Volumes list Tender 116/12 Section Title Submission Method 1. Invitation to tender C.D 2. Contract 3. Prerequisites and introduction to the special specifications 4. Bill of quantities (BOQ) 5. Engineering 5/1. Special specifications 5/2. General specification 5/3. Interface management plan(imp) - All 3 lines ( + general (INECO) 5/4. Reliability, availability, maintainability and safety(rams) All 3 Lines (INECO) 5/5. Quality assurance plan (QAP) Touchstone Renard 5/6. Health and safety plan (HSP - Touchstone Renard 5/7. J. Friedman - Report on fire safety instructions - Akko Carmiel Line (AC) Gilon-Tunnels 5/8. DD railway line Akko-Carmiel (INECO) 5/9. DD railway line Haifa-Bet Shean (INECO) 5/10 Preliminary design railway line Herzliya-Kefar Saba Line (INECO) 5/11. Plans list 5/12. Plans 5/13. Technical appendices 6. Appendices 6/1. Safety appendices NI & ISR 6/2 NI Work Log
Tender Number 116/12 Volume 5.1 Special Specification
Table of Contents 0. NI Document's name Submission 1. Special Specification for Gilon Tunnel Attached 2. Technical Specifications Akko-Carmiel line 3. Technical Specifications Haifa- Beit Shean line
Tender Number 116/12 Volume 5.2 General specification These are translated documents; the binding documents are the original documents in Hebrew
Table of Contents 0. Document's name Submission 1. Chapter 02: On-Site Concrete Works - Subchapter 01: On-Site Cast Concrete Attached Works 2. Chapter 23: Deep Foundations In Site Drilled Piles and Cast Slurry Walls 3. Chapter 51: Paving Works - Subchapter 01: Preparatory Works 4. Chapter 51: Paving Works - Subchapter 02: Earthworks 5. Chapter 51: Paving Works - Subchapter 03: Sub base and Graded Crushed Aggregate Base Layers 6. Chapter 51: Paving Works - Subchapter 04: Drainage and Erosion Prevention 7. Chapter 51: Paving Works - Subchapter 05: Drainage and Erosion Prevention 8. Chapter 51: Paving Works - Subchapter 06: Tiling Works, Curbstones, Gutter Stones and Stairs 9. Chapter 51: Paving Works - Subchapter 31: Sign and Traffic Sign Work 10. Chapter 51: Paving Works - Subchapter 32: Road Marking 0. Blue Book Document's name Submission 1. Chapter 34: Fire Detection and Fire Extinguishing Systems Attached 2. Chapter 57: Water Lines, Sewage and Channeling
Tender Number 116/12 Volume 5.3 Interface Management Plan (IMP)
Table of Contents 0. Document's name Submission 1. Closure of interfaces Akko-Carmiel Attached 2. Closure of interfaces Haifa-Bet Shean 3. Closure of interfaces Herzlia-Kfar Saba 4. Interface management plan 5. Interface register Haifa-Bet Shean 6. Interface register Herzlia-Kfar Saba 7. Interface register Akko-Carmiel
Tender Number 116/12 Volume 5.4 Reliability, Availability, Maintainability and Safety(RAMS)
Table of Contents 0. Document's name Submission 1. General RAMS Plan Attached 2. Subsystem RAMS Plan Attached
Volume 5.12 Plans
Table of Contents 3. Document's name Submission 4. Plans for Gilon Tunnel Architect- (Plancon Ltd) Attached 5. Plans for Gilon Tunnel Structural (S. Engel Engineers Ltd) Attached 6. Plans for Gilom Tunnel Lighting and Electricity (Topaz Electricity Engineering Attached and Light (1992) Ltd) 7. Plans for Gilon Tunnel Water Systems (M. Rosental Engineers Ltd) Attached 8. Plans for Gilon Tunnel H.A.V.C (Advance Energy Systems Ltd) Attached 9. Plans for GIlon Fire Safety (JFPE Ltd. Fire Protection Engineers Consultants) Attached 10. Level Crossing Plans - line Haifa-Bet Shean (Yenon Planning Consulting & Attached Research Ltd) E12 11. Fiber optic backup cables plans Akko-Carmiel Line - (Yenon Planning Consulting Attached & Research Ltd) 12. Fiber optic backup cables plans Haifa-Bet Shean Line (Yenon Planning Attached Consulting & Research Ltd) 13. Tracks plans for Akko-Carmiel Line-(INECO) Attached 14. Tracks plans for Haifa-Bet Shean Line -(INECO) Attached 15. Drainage plans for Gilon Tunnel (INECO) Attached
Volume 5.13 Technical Appendices
Table of Contents 0. Document's name Submission 1. Collection of general specifications for paving and bridging work - NI, last edition. www.iroads.co.il 2. NI Guidelines for Planning and Execution www.iroads.co.il 3. Guidelines for traffic control at inter-city work Sites - NI, January, 2006 Reference 4. Up dated traffic signs Reference 5. NI Guidelines no. 08.02.47 with accompanied by staff (national infrastructure Reference committee etc.) 6. Collection of general technical specifications - Israel Railways Ltd www.iroads.co.il 7. Israel Railways Ltd. (ISR) Guidelines for Planning and Execution www.iroads.co.il 8. Israel Railways Ltd. special specifications Reference 9. General construction specifications published by Inter 0ffice Committee (The Blue Reference Book - BB) by chapter, the most up to date edition as of the publication date for this tender/contract, including measuring s and contents of prices attached to these chapters. 10. BEZEQ - International Corporation Ltd (Telephony Corporation) specification Reference (specifications for communication infrastructure construction) (August, 2001) 11. Israel Electrical Corporation special technical specifications last edition Reference 12. Safety regulations construction work (Chapter I) Reference 13. Guidelines for water pipes infrastructure for water and drinking water published by Reference the ministry of health (January, 2011 edition) 14. Any specification and/or guidelines related to the description of the work of this Reference tender 15. State of Israel regulations Reference 16. National infrastructure committee guidelines for detailed planning prior to Attached execution of works 06.2012 17. Special specification for the use of recycled material made out of shredded concrete Attached (2009) - Israel Railways Ltd. 18. Specification for quality assurance and performance management using F.W.D Attached (Falling Weight Deflectometer) - Israel Railways Ltd. 19. CAD (Computer-Aided Design) Specification- Israel Railways Ltd. Attached 20. Final Product To Be Delivered To ISR - All 3 lines (INECO) Attached 21. Israel Railways Ltd. General Guidelines Design of preparation for electrification Attached of civil work 22. Railway Tracks Design Guidelines 2013 (3 volumes) Attached