PROJECT NO. CWA 2013-04 SEPTEMBER 24, 2014 ADDENDUM NO. 6 BESSEMER RECREATION & WELLNESS CENTER BIDS RECEIVED: CITY HALL, CITY OF BESSEMER TIME: 2:00pm DATE: October 2, 2014 City of Bessemer -------------------------------------------------------------------------------------------------------------------------------------------- ---------- THIS ADDENDUM IS DIRECTED TO ALL PRIME BIDDERS, AND ALL OTHERS TO WHOM DRAWINGS AND SPECIFICATIONS HAVE BEEN ISSUED. THIS ADDENDUM FORMS A PART OF THE CONTRACT DOCUMENTS. THE FOLLOWING CONDITIONS TAKE PRECEDENCE OVER ANY CONFLICTING CONDITIONS IN THE DRAWINGS AND SPECIFICATIONS. THE DRAWINGS AND SPECIFICATIONS ARE HEREBY AMENDED IN THE FOLLOWING PARTICULARS. ------------------------------------------------------------------------------------------------------------------------------------------- GENERAL N/A DRAWINGS Sheet SP-1- See attachment 1. Revised pool stair shape per Health Department comments. 2. Added safety rope between lane pool and play pool, per Health Dept. comments. Sheet SP-2- See attachment 1. Schedule revised to reflect added/changed components per Health Dept. comments. Sheet SP-3- See attachment 1. Changed deck/pool dimension at play pool per Health Dept. comments. Sheet SP-5- See attachment 1. Revised pool stair shape per Health Department comments. Sheet SP-8- See attachment 1. Added safety chain to secure CO2 container to wall. Sheet P2.14 1. Storm lines lowered to clear structural footings. See supplemental drawing P2.14 ADD6 ELECTRICAL GENERAL / CLARIFICATIONS 1. For clarity the electrical contractor is responsible for the purchase, installation, and wiring of all hand dryers shown on the documents. 2. The electrical contractor is responsible for conduit and boxes only for all voice/data outlets. 3. Bessemer Utilities will be responsible for the installation of Light Poles PL1, PL2, and PL22. The electrical contractor shall be responsible for the raceway infrastructure as called for on Sheet E1.02. Sheet E0.03 Electrical Details 1. Add Auxiliary Entrance Riser to sheet. See supplemental drawing E3.03A-ADD6
2. Add Auxiliary Outlet Detail to sheet. See supplemental drawing E3.03B-ADD6. Sheet E0.05 Electrical Details 1. Add Panel RP-P schedule to the sheet. See supplemental drawing E3.05-ADD6. 2. At Enlarged Pool Equipment Room Electrical change GFCI receptacles to Weatherproof-GFCI While-In Use type Receptacles. Sheet E1.02 Electrical Site Plan 1. Sheet re-issued in its entirety. Revisions have been clouded. Sheet E1.03 Baseball Field Lighting 1. At Baseball Field #1, change Fixture Tag for B2 (XRL) along first base line to B1 (XRL) Circuit shall homerun to Contactor BB1-B1 via pull boxes BB1-PB2 and BB1-PB1. Sheet E1.06 Concessions Building 1. Add connection to electric unit heater in Storage #401. Connect to 20/2 Breaker Panel P-CB1#14,16 with 3#10, 1#10G-3/4 C. Sheet E2.01 First Floor Plan - Block A Lighting 1. Provide (2) Type S3 fixtures in elevator shaft (one at top and one at bottom) for maintenance. Provide 3-way switch adjacent to each to turn on-off. Connect to lighting circuit in adjacent janitor storage closet with 2#12, 1#12G-3/4 C. Coordinate exact location with the elevator supplier prior to any roughing. Sheet E2.05 Second Floor Plan Block F - Lighting 1. Lighting Control Panel LCP shall be located adjacent to Panel LP2 in Electrical Room #210. Provide 120 Volt control power from Spare 20/1 Breaker at Panel RP2A. Sheet E3.01 First Floor Plan Block A - Power 1. Connect GFCI receptacles at Men s #103 and Women s #104 to Panel RP1A#53. 2. Provide (2) GFCI receptacles in elevator shaft (one at top and one at bottom) for maintenance. Connect to panel RP1B#35. Coordinate exact location with the elevator supplier prior to any roughing. 3. Add (4) ceiling mounted receptacles at Strength #125 for TV power. Connect to 20/1 Breaker at Panel RP1B#35 with 2#12, 1#12G-3/4 C. Verify exact location with the owner and architect prior to roughing. Sheet E3.02 First Floor Plan Block B - Power 1. Connect electric water cooler in Pool #120 to 20/1 GFCI breaker at Panel RP1B#33. 2. At Equipment Connection Schedule, connect EUH-1D to 15/3 Breaker at Panel RP1A#44,46,48. 3. At Equipment Connection Schedule, connect EUH-1E to 15/3 Breaker at Panel RP1A#50,52,54. 4. Provide Connection to DCU-1 in Telecom Room #110A. Unit receives it power from CU-1 located on roof. Provide 2#12, 1#12G-3/4 C. through 30/2 disconnect and connect each end as required. Sheet E3.04 Second Floor Plan Block F - Power 1. Homeruns and control wiring for motorized backboards to go through Raise-Stop-Lower switches (furnished by manufacturer). Switches to be installed and wired by the electrical contractor in Storage Room #141. Provide all conduit and wiring as required for a complete functional backboard as intended. Typical of 4.
2. Provide 120 Volt Power to fusible link at fire shutters located at walking track. Connect to Panel RP2A#33. Verify all wiring requirements with fire shutter supplier prior to any work. Sheet E3.05 Roof Plan - Electrical 1. At Equipment Connection Schedule, connect EF-7 to Panel RP2A#49. 2. At Equipment Connection Schedule, connect EF-8 to Panel RP2A#51. Sheet E4.01 First Floor Plan Block A - Auxiliary 1. Provide fire alarm smoke and heat detectors in bottom of elevator shaft. 2. Add (4) single gang ceiling mounted outlet boxes with 30-0 of 1 C stubbed to Corridor #C2 above ceiling for TV cable connections. Verify exact location with the owner and architect prior to roughing. Sheet E4.02 First Floor Plan Block B - Auxiliary 1. Add smoke detector in Telecom Room #110A above fire alarm control panel. 2. Add fire alarm speaker strobe device in Corridor #C3 on wall adjacent to Conference Room #112. Sheet E4.04 Second Floor Plan Block F - Auxiliary 1. Provide fire alarm smoke and heat detectors in top of elevator shaft. 2. Smoke detectors shown on each side fire shutters shall be interlocked with the fire shutter fusible link as required. Provide all control wiring, fire alarm relays, and fire alarm control/monitoring zams as required. Sheet E5.01 Single Line Diagram 1. At Transformer TX-DP1, change system ground connection from #2 to #1/0 2. Change feeder from Switchboard MSB-1 to Transformer TX-DP1 to 3#4/0, 1#4G-2 ½ c. 3. Change feeder from Switchboard MSB-1 to Panel LP2 to 4#1, 1#6G-1 ½ C. 4. At Pad Mounted Transformer Detail Recreation Center, add secondary electric connection to Panel P-BB via feed through meter. Sheet E5.02 Single Line Diagram 1. Delete Pad Mounted Transformer Detail Sports Athletic Lighting. 2. Secondary electric at Single line Diagram Sports Athletic Lighting to come from Pad Mounted service transformer serving the Recreation Center. See Sheet E1.02 for required secondary routing. Sheet E5.03 Panelboard Schedules 1. At Panel DP1 schedule, change breaker size for Panel RP2A to 150/3. 2. At Panel RP2A change breakers sizes at Spaces 49,51,53 to 15/1. Sheet E5.04 Panelboard Schedules 1. At Panel P-BK schedule, change all breaker sizes from 20/3 to 15/3. 2. At Panel P-TN schedule, change all breaker sizes from 20/3 to 15/3. SPECIFICATIONS 1. Section 08 71 00 DOOR HARDWARE a. Part 2- Add the following: Butt Hinges: Ives 5 Knuckle Hinge 5BB1 (standard weight); 5BB1HW (Heavy Weight) as equal to specified McKinney Hinges TA2714; T4A3786; T4A3386
Door Locks and Latches: Schlage L9000 series mortise lock as equal to specified Sargent 8200 Series mortise lock. Lock Cylinder Key System: Schlage Primus (Patented Key System) Part #20-787 for controlled access; #20-587 for high security UL437. Surface Door Closers: LCN 4040 Series as equal to the specified Sargent 350 Series Door Closers. Exit Devices (Wide Stile Wood and Hollow Metal Doors): Von Duprin 98 rim devices, 9827 surf vertical rod exit device, 9875 mortise exit device, 9847 wood door concealed vertical rod exit device, Exit Devices (Narrow Stile for use on Aluminum Doors or where narrow stile devices are specified) 35 narrow stile rim exit device, 3547 narrow stile concealed vertical rod exit device. All are equal to the specified Sargent 8000 series exit devices. Flat Goods (Kick and Mop Plates, Flush Bolts, Wall Stops, Silencers, Etc.): Ives. REQUEST FOR INFORMATION/CLARIFICATIONS 1. Please clarify if the scoreboard is to be a Model 2700 or if it should be Model 2770 which aligns with more of the requirements called for in the specs? a. The Basis of Design is the Model 2700. 2. Drawings A2.13 and A2.40 show concrete column covers. Are these cast in place or GFRC? a. Canopy column covers are cast-in-place, dimension as shown on A2.40. 3. On this finish schedule does SC stand for stained concrete or sealed concrete. What does CONC stand for? a. Per the Abbreviations legend on Sheet A4.10, SC Stained Concrete; CONC Concrete, Sealed. 4. What species does the veneer need to be for the wood doors? a. Cherry 5. Please clarify the construction of the walking track. Civil indicates concrete. Landscape indicates asphalt. a. The note on the Civil Site Plans (Sheets C2.0 and C2.1) to See landscape architect s plan for details of hardscape in park area will take precedent over the concrete walking track shown on Sheets C2.0 and C2.1. END OF ADDENDUM NO. 6 Attachment 1: Sheet SP-1, SP-2, SP-3, SP-5, and SP-8 (Full Size) Attachment 2: Sheet E1.02 (Full Size) Attachment 3: Sketch E0.03A-ADD6 Attachment 4: Sketch E0.03B-ADD6
Attachment 5: Sketch E0.05-ADD6 Attachment 6: Sketch P2.14-ADD6 -------------------------------------------------------------------------------------------------------------------------------------------
Project Title: Bessemer Recreation Center Revisions No. Date Description 1 9/24/14 ADDENDUM 6 SP-1
SP-2 Project Title: Bessemer Recreation Center Revisions No. Date Description 1 9/24/14 ADDENDUM 6
SP-3 Project Title: Bessemer Recreation Center Revisions No. Date Description 1 9/24/14 ADDENDUM 6
Project Title: Bessemer Recreation Center Revisions No. Date Description 1 9/24/14 ADDENDUM 6 SP-5
SP-8 Project Title: Bessemer Recreation Center Revisions No. Date Description 1 9/24/14 ADDENDUM 6
W D UP W W W W W W W W W W W SS OHE OHE OHE OHE OHE OHE OHE OHE OHE OHE OHE SS W SS OHE OHE OHE W W OHE OHE OHE W W W W SS W W W W W W W W W W W W SS W W OHE OHE OHE OHE OHE OHE OHE OHE OHE OHE SS SS SS OHE OHE OHE OHE OHE OHE OHE OHE W W W W W W W W W W W W W W W 14TH STREET SOUTH (HIGHWAY 150) SITE PLAN - ELECTRICAL SCALE: 1" = 60'-0" HALL AVENUE Job No. Date: R 14E-02-01400 File: SITE PLAN - ELECTRICAL.dwg Sep 24, 2014 Time: 3:18:19 pm LIGHT POLE 'PL1', 'PL2', 'PL22' DETAIL NOT TO SCALE W SS 2013-04 08/22/14 Project Title: Bessemer Recreation Center 100 14th Street South Bessemer, Alabama City of Bessemer BID SET E N G I N E E R No. 23664 PROFESSIONAL SITE PLAN - ELECTRICAL JLB KRA E1.02 K HOS RO W R. A B DI REG I ERED A L S T A M A A B Revisions No. Date Description
FD 8 7 8"ø 8"ø 4"ø FD 4"ø 4"ø POOL EQUIP. 132 POOL CHEM. 133 WH-1-6' - 4 7/32" BOP K TRENCH POOL-1 120-1 4"ø L 5"ø 5"ø 4"ø TRENCH 4"ø M -3' - 7 15/32" BOP 5"ø 1 FIRST FLOOR - POOL - STORM 1/8" = 1'-0" P2.14 Charles Williams & Associates. Inc A R C H I T E C T S 3601 8TH AVE. SOUTH BIRMINGHAM, ALABAMA 35222 PH: 205 250 0700 FAX: 205 250 0515 A L REG I E N G A B ST I A M A ERED No. 17995 MPROFESSIONAL A H M O U D ( M N E E R E I K A ) H I S D 9/22/14 DATE: 09/24/14 PROJECT NUMBER: 2013 04 PROJECT NAME: Bessemer Recreation Center REFERENCE SHEET NO: P2.14-ADD6