PROJECT No.1 Supply, installation and commissioning of HW of GPON GNC-ALFA CJSC (Rostelecom Armenia) 2012 - on-going Goods and works Supply, installation and commissioning of GPON equipment: Optical line terminals (OLT) Optical network terminals (ONT) Edge routers & routers Ethernet switches Transceivers. Line card bundle Equipment Management System (EMS) JUNOS Software Suite etc. ZyXEL Juniper FiberHome HP DELL The total number of OLT supplied and installed in Armenia: 34 The total number of installed ports: 1,883 1 (one) year of warranty for the equipment supplied.
PROJECT No.2 Supply, installation and commissioning of SW platforms (OSS/BSS/NMS) GNC-ALFA CJSC (Rostelecom Armenia) Dec 2012 - on-going In order to support the Armenian telecom operator s demand for new multimedia applications a special software platform (OSS/BSS) was supplied, installed, integrated. Thus provision and activation of important features on the fly, add bandwidth, bill for content, track customer usage, monitor service performance, and ensure revenue capture have been achieved. OS Group (Russia) The following software was supplied, installed and integrated: Equipment manager Billing Oracle Data Base Processing License 1 (one) year of warranty for the SW integrated platform.
PROJECT No.3 Installation and commissioning of VoIP technological communication equipment at the railway stations in Armenia GNC-ALFA CJSC (Rostelecom Armenia) Nov 2012 - Dec 2012 Supply and indoor installation of VoIP technological communication equipment at 10 railway stations in Armenia, including: Server equipment Single Fiber Bi-Di(WDM) Media Converters Directional Transceivers Cabling etc. Cisco D-link Hyperline APC The works have been implemented at 10 (ten) railway stations in Armenia. 1 (one) year of warranty for performed installation works.
PROJECT No.4 Installation of FO passive network and maintenance of GPON network of Rostelecom Armenia GNC-ALFA CJSC (Rostelecom Armenia) March 2013 - on-going Installation and commissioning of FO passive network in the following administrative districts of Yerevan city: Avan Nor Nork Kentron Arabkir N/A Construction, commissioning and maintenance of entire GPON of the Rostelecom Armenia in the regions of Armenia and Yerevan city. The regime of maintenance 24/7. Guarantee (if any): 1 (one) year of warranty for performed of GPON installation works.
PROJECT No.5 Supply and installation of network security equipment in Gazprom Armenia ArmRusgasprom CJSC Dec 2013 Feb 2014 Goods ZyXEL ZyWALL USG 2000 Panasonic KX-TES824 Panasonic KX T7730 ZyXEL Panasonic N/A Guarantee (if any): 1 (one) year of warranty for the equipment supplied.
PROJECT No.6 Dilijan International School of Armenia RD Construction Management Armenia Dec 2013 - Aug 2014 Installation and commissioning of structuring cabling system. The main features are brought below: Total length of installed UTP cable 75 km (cat 6, 6A & 7) Total length of installed fiber cable 4.5 km Total number of server and cabling racks - 23 Total number of ports 1,420 TE Connectivity AMP NETCONNECT All installation works are performed in accordance with ISO/IEC 11801 Second Edition, CENELEC Standards. 25 years of system guarantee for structuring cabling system.
PROJECT No.7 Meridian Jewelry Free Economic Zone in Armenia AJA Free Economic Zone CJSC Jul 2014 - Nov 2014 Design, supply, installation and commissioning of low current system: Structuring cabling system Fire alarm system Video surveillance HP ZyXEL Supermicro Hikvision Nexans Hyperline UTP cable - 5840 m Category 5e Fiber-optic cable - 700 m Telecommunication cabinets - 4 Number of ports - 129 Surveillance cameras 52 2 years of warranty for structuring cabling system.
PROJECT No.8 Low current systems of multifunctional building K & K LLC Jan 2014 Dec 2014 Design, supply, installation and commissioning of low current systems: Structuring cabling system Fire alarm system Video surveillance Wireless internet (Wi-Fi) HP ZyXEL Supermicro Hikvision Nexans Hyperline UTP cable - 15950 m Category 5e Fiber-optic cable - 1800 m Telecommunication cabinets - 11 Number of ports - 250 Surveillance cameras - 108 1 (one) year of warranty for performed installation works.
PROJECT No.9 Installation of IPTV platform ZTE Corporation (China) July 2015 - Aug 2015 Indoor installation of IPTV platform equipment. ZTE Rack installation with all accessory 2U of Ethernet Switch installation with all accessory (2928E) 2U of Ethernet Switch installation with all accessory (8905) 1 (one) year of warranty for performed installation works.
PROJECT No.10 Installation of DWDM equipment ZTE Corporation (China) Oct 2015 Indoor installation of Enhanced Optical Transport Network equipment on 5 selected sites in the regions of Armenia. ZTE The works also included network management system (PC and cables) installations. 1 (one) year of warranty for performed installation works.
PROJECT No.11 Low current system in the IBIS Hotel in Yerevan: Local Developers LLC Nov 2015 - on-going Design, supply, installation and commissioning of low current system of the IBIS Hotel (to be operated by ACCOR, FRANCE) in Yerevan: Structuring cabling system Video surveillance Wireless internet (Wi-Fi) PBX TV System Audio and video of conference rooms Digital Signing Servers All proposed technical solutions and equipment are in full compliance with applicable standards of the hotel s future operator ACCOR. 2 (two) years of warranty after commissioning. Nexans Ruckus Alcatel-Lucent Teleste Samsung Intel Panasonic Kramer
PROJECT No.12 Rooms automation system in the Monarch Erevan Hotel Mon-Arkh CJSC Nov 2015 - ongoing Design, supply, installation and commissioning of rooms automation system in the Monarch Yerevan Hotel in Yerevan. INNCOM by Honeywell All proposed technical solutions and equipment are in full compliance with applicable standards of future operator Interstate Europe. 2 (two) years of warranty after commissioning.
PROJECT No.13 Installation, testing and commissioning of the SCADA/Telemetry equipment in 6 (six) 220 kv high-voltage substations in Armenia. ISKRA SISTEMI (Slovenia) Jun 2014 - on-going Installation, testing and commissioning of all connections to the existing SCADA system at each substation, complete in every respect and suitable for satisfactory operation. All the works within the substations regarding the SCADA connections. ISKRA SISTEMI Supply, installation, connection and testing of fibre optic cables between OPGW and ODF in the telecommunication cabinets. Supply, installation, connection and testing of power cables between the telecommunication cabinets Supply, installation, connection and testing of signal cables between the terminal equipment Teleprotection DZ9 in the telecommunication cabinets Supply, installation, connection and testing data cables between the MDF of SDH Optical equipment and Flexible multiplexer in the telecommunication cabinets supplied by the Client to the Existing SCADA system Amendment of Project Design of telecommunication cabinets with relevant information s to produce As Built Project. 2 (two) years of warranty after commissioning.
PROJECT No.14 Supply of special equipment. R2E2 Fund July 2015 - Nov 2015 Goods Supply of meteorological stations, solar measurement, air and water temperature monitoring equipment, Remote Monitoring Station, micro-spectrophotocolorimeter, pyronometers, sensors etc. Fuji Electric Micronics Limited Onset Computer Corporation Hopoo Optoelektronics Rapid Electronics HP Lenovo D-link The supplied equipment is intended to be used in a laboratory to be specialized in R&D of the renewable energy field. 1 (one) year of warranty for supplied equipment.