Play areas overlooking climbing hill. School & playgrounds overlooking pond bottom ballfields. Project experience while at Loris and Associates, Inc.

Similar documents
Firm Overview. We believe that a good site design accentuates the beauty of the architecture,

Neighborhood Districts

APPENDIX F: DETAIL DRAWINGS

MASTER PLAN IMPLEMENTATION COSTS. Appendix A

Stormwater Regulations & Considerations Morse Study Area. Pam Fortun, P.E. CFM Senior Stormwater Treatment Engineer Engineering Services Division

Long Branch-Wayne Local Park Renovation Project

A G E N D A Council Update Training Room September 26, :45 p.m.

Appendix A. Park Land Definitions

The following principles guide the development of goals and strategies to protect and promote these amenities:

Southeast Quadrant Plan

PRELIMINARY PLAT DESIGN REQUIREMENTS Updated 4/8/2016

CITY OF TUMWATER 555 ISRAEL RD. SW, TUMWATER, WA (360) (360) (FAX)

AWR Engineering, LLC

Prado Ranch North Common Open Space Tentative Map. Washoe County Planning Commission July 3, 2018

South Bismarck Watershed Model Update and Stormwater Improvement Project

Chapter 3 Site Planning and Low Impact Development

ADOPTED CAPITAL IMPROVEMENT PROGRAM BUDGET ARROYO PROJECTS

Civic Center District

russell+mills studios

Town of Windham. Planning Department 8 School Road Windham, ME voice fax

Rainwater Management

Sheet Index. Legal Description. General Notes: Vicinity Map Scale 1" = 600'

FY Capital Improvement Program Parks and Landscaping. 8 - Summary

1. Parks & Recreation Neighborhood Parks Community Parks Special Use Sites 2. Open Space 3. Trails

Charles P. Johnson and Associates. Annapolis Landscape Architects

6.1. INTRODUCTION 6.2. EXISTING CONDITIONS

LOUISIANA STATE UNIVERSITY COMPREHENSIVE & STRATEGIC CAMPUS MASTER PLAN. APPENDIX G - Stormwater Study Findings & Stormwater Solutions

North Oakville East Parks Facilities Distribution Plan. November, 2009

OP Council Resolution June 16, Planning and Development Services

November 21, Planning Commission Charter Township of Lyon Grand River Ave. New Hudson, MI 48165

Urban Water Management and Soils (ESRM 311 & SEFS 507)

City of Waco Stormwater Management Regulations

Hidden Pointe Landscape Master Plan. June, archi terra

Courthouse Planning Area

City of Elmhurst. City of Elmhurst. Storm Sewer System Workshop November 22, 2010

THREE-YEAR CAPITAL IMPROVEMENT PLAN FY

Mendota Heights 2040 Comprehensive Plan Draft Vers

Level 1 Downstream Analysis

Green Gables. April 24, 2013

VALUE OF URBAN DRAINAGE PLANNING AND FLOOD HAZARD REDUCTION PROJECTS IN THE 2013 FLOOD

Y Sports Complex PROGRAMMING Capitol Improvement Plan. Anticipated/Suggested Improvements. Sedgwick County Park: Sports Complex:

APPENDIX E. Flood Plain Management

29 Bella Fontaine Park

Section 11 Grading and Drainage Standards

Draft Master Plan for Franklin Park

EXHIBIT A 2019 FINANCING: PROJECT AUTHORIZATIONS

Special Revenue Funds

Spring 2018 Construction Update

APPENDIX A SIMPLIFIED APPROACH TO STORMWATER MANAGEMENT FOR SMALL PROJECTS. In West Sadsbury Township, Chester County, Pennsylvania

WQ-23 MOUNTAINOUS AND STEEP SLOPE SITES

ARROYO PROJECTS ADOPTED CAPITAL IMPROVEMENT PROGRAM BUDGET

Improve Neighborhood Design and Reduce Non Point Source Water Pollution

3.2 P - Park District

CARMODY PARK MASTER PLAN

PLANNED UNIT DEVELOPMENT & SUBDIVISION STAFF REPORT Date: May 18, 2017

SITE FEASIBILITY TEST FIT LAYOUT NORTHERN AREA INTERNATIONAL SCHOOL DECEMBER 2016

Metropolitan Area Planning Council 60 Temple Place, Boston, Massachusetts fax

Design Specifications & Requirements Manual

7. SITE DESIGN, RETAINING

EXISTING PLANS Harriet Festing Center for Neighborhood Technology Midlothian Community Meeting March 12, 2015

DESIGN CRITERIA PACKAGE

include playgrounds, sports fields, community gardens and picnic areas.

City of Bonney Lake Allan Yorke Park. MASTER PLAN SUMMARY REPORT June 30, 2016

East Whiteland Township Current Land Development Projects

Abbott Loop. Community Council Survey Capital Projects Needs Ranking Survey. Comm Council Priority Rank. Rank # ABBOTT LOOP COMMUNITY PARK

Town Center. Block 5 Existing multifamily residential units are expected to remain.

Fresh Kills Park in Regional Context

When planning stormwater management facilities, the following principles shall be applied where possible.

understanding Green Infrastructure In Zoning

Dowdy Park. Concept Plans TOWN OF NAGS HEAD NORTH CAROLINA. Developed by: Albemarle & Associates, Ltd VHB/ Vanasse Hangen Brustlin, Inc.

Design Specifications & Requirements Manual

APPENDIX G: TOWN ORDINANCE REVIEW

Kempsville Planning Area

Draft Stillwater 2030 Comprehensive Plan- Goals and Policies

Toronto Complete Streets Guidelines

Urban Stormwater: Best Practice Environmental Management Guidelines. CSIRO This electronic edition published by CSIRO PUBLISHING, 2006.

Capital Projects in and near Odenton Town Center

Description of Preferred Alternative

Butchers Hill. Greening Feasibility FINAL REPORT MAY 2009 N PORT ST N WOLFE ST S MADEIRA ST. Submitted To: Submitted By:

The Illinois Department of Transportation and Lake County Division of Transportation. Route 173, including the Millburn Bypass

GOCO Grants Awarded to Projects in Arapahoe County through June 2015

SEATTLE PUBLIC UTILITIES Drainage Design Options for street right of ways.

PLANNED UNIT DEVELOPMENT STAFF REPORT Date: June 2, 2016

OPEN SPACE TYPES. SIZE 8 acres. SIZE 20 acres. SIZE 1 acre

Fall 2017 Construction Update

BY GEOFF DEIGAN 2 0 I l l i n o i s P a r k s a n d R e c r e a t i o n w w w. I L i p r a. o r g

Outdoor Recreation Facilities Inventory

OPPORTUNITIES AND CONSTRAINTS - OXBOW PARK ENTRANCE AND PUT-IN

CROWN POINT SUBDIVISION

ACADEMY AREA CONCEPT PLAN

Index to Projects by Project Name

The only significant recreation deficiency in Conway is the absence of an integrated greenway and multipurpose trail system.

Tennessee Stormwater Management Program. Stormwater Management Site Assessment and Inventory Checklist. Quick Check o Vicinity Map within Watershed

Daniels Park Master Plan

New Park / Entry Court & Plaza Concept Design

KASPER. City of Georgetown, Texas PUD Planned Unit Development. December 30, 2015 Revised January 27, 2016

SOUTH PARK. Construction of a Portion of South Park at Fresh Kills Park, Staten Island

Storm Water Quality and Shoreline Restoration Improvements - Grant Funding Request City of Mound Carlson Park Bolton & Menk Project No.

MILLS PARK & PANTHER CREEK GREENWAY

Town of Peru Comprehensive Plan Executive Summary

Transcription:

City of Thornton Parks & Open Space Cherrywood Park Thornton, CO Architect: Design Concepts Construction of this seven-acre City park, located adjacent to Adams Twelve Five Star Prairie Hills Elementary School, was completed in 2003, providing a shared use facility for the both the school and local community. To complete the design of the City park, the existing 17 acre-foot detention pond was redesigned to incorporate the layout of a baseball field, soccer field, climbing hill and shelter within the bottom by reconfiguring the outlet to maintain historic release rates. Pond storage outside of the pond bottom play fields was sufficient to contain the minor storm event within the educational wetlands located at the bottom detention pond without inundation. Play areas overlooking climbing hill School & playgrounds overlooking pond bottom ballfields Several children s play areas, a sheltered pavilion and a multi-use play field were located above the pond. These areas were directly connected into the school playgrounds. Site ADA access from the bottom of the pond to the adjacent sites was achieved without retaining walls exceeding ADA requirements. An wetland area was incorporated at the base of the pond to enhance stormwater quality and provide an educational area for the school and local community. Sheltered pavilion located at pond bottom Project experience while at Loris and Associates, Inc.

City of Louisville Louisville Community Skate Park Louisville, CO Architect: Design Concepts Louisville Community Skate Park, currently under construction, was a much anticipated projects for many of the young residents of Louisville. Inline skaters and skateboarders from the surrounding community were asked to provide design feedback and ideas to assist in creating a skate park facility that could not only teach beginners but challenge experts. Final Skate park rendering by Design Concepts The project, located at the corner of Via Appia and McCaslin Boulevards, was placed adjacent to an existing inline hockey rink at an elevation 15-feet below the bordering Via Appia Boulevard. The complexity of this infrastructure design was challenging due its proximity to a major drainage way, and its location at the bottom of a hill below Harper Lake, causing a high groundwater table. To accomplish the task of placing a skate park, comprised of below ground skate bowls in a high groundwater elevation area, an underground dewatering system was designed around each skate bowl to alleviate subsurface pressure on the bowls, and minimize the chances of slippery wet concrete surfaces within the bowls. A road entrance was provided off Via Appia Boulevard, and was designed to provide parking lot access to the skate park, and a future street connection the adjacent police station and municipal court building also under construction. Onsite storm sewer was designed to drain water from inside the skate bowls and convey subsurface drainage to the adjacent major drainage way and regional detention pond. Site circulation and access included sidewalks, crusher fine trails and a connection to the adjacent Louisville Arboretum via a pedestrian bridge crossing over the local drainage way. Construction is anticipated to be completed fall of 2004. Pre-construction photo - New skate park will be located behind the existing inline hockey rink Pre-construction photo - Louisville Community Skate Park at proposed road entrance Project experience while at Loris and Associates, Inc.

Boulder County Parks & Open Space Antelope Drive Trailhead Lyons, CO Boulder County Parks and Open Space Department Design of this scenic Boulder County Parks and Open Space trailhead located outside the town of Lyons, was completed in 2002. The redesigned area included eight new trailhead parking spaces within the cul-desac parking area. To create a flat area large Cul-de-sac overlooking native drystack wall enough to design a cul-de-sac with an internal parking island, native rock material from the area was used to create a drystack retaining wall. The use of this material blended with the surroundings and provided a more natural feel for this entrance into Hall Ranch Open Space. Entrance to Antelope Drive Trailhead, Boulder County Hall Ranch Open Space Hall Ranch is a 3206-acre wild life habitat home to many rare and protected animals. This property, previously home to the Arapaho and Cheyenne Indian tribes, now consists of over 12 miles of multi-use hiking, mountain-biking and equestrian trails as well as a group shelter and picnic area. Native drystack wall Cul-de-sac parking overlooking drystack wall Native drystack wall

City and County of Broomfield Emerald Streetscape Broomfield, CO Architect: Winston & Associates This City and County of Broomfield capital improvement project, completed in 2004, included detaching existing four and five foot wide sidewalks adjacent to Emerald Elementary School to promote child safety and provide an aesthetic face-lift to the existing streets. Sidewalks were detached providing a five-foot landscape buffer between the streets and sidewalks with an adjacent low-maintenance patterned rumble strip on the outside edge for pedestrian comfort. Design also included new school drivecuts and updating site handicap ramps to meet ADA standards requiring truncated dome landings at the base of ramps. Elmhurst streetscape tree lawn and rumble strip Elmhurst Streetscape overlooking school playgrounds Emerald Streetscape overlooking new ADA curb ramp Emerald Streetscape overlooking drive entrance

City & County of Broomfield Community Park Drive Broomfield, CO City and County of Broomfield Capital Improvements Project To improve access and circulation to the existing baseball fields and City skate park, Community Park Drive, was designed. The project, currently scheduled for construction in the spring of 2006, minimizes the number of parking spaces lost with this new roadway by connecting to the existing parking lot round-about. A two-way drive isle was constructed on the south half of the round-about, converting the north end into a dropoff loop, while providing improved emergency access through the south half of the round-about which was not previously feasible. Aerial View of the existing park & future Community Park Drive A three-sided box culvert was installed over the floodplain conveying 2500 cubic feet per second of water, effectively increasing the conveyance capacity through the narrow flood plain. The box culvert was designed to allow future channel improvements to excavate underneath the box culvert without removal and replacement of the structure. A new sidewalk provides ADA access and connects East First Avenue to the existing park facilities. Site plan layout of Community Park Drive Existing pedestrian bridge overlooking downstream drop structure (top) Existing pedestrian bridge, shelter & round-about (right)