PROPOSED DRAINAGE PATTERNS

Similar documents
SILT FENCE MACHINE SLICED ERO-1A STEEL FENCE POST (T-POST), MINIMUM 5' LONG, 6' MAXIMUM SPACING.

CITY OF TUMWATER 555 ISRAEL RD. SW, TUMWATER, WA (360) (360) (FAX)

Checklists. Project Name: Location: File Number: Date of Submittal: Reviewer: Date: Applicant: Contact Name: Phone Number:


Huntington Stormwater Utility

Urban Conservation Practice Physical Effects ESTABLISHMENT, GROWTH, AND HARVEST NUTRIENT MANAGEMENT

FOR SALE ± ACRES VALENTINES, VIRGINIA Price: $150,000

FOR PROJECTS INITIATED AFTER FEBRUARY 1, 2010 REVISION 1 ITEM 709 TRIANGULAR FILTER FABRIC FENCE

PLAN SUBMITTER'S CHECKLIST

City of Stoughton Erosion Control Permit Application (effective 2/6/2018)

Old Mill Community Association Bioretention Facility

Information for File # JTF

Department of Agriculture. Conservation Service. United States. Natural Resources REVISED 8/26/16

Town of Essex Small Site Erosion Control Guide

CHAPTER 4. SPECIAL CONDITION EROSION CONTROL MEASURES

Wisconsin Contractors Institute Continuing Education

Planning the BMP. Region 2000 Planning District Commission Lynchburg, VA December 13, 20013

Information for File # ARC

Project: Mooney Lake Preserve Received: Location: 300 Sixth Ave. N., Orono Complete: Noticed:

Drainage Analysis-Newgate/Phelps & Hatchett Hill Road Areas Rev. 0 Erosion & Sediment Control Measures

TOWNSHIP OF LOGAN SOIL & FILL IMPORTATION AND PLACEMENT APPLICATION SUBMITTAL CHECKLIST

Gloucester County PLAN SUBMITTER'S CHECKLIST

Florence County Small Commercial Land Disturbance Permit Application

ATTACHMENT 1 WILSON MINE LECROY AREA SEMIPERMANENT DEWATERING SYSTEM

STREAM ALTERATION PRACTICES

Soil Erosion & Sediment Control Plan Requirements for Submittal to the Cape Atlantic Conservation District

Preliminary Sediment & Stormwater Management Plan Review Checklist DATE RECEIVED: PROJECT NUMBER: PROJECT NAME:

Shelbyville, KY Stormwater Best Management Practices. Section 2 EROSION PREVENTION AND SEDIMENT CONTROL PLAN

Monica Smith, PE President Robinson Engineering Company

ENVIRONMENTAL ENGINEERING LAND SURVEYING

Project: Developer/Designer: Reviewer: I. Narrative: 1. Project Description: Describes the nature and purpose of the land disturbing activity.

Stormwater Drainage Assessment For Single Family Residence

MANUAL OF DESIGN, INSTALLATION, AND MAINTENANCE REQUIREMENTS FOR STORMWATER MANAGEMENT PLANS

STORMWATER SITE PLAN INSTRUCTIONS AND SUBMITTAL TEMPLATE Medium and Large Projects

Project Applicant Checklist for NPDES Permit Requirements SAN MATEO COUNTYWIDE STORMWATER POLLUTION PREVENTION PROGRAM

A. INTRODUCTION AND SUMMARY OF FINDINGS B. EXISTING CONDITIONS. Table 10-1 Adjacent Storm Drains

EROSION PREVENTION BMP SUGGESTED USES MATRIX

SOP 6: Erosion and Sedimentation Control SOP 6: EROSION AND SEDIMENTATION CONTROL

PRELIMINARY DRAINAGE REPORT LATHAM 200 MMSCFD GAS PROCESSING PLANT

General Information. Site Conditions. 9b 9b. 9a 1b. Best Management Practices Illustration

Chapter 4 - Preparation of Stormwater Site Plans

Methods, approaches, and procedures to minimize active agricultural land impacts during pipeline construction, surface restoration, and pipeline

Erosion Control for Home Builders in the. City of Jacksonville

HILCORP ALASKA, LLC HAPPY VALLEY MIDDLE NATURAL GAS EXPLORATION PROJECT DEEP CREEK UNIT BOUNDARY PROPOSED ACCESS ROAD T02S T03S R14W

SUPPORTING DOCUMENT STORMWATER POLLUTION PREVENTION PLAN (SWPPP) NARRATIVE

Plan Review Checklist

STORMWATER REPORT FOR WALMART SUPERCENTER STORE # SIOUX FALLS, LINCOLN COUNTY, SOUTH DAKOTA BFA PROJECT NO

Geosynthetics for Erosion Control and Reinforcement

Erosion & Sediment Control Plan Application Form & Checklist

Tour of Nonpoint Source Pollution Reduction Projects in the Western Lake Superior Watershed

4. Contractor (and subcontractors if applicable) certification statement(s)

Site Formation Excavation - 6' depth square yard $8.00 $0.00 Grading square yard $1.50 $0.00 Hauling off-site - 6' depth square yard $10.00 $0.

Guidance on Preparation of Construction and Maintenance Costs

Public Works Department 104 W. Magnolia Street, Suite 109 Bellingham, WA (360)

EROSION & SEDIMENT CONTROL

Preventing Storm Water Pollution: What We Can Do

VEGETATED SLOPE STABILIZATION DESCRIPTION APPLICABILITY. Advantages

Major Subdivision Sketch Plan Checklist

SOIL EROSION AND SEDIMENT CONTROL

Use of Best Management Practices

Methods, approaches, and procedures to minimize active agricultural land impacts during pipeline construction, surface restoration, and pipeline

City of Waco Stormwater Management Regulations

Appendix I. Checklists

RAIN GARDEN ILLINOIS URBAN MANUAL PRACTICE STANDARD. (feet) CODE 897 DEFINITION

Severn River Sub-Watershed: BMP 09-Retrofit

NOVEMBER 14, 2016 BURRELL ENGINEERING TROY BURRELL N FLORIDA AVE DUNNELLON, FL 34434

Soil Erosion and Sediment Control

Chapter 14. Stormwater Quality Introduction

Information for File # ARC

Post Construction BMPs

WQ-23 MOUNTAINOUS AND STEEP SLOPE SITES

Vegetated Filter Strips and Buffers

Vegetated Filter Strips and Buffers

A. Install all temporary erosion control measures (in accordance with MNDOT General Conditions 2573) prior to site disturbance.

SECTION 1 CLEARING /GRADING PERMIT APPLICATION:

CHAPTER 102 REQUIREMENTS CRITCAL STAGES DURING CONSTRUCTION ACTIVITIES

Storm Water Quality and Shoreline Restoration Improvements - Grant Funding Request City of Mound Carlson Park Bolton & Menk Project No.

Urban Planning and Land Use

FKW PROPERTIES LINDON. Site VINEYARD OREM. Vicinity Map. Timpridge Development 451 East 1000 South Suite A Pleasant Grove, Utah

/s/ Michael T. Loeffler. Michael T. Loeffler Senior Director, Certificates and External Affairs. Attachment. September 14, 2018.

CHAPTER 9 STORM DRAINAGE. Minimum Requirements for New Development and Redevelopment

Design Considerations for Open Channel and Detention Pond Design. Howard Redfearn, City of Mansfield


STORMWATER MANAGEMENT CODES ANALYSIS RICHLAND COUNTY, SC SITE PLANNING ROUNDTABLE

Part IV(a): BMPs for Erosion, Sediment, Velocity Control

Information for File #MVP DAS

Structural Storm Water Best Management Practices (BMPs)

Information for File MMJ Main Stem Bassett Creek Restoration Project

Key elements : Filter Strips must be designed within parameters required by the Fort Wayne s Development Standards/Criteria Manual.

MASTER DEVELOPMENT DRAINAGE PLAN FOR MONUMENT HEIGHTS

Final Report: Appendix G. LID Driveway Retrofit and Teaching Tool at Bristol County Agricultural High School, Dighton - Supporting Information

REFERENCE DRAWINGS FOR 332 W. MAIN STREET ROCK HILL, SOUTH CAROLINA

STREAM BUFFER PROTECTION AND MANAGEMENT

Storm Water Basics for Construction Sites Presented by Representatives from the City of Grass Valley and Nevada County

POND Construction. Perry L. Oakes, PE State Conservation Engineer Natural Resources Conservation Service

A. Install all temporary erosion control measures (in accordance with MNDOT General Conditions 2573) prior to site disturbance.

Draft Rhode Island Stormwater Design and Installation Standards Manual

Custom Soil Resource Report Soil Map

Using the Updated RI Soil Erosion and Sediment Control Handbook. The Introductory Workshop for RIDEM/CRMC Staff January 23, 2015

New Development Stormwater Guidelines

Transcription:

1121 1118.50 Basin Floor 1120 1119 0 N 100 200 PROPOSED DRAINAGE PATTERNS Deroiser Drive Riverwood Drive County 260

0 100 200 Project Name: Riverwood Drive LITTLE FALLS TOWNHOMES Project Location: LITTLE FALLS, MINNESOTA PROJECT LOCATION: SOUTHWEST OF THE INTERSECTION OF DEROISER DR AND RIVERWOOD DR APPROXIMATE CENTROID OF PROJECT: LATITUDE: 46.0026 N LONGITUDE: 94.3575 W Project Description: N Deroiser Drive THE CONSTRUCTION OF THE LITTLE FALLS TOWNHOMES WILL CONSIST OF THE CONSTRUCTION OF A NEW STREET AND UTILITY EXTENSIONS ON THE NORTH SIDE OF THE CITY OF LITTLE FALLS WITHIN PRIVATE PROPERTY OWNED BY ROACH DEVELOPMENT, LLC. THE ACTIVITIES ASSOCIATED WITH THE CONSTRUCTION OF THE FACILITIES WILL RESULT IN THE DISTURBANCE OF EXISTING SOILS. THIS STORM WATER POLLUTION PREVENTION PLAN (SWPPP) WILL OUTLINE THE STRATEGIES AND STEPS THAT WILL BE TAKEN TO PREVENT DISCHARGING OF SOILS FROM THE CONSTRUCTION SITE. CONSTRUCTION ACTIVITIES AND UNFORESEEN PROCESSES MAY NECESSITATE THE MODIFICATION OF THE SWPPP BY THE CONTRACTOR AND ENGINEER PROJECT LOCATION Project Information: PROJECT SIZE: 8.80 ACRES EXISTING IMPERVIOUS SURFACE AREA IN PROJECT LIMITS: 0.30 ACRES PROPOSED IMPERVIOUS SURFACE IN PROJECT LIMITS: 2.57 ACRES RECEIVING WATERS FROM PROJECT SITE: ON SITE TREATMENT AND OVERFLOW TO AN EXISTING DRAINAGE WAY TOWARD THE MISSISSIPPI RIVER. ACCORDING TO THE MINNESOTA POLLUTION CONTROL AGENCY WEBSITE, THERE IS ONE IMPAIRED WATER WITHIN ONE MILE OF THE PROJECT LIMITS. THE MISSISSIPPI RIVER IS AN IMPAIRED RIVER/STREAM BUT ONLY FOR AQUATIC CONSUMPTION. THERE ARE ALSO NO KNOWN CALCAREOUS FENS NEAR DISCHARGE LOCATIONS. EXISTING SOILS IN THE PROJECT AREA CONSIST PRIMARILY OF LOAMY SANDS (TYPE A). USGS LOCATION MAP Responsible Parties: OWNER: ROACH DEVELOPMENT, LLC MR. TERRY ROACH terryroachnoparking@hotmail.com 1414 PAUL LARSON DRIVE LITTLE FALLS, MN 56345 CONTRACTOR: NAME OF CONTRACTOR ADDRESS SWPPP DESIGNER: MR. JADE BERUBE, P.E. APEX ENGINEERING GROUP JADE.BERUBE@APEXENGGROUP.COM STORMWATER SUMMARY: EXISTING CONDITIONS CONTRIBUTING AREAS: PROJECT SITE: 8.80 Acres Soil Type A Time of Concentration: 67.2 MINUTES Design Storm Discharge 100 YEAR POST CONSTRUCTION CONDITIONS CONTRIBUTING AREAS: PROJECT SITE: 8.80 Acres Percent Impervious: 29 0 100 200 EXISTING DRAINAGE PATTERNS County 260 SWPPP SITE INSTALLER: Riverwood Drive SWPPP SITE INSPECTOR: INSPECTION AND MAINTENANCE DOCUMENTS FOR THE PROJECT SHALL BE KEPT AT AN ON SITE LOCATION TO BE DETERMINED BY THE SWPPP SITE INSPECTOR. THE INSPECTOR SHALL BE RESPONSIBLE FOR MAINTAINING THE LOCATION, AS WELL AS PROVIDING THE INFORMATION TO ANY INTERESTED PARTIES. Temporary Erosion Control: THE ITEMS INDICATED BELOW ARE TO BE CONSIDERED A PRELIMINARY ESTIMATE OF THE TEMPORARY EROSION CONTROL DEVICES NECESSARY TO LIMIT EROSION FROM THE SITE. THE CONTRACTOR'S MEANS AND METHODS WILL ULTIMATELY DICTATE THE QUANTITY AND PLACEMENT OF TEMPORARY EROSION CONTROL DEVICES. STORMWATER QUALITY: INFILTRATION BASIN Top of Basin Elevation = 1120.00 (MIN.) Bottom Elevation = 1118.50 (MIN.) Pond Emergency Overflow Elevation = 1121.00 (MIN.) Surface Area at Bottom Elevation = 3,920 S.F. Side Slopes Of Basin = 10:1 Design Infiltration Rate ( 2 1 USGS Rate) = 10"/Hour Design Year (100) High Water = 1119.38 N Deroiser Drive 1120 Basin Floor 1118.50 1119 1121 ITEM TEMPORARY SILT FENCE CULVERT INLET PROTECTION QUANTITY 250 L.F. 5 EACH OTHER POLLUTANT SOURCES ON THE SITE WILL BE THOSE CONSISTENT WITH CONSTRUCTION ACTIVITY AND MUST BE CONTROLLED BY THE CONTRACTOR. THESE SOURCES WILL INCLUDE, BUT ARE NOT LIMITED TO THE FOLLOWING: DUST, OILS, GREASES, GARBAGE, CONSTRUCTION DEBRIS. Permanent Erosion Control: THE IMPROVEMENTS WILL BE TREATED THROUGH A VARIETY OF STORM WATER TREATMENT METHODS INCLUDING VEGETATED STRIPS, HOLDING DITCHES, AND INFILTRATION BASINS. County 260 PROPOSED DRAINAGE PATTERNS Issue # REVISIONS Description Date STORM WATER POLLUTION PREVENTION PLAN (SWPPP) Bismarck - Detroit Lakes - Fargo 1265 Highway 10 West, Suite # 4 Detroit Lakes, Minnesota 56501 Office: 218-844-2580 www.apexenggroup.com Apex Project #: 15.214.0044 Date: April XX, 2015 Drawn By: Cade K. Checked By: Bob S. Approved By: Jade B. I hereby certify that this plan, specification or report was prepared by me or under my direct supervision and that I am a duly Licensed Professional Engineer under the laws of the State of Minnesota. Jade A. Berube Date:X/XX/XXXX PRELIMINARY License Number: 47122 Sheet: G-01

SYMBOLS LEGEND PLAN NOTES TEMPORARY EROSION CONTROL SILT FENCE INLET PROTECTION PERMANENT EROSION CONTROL INFILTRATION BASIN PROPOSED 15" CULVERT 1. ALL AREAS DISTURBED BY THE CONSTRUCTION ACTIVITY SHALL BE RESTORED BY THE CONTRACTOR AS SOON AS PRACTICAL AND IN ACCORDANCE WITH THE NPDES PERMIT. 2. IN THE EVENT THAT PERMANENT RESTORATION CANNOT BE COMPLETED WITHIN THE PERMITTED TIME FRAMES, THE CONTRACTOR WILL BE RESPONSIBLE FOR TEMPORARY STABILIZATION. 3. ALL TEMPORARY STOCKPILES SHALL BE STABILIZED TO COMPLY WITH THE MPCA NPDES PERMIT. 4. THE DEPICTED EROSION AND SEDIMENT CONTROL PLAN SHOULD BE USED AS A GENERAL GUIDELINE. THE CONTRACTOR'S CONSTRUCTION METHODS MAY REQUIRE ADDITIONAL EROSION AND SEDIMENT CONTROL DEVICES TO REMAIN WITHIN THE REQUIREMENTS OF THE NPDES GENERAL STORM WATER PERMIT. 5. THE CONTRACTOR IS RESPONSIBLE FOR MINIMIZING AREAS OF DISTURBANCE AND MUST ESTIMATE THE AREA THAT WILL REQUIRE TURF RESTORATION BASED ON THE PROPOSED WORK AND THE CONTRACTOR'S CONSTRUCTION METHODS. 6. TURF ESTABLISHMENT SHALL INCLUDE TOPSOIL PLACEMENT/PREPARATION, SEEDING, AND WATERING AS ILLUSTRATED IN THIS STORM WATER POLLUTION PREVENTION PLAN. 7. CONSTRUCTION OF INFILTRATION BASINS SHALL SHALL NOT BE COMPLETED UNTIL THE CONTRIBUTING DRAINAGE AREA HAS BEEN CONSTRUCTED AND FULLY STABILIZED. CULVERT INLET PROTECTION CULVERT INLET PROTECTION Riverwood Drive FLOW 2'-0" DITCH PROFILE NOTE: POINT 'A' MUST BE 6" MINIMUM HIGHER THAN POINT 'B'. Deroiser Drive 6' MAX STEEL "T" POST WITH 3 PLASTIC ZIP TIES (50LB. TENSILE) IN TOP 8" (MACHINE SLICED) OR 2" X 2" WOOD POST WITH STAPLES SPACED DOWN THE LENGTH OF THE POST (PRE-ASSEMBLED) POINT 'A' 5'-0" SIDE VIEW CLASS 1-4 RIPRAP (SPEC. 3601) POINT 'B' GEOTEXTILE FABRIC LINER TYPE 4 (SPEC. 3733) ALONG BOTTOM OF RIPRAP POINT 'A' 2.0' MIN. DIRECTION OF FLOW FRONT VIEW GEOTEXTILE FABRIC LINER TYPE 4 (SPEC. 3733) ALONG BOTTOM OF RIPRAP PLAN VIEW BACKFILLED TRENCH 2 EROSION CONTROL ROCK CHECK DETAIL NO SCALE NOTES: 1. INSPECT AND REPAIR FENCE AFTER EACH STORM EVENT AND REMOVE SEDIMENT WHEN NECESSARY. 2. REMOVED SEDIMENT SHALL BE DEPOSITED TO AN AREA THAT WILL NOT CONTRIBUTE SEDIMENT OFF-SITE AND CAN BE PERMANENTLY STABILIZED. STORM PIPE N 250 L.F. SILT FENCE County 260 3. SILT FENCE SHALL BE PLACED ON SLOPE CONTOURS TO MAXIMIZE PONDING EFFICIENCY. OVERLAP GEOTEXTILE FABRIC 6" & FASTEN AT 2' INTERVALS. 30" MIN. WIRE MESH DIRECTION OF FLOW 6" MIN. 5.0' MIN. LENGTH POST AT 6.0' MAX. SPACING WIRE MESH REINFORCEMENT GEOTEXTILE FABRIC, 48'' WIDE BACKFILLED TRENCH FABRIC ANCHORAGE IN TRENCH. BACKFILL W/ TAMPED ORIGINAL SOIL 6.0' MINIMUM VARIES VARIES FLARED END SECTION 6.0' MINIMUM 0 100 200 2.0' MIN. POST EMBEDMENT 4" MIN. EXTEND WIRE MESH INTO TRENCH 4.0' MIN. TOE SECTION VIEW FLOW NOTE: PIPE DIA. < 42" = FIBER ROLL 12IN PIPE DIA. > FIBER ROLL 20IN 1 SILT FENCE DETAILS NO SCALE 3 FIBER ROLL END OF PIPE PROTECTION NO SCALE Issue # REVISIONS Description Date SITE EROSION CONTROL PLAN AND DETAILS (SWPPP) Bismarck - Detroit Lakes - Fargo 1265 Highway 10 West, Suite # 4 Detroit Lakes, Minnesota 56501 Office: 218-844-2580 www.apexenggroup.com Apex Project #: 15.214.0044 Date: April XX, 2015 Drawn By: Cade K. Checked By: Bob S. Approved By: Jade B. I hereby certify that this plan, specification or report was prepared by me or under my direct supervision and that I am a duly Licensed Professional Engineer under the laws of the State of Minnesota. Jade A. Berube PRELIMINARY Date:X/XX/XXXX License Number: 47122 Sheet: G-02

94 21' 34'' W Soil Map Morrison County, Minnesota 94 21' 19'' W 46 0' 12'' N 394740 394770 394800 394830 394860 394890 394920 394950 394980 395010 395040 46 0' 12'' N 5095120 5095150 5095180 5095210 5095240 5095270 5095300 5095120 5095150 5095180 5095210 5095240 5095270 5095300 46 0' 5'' N 394740 394770 394800 394830 394860 394890 394920 394950 394980 395010 395040 46 0' 5'' N 94 21' 34'' W N Map Scale: 1:1,470 if printed on A landscape (11" x 8.5") sheet. Meters 0 20 40 80 120 Feet 0 50 100 200 300 Map projection: Web Mercator Corner coordinates: WGS84 Edge tics: UTM Zone 15N WGS84 94 21' 19'' W Natural Resources Conservation Service Web Soil Survey National Cooperative Soil Survey 3/12/2015 Page 1 of 3

Soil Map Morrison County, Minnesota Map Unit Legend Morrison County, Minnesota (MN097) Map Unit Symbol Map Unit Name Acres in AOI Percent of AOI D67A D67B Hubbard loamy sand, Mississippi River Valley, 0 to 2 percent slopes Hubbard loamy sand, Mississippi River Valley, 2 to 6 percent slopes 8.9 77.1% 2.7 22.9% Totals for Area of Interest 11.6 100.0% Natural Resources Conservation Service Web Soil Survey National Cooperative Soil Survey 3/12/2015 Page 3 of 3

Morrison County, MN Date Created: 4/8/2015 Overview 451 ft Parcel ID 486960001 Sec/Twp/Rng 26-41-32 Property Address Alternate ID 486960001 Class 4BB-Residential Non-Homestead SFD Acreage 8.800 Legend Corporate Limits Political Townships Subdivisions Parcels Main Roads State Highway US Highway Road Centerlines Flood Plain IN OUT, 500yr PZ_Feedlots PZ_Zoning AG Owner Address ROACH DEVELOPMENT LLC 1414 PAUL LARSON DR LITTLE FALLS MN 56345 C MHB MI R RR SC SP SR PZ_Flood Plain IN OUT, 500yr PZ_Army Compatible Use Buffer PZ_Urban Fringe Zoning District Brief Tax Description LITTLE FALLS EAST-#482-HRA PT OF GOV LOT 2 SEC 27 & OF NW1/4 OF SW1/4 SEC 26 DESC AS: COM AT NE COR OF SAID GOV LOT 2, S 0*01'33" E 937.97 FT ALG E LN, N 89*54'45" W 183.36 FT, N 7*33'25" W 127.21 FT TO SW COR OF DOC 295754 PT OF BEG, S 7*33'25" E 127.21 FT, S 89*54'45" E 232 FT TO CTRLN OF CO RD, S 17*10'39" E 134.38 FT ALG CTRLN, CONT ALG CTRLN S 19*15'32" E 36.95 FT TO INTERS WITH N LN OF DOC 321712, S 89*57'19" W 280.85 FT ALG SAID N LN TO ITS NW COR, S 0*02'41" E 25.46 FT ALG W LN TO S LN OF N 1130.84 FT OF GOV LOT 2, N 89*54'45" W 80.07 FT TO

Little Falls Townhomes Mar 27, 2015 User Remarks: This map is for general reference only. The US Fish and Wildlife Service is not responsible for the accuracy or currentness of the base data shown on this map. All wetlands related data should be used in accordance with the layer metadata found on the Wetlands Mapper web site.