CITY OF CLEVELAND GREEN DESIGN GUIDELINES

Similar documents
City of Langford Green Development Checklist

BOROUGH OF HADDONFIELD GREEN DEVELOPMENT PRACTICES CHECKLIST November 15, 2013

What does LEED characterize?

Smart Growth Development Checklist

Green Infrastructure and Low-Impact Development Technologies

Proposed for Vic West Neighbourhood Plan. Design Guidelines for Intensive Residential Development - Townhouse and Attached Dwelling

Green Infrastructure & Low Impact Development

² Vicinity Map. Feet. DCB Construction Company Inc. 700 Golden Ridge Road JEFFERSON COUNTY PARKWAY 6 HIGHWAY 6 HIGHWAY WARNER DRIVE

Landscape and Streetscape Design 2.5

Application for Site Plan Review

Appendices: Glossary. General Terms. Specific Terms. Low Impact Development Approaches Handbook

The West Vaughan Employment Area Secondary Plan Policies

ARTICLE 17 SITE PLAN REVIEW

Part 9 Specific Land Uses - Housing on Small and Narrow Lots

TORONTO GREEN STANDARD VERSION 2.0

Little Mountain UDP Presentation

APPENDIX A. Proposed Guidance and LID checklists for UConn and Town of Mansfield

Toronto Complete Streets Guidelines

Green Infrastructure Overview

Kelowna Sustainability Checklist

FRUITVALE TRANSIT VILLAGE (Phase 2) Residential Project

Article 15. Sustainable Development Practices

5. LOW IMPACT DEVELOPMENT DESIGN STANDARDS

DEFINITIONS AND RULES OF MEASUREMENT DEFINITIONS AND RULES OF MEASUREMENT 7-1

In the Plan Area, sustainable principles and strategies should be incorporated into the planning and design of buildings, streets and sidewalks, and

Design Standards. Green Development. Shadow Studies. Standards. July 2010 Updated October 2014

Appendix E: Illustrative Green Infrastructure Examples

CHAPTER 26 LANDSCAPING (Chapter added in its entirety 05-08)

Landscape and fencing requirements of this Chapter shall apply to all new landscaped areas.

Cape Cabarita (Formerly known as the Wellcome Site) Development Control Plan. Date of Adoption: 4 September 2007 Effective Date: 7 March 2008

ARTICLE 9: LANDSCAPING AND FENCING REQUIREMENTS

Performance Level: Tier 1 (Required) Tier 2 Tier 3 Tier 4. Application Information: Site Plan Control Zoning Bylaw Amendment Draft Plan of Subdivision

Stormwater Management Techniques WMPF LAND USE TRAINING INSTITUTE MARCH 14, 2018

SECTION VIII Croman Mill District Standards Adopted by the Ashland City Council 08/17/10 Ordinance 3031

The purpose of the requirements in this Article is to provide for landscaping and screening of parking and other outdoor areas that will:

5.1 Commercial and Industrial Development. (Effective April 1, 2006)

Design Guidelines - 1 -

Using Green Infrastructure To Protect Water Quality

Green Infrastructure on Brownfields

Procedures IV. V. Rural Road Design Option

Green Infrastructure Recommendations For Parks and Public Spaces

B L A C K D I A M O N D D E S I G N G U I D E L I N E S for Multi-family Development

Can Urban Redevelopment Restore Aquatic Resources

Plat Requirements CHECKLIST FOR SITE PLAN REVIEW

Neighborhood Infrastructures Blue Green Infrastructure

Harmony Technology Park Third Filing, Second Replat Custom Blending, Project Development Plan/Final Development Plan - FDP #130021

B. Blocks, Buildings and Street Networks

GUIDELINES FOR ECOLOGICAL PERFORMANCE

BUFFERS, TREE PROTECTION AND LANDSCAPING. Sec Purpose and Intent.

Chapter 1123: Landscaping and Buffering

PRINCE EDWARD COUNTY HIGHWAY CORRIDOR OVERLAY DISTRICT DESIGN GUIDE

Growing Sustainable Communities Conference

Importance of Master Planning Marcy Colclough

3. Are there any projects exempt from the definition of Regulated Projects?

ARTICLE 13 STREETS General

CITY OF VIRGINIA BEACH PLANNING COMMISSION DESIGN AWARDS PROGRAM 2012

Proposed Credit Program

Guidelines. Building. The minimum setback of an attached garage from the lot line shall be 6m. 4. Zoning Provision

E. Natural areas include habitats such as wetlands, tidal marshes, waterways, natural drainage-ways, woodlands and grassland meadows.

ARTICLE VI: SITE PLAN REVIEW

4.1.3 LAND USE CATEGORIES

understanding Green Infrastructure In Zoning

Transit Station Area Development Guidelines

Site Design for Protecting Water Quality 2013 Award Winning Projects

ARTICLE 12. LANDSCAPING REQUIREMENTS.

SUNY Green Infrastructure Summit. April 17, 2014

5.1.1 The streetscape along US Highway 64 (Brevard Road); and, The built environment within new residential developments; and,

COMMUNITY SUSTAINABILITY AND ENVIRONMENTAL MASTER PLAN IMPLEMENTATION UPDATE

City of Vaughan Urban Design Guidelines for Infill Development in Established Low-Rise Residential Neighbourhoods

GD, Green Zone Planned Development District

Complete Neighbourhood Guidelines Review Tool

Annual Reporting for FY Regional Supplement for New Development and Redevelopment

APPENDIX A - Block and Draft Plan

Site Development Plan (SDP) Checklist

Town of Cedarburg Design Guidelines & Standards Commercial / Multi Family / Senior Care /Institutional/ Government Facilities Adopted August 6, 2014

NON-PRIORITY PROJECT WATER QUALITY PLAN (NPP)

CHESAPEAKE LANDSCAPE ORDINANCE

Community Mixed Use Zone Districts (CMU)

Title 11 Streets and Sidewalks

LOUISIANA STATE UNIVERSITY COMPREHENSIVE & STRATEGIC CAMPUS MASTER PLAN. APPENDIX G - Stormwater Study Findings & Stormwater Solutions

DEVELOPMENT DESIGN GUIDELINES

Mixed Use Centres Development Permit Guidelines

Tennessee Stormwater Management Program. Stormwater Management Site Assessment and Inventory Checklist. Quick Check o Vicinity Map within Watershed

COMPLETE GREEN STREET CHECKLIST

CHAPTER 8. Mrs. Zimman s Class - Central Elementary

SITE PLAN REVIEW ITEMS - REFERENCE CHECKLIST

The Baileys Planning District portion of the Comprehensive Plan contains site design recommendations for both the Baileys Crossroads Community

Building and Site Design Standards

Harvesting the Rain: Green Infrastructure for a Healthier Rahway River Watershed

MIXED-USE ZONING DISTRICT DESIGN GUIDELINES

Coffee Creek Park Development Low Impact Development (LID)

FLORIN ROAD CORRIDOR Site Plan and Design Review Guidelines Checklist

SEPA Modification Application

City of Redlands Architectural Guidelines for Non-Residential Development

SITE PLAN REVIEW APPLICATION AND CHECKLIST

Transportation. Strategies for Action

FORMER CANADIAN FORCES BASE (CFB) ROCKCLIFFE SECONDARY PLAN. Official Plan Amendment XX to the Official Plan for the City of Ottawa

PLANNED UNIT DEVELOPMENT & SUBDIVISION STAFF REPORT Date: May 18, 2017

APPENDIX C. Architectural and Environmental Design Standards. Environmentally sensitive areas should be protected.

Clarington Energy Business Park Secondary Plan

Transcription:

CITY OF CLEVELAND GREEN DESIGN GUIDELINES SEPTEMBER 18, 2008 PROJECT COMPLIANCE PATH: 1. Approved master plan 2. Approved design district boundaries 3. Approved district design guidelines, Green design guidelines and updated zoning PURPOSE: A set of design and development guidelines intended to support the conservation of energy and material resources, innovation in sustainable design and the development of healthy and vibrant neighborhoods for the City of Cleveland. A. SITE 1. GENERAL CONSERVATION a. HABITAT - For any previously undeveloped land within the project site, habitat of endangered or threatened species must be protected. b. PROTECTION OF ENDANGERED SPECIES - If endangered species occur on the project site, the project must comply with or exceed local standards for endangered or threatened species protection. To check whether endangered species exist on site, the project can submit a site map to the Ohio Department of Resources Natural Heritage Program, which will check the map against its surveys in the Natural Heritage Database for endangered flora and fauna. c. WETLANDS If wetlands occur on project site, project must comply with or exceed State of Ohio EPA standards for wetlands protection. Projects that are within Watercourse Protective Zone Districts as defined by the City of Cleveland must comply with all guidelines that apply to those districts. d. FLOODPLAIN Projects may not incorporate land within the 100- year floodplain as determined by the Federal Emergency Management Agency. 2. NEIGHBORHOOD PATTERN AND DESIGN a. OPEN COMMUNITY Streets and sidewalks that are built as part of the project shall be available for general public use and not gated. Gated areas do not qualify, with the exception of education and health care campuses where gates are used for security purposes. b. ACCESS TO SURROUNDING VICINITY The project shall have at least one through-street at the project boundary every 800 feet, or at existing abutting street intervals, whichever distance is smaller. This does not apply to connections that cannot physically be made: e.g. wetlands, rivers, railroads, extreme topography,

natural gas lines, pipeline easements, electric power easements, highways, expressways and other limited-access roads. c. WALKABLE STREETS The project shall achieve each of the following (blanks to be filled in by CDC or other neighborhood organization): i. Each building in the project shall have a principal functional entry with a front façade facing a public space such as a street, square, park or plaza, AND ii. A minimum of 30% of all street frontages located within the project shall have minimum building-height-to-street-width iv. proportions of 1:3, AND All streets along exclusively residential blocks within the project, whether new or existing, shall be designed for a maximum speed of 25 mph. d. ACCESS TO PUBLIC OR ACTIVE SPACES The project shall be located/designed so that either: i. 90% of all dwelling units and business entrances are within a 1/4 mile walk distance of a park, green plaza or square at least 1/6 acre in area, OR ii. 90% of all dwelling units and business entrances are within a ½ mile walk distance of an active open space (e.g. general playfields, soccer, baseball, basketball and other sports fields) of at least 1 acre in area. 3. PARKING, HEAT ISLAND EFFECT and PAVING MATERIALS a. REDUCED PARKING ALLOWANCE The minimum off-street parking requirement for various uses shall be 50% of what is required in Section 349.04 of the Zoning Code, so long as the project is supported by availability of shared parking, on-street parking and/or alternative transportation options including public transportation, car sharing, and bicycle facilities. (Adapted from 344.08) b. BICYCLE FACILITIES Secure bicycle parking shall be provided for 15% of residential units for multifamily and mixed-use buildings and 5% of full-time equivalent employees for commercial and institutional buildings. c. HEAT ISLAND EFFECT To reduce the heat island effect, the project shall provide any combination of the following strategies for at least 50% of the site s hardscape area (including roads, sidewalks, courtyards and parking lots): i. Shade (within 5 years of occupancy) either through roof overhangs with an SRI of 29 or greater, or through shade trees. For surface parking lots, an alternate compliance path is to plant one tree for every 10 parking spaces. ii. Paving materials with a Solar Reflectance Index (SRI) of at iii. least 29 An open-grid or permeable pavement system (which achieves the secondary benefit of facilitating on-site infiltration of stormwater) d. RECYCLED MATERIALS IN INFRASTRUCTURE The project shall use recycled materials in any new roadways, parking lots,

sidewalks and curbs constructed as part of the project. Examples of recycled materials include crushed Portland cement concrete and crushed asphalt concrete; scrap tires; asphalt roofing shingles; and recycled mineral admixtures (e.g. coal fly ash, blast furnace slag, rice hull ash and silica fume). 4. LANDSCAPING a. TREE PRESERVATION For multifamily, institutional and commercial projects, applicants must submit a tree preservation plan and indicate how existing trees will be preserved. Where they cannot be preserved, trees with a DBH (diameter at breast height) between 2 and 6 inches shall be replaced with new trees of 2 inch caliper or larger. Trees with a DBH greater than 6 inches shall be replaced with new trees of 4 inch caliper or larger. Replacement trees shall be planted on-site where practical, or elsewhere in the district. b. PLANT SPECIES The use of invasive species for landscaping is prohibited. The Ohio Department of Natural Resources Division of Natural Areas and Preserves maintains a list of invasive plants and a list of alternative plants. The division may be contacted directly at (614) 265-6453. c. IRRIGATION Multifamily, institutional and commercial projects shall be designed so as to limit or eliminate use of municipal potable water supplies for the purposes of irrigation. This can be accomplished through selection of native, locally adapted and drought-resistant species. Projects may also reuse graywater and storm water through use of cisterns, rain barrels or other rainwater harvesting techniques. Potable water may be used for irrigation only if water-efficient irrigation systems are installed, such as drip systems, micro misters or subsurface irrigation systems where applicable. d. STORMWATER Projects over an acre in size must comply with the U.S. EPA s Stormwater Phase II regulations. Multifamily, institutional and commercial projects that are smaller than one acre (new construction or major renovation) shall submit a stormwater management plan that considers strategies for the onsite retention and infiltration of stormwater, such as porous or permeable paving, tree pits with integrated bioretention, green / vegetated roofs, rain harvesting, bioswales, etc. Newly constructed single-family subdivisions with 6 or more contiguous lots shall also submit a stormwater management plan. (Ref: Residential Design Review process.) 5. SITE LIGHTING a. Energy-efficient Fixtures Applicants shall use high-efficiency lighting for site accent and safety lighting fixtures. These may include T5 or T8 fluorescent lamps, LED lamps, fluorescent ballasts and high-intensity discharge ballasts or lamps. b. Light Pollution Controls Site lighting shall minimize light pollution through the use of cut-off fixtures that direct light in a 90 degree or lower angle from nadir (straight down).

6. ON-SITE RENEWABLE ENERGY GENERATION The Design Review Board is encouraged to waive requirements that might prohibit the application of on-site renewable energy generation systems. 7. BUILDING ORIENTATION Buildings and site features are encouraged to be oriented wherever practical to take advantage of solar orientation. This may include building orientation / configuration to use passive and active solar energy, natural ventilation and other passive heating and cooling strategies, the location of parking areas to the north side of buildings to enable partial shading of pavement, the incorporation of landscape features to optimize passive heating and cooling effects, etc. B. BUILDINGS NEW CONSTRUCTION AND SUBSTANTIAL RENOVATION These guidelines apply only to projects involving new construction or substantial renovation of buildings. Substantial renovation is defined as involving elements of major HVAC renovation, significant envelope modifications and major interior rehabilitation. 1. RESIDENTIAL Single-family, two-family and townhouse projects (residential buildings 3 stories or lower) are encouraged to be certified under LEED or Enterprise Green Communities rating systems. At a minimum they shall qualify as Energy Star homes, and have plumbing fixtures that meet EPA WaterSense standards. a. Construction Waste Project must document the recycling of a 2. MULTIFAMILY, MULTIFAMILY MIXED-USE, COMMERCIAL, INSTITUTIONAL Commercial and institutional projects shall be certified under the appropriate LEED rating system (New Construction, Hospitals, Schools etc.). Multifamily buildings may be certified under either LEED or Enterprise Green Communities. a. Roofing Materials - Roofing materials must be Energy Star compliant or the project shall install a vegetated roof over at least 50% of the roof area. b. Construction Waste Project must document the recycling of a 3. MULTIPLE BUILDINGS Projects involving more than one building shall individually certify each building under LEED or Enterprise Green Communities, OR shall certify the overall project under LEED for Neighborhood Development. a. Construction Waste Project must document the recycling of a C. DESIGN / DEVELOPMENT PROCESS 1. DESIGN REVIEWS / APPROVALS

a. This is a Design Review District. All new development and exterior building alterations in the district shall be reviewed by the City Planning Commission before being approved for a Building Permit. The purpose of the Design Review District is to ensure that new development and building alterations in the district will meet high standards of design and will be respectful to the character of the neighborhood. A set of Design Guidelines has been prepared and adopted by the City Planning Commission for use in reviewing projects in the district. The guidelines will help ensure that the design review process is straightforward and is easy to understand and will be effective in accomplishing the goal of achieving good design for the neighborhood. b. All applicants in this district shall complete a project checklist provided by the City Planning Department that may include an explanation of how the green zoning guidelines will be implemented. Copies of the checklist shall be submitted to the Design Review Committee as a mandatory prerequisite to the formal public review process.