ENVIRONMENTAL ADVISORY COMMITTEE WEDNESDAY, JANUARY 11, 2017 AT 7:00 P.M. CITY HALL MEETING ROOM C MINUTES

Similar documents
ENVIRONMENTAL ADVISORY COMMITTEE WEDNESDAY, APRIL 09, 2014 AT 6:00 P.M. COUNCIL COMMITTEE ROOM C MINUTES

Meeting Agenda. City of Guelph. River Systems Advisory Committee. Agenda Items. Item 1, 2 and 3. Item 4 Ward to Downtown Pedestrian Bridge

ENVIRONMENTAL ADVISORY COMMITTEE MEETING JANUARY 10, :00 P.M. MEETING ROOM C CITY OF GUELPH - CITY HALL 1 CARDEN STREET A G E N D A

Infrastructure, Development and Enterprise Services. Natural Heritage Action Plan (NHAP) Project Initiation

July 9, Adèle Labbé Environmental Planner City of Guelph 1 Carden Street Guelph, Ontario N1H 3A1. Dear Ms. Labbé.

Working Group Meeting

STORMWATER GREEN INFRASTRUCTURE AND PLANNING/ZONING BOARDS

APPLICATION SUBMITTAL CHECKLIST LAND USE PERMITS

Declarations of Pecuniary Interest under the Municipal Conflict Of Interest Act

DESIGN REVIEW PANEL TERMS OF REFERENCE AND PROTOCOL

Master Environmental Servicing Plan & Secondary Plan

INTRODUCTION Key Issues and Findings Goals, Objectives, and Policies - Natural Resources - Map M18 - Environmental Resources

Urban Design Review Panel Terms of Reference

OVERMOUNTAIN VICTORY TRAIL BURKE CALDELL CORRIDOR FEASIBLITY STUDY REQUEST FOR QUALIFICATIONS CALDWELL COUNTY PATHWAYS

AMENDMENT NO. 30 TO THE OFFICIAL PLAN OF THE TOWN OF MILTON

ST. MARY S SOIL CONSERVATION DISTRICT (SMSCD) AND DPW&T CONCEPT EROSION AND SEDIMENT CONTROL AND STORMWATER MANAGEMENT GUIDELINES AND CHECKLIST

HICKORY NUT FOREST DESIGN GUIDELINES

WEFTEC.06. ** City of Caldwell, Idaho

O Dell Parkway PUD Association, Inc. PO Box 1335

Manchester. Vision for Manchester

7.0 SOCIAL, ECONOMIC, AND ENVIRONMENTAL ISSUES

GEOMETRIC IMPROVEMENTS AND WATERMAIN LOOPING MUNICIPAL CLASS ENVIRONMENTAL ASSESSMENT

FURTHER TO EXECUTIVE COMMITTEE MEETING #11/12 To be held on Friday, January 11, 2013

Presentation to Parks and Open Space Advisory. Committee September 22, 2016

THE CORPORATION OF THE CITY OF WINDSOR Office of the City Solicitor Planning Department

City of Westbrook PLANNING BOARD MINUTES 2 York Street Westbrook, Maine (207) Fax: (207)

McKay Road Interchange and Salem / Lockhart Crossing

Architectural and Site Control Commission March 12, 2010 Special Field Meeting, 330 and 340 Golden Hills Drive, Klope

Goal 1: To Encourage the Orderly, Harmonious and Judicious Use of University Resources in the Development of University Land.

Toronto Complete Streets Guidelines

City of Toronto. Emery Village Transportation Master Plan

PepsiCo R & D Facility Expansion Town of Mount Pleasant, Westchester County, NY Draft Environmental Impact Statement Scoping Outline

St. Croix County Shoreland Overlay Zoning Districts. Public Hearing Community Development Committee December 19, 2013

PRELIMINARY STAFF PLANNING REPORT TO THE WALWORTH COUNTY ZONING AGENCY X CONDITIONAL USE

ADDENDUM TO BIOLOGICAL SCOPING SURVEY REPORT, BOTANICAL SURVEY AND WETLAND DELINEATION

Kittson Parkway / Watershed Park Parking Lot

TRCA Field Staking Protocol December 2016

TERRESTRIAL NATURAL HERITAGE SYSTEM STRATEGY APPENDIX F: MODEL POLICIES FOR THE IMPLEMENTATION OF THE TARGET TERRESTRIAL NATURAL HERITAGE SYSTEM

Coffee Creek Park Development Low Impact Development (LID)

April 11, 2016 Park Board Chair and Commissioners General Manager Vancouver Board of Parks and Recreation New Brighton Salt Marsh - Preferred Concept

MUNICIPAL SEPARATE STORM SEWER SYSTEM 2009 ANNUAL REPORT

March 21, 2018 ALCA Meeting. March 21, 2018

Town of Windham. Planning Department 8 School Road Windham, ME voice fax

OCEANSIDE DEVELOPER S CONFERENCE. 1. 9:30-10:30 a.m. Proposed hotel on a 12,000 sq. ft. site at the northeast corner of Topeka St. and Tremont St.

Request for Statement of Interest in Implementation of the Roosevelt Road Redevelopment Plan

Description of Preferred Alternative

M E M O R A N D U M. Chair and Members of North West Planning Advisory Committee

Appendix I. Checklists

City of Kitchener Integrated Stormwater Management Master Plan (ISWM-MP) Public Open House No. 2 April 28, 2016

North York Centre South Service Road

Clair-Maltby Community visioning

MUNICIPAL SEPARATE STORM SEWER SYSTEM 2008 ANNUAL REPORT

Town of Newmarket 395 Mulock Drive P.O. Box 328, Newmarket, Ontario, L3Y 4X7. Website: newmarket.ca Phone:

Public Information Centre. Welcome

REQUEST FOR PROPOSAL RFP PRESERVATION MASTER PLAN FOR THE ELAM MARTIN FARMSTEAD CITY OF WATERLOO RIM PARK TERMS OF REFERENCE

Stormwater Management Techniques WMPF LAND USE TRAINING INSTITUTE MARCH 14, 2018

Northeast Anthony Henday Drive Manning Freeway to Whitemud Drive Welcome to this Construction Information Session

Ashbridges Bay Erosion and Sediment Control Project

Marshview Park. Concept Briefing and Feedback Session. Aquarium/Owls Creek Plan Steering Committee March 20, 2012

STREAM BUFFERS

Northwest Corridor LRT Line to Irving/DFW Public Meeting No. 1 Project Overview

APPENDIX 1: SCOPED ENVIRONMENTAL IMPACT STATEMENT (EIS) FORM

The West Vaughan Employment Area Secondary Plan Policies

PLANNED DEVELOPMENT (MASTER PLAN & UNIT PLAN)

TO: Port of Orcas FROM: Tina Whitman, Science Director SUBJECT: Master Plan Update DATE: September 7, 2018

Richmond Hill Official Plan PART II SECONDARY PLANS

Climate Smart Communities Green Infrastructure Case Studies

COMMUNITY DEVELOPMENT SERVICES PLANNING AND BUILDING DEPARTMENT PLACERVILLE OFFICE:

R E S O L U T I O N. Designation: Section 2, Block 17, Lot 20.G-1 ( ) R-2A (1-Family, 2-acre Minimum Lot Size) 46 North Greenwich Road

WELCOME! 8 8:30 6: TH STREET IMPROVEMENTS. Open House. Presentation & Q&A

CORPORATION OF THE TOWNSHIP OF ESQUIMALT DESIGN REVIEW COMMITTEE AGENDA. WEDNESDAY, May 13, :00 P.M. ESQUIMALT COUNCIL CHAMBERS

BLACK/HARMONY/FAREWELL CREEK WATERSHED EXISTING CONDITIONS REPORT CHAPTER 5 IMPERVIOUS SURFACES

Notice of Preparation of an Environmental Impact Report and Scoping Meeting for the Canyon Lane Roadway Improvements Development Project

26/Old Dominion Task Force

TOWNSHIP OF LOGAN SOIL & FILL IMPORTATION AND PLACEMENT APPLICATION SUBMITTAL CHECKLIST

Welcome: Roll call and certification of quorum Introduction of members and city staff Declaration of pecuniary interest or conflict of interest

MacDonnell Heights Town Center

Highway 427 Industrial Secondary Plan Area 47 Schedule C Class Environmental Assessment For Arterial Roadways

Town of Peru Comprehensive Plan Executive Summary

AGENDA River & Streams Board

FY Capital Improvement Program Arroyo Projects

Submitted by: Phillip L. Harrington, Director, Department of Public Works. Framework for Green Infrastructure Plan Development

APPENDIX A SIMPLIFIED APPROACH TO STORMWATER MANAGEMENT FOR SMALL PROJECTS. In West Sadsbury Township, Chester County, Pennsylvania

ARB ACTION MEMO. Mr. Missel called the meeting to order at 1:00 p.m. and established a quorum.

CHAPTER 2 SUMMARY 1. PROJECT SUMMARY DATA

PDS June 1, 2016 Page 1. Planning and Development Committee. MEETING DATE: Wednesday, June 01, 2016

Chapter 4 - Preparation of Stormwater Site Plans

CITY OF COCOA BEACH DEPARTMENT OF DEVELOPMENT SERVICES PLANNING BOARD BRIEFING For Meeting Scheduled for April 1, 2013 Agenda Item C2

STATELINE RETAIL CENTER FINAL ENVIRONMENTAL IMPACT STATEMENT

DESIGN REVIEW PANEL PROCEDURES AND PROTOCOL

Municipal Class EA Study Public Information Centre No. 1 December 13, :00 pm 7:00 pm. Please sign in so we can keep you updated on this study

ADOPTION OF THE REVISED OPEN SPACE AND CONSERVATION ELEMENT OF THE GENERAL PLAN

Just The Basics: Illicit Discharge. What does it mean to me?

Phase I Ecological Network Report Terms of Reference

319 Grant: Baker Creek & Centenary Creek Restoration Initiative

2016 Comprehensive Plan Amendments C OMPREHENSIVE P LAN T EXT AND M AP A MENDMENT

COMMUNITY SUSTAINABILITY AND ENVIRONMENTAL MASTER PLAN IMPLEMENTATION UPDATE

Lake Nokomis Shoreline Enhancement Project

CHAPTER 11 SITE DESIGN AND LOW IMPACT DEVELOPMENT

TOWN OF BURLINGTON Conservation Commission

Transcription:

ENVIRONMENTAL ADVISORY COMMITTEE WEDNESDAY, JANUARY 11, 2017 AT 7:00 P.M. CITY HALL MEETING ROOM C MINUTES Present: C. Oakes (Chair) M. Wilson A. Baron A. Miller A. Singh L. Todd L. Renzetti Regrets: City: External Groups: V. Capmourteres A. Nix, A. Labbe, M. Myhill Lloyd Grinham Grinham Architects Caroline Prochazka Grinham Architects Todd Fell Dougan & Associates John Vanos University of Guelph Eric Lyons University of Guelph Steve Davies Matrix Solutions John Ambrose Delegate 1. Call to Order The meeting was called to order at 7:00 pm. 2. Call and Certification of Quorum Attendance was noted and a quorum was declared. Introduction of EACs newest member. 3. Declarations of Pecuniary Interest or Conflict of Interest None 4. 190 216 Arkell Road A. Nix, Environmental Planner with the City of Guelph, reviewed the staff report and was available to answer questions from the Environmental Advisory Committee. General comments: No specific infiltration targets discussion around water budget analysis, wetland water balance and adjacency to wetland

3 E.A.C. Minutes January 11, 2016 No underground parking facility or parking lot proposed at this time, development will provide parking for each on the units and will need space for visitor parking/accessible parking per the City s zoning requirements Questions around the driveway along the NE boundary and its removals this is being looked at in relation to multiple applications and will need to be addressed Development applications bordering PSW and their cumulative effects this site is one of the last around the Torrance PSW. Hopefully post construction monitoring will assist with assessing this Discussion around buffer analysis at Dawes Avenue needing to be in scope less than 30 metres is proposed in order to bring the road onto the site. Alignment of Dawes Ave was shifted when the adjacent land was developed in an effort to have the future road extension be outside of the wetland boundary however the wetland limit has been revised Comments from NSRI: Accepts comments from the City and EAC and will address in updated TOR Discussion around trail network sidewalks within right of way would provide pedestrian connections which has been discussed with Parks as well Field surveys for significant wildlife habitat map will be provided that shows different monitoring stations and discrepancies in screening tables will be updated to include any additional surveys MNRF has provided a formal document for SAR snakes which will be included in updated TOR MTE will be completing ground water monitoring program and detailed water balance TOR identified tree inventory would take place 10-15 m into the edge from proposed development Reference 2016 Guelph District MNRF for treed habitats and bats MNRF Guelph District is planning to have descriptions for SAR bats in near future Significant wildlife habitat analysis relate rationale back to MNRFs criteria and if data cannot carry forward into EIS, rule out Provide consideration of impacts to features where limits extend beyond 120 metres Identify where SAR have been considered and type of study in terms of specific species In the EIS stage the trail alignment proximity to the wetland buffer and trail concept plan will be done by a landscape architect looking at trail from trail connectivity perspective in that area and not just relying on pedestrian access The Environmental Advisory Committee went into Committee to discuss. Moved by L. Todd and seconded by L. Renzetti, THAT a revised EIS TOR is provided which includes: A more detailed description of the proposed undertaking recognizing the necessary trail connections and storm water management facilities that will be part of the development; That the trail alignments clearly illustrate the proximity to the wetland and buffer area and that the preliminary design will be completed by a Landscape Architect (member of the OALA);

3 E.A.C. Minutes January 11, 2016 Clarification as it relates to the field study program including point/plot locations for amphibian, breeding bird and crepuscular bird surveys; Clarification that the EIS will include an evaluation of significance for Significant Wildlife Habitat and Habitat for Significant Species, as applicable and that this be carried into the impact assessment; Consideration for the protection of ground water functions including recharge, as well as recommendations or requirements from the Torrance Creek Subwatershed Study within the EIS; and, Identification of Opportunities for protection, enhancement and restoration of trees within the Urban Forest as part of the EIS; The use of current protocols for bat surveys (including SAR bats) of treed habitats and buildings as available from Guelph District MNRF; Clear rationale for the identification of candidate SWH that reflects MNRF s Criteria Schedules for Ecoregion 6E. -Unanimous- 5. Guelph Turfgrass Institute Relocation A. Labbe, Environmental Planner with the City of Guelph, reviewed the staff report and was available to answer questions from the Environmental Advisory Committee. General Discussion: Water balance for the original report had larger study area based on previous site plan, 2.4 hectare not within tributary catchment area Clarification around risk management associated with Source Water Protection and the need for a risk management and salt management plans at Site Plan stage Consideration of ecological value of constructed wetland SWM infrastructure is not habitat Compensation wetland receiving flows from SWM facility and ability to have clean water going into this Discussion around habitat classification provided by the MNRF Comments from Dougan: They will address City and EAC comments successfully Dr. Whitely s dataset was incomplete but his interpretation is valued and aligns with Dougan s Will include statement in report that data received by Dr. Whitely will not be included in analysis Inaccuracies in the Water Balance table (15, 16, 17) on page 35 Dougan to address Provide clarity around the numbers in tables, 19, 29, 21 on page 41 Significant discussion around tile drainage and water balance Consider impacts to significant species and carry forward in adaptive monitoring plan Delegation: John Ambrose

3 E.A.C. Minutes January 11, 2016 Consider Barn Swallows that were nesting in equipment sheds Section 6.1.4 City should ensure this is looked after and some kind of monitoring should be put in place Grasslands and meadows provide significant habitat but are prime development areas what can be done to protect these? Weakness of institutional zoning this area is open space Chemicals being introduced into stream drainage are registered chemicals known to have impacts and monitoring is needed. Nutrient loading is also a concern. Consider wildlife managament issues that may occur due to conflicting use of turf research and arboretum, and propose measures to address them Consider insect control Consider enhancements to the stream system that goes through Arboretum The Environmental Advisory Committee went into Committee to discuss. Moved by A. Baron and seconded by L. Todd, THAT the meeting be extended past 10:00 PM Moved by L. Renzetti and seconded by A. Baron, -6 moved, 1 abstained- The Environmental Advisory Committee conditionally support the EIS Addendum #2 by Dougan and Associates dated November 2016, subject to the following conditions: THAT an EIS Addendum #3 is prepared in the form of a Letter Report to the satisfaction of staff which: Clarifies the habitat restoration goal and conceptual design; Includes information regarding the impacts associated with servicing; Updates the impact analysis for water quality and quantity to include impacts and mitigation measures where it is currently indicated no impact; Clarifies how all compensation habitat will be protected long term given the universities institutional zoning; Referring to figure SK-14F that was presented at the EAC committee meeting, Jan 11, 2017, presenting the SWM strategy, EAC requests that a cost analysis be conducted to explore the opportunity to replace the SWM infrastructure (SWM facility, storm pipes, OGS, and infiltration gallery) with a strategy that uses only permeable pavers to manage stormwater; That a monitoring well be shown on the drawings, and that monitoring of the permeable pavers is a requirement; Considers expanding upon the water quality monitoring to include nutrients; Revisit numbers presented in the water balance table and include irrigation component to the tables; and

E.A.C. Minutes January 11, 2016 THAT an Environmental Implementation Report is prepared in support of the Site Plan application and include: 3 A stormwater management design brief that incorporates LID as recommended in the EIS Addendum #2; A servicing report which includes information regarding the limit of disturbance and minimizes impacts to trees along College Avenue; A detailed Tree Inventory and Preservation Plan for Phase 2 of the development and a comprehensive compensation plan which considers all phases of the development; Detailed Erosion and Sediment Control Plans; Integration of EIS recommendations onto drawings (i.e., wildlife sighting protocol, etc.); A habitat restoration plan that support mitigating/offsetting impacts to Habitat for Significant Species; Detailed Landscape Plans prepared by a member of the OALA; A detailed adaptive monitoring plan including monitoring stations, design and reporting guidelines and deadlines. The adaptive monitoring and management plan be expanded to include potential management responses to rectify potential negative impacts, verify performance targets (e.g. habitat for target species), and unforeseen negative ecological impacts; A maintenance plan for the permeable pavers, and any other LID features, developed as a requirement of the EIR; and As part of the EIR EAC requires a vegetated filter strip be designed as part of the buffer to the tributary that receives runoff from the site to release water as sheet flow. -6 moved, 1 abstained- 6. Approval of Minutes from December 14, 2016 Moved by L. Renzetti and seconded by A. Singh, THAT the Minutes from the December 14, 2016 meeting be approved. - 6 moved, 1 abstained- 7. Correspondence & Information Review EnviroGuide for next meeting Updated appendices for binder Vice chair position available Still working through Victoria Park Village EIR 8. Next Meeting- February 8, 2017

9. Adjourn Moved by M. Wilson and seconded by A. Baron, -Unanimous- CHAIRMAN