Permeable Paving. Sustainable Control Of Urban Storm Water Pollution. The volume of storm water being diverted to

Similar documents
Installation Manual May 9/14 No revision

815 NE 172 nd Avenue Vancouver, WA Installation Manual

A. Install all temporary erosion control measures (in accordance with MNDOT General Conditions 2573) prior to site disturbance.

The Concept. Features. Benefits

GREEN COLLECTION E C O - F R I E N D LY P E R M E A B L E P A V E R S T R E M R O N. C O M

5. LOW IMPACT DEVELOPMENT DESIGN STANDARDS

Green Infrastructure and Low-Impact Development Technologies

Post Construction BMPs

COMMERCIAL PAVING 2017 CAUSEWAY. permeable concrete pavers

PAVING GRID OUTSTANDING DURABILITY

Paving - 8 easy steps for DIY and professional landscapers

Capillary Action Subsurface Irrigation

C L AY PAV E R S Naturally best. How to pave. Easy guide to a good professional finish with Claypave

Pavers Spade, rake (metal prongs), wheelbarrow, wooden stakes, string line, tape measure, pegs and spirit level

Appendix G. Detailed Design

Installation & WillowCreekPavingStones.com POWER TOOLS YOU MAY NEED TO RENT PROJECT COMPONENTS. Willow Creek pavers Aggregate base material

Appendix D - Technical Design Criteria for BMPs

Tree Pits Construction Guide

Green Street BMP Matrix

ENVIRONMENTAL PAVING SOLUTIONS

4. CONCEPT PLAN DEVELOPMENT

WQ-07 INFILTRATION TRENCH

GRASSRINGS Turf reinforcement system

Masonry. Landscape Product Guide. what can you build with Selkirk?

SmartSoak Residential Stormwater Management System

Pavements Built for the Future

planning, designing and installation guide for interlocking segmental pavers installation guide

Site design measures. Chapter. This Chapter explains how site design measures can reduce the size of your project s stormwater treatment measures.

Installation guidelines

n1. Design 5.4.6a Urban Bioretention 5.4.6a Urban Bioretention Variations: Planter box, Extended tree pits, Stormwater curb extensions.

6.1 Bioretention Areas

Low Impact Development Site Design

Green Infrastructure Overview

MAINTENANCE APPENDIX. G.1 Introduction. G.1.1 Goals and Objectives

317)

Placement of the soil should be in lifts of mm and loosely compacted (tamped lightly with a backhoe bucket).

High Point Community: Site Drainage Technical Standards. High Point Community Site Drainage Technical Standards

Carparks Service Access Areas Golf Courses Caravan Parks Footpaths. Turf Reinforcement System

BuildingProductsCorp.com

Proposed Credit Program

Technical Assistance Permeable Interlocking Concrete Pavement PICP

EZ Base is a high-density panel base system that replaces traditional compacted aggregate-base installations.

SMALL PAVER PROJECT. Home Gardeners School March 19, Presented by Robert W. Bellek Owner

DRIVABLE GRASS GUIDELINE FOR PLANTED INFILL INSTALLATION

Low Gradient Velocity Control Short Term Steep Gradient [1] Channel Lining Medium-Long Term Outlet Control Soil Treatment Permanent

County of Prince Edward. Stormwater Management Plan. Agreement in lieu of a Stormwater Management Plan

LOUISIANA STATE UNIVERSITY COMPREHENSIVE & STRATEGIC CAMPUS MASTER PLAN. APPENDIX G - Stormwater Study Findings & Stormwater Solutions

RAIN GARDEN ILLINOIS URBAN MANUAL PRACTICE STANDARD. (feet) CODE 897 DEFINITION

Permeable Interlocking Concrete Pavement A Low Impact Development Tool Training for Developers

Lesson 2: Stormwater Best Management Practices (BMPs)

Permeable Interlocking Pavers

LEADING INNOVATIONS IN SUSTAINABLE URBAN DRAINAGE

BorAL. PAvErS Build something great. commercial pavers BUILD A TRADITION IN YOUR COMMUNITY WITH BORAL PAVERS.

P A V E R S Are they really the same? The 3-P s and how they relate to storm water management

Certain areas of your yard or property may not represent a good location for your rain garden. Don t plant your rain garden:

Technical Bullet Series on Clay Brick Pavers

2

5/15/2013. Basin Area. Vegetation. Rainfall & Runoff. Soil Type. Topics. Factors Influencing Erosion. Factors Influencing Erosion

HORSE STABLE USING AZEK PAVERS.

Site Design Measures. Chapter

Pavement Removal Fact Sheet

Residential Stormwater Credit Application

Residential Stormwater Credit Application

Appendix B DETAILED DESIGN

PavePro Stabilise Gravel & Decorative Stone.

Resin Bound and Bonded Surfacing Solutions

Urban Drainage Geomembrane (UDG)

Urban Water Management and Soils (ESRM 311 & SEFS 507)

9 Steps to a Lasting Paver Installation

Stormwater protection

AquaBlox Water Matrix

Urban Stormwater: Best Practice Environmental Management Guidelines. CSIRO This electronic edition published by CSIRO PUBLISHING, 2006.

From and

Using Green Infrastructure To Protect Water Quality

Use of Best Management Practices

Structural Stormwater Best Management Practices

A. Install all temporary erosion control measures (in accordance with MNDOT General Conditions 2573) prior to site disturbance.

UNITARY PLAN. Your Easy Guide to understanding the Residential Standards. Version 35. waste. outlook. landscapes. context. parking

Homeowners Guide to Stormwater BMP Maintenance

Permeable Pavers. EZ Roll Gravel Paver. Tufftrack Grass & Gravel Paver. EZ Roll Grass Paver. High Performance Alternative to Traditional Paving

STORMWATER TOOL. Rain Garden

RUBBERSIDEWALKS Installation Manual

Small Town Sustainable Stormwater Solutions

Zoning Regulation Amendments Adopted December 19, 2018 effective date January 7, 2019

LANDSCAPING. Design. Development of the site shall not unreasonably impair the ability of adjoining properties to utilize solar energy.

APPENDIX A SIMPLIFIED APPROACH TO STORMWATER MANAGEMENT FOR SMALL PROJECTS. In West Sadsbury Township, Chester County, Pennsylvania

INTRODUCTION TO GREEN INFRASTRUCTURE HOW WE CAN PROTECT OUR COMMUNITIES AND OUR WATERS Maywood Public Library Bergen County, New Jersey

12/31/2014 County of Mendocino s Low Impact Design Standards Manual v1.0 A P P E N D I X 8. Site Design Measures. 32 P a g e

Brick Paver Installation Guide

Selkirk. Masonry. Landscape Product Guide. Picture depicts split face blocks. Landscaping Guide. What can. you build. Selkirk?

Stormwater Management Techniques WMPF LAND USE TRAINING INSTITUTE MARCH 14, 2018

2014 Southeast NY Stormwater Conference October 15, John Dunkle, PE, CPESC, CMS4S

stone oasis collection oasis circle patio (diameter ) instruction guide

Need a Geotextile or Weed Control Membrane?

SECTION A-1: DESCRIPTION

Small Project Guidance Document

Pondless Waterfall Vault

pavers. effortless style Pavers Tasmania

Green Infrastructure & Low Impact Development

Worksheet #14 Water Runoff Management

Transcription:

permeable Solutionz

The volume of storm water being diverted to Permeable Solutionz provides a unique and outfall is increasingly burdening our current economical solution through our porous, storm water infrastructure. Contamination New Zealand natural stone paving that of this water adversely affects our allows rainwater to flow through the body environment worldwide. of the paver, thus reducing stormwater Permeable Paving Sustainable Control Of Urban Storm Water Pollution Providing a long term, sustainable solution to properly managing water run-off and water pollutants, will ensure a sustainable future. pollution, outflow and soil rehydration. They filter 100% of gross pollutants from storm water run-off while providing a strong and durable surface required by our urban way of life.

Permeable Solutionz pavers have an extremely high permeability rate, i.e. water flows through the body of the paver at a rate of no less than 30 litres/m 2 per second. The pavers are suitable for vehicular and pedestrian traffic (specific sizes apply), for residential or commercial use, including carparks, driveways, pathways or patios; in fact anywhere that stormwater may collect. Our tree pit design offers a growth adjustable and servicable solution to increase water absorption to tree roots. Our cesspit filters prevent gross pollutants from entering the stormwater system.

Installation steps: Planning of area and layout Excavation and preparation of soil base Construct edge restraints for perimeter of paved area Lay separation layer of geotech cloth (A14 for patios; A19 for driveways; must have 300mm overlap on all joins) Spread and compact drainage metal as below (no fines) Non-Trafficable Areas: Minimum of 100mm of compacted 7/13 or WAPP12 drainage metal Trafficable areas: Minimum of 150mm of compacted 7/13 or WAPP12 drainage metal 2 nd layer of geotech cloth (must have 300mm overlap on all joins) Place 25mm of No.2 sand or McCallums EQ3 as bedding layer The pavers are easily laid; bedded in gravel and butt jointed, providing the substrate is Lay pavers butt-jointed, in a stretcher-bond style, sound (substrate requirements are site specific). i.e. not stacked Pavers to be laid top side up; (the top of the paver Application The permeable pavers may be used in conjunction with other traditional impervious surfaces, and may still be classifed by Councils as permeable. Our exceptionally high levels of porosity, which are generally unaffected by gradient, will slow and dissipate the water captured from surrounding impervious surfaces. Base Set-Up Guidelines has a rounded edge) Pavers may be cut with a diamond bladed wet saw if necessary Compact pavers with a protective mat over vibrator (e.g. carpet)

The top side of paver must have rounded corners Permeable Solutionz paver 50mm 25mm of No. 2 sand or McCallums EQ3 compacted bedding layer 2nd layer of A14 geotech cloth 100mm minimum compacted 7/13 or WAPP12 drainage metal (pedestrian) or 150mm minimum (trafficable) Layer of A14 geotech cloth Soil base In-situ pour Rain Flow Diagram Permeable Solutionz pavers keep all gross pollutants above ground while allowing the water to pass through to the earth aquifer.

Puketutu Winton Gold 50 50 230 115 400 400 Sizes: 230 x 115 x 50mm (trafficable). For coverage of 1m 2, please multiply by 37.8 bricks. 400 x 400 x 50mm (pedestrian traffic only). For coverage of 1m 2, please multiply by 6.25 pavers. Specifications Tolerances: Pavers are uniform in size, with no shrinkage in the manufacturing process. UV resistant; can be cut with a continuous wet saw blade. Southcape Egmont Sand Ashhurst*

permeable Solutionz Replenishing Earth s Water 38 Anvil Road, Silverdale, Auckland PO Box 308106, Manly, Auckland 0952 New Zealand ph: 0800 041 444 mob: 027 4850 720 email: sales@permeablesolutionz.co.nz www.permeablesolutionz.co.nz