INSTRUCTIONS

VENT SYSTEM COMPONENTS

Installation, Operation and Service Manual

SEPARATED COMBUSTION. General

SEPARATED COMBUSTION. General WARNING

Saf-T Vent SC Plus/SC 316

EUTECTIC EC-10DV Series

Twin Wall Installation Instructions And Maintenance Guide

Mitchell Metal Products, Inc.

R5-9/09. Price - $5.00

Installation & Operation Manual Models:

Instruction manual. Carlin Combustion Technology, Inc. 70 Maple Street East Longmeadow, MA Ph Fx

Installation and Maintenance Instructions

SEPARATED COMBUSTION WARNING

Heat Exchanger Block Replacement Instructions

C. Manufactured double wall chimneys for fuel fired equipment. D. NFPA 54 - National Fuel Gas Code; National Fire Protection Association; 2009.

CWD Series. Gas-Fired Direct Vent Hot Water Boilers INSTALLATION INSTRUCTIONS These instructions must be affixed on or adjacent to the boiler

24 VAC SYSTEM CONTROL KIT

P-K MACH GAS-FIRED BOILER C1500H C2000H OUTDOOR BOILER KIT GUIDE

INS A T LL T A ION, OPER T A ING AND SERVICE INSTRUCTIONS FOR FREEDOM CONDENSING HIGH EFFICIENCY DIRECT VENT GAS - FIRED HOT

Gas Stoves. H15-10 Direct Vent Gas Stove. Model H15-NG10 H15-LP10. Approved Venting Systems

TRIAD Boiler Systems, Inc Atlantic Drive, Unit 2 West Chicago, IL

COMBUSTION AIR SYSTEM

Noble Fire Tube Boiler and Combi Installation & Service Manual NKC NKB

PelletVent Multi-fuel venting system. UL 641.

INSTALLATION OF VENTING SYSTEM COMPONENTS WARNING

Installation & Operation Manual Models: WH

R4-2/06. Price - $5.00

Direct Vent Training & Installation Instructions for Venting 40/50 gallon models Telescoping Vent Kit (standard)

INSTALLATION OF DURAVENT POLYPRO SINGLE WALL POLYPROPYLENE VENTING SYSTEMS

Saf-T Vent Model EZ Seal Plus/EZ 316 Single Wall Gas Vent Connector Chimney Liner & Special Gas Vent (USA) / Type BH Vent Class I/II (Canada)

Ventis Direct Vent. Installation Instructions

Description Model Weil-McLain part number. Vent Termination Kit for 3" Stainless Steel All

Installation Instructions T 9822 Gas Dryer. en - US, CA. To prevent accidents

Installation instructions for the T 9820 Gas Dryer

SUBJECT: SELKIRK MODEL DT DIRECT VENT SYSTEM FOR PELLET & CORN FIRED APPLIANCES / TERMINATION CLEARANCES TO OPENINGS IN BUILDINGS

SVB SERIES II. Gas-Fired Hot Water Induced Draft Boilers. Models SVB-2 SVB-3 SVB-4 SVB-5 SVB-6 SVB-7 INSTALLATION, OPERATION & MAINTENANCE MANUAL

St. Croix Greenfield Installation Manual

Installation & Operation Manual Models:

CHAPTER 8 CHIMNEYS AND VENTS

CHIMNEYS AND VENTS CHAPTER 8

VENTING APPLICATION GUIDE

Side by side. Cascade Venting System for RTG 199HE. Extension Set for units 3 or Installation instructions

Installation & Operation Manual Models:

Fire Tube Combi Boiler Installation & Service Manual Models:

Installation and Maintenance Instructions. Double Wall AL 29-4C Stainless Steel Special Gas Vent and Type L Vent

Combustion Air System DVL. DuraBlack. Triple-wall stovepipe system designed to provide air for combustion through its components. ULC S641.

TYPE L VENT / VENT SYSTEM FOR PELLET BURNING APPLIANCES

BESB Box Ventilator USA CAN. Product Information. Mechanical Installation. ... Chapter 3. Electrical Installation. ... Chapter 4

Models CB-45 through CB-180 Cast-iron Hot Water Boilers Gas-fired Sealed Combustion Direct Vent, Category I, or Category IV Venting Flexibility

Back to back. Cascade Venting System for RTG 199HE. Basic Set for units 1 and Installation instructions

Installation & Operation Manual Models: Series: 100 & 101

Vertical Termination Part No: 3CGRVT 16 7/8" 18 Vent Pipe Extension Part No: 3CG18 9 7/8" Wall Hanger Part No: 3CGWH 7 7/8" 7 3/8"

XEB Series II. Models XEB-2 XEB-3 XEB-4 XEB-5 XEB-6 XEB-7. Gas-Fired Hot Water Induced Draft Boilers INSTALLATION, OPERATION & MAINTENANCE MANUAL

Weil-McLain part numbers are found in Weil-McLain Boilers and Controls Repair Parts Lists.

H35 Direct Vent Gas Stove. 17,500 BTU/h (5.13 kw) 34,000 BTU/h (9.97 kw) 15,000 BTU/h (4.39 kw) 28,500 BTU/h (8.35 kw)

H35 Direct Vent Gas Stove. 17,500 BTU/h (5.13 kw) 34,000 BTU/h (9.97 kw) 15,000 BTU/h (4.39 kw) 28,500 BTU/h (8.35 kw)

Omega II SUBMITTAL DATA. Pre Engineered Packages. Products by: COMBUSTION RESEARCH CORPORATION PROJECT: LOW-INTENSITY INFRARED HEATING SYSTEMS

SECTION DUCTWORK

Transcription:

GOLD GV Water Boiler Series 3 & 4 Venting Supplement Direct Vent Through-Roof or Through-Unused-Chimney For use with Weil-McLain Through-Roof or Through- Unused-Chimney Termination Kit Kit part # 382-200-435 27201

Please...read this page first Hazard definitions The following defined terms are used throughout these Instructions to bring attention to the presence of hazards of various risk levels or to important information concerning the life of the product. Indicates presence of hazards that will cause severe personal injury, death or substantial property damage. Indicates presence of hazards that can cause severe personal injury, death or substantial property damage. Indicates presence of hazards that will or can cause minor personal injury or property damage. Indicates special instructions on installation, operation or maintenance that are important but not related to personal injury or property damage. To the installer: Boiler must be vented and supplied with combustion air as described in this Supplement. Failure to do so will result in severe personal injury, death or substantial property damage. This Venting Supplement must only be used by a qualified installer/service technician. Read these Instructions completely before beginning the installation. Failure to follow all instructions can cause severe personal injury, death or substantial property damage. To install a new vent system follow instructions in: This Venting Supplement. GV Boiler Manual. Weil-McLain venting supplements for FasNSeal, Saf-T Vent, StaR- 34 or Z-Vent II. Vent pipe manufacturer s instructions supplied with vent material. 2

Table of contents Please read this page first Hazard definitions... 2 Note to the installer... 2 Parts Provided by others... 4 Provided in kit... 5 Parts assembly illustration... 6 Installation Definitions... 7 Vent limits... 7 Pre-installation planning... 7 Configuration example... 7 Installation assembly Step 1 Construct combustion air run... 10 Step 2 Install vent support... 11 Step 3 Install 5" x 5" x 3" tee... 11 Step 4 Install rain cap... 12 Step 5 Finish installation... 12 3

Parts Table 1 Figure 1 Lists parts, which must be provided by others. Shows parts, which are provided in the Weil-McLain Through-Roof or Through- Unused-Chimney Termination Kit Table 1 Parts provided by others Description Quantity Rain cap, galvanized, 5" 1 Adjustable flashing, type B, 5" 1 Fire stop for each floor or attic penetration 1 Storm ring, type B, 5" 1 Support, type B, 5" 1 Draft hood connector, type B, 5" 1 Adequate B Vent with clamp rings for combustion air run (less than 30 feet) Adequate 3" vent material for vent run and elbows from one of the following (See Note 1): Heat-Fab, Inc. Saf-T Vent Flex-L International, Inc. StaR-34 ProTech Systems FasNSeal Z-Flex, Inc. Z-Vent II -- -- Adequate sealant specified by vent pipe manufacturer s instructions -- Adequate 3" PVC, galvanized or dryer vent for combustion air supply piping between tee and boiler -- Notes: 1. Do not mix types of vent material. CSA certification will be void. 4

Parts continued Figure 1 Parts provided in kit 1 3 2 4 6 8 7 5 27202 Item number Description Quantity 1 Tee, galvanized 5" x 5" x 3" 1 2 Vent clamp 5 3 Bottom cap galvanized with 4 ½" hole 1 4 Vent support 1 5 Elastomer grippers 11 6 Screws sheet metal type A, #10 x 1 ¼" 7 Screws sheet metal type A, #10 x ½" 11 3 8 Elastomer flashing 2 5

Parts continued Figure 2 Parts assembly illustration Termination coupling Elastomer flashing* 5 Type B rain cap with hole in top for vent pipe 5 Type B storm ring 5 Type B adjustable flashing For minimum height follow Type B gas vent manufacturer s instruction 5 Type B stack Fire stop Vent pipe Fire stop Single wall stack reducer tee* 5 type B support 5 type B draft hood connector Cap with hole for vent pipe Elastomer flashing* Air intake pipe 3 pvc, standard 3 galvanized or aluminum single wall pipe, or 3 flexible dryer vent 3 vent pipe: Heat -Fab Saf-T Vent Z -Flex Z-Vent II Flex -L International StaR-34 P rotech Systems FasNSeal GV Gold boiler Vent starter tee must be by same manufacturer as the vent pipe. * furnished in kit 27203 6

Installation Definitions This is a direct vent installation, which differs from the non-direct venting through-roof installation as shown in the Weil-McLain vent manufacturer s special gas vent system Vent and Combustion Air Venting Supplements. See below for definitions. Direct vent Uses outside combustion air with combustion air piping sealed at all joints and seams. Also known as sealed combustion. Non-Direct vent Uses inside combustion air with no combustion air piping. Vent limits The following is a list of vent limitations: B-Vent sections must be straight no elbows. Maximum B-Vent combustion air run length is 30 feet. Total vent or combustion air pipe equivalent length can be no more than 80 feet (see Table 3 to calculate). Pre-installation planning Codes Follow national, state, local or provincial codes or regulations when venting GV boiler. No connectivity Do not connect: Any other appliance to combustion air run or vent piping. When installing through chimney no other appliance can be vented into or through the chimney. Multiple boilers to common vent. Vent length limits 1. Position boiler as close as possible to vertical run. 2. Determine vent system length and potential boiler derate. See page 8 for configuration example. B-Vent length and total equivalent length cannot exceed limits listed above. Materials and construction 1. Seal all B-Vent combustion air joints with approved silicone sealant (Dow Corning 700 or 732, General Electric 108 or 800, or sealant specified by vent pipe manufacturer). 2. Construct vent joints per vent pipe manufacturer s instructions including use of their specified sealant. Vent pipe enclosed in B-Vent combustion air piping must also have vent clamps with elastomer grippers installed per these instructions. 3. Use only one of the following for vent piping: Heat-Fab, Inc. Saf-T Vent Flex-L International, Inc. StaR-34 ProTech Systems FasNSeal Z-Flex, Inc. Z-Vent II Do not mix types of vent material. CSA certification will be void. 4. Install boiler per GV Boiler Manual. 7

Installation continued Configuration example Follow the steps and sample information below to determine a vent system length and potential boiler derate. (See Vent length limits on the previous page.) Known factors : Vent and combustion air piping per Figure 3 Boiler model number example: GV-5 2 elbows on vent connector piping 2 elbows on combustion air connector piping 20 feet of B-Vent length (no elbows) Note: maximum allowable length = 30 feet. Step 1 Find maximum connector pipe length of combustion air connector piping based on known factors: length of B-Vent, L = 20 feet number of elbows in combustion air connector piping = 2 Go to Table 2 to determine maximum connector pipe length, which in this case is 40 feet. (L = 20 and number of elbows = 2) See Figure 3 Combined length of A, B and C, in Figure 3, must be equal to or less than the maximum connector pipe length found in Table 2. If combined length of A, B and C is too long, consider moving the boiler closer or reducing the number of elbows (where possible) to shorten the combustion air run. Step 2 Find maximum vent connector piping based on known factors: length of B-Vent, L = 20 feet number of elbows in vent connector piping = 2 Go to Table 2 to determine maximum connector pipe length, which in this case is 40 feet. (L = 20 and number of elbows = 2) See Figure 3 Combined length of D and E must be equal to or less than the maximum connector pipe length found in Table 2. If combined length of D and E is too long, consider moving the boiler closer or reducing the number of elbows (where possible) to shorten the combustion air run. Step 3 Look at the results from steps 1 and 2. Select the connector piping which had the shorter maximum connector length, which in either step = 40 feet. Use this piping information for the following step (4). Step 4 Calculate the total equivalent length of the connector piping selected in Step 3 by adding together the following (see Note in Table 3): 1. B-Vent length 20 feet 2. number of elbows x 10 feet 20 feet 3. maximum allowable length 40 feet The total equivalent length is 80 feet. Step 5 From Table 3, obtain the reduced DOE output of a GV-5 boiler with 80 feet total equivalent length. For this example Table 3 shows 113 MBH. 8

Installation continued Table 2 Maximum connector pipe length, each: vent connector pipe combustion air connector pipe Figure 3 Configuration example illustration B-Vent length (feet) L Total number of elbows 1 2 3 4 5 6 7 Max. length from boiler to B-Vent 5 65 55 45 35 25 15 5 10 60 50 40 30 20 10 -- 15 55 45 35 25 15 5 -- 20 50 40 30 20 10 -- -- 25 45 35 25 15 5 -- -- 30 40 30 20 10 -- -- -- Note: Vent connector pipe length = D + E Combustion air connector pipe length = A + B + C L L = B-vent length Vent pipe connector length = D + E Table 3 Reduced DOE output (MBH) at sea level Boiler model number Total equivalent length (see Note) 20 40 60 80 Reduced DOE output (MBH) GV-3 60 60 60 60 GV-4 91 90 89 87 GV-5 119 116 115 113 GV-6 148 144 140 138 Note: Total equivalent length = B-Vent length, L + 10 ft x number of elbows + maximum allowable length from Table 2 E 27204 Vent piping Elbows D Elbow A Combustion air piping Air pipe connector length = A + B + C Elbow C B 9

GOLD GV Series 3 & 4 Direct Vent Through-Roof or Through-Unused-Chimney Venting Supplement Installation assembly Step 1 Construct combustion air run Figure 4 Follow vent pipe manufacturer's instructions to assemble and seal joints. Sealant recommended by vent pipe manufacturer must be used as indicated in their instructions. Vent and combustion air connector piping must be sealed gas-tight to prevent possibility of flue gas spillage and carbon monoxide emissions, resulting in severe personal injury or death. 1. Install 5" type B support, B-Vent combustion air run, flashing, fire stops and storm collar per manufacturer s instructions. Apply approved sealant to each B-Vent joint. See Figure 4. 2. Install type B draft hood connector to bottom of combustion air run. Seal with approved sealant. 3. From top or bottom of combustion air run, install vent piping. Top of vent piping must extend 3" above top of rain cap. See Figure 2, page 6. Bottom of vent piping must extend 18" below draft hood connector. Figure 5 At each vent joint: a. Follow vent pipe manufacturer s instructions to assemble and seal joints. Sealant recommended by vent pipe manufacturer must be used as indicated in their instructions. b. Apply 2 self-adhesive elastomer grippers to vent clamp. Grippers must be positioned on clamp as shown in the Figure 5. Bend out 2 ears on vent clamp. c. Fasten clamp around vent pipe with 2 1 ¼" screws in top and bottom holes, about every 5 feet. See Figure 6. Tighten screws until clamp does not turn or slide around vent piping. 27206a Figure 6 27207 10

Installation assembly continued Step 2 Install vent support Figure 7 1. Apply 1 elastomer gripper to vent support. 2. Install vent support around vent piping just below draft hood connector as shown in the picture above. Fasten support around vent piping with 1 1¼" screw. 3. Tighten screw until support does not turn or slide around vent piping. Draft hood connector Vent support 27208 Step 3 Install 5" x 5" x 3" tee Figure 8 1. Slide tee over vent piping and attach uncrimped end to bottom of draft hood connector: a. Drill 3 holes about 120 apart in tee for ½" length sheet metal screws. Do not allow drill to penetrate vent pipe. Drill holes carefully in tee and use only ½" screws to fasten tee to draft hood connector. Failure to do so can damage vent pipe, causing severe personal injury or substantial property damage. b. Seal all seams and screws with approved sealant. Draft hood connector 5 x 5 x 3 Tee Bottom cap Elastomer flashing 2. Secure bottom cap to tee with duct tape. Slide elastomer flashing up around vent pipe and tuck lip into cap s bottom opening. Seal with approved sealant. 27209 11

Installation assembly continued Step 4 Install rain cap Figure 9 1. On roof, cut 4½" hole in top of rain cap and install cap over protruding vent pipe. Slide elastomer flashing down around vent pipe and tuck lip into cap s top opening. 2. Connect termination coupling to vent pipe using vent pipe manufacturer s specified sealant. Vent pipe Elastomer flashing Rain cap 27210 Step 5 Finish installation 1. Complete vent piping to boiler, making sure to follow vent pipe manufacturer s instructions and Weil-McLain vent manufacturer s special gas vent system Vent and Combustion Air Venting Supplements. 2. Use any of the following to install combustion air connector piping from tee to boiler, making sure to seal all joints and seams: a. 3" Flexible dryer vent A piece of 3" galvanized is required at each end to adapt. Seal all pipe joints and seams between pipe and dryer vent with approval sealant. b. Galvanized or aluminum single wall pipe Seal all joints and seams using approved sealant. c. 3" PVC Seal all joints using PCV cement. 12