Liebert Small System MCD and PFH Condensers (1-5 Ton) Warranty Inspection Check Sheet

Similar documents
Liebert Fin/Tube Condenser Warranty Inspection Check Sheet

Liebert DataMate (1-3 Ton) Warranty Inspection Check Sheet

Liebert Xtreme Density Chiller (XDC) Unit Warranty Inspection Check Sheet

Liebert CRV Warranty Inspection Check Sheet

Liebert InteleCool Warranty Inspection Check Sheet

Service Step by Step Trouble-Shooting Check-List

Liebert Prop Fan Condensing Unit

Liebert Challenger 3000/Liebert Challenger ITR with Liebert icom Control. Operation & Maintenance Manual - 50 & 60Hz

For an administrative fee of $9.97, you can get an un-locked, printable version of this book.

Condensing Unit Installation and Operating Instructions

SA Series Startup Form

START UP FORM PACKET

Construction Standards Page

APPLICATION GUIDELINES FOR COPELAND COMPLIANT SCROLL COMPRESSORS (ZR*1 Models)

YCIV Hz & Hz

Table of Contents. Service Procedures. Service Procedures. Measuring Superheat (4) Measuring Subcooling (5) Airflow Calculation (6-8)

Condensing Unit Installation and Operating Instructions

M2 Series Startup Form

Liebert CSU3000 Chiller

Owners Manual Refrigerated Air Dryer MHT SERIES

SECTION PACKAGED COMPRESSOR AND CONDENSER UNITS

Warm Case Troubleshooting Guide 9/18/2014

PARALLEL RACK SYSTEM INSTALLATION & OPERATIONS MANUAL With Master Rack Compressor Sequencer

F1 Series. Installation, Operation & Maintenance. Indoor Air Handing Units WARNING WARNING WARNING NOTICE QUALIFIED INSTALLER

START UP FORM PACKET

Installation Instructions

Installation Instructions

MODEL URS-1: FACTORY RETROFIT PROGRAM

Otherwise, you can continue reading the file on the following pages.

Mortex INSTALLATION INSTRUCTIONS AIR CONDITIONING & HEAT PUMP INDOOR COILS

PACKAGED LIQUID CHILLERS

AE R1 October to 5 Ton ZPS*K6 Copeland Scroll Two-Stage Compressors

INSTALLATION GUIDE. 4AC 14* ASA1 SERIES R-410a CONDENSING UNITS R-410A ATTENTION, INSTALLER! ATTENTION, USER!

BasicTroubleshooting Information and Guidelines

HP50HA ABG Heat Pump

SECTION 7 AIR CONDITIONING (COOLING) UNIT 41 TROUBLESHOOTING

User s Information and Installation Instructions

SECTION 7 AIR CONDITIONING (COOLING) UNIT 38 INSTALLATION

This manual should be maintained in legible condition and kept adjacent to the heat pump or in a safe place for future use.

CS/CD/CP AIR COOLED CONDENSING UNITS (P/N E207120C R2)

Owners Manual UA75 TO UA1200 SERIES Refrigerated Air Dryer

MODEL YVAA EQUIPMENT PRE-STARTUP AND STARTUP CHECKLIST CUSTOMER: LOCATION: ADDRESS: CUSTOMER ORDER NO: PHONE: JCI CONTRACT NO: JOB NAME:

INSTALLATION INSTRUCTIONS

M2 Series Startup Form

Commercial High-Efficiency Condensing Units

SA Series Start up Report

Cased Aluminum Coils "Dedicated Upflow / Downflow" Convertible to horizontal with separately purchased kit

Calhoon MEBA Engineering School. Study Guide for Proficiency Testing Refrigeration

EQUIPMENT PRE-STARTUP AND STARTUP CHECKLIST TEL NO: ORDER NO: CONTRACT NO:

Liebert Air-Cooled, Direct-Drive Drycoolers Technical Design Manual 50 Hz & 60 Hz

PDF Created with deskpdf PDF Writer - Trial ::

TECHNICAL GUIDE DESCRIPTION SPLIT-SYSTEM AIR-COOLED CONDENSING UNITS. HA300, HB360, HB480 & HB thru 50 NOMINAL TONS (50 Hz)

ICE CREAM TOPPING CABINETS REFRIGERATOR or FREEZER Installation, Operation and Maintenance Instructions

NEWGATE TECHNOLOGIES, INC.

Split system air conditioner

LC Series. Installation, Operation & Maintenance. Air-Cooled Condenser Chillers WARNING WARNING WARNING

Installation Instructions

Series 9. Commissioning Checklist. MISSION CRITICAL Air Conditioning Systems. ClimateWorx International Inc.

TABLE OF CONTENTS. NOTE: Read the entire instruction manual before starting the installation. TROUBLESHOOTING... 13

Air-Cooled Split-System Condensing Units for Rooftop Systems and Air Handlers Models RCS 10E to 20E 10, 12.5, 15 & 20 Tons

Installation Instructions

CHILLER. Operator s & Installation Manual

User s Information and Installation Instructions

REFRIGERATORS AND FREEZERS Installation, Operation and Maintenance Instructions

Data Aire, Inc. reserves the right to make design changes for the purpose of product improvement or to withdraw any design without notice.

Installation Instructions

KITS COMMON TO HEATING AND COOLING EQUIPMENT 504,652M 03/04. Supersedes 503,249M

Use and Care Manual. MODELS H VAR 1.5 THRU 5 TON 13 Seer Split System Heat Pump REV. 4/06

Instructors: Contact information. Don Reynolds Doug McGee Factory Tech Support

TECHNICAL GUIDE DESCRIPTION SPLIT-SYSTEM AIR-COOLED CONDENSING UNITS MODELS: HF-07 FEATURES B-0703

Electric Heat Inspection Form Revised September 2012

38ASB/CCARS240~600 (036~060) AIR-COOLED CONDENSING UNIT

PACKAGE AIR CONDITIONER

Installation Owner Diagnostics

PL Series Premier Indoor Plenum Coils

INSTALLATION INSTRUCTIONS

Residential Piping and Long Line Guideline

SWIMMING POOL HEAT PUMP UNIT ECO - series. Installation & Instruction manual

SPX SERIES PACKAGED AIR CONDITIONING/HEAT PUMP UNITS INSTALLATION, OPERATION AND MAINTENANCE INSTRUCTIONS

LF Series. Installation, Operation, & Maintenance. Air-Cooled Condenser Chillers WARNING WARNING WARNING

Liebert DSE Thermal Management System

Checking the Charge on a Heat Pump in the Winter

DRYMAX DRYMAX DRYMAX DRYMAX

URS-1 SERVICE AND PARTS MANUAL SERIAL NUMBERS: UP TO

Installation Instructions

Installation Instructions

Installation Instruction

Installation Guide & Owner s Manual. Water Source Heat Pumps Vertical / Horizontal 1 5 Nominal Ton GEOCOOL SERIES

Commercial High-Efficiency Condensing Units

POLICY BULLETIN Tecumseh Compressor Company Compressor Group

UNDERCOUNTER LABORATORY REFRIGERATORS and FREEZERS Installation, Operation and Maintenance Instructions

GENERAL LABORATORY REFRIGERATORS AND FREEZERS Installation, Operation and Maintenance Instructions

Outdoor Condensing Units

Air Cooled Condenser Installation and Operating Instructions

INSTALLATION INSTRUCTIONS TXV Coils for Manufactured Housing EMA

12 In Row. Installation Manual. MISSION CRITICAL Air Conditioning Systems. ClimateWorx International Inc.

Series 6, Vertical Floor-Mount Units

Full Range Systems. Mokon Troubleshooting Guide Model 311. Process/Water Loop. Problem Possible Cause Corrective Measure. Process pump will not start

CL SERIES Installation, Operation & Maintenance

APPLICATION DATA SHEET

Transcription:

The following information must be fully completed and forwarded to your local Liebert sales office to establish your equipment warranty. Installer Address Owner Address Owner e-mail address Installation Date Was the unit received in good condition? Yes No If no, has the carrier been notified? Yes No Have the manuals been kept with unit? Yes No PRE-START-UP Condenser / Drycooler Serial Number: Condenser / Drycooler Model Number: Indoor Unit Serial Number: Indoor Unit Model Number: Compressor Serial Number: Compressor Model Number: Page 1 of 5 2014 Emerson Electric Co. All rights reserved Rev. 3 10/2015

Arc flash and electric shock hazard. Open all local and remote electric power disconnect switches, verify with a voltmeter that power is off and wear personal protective equipment per NFPA 70E before working within the electric control enclosure or any hazardous voltage electric connection enclosure. Failure to comply can cause serious injury or death. With the electric power to the unit OFF check the following items as noted: Is condenser at least 18 from any obstructions, walls, or adjacent units? Field piping properly supported and secure. All piping secured and isolated for vibration reduction. Refrigerant lines pitched according to User Manual. Field piping trapped according to User Manual. Field piping properly sized according to the User Manual. ALL electrical connections are tight and properly terminated on Evaporator and Condenser. Heat Rejection Interlock wiring has been correctly installed between Evaporator and Condenser. Equipment is installed level. Remove all debris from unit area. Condenser fan is secure, blade rotate freely with no obstructions. All panels are securely fastened to unit? Page 2 of 5 2014 Emerson Electric Co. All rights reserved Rev.3 10/2015

Condenser Inspection Risk of electric shock, contact with high speed moving parts and hot surfaces, Can cause serious injury or death. Use extreme caution when working inside the unit cabinet of an energized unit near bare live hazardous voltage terminals, high speed moving parts such as fan blades and hot surfaces such as motors, hot gas lines 1. Check voltage at disconnect and record. L1-L2 (If Applicable) L2-L3 (If Applicable) L1-L3 2. Close all local and remote electric power disconnect switches. Verify with a voltmeter that power is on and the supply voltage matches the marked unit voltage rating. Arc flash and electric shock hazard. Wear personal protective equipment per NFPA 70E before working within the electric control enclosure or any hazardous voltage electric connection enclosure. Use extreme caution when checking the status of live hazardous voltage circuits. Failure to comply can cause serious injury or death. Check unit electrical phasing with a phase meter. If phasing is incorrect, change wiring at input source to unit. Do not change any unit or component phasing. Air Cooled Field Charge Verification An integral sight glass is provided with the receiver to assist in field charge verification. During charge verification set the control temperature down to keep the system running. If the system is equipped with hot gas bypass, de-energize it by removing power from the hot gas solenoid valve coil. When charge verification has been completed, replace and secure all wire connections and covers. During operation at design ambient conditions (95 or 105 F; 35 or 41 C) the charge level will be above the sight glass in the receiver. If levels are below the sight glass an undercharge condition is likely. If levels are above the sight glass and higher discharge pressures than normal are observed an overcharge condition may be likely. However, verify that other high discharge pressure causes such as dirty coil and restricted airflow are not responsible before removing charge. At temperatures below design ambient, refrigerant backs into the condenser coil and the level in the receiver will drop below the sight glass. If you are trying to verify charge level at lower ambient, block the condenser coil to maintain 230psig (1585kPa) discharge pressure to ensure the head pressure control valve is closed. At these conditions the charge level should be above the sight glass in the receiver. Page 3 of 5 2014 Emerson Electric Co. All rights reserved Rev.3 10/2015

Note: Liebert Small System MCD and PFH Condensers The 5-ton high ambient, 5-ton Quiet-Line and 8-ton models consist of two condenser coils and two receivers. When restricting airflow on these units, the coils should be blocked off proportionally. If one coil is restricted significantly more than the other, liquid can remain in the restricted coil causing lower levels in the receivers. The receiver liquid level should be above the sight glasses in both receivers. There may be some variation in charge level between the two receiver sight glasses due to piping and assembly variations. When adding charge, determine which receiver level is lower and use that sight glass to gauge charge level. Note: If no level is visible in the sight glass, add charge until the level is in the middle of the sight glass. Check the discharge pressure during this procedure and adjust coil restrictions to maintain 230 psig (1585 kpa). Once the charge is in the middle of the sight glass, add additional system charge. After charging, unblock the coil and allow the unit to operate normally. After conditions have stabilized, restrict the coil if required to maintain 230psig (1585kPa) discharge pressure and verify that the charge level is above the sight glass. Water/Glycol System Operation If the head pressures recorded above equal 105 F condensing temperature, no adjustment of the glycol/water regulating valve are required. If the condensing temperatures are above 110 F, adjust the glycol/water regulating valve to lower the head pressure. If the system has balancing valves in it, these valves should be adjusted to the required GPM for this piece of equipment. After the condensing temperature has been set up properly, the system should be allowed to run for 10 to 15 minutes to obtain stable conditions. Entering condenser water/glycol temperature Leaving condenser water/glycol temperature After the refrigeration system is completely charged. Check and record the following. 3. Check compressor operating pressures and record. Suction Pressure Discharge Pressure 4. Check and record superheat (should be between (10-15 F) F 5. Check and record the compressor amperage. L1 L2 (if Applicable) L3 Page 4 of 5 2014 Emerson Electric Co. All rights reserved Rev.3 10/2015

6. Check and record amperage of compressor crankcase heater. Compressor CCH 7. Check and record amperage to receiver heater. Receiver Heater 8. Check condenser fan motor for proper rotation and record condenser fan amperage. L1 L2 (If Applicable) L3 Your start-up is now complete. Your input is important to us. Did you encounter any factory or field issues? If YES, please check the YES box and supply detailed description below. If NO, please check the NO box; however please feel free to provide any additional comments or suggestions. YES NO Comments: START-UP PERFORMED BY START-UP DATE (Please print name) COMPANY PHONE # IMPORTANT: This form must be properly completed and returned to your local Liebert Sales office. If you do not know who your local Liebert sales office is, call 1-800-Liebert or check our website at: http://www.emersonnetworkpower.com/en-us/brands/liebert/pages/default.aspx Page 5 of 5 2014 Emerson Electric Co. All rights reserved Rev.3 10/2015