Volumes list Tender 116/12

Similar documents
CLOSURE OF INTERFACES FOR RAILWAY LINE HERZELYA KEFAR SABA IN CLOSURE_INTERFACES_HZL-01

Dor Havkin. Founder, Dor Havkin ECO-STRATEGIS, sustainable development & green building, consultancy & design (Since 2003)

IMMERSED TUNNEL An innovation to cross a water-body. Presented by: Sumit Kar & Vishnu Saini On 20 February 2015 Page 1

Fire Safety Instructions Report

PROTECTIVE MEASURES FOR TREES DURING CONSTRUCTION

Introduction. Functions of Non woven Geotextile (TechGeo) Separation. Filtration. Drainage. Containment. Tech Geo. . Geotextile Overview

B) Addressing TSI open points: National requirements where there are no TSI requirements. None None None. None None None.

Soil Erosion & Sediment Control Plan Requirements for Submittal to the Cape Atlantic Conservation District

Monitoring Systems for Railway Safety

CITY OF KITCHENER CONDITIONS REQUIRED FOR ISSUANCE OF SITE PLAN APPROVAL

IDAHO PORT-OF-ENTRY RAMP MONITORING. August 29, 2011.

511 - RIP RAP - OPSS 511 ROCK PROTECTION - OPSS 511 GRAVEL SHEETING - OPSS 511 GEOTEXTILE - OPSS 511

Expo Line Transit Project. Project Status Update Meeting West End Corridor Segment C

Aashto Maintenance Manual For Roadways And Bridges Full Online

South Fraser Perimeter Road (SFPR)

COMMUNITY DEVELOPMENT DEPARTMENT POLICY DRAINAGE FOR RESIDENTIAL PROJECTS WITH ONE OR TWO UNITS REVISED JANUARY 4, 2018

DESIGN SCENE SUBJECT INDEX

APPENDIX C REGULATORY AGENCIES AND INDUSTRY STANDARDS 1.0 APPLICABLE GOVERNMENT CODES AND REGULATIONS

Safety Management and Certification on Singapore Longest Road Tunnel - Kallang and Paya Lebar Expressway (KPE)

CONSTRUCTION SPECIFICATION FOR THE INSTALLATION OF INTERLOCKING CONCRETE PAVERS

Ken Kortkamp, PE San Francisco Public Utilities Commission San Francisco, CA

Tunnel Solution. PSI Incontrol Sdn Bhd

ENBRIDGE GAS DISTRIBUTION INC. Proposed Relocation for Ninth Line, Markham and Whitchurch-Stouffville. Environmental Screening Report

Integrating safety in new transport infrastructure construction projects

University of Texas Project Schedule Narrative February 17, 2009 Page 1

I-66 EASTBOUND WIDENING INSIDE THE BELTWAY PARDON OUR DUST MEETING

Peoria Riverfront Development (Ecosystem Restoration) Upper Mid-sized Island Critical Restoration Project (September 2011)

Sidney, Ohio 1204 FORMAL ISSUANCE OF CERTIFICATE OF SUBSTANTIAL COMPLETION... ON OR BEFORE JULY 30, 2015.

Charudatta R. Prayag Deputy Director Ahmedabad Textile Industry s Research Association Ahmedabad

Urban Conservation Practice Physical Effects ESTABLISHMENT, GROWTH, AND HARVEST NUTRIENT MANAGEMENT

ANNE ARUNDEL COUNTY OFFICE OF PLANNING AND ZONING - DEVELOPMENT DIVISION FINAL PLAN - SUBMITTAL APPLICATION REQUIREMENTS.

Chapter 4 - Preparation of Stormwater Site Plans

Please see attached for more detailed project information. Project Schedule Designer Award by SBC Executive Sub-Committee December 21, 2015

ONYX FirstVision Specification Interactive Firefighters Display

SECTION 02230BP AGGREGATE BASE

2016 REVISIONS COMMENT FORM RULES AND REGULATIONS FOR CONSTRUCTION IN THE PUBLIC WAY COMMENT PERIOD: JUNE 1 TO JUNE 30, 2015

Specimen Format (1) COMPANY PROFILE

Permeable Interlocking Pavers

5. LOW IMPACT DEVELOPMENT DESIGN STANDARDS

THE ROLE OF GREEN ROOFS IN URBAN DRAINAGE A REVIEW OF THE CASE FROM AUGUSTENBORG ECO-CITY

Facility Condition Assessment Summary Report. British Columbia Institute of Technology NE6 - Plumbing and Pipefit Building

CALL TO ARTISTS: REQUEST FOR QUALIFICATIONS

C-10. Disconnected Impervious Surface

1. Extension Concept of IfcRoad

Appendix G. Detailed Design

MPRD s Keith Mione (Community) Park Midlothian Road Entrance Traffic Signals

ARGE Guideline - Part 3 "System functionality fire detection and fire fighting systems in rolling stock"

B511 - RIP-RAP, ROCK PROTECTION AND GRANULAR SHEETING - OPSS 511

Highlands Region Stormwater Management Program Guidance

MERIT Experiment Status of Activities at CERN

Milpitas College Extension Milpitas Dry Landscape

THE GOVERNMENT SOCIALIST REPUBLIC OF VIET NAM Independence - Freedom Happiness No. 37/2010/ND CP Hanoi, April 07, 2010

Green City, Clean Waters

PcVue Solutions. PcVue Solutions

Emergency Ventilation System Design - Preliminary Report Shishir Gupta

Policy Manual. Municipality of North Cowichan DEVELOPMENT SERVICES

Australian Standard. Electroacoustics Sound calibrators AS IEC This is a free 7 page sample. Access the full version online.

Raising the standards

OVERMOUNTAIN VICTORY TRAIL BURKE CALDELL CORRIDOR FEASIBLITY STUDY REQUEST FOR QUALIFICATIONS CALDWELL COUNTY PATHWAYS

2100 PENNSYLVANIA AVENUE, NW Z.C. CASE NO O/06-12O PRE-HEARING SUBMISSION

SECTION PLANTING PART 1 - GENERAL 1.1 RELATED DOCUMENTS

I-485/ I-85 Interchange Charlotte, NC December 6, LANE The Lane Construction Corporation, 90 Fieldstone Court Cheshire, CT 06410

BUSINESS PLAN CEN/TC 250 STRUCTURAL EUROCODES EXECUTIVE SUMMARY

Stormwater Control Plan: Small (Tier 1) Land Development Project

II PREVIOUS REPORTS PERTINENT TO THIS MATTER II

ARCHITECTURE AND PLANNING

Australian/New Zealand Standard

DATE OF BIRTH : 23 October 1971 YEARS EXPERIENCE : 21

TRANSPORTATION COMMITTEE

European Standards and Services. Cinzia Missiroli CEN/CENELEC Programme Manager Port of Spain, 05 April 2011

CANADA 952.0M 7,500 SELECTED AWARDS NET REVENUES BY MARKET SEGMENT (%) 2016 ANNUAL REPORT TRANSPORTATION & INFRASTRUCTURE 25 PROPERTY & BUILDINGS 19

EIA process in Malaysia. Approaches and Strategies. Way Forward

9 Steps to a Lasting Paver Installation

Technology Today. Raytheon s Command, Control, Communications and Intelligence Core Market Delivering Operational Advantages for Our Customers

ANNE ARUNDEL COUNTY OFFICE OF PLANNING AND ZONING - DEVELOPMENT DIVISION. Site Development Plan Submittal Application Requirements

BANK OF BARODA BIHAR REGIONAL OFFICE, 4 TH FLOOR, ANAND VIHAR, West Boring Canal Road, Patna TENDER NOTICE

Walker Children s Club Health and Safety Policy

GUJARAT TECHNOLOGICAL UNIVERSITY, AHMEDABAD, GUJARAT COURSE CURRICULUM COURSE TITLE: HIGHWAY ENGINEERING (COURSE CODE: ) Civil Engineering

Research Road Map. 4. Quiet Pavements

SECTION AUTOMATIC VERTICAL CONVEYOR SYSTEM CLOSURE FIRE BARRIER

Health Chapter ALABAMA STATE BOARD OF HEALTH ALABAMA DEPARTMENT OF PUBLIC HEALTH ADMINISTRATIVE CODE

AESTHETIC APPEARANCE. Design Guidelines for Grade-Separated Pedestrian, Cyclist and Equestrian Structures

SACRAMENTO FIRE DEPARTMENT FIRE PREVENTION DIVISION FIRE DEPARTMENT DEVELOPMENT SERVICES UNIT CONTRATOR INFORMATION PACKET

Rainwater Harvesting: Soil Storage and Infiltration Systems

The NBN and New Developments Bill Dimopoulos Regional Manager, New Developments

BANK OF BARODA ZONAL OFFICE, MP & CG ZONE BHOPAL TENDER NOTICE

Rt. 29 Solutions Project Delivery Advisory Panel. January 7, 2016

CIVIL ENGINEERING PERMIT APPLICATION

[TEMPLATE FOR] STORMWATER FACILITIES OPERATION AND MAINTENANCE PLAN. [date] [revision date]

Australian Standard. Functional safety Safety instrumented systems for the process industry sector

FINDINGS FROM FIRE TESTS IN TUNNEL CONSTRUCTIONS WITH VENTILATION SYSTEMS AND FIXED FIRE SUPPRESSION SYSTEMS

City of Westbrook. 2 York Street Westbrook, Maine (207) Fax:

CALL TO ARTISTS Expression of Interest (EOI)

2993-ARM: North-South Road Corridor Investment Program - Tranche November 2015, 15:00 (Yerevan time)

// Reform of the Land Use and Building Act in Finland. PowerPoint template 16:9

Garfield Elementary School Feasibility Study for New Library Building Project Number A C

PAVING PARKING AREAS AND ROADS DESCRIPTION. Alternate Names: Pavement Practices, Impervious Paving

AS/NZS 3111:2009. Approval and test specification Miniature overcurrent circuitbreakers AS/NZS 3111:2009. Australian/New Zealand Standard

Safely into the Future. PINTSCH BAMAG.

LEADING INNOVATIONS IN SUSTAINABLE URBAN DRAINAGE

Transcription:

Volumes list Tender 116/12 Section Title Submission Method 1. Invitation to tender C.D 2. Contract 3. Prerequisites and introduction to the special specifications 4. Bill of quantities (BOQ) 5. Engineering 5/1. Special specifications 5/2. General specification 5/3. Interface management plan(imp) - All 3 lines ( + general (INECO) 5/4. Reliability, availability, maintainability and safety(rams) All 3 Lines (INECO) 5/5. Quality assurance plan (QAP) Touchstone Renard 5/6. Health and safety plan (HSP - Touchstone Renard 5/7. J. Friedman - Report on fire safety instructions - Akko Carmiel Line (AC) Gilon-Tunnels 5/8. DD railway line Akko-Carmiel (INECO) 5/9. DD railway line Haifa-Bet Shean (INECO) 5/10 Preliminary design railway line Herzliya-Kefar Saba Line (INECO) 5/11. Plans list 5/12. Plans 5/13. Technical appendices 6. Appendices 6/1. Safety appendices NI & ISR 6/2 NI Work Log

Tender Number 116/12 Volume 5.1 Special Specification

Table of Contents 0. NI Document's name Submission 1. Special Specification for Gilon Tunnel Attached 2. Technical Specifications Akko-Carmiel line 3. Technical Specifications Haifa- Beit Shean line

Tender Number 116/12 Volume 5.2 General specification These are translated documents; the binding documents are the original documents in Hebrew

Table of Contents 0. Document's name Submission 1. Chapter 02: On-Site Concrete Works - Subchapter 01: On-Site Cast Concrete Attached Works 2. Chapter 23: Deep Foundations In Site Drilled Piles and Cast Slurry Walls 3. Chapter 51: Paving Works - Subchapter 01: Preparatory Works 4. Chapter 51: Paving Works - Subchapter 02: Earthworks 5. Chapter 51: Paving Works - Subchapter 03: Sub base and Graded Crushed Aggregate Base Layers 6. Chapter 51: Paving Works - Subchapter 04: Drainage and Erosion Prevention 7. Chapter 51: Paving Works - Subchapter 05: Drainage and Erosion Prevention 8. Chapter 51: Paving Works - Subchapter 06: Tiling Works, Curbstones, Gutter Stones and Stairs 9. Chapter 51: Paving Works - Subchapter 31: Sign and Traffic Sign Work 10. Chapter 51: Paving Works - Subchapter 32: Road Marking 0. Blue Book Document's name Submission 1. Chapter 34: Fire Detection and Fire Extinguishing Systems Attached 2. Chapter 57: Water Lines, Sewage and Channeling

Tender Number 116/12 Volume 5.3 Interface Management Plan (IMP)

Table of Contents 0. Document's name Submission 1. Closure of interfaces Akko-Carmiel Attached 2. Closure of interfaces Haifa-Bet Shean 3. Closure of interfaces Herzlia-Kfar Saba 4. Interface management plan 5. Interface register Haifa-Bet Shean 6. Interface register Herzlia-Kfar Saba 7. Interface register Akko-Carmiel

Tender Number 116/12 Volume 5.4 Reliability, Availability, Maintainability and Safety(RAMS)

Table of Contents 0. Document's name Submission 1. General RAMS Plan Attached 2. Subsystem RAMS Plan Attached

Volume 5.12 Plans

Table of Contents 3. Document's name Submission 4. Plans for Gilon Tunnel Architect- (Plancon Ltd) Attached 5. Plans for Gilon Tunnel Structural (S. Engel Engineers Ltd) Attached 6. Plans for Gilom Tunnel Lighting and Electricity (Topaz Electricity Engineering Attached and Light (1992) Ltd) 7. Plans for Gilon Tunnel Water Systems (M. Rosental Engineers Ltd) Attached 8. Plans for Gilon Tunnel H.A.V.C (Advance Energy Systems Ltd) Attached 9. Plans for GIlon Fire Safety (JFPE Ltd. Fire Protection Engineers Consultants) Attached 10. Level Crossing Plans - line Haifa-Bet Shean (Yenon Planning Consulting & Attached Research Ltd) E12 11. Fiber optic backup cables plans Akko-Carmiel Line - (Yenon Planning Consulting Attached & Research Ltd) 12. Fiber optic backup cables plans Haifa-Bet Shean Line (Yenon Planning Attached Consulting & Research Ltd) 13. Tracks plans for Akko-Carmiel Line-(INECO) Attached 14. Tracks plans for Haifa-Bet Shean Line -(INECO) Attached 15. Drainage plans for Gilon Tunnel (INECO) Attached

Volume 5.13 Technical Appendices

Table of Contents 0. Document's name Submission 1. Collection of general specifications for paving and bridging work - NI, last edition. www.iroads.co.il 2. NI Guidelines for Planning and Execution www.iroads.co.il 3. Guidelines for traffic control at inter-city work Sites - NI, January, 2006 Reference 4. Up dated traffic signs Reference 5. NI Guidelines no. 08.02.47 with accompanied by staff (national infrastructure Reference committee etc.) 6. Collection of general technical specifications - Israel Railways Ltd www.iroads.co.il 7. Israel Railways Ltd. (ISR) Guidelines for Planning and Execution www.iroads.co.il 8. Israel Railways Ltd. special specifications Reference 9. General construction specifications published by Inter 0ffice Committee (The Blue Reference Book - BB) by chapter, the most up to date edition as of the publication date for this tender/contract, including measuring s and contents of prices attached to these chapters. 10. BEZEQ - International Corporation Ltd (Telephony Corporation) specification Reference (specifications for communication infrastructure construction) (August, 2001) 11. Israel Electrical Corporation special technical specifications last edition Reference 12. Safety regulations construction work (Chapter I) Reference 13. Guidelines for water pipes infrastructure for water and drinking water published by Reference the ministry of health (January, 2011 edition) 14. Any specification and/or guidelines related to the description of the work of this Reference tender 15. State of Israel regulations Reference 16. National infrastructure committee guidelines for detailed planning prior to Attached execution of works 06.2012 17. Special specification for the use of recycled material made out of shredded concrete Attached (2009) - Israel Railways Ltd. 18. Specification for quality assurance and performance management using F.W.D Attached (Falling Weight Deflectometer) - Israel Railways Ltd. 19. CAD (Computer-Aided Design) Specification- Israel Railways Ltd. Attached 20. Final Product To Be Delivered To ISR - All 3 lines (INECO) Attached 21. Israel Railways Ltd. General Guidelines Design of preparation for electrification Attached of civil work 22. Railway Tracks Design Guidelines 2013 (3 volumes) Attached