The Process. Phase 1: Detailed Assessment, Design Framework Phase 2: Conceptual Design. Phase 3: Master Plan Document

Similar documents
Riverfront Development Plan

Welcome! HORSESHOE BAY PARK. Welcome!

JACKsON STREET PIER CONCEPTUAL DESIGN PACKAGE SEPTEMBER 21, 2017

Call for Artists for: Design and Construction of Environmental Art Activation Story Mill Community Park, Bozeman, MT

Waterfront Development Master Plan

Hamilton Pier 7&8 Draft Urban Design Plan

Sub-committee on Harbour Plan Review of Harbour-front Enhancement Committee. Ninth Meeting

PRELIMINARY DESIGN + DEVELOPMENT PLAN

Providence Waterfront Park

City of Rockingham. Local Management Practices, Costs and Strategic Coastal Planning

George Hotel application STAFF REVIEW COMMITTEE OF THE WHOLE JANUARY 14, 2014

Community Conversation. Thursday, March 30, James St N 7:00 pm 9:15 pm

Public Workshop 2 December 11, 2014 OLIN

PORT OF SAN FRANCISCO

Task Force on Kai Tak Harbourfront Development

Sunshine Coast Council Coastal Management Overview. January 2016 edition

Coastal Erosion Protection Strategies Private Works on Public Land

STORMWATER MANAGEMENT FACILITIES/STORMWATER PONDS - What Are They?

There is an ongoing regulatory concern that

PHASE 3-4 PARKS SOUTH PARK AND CHANNEL PARK

George Hotel application

INTRODUCTION BACKGROUND

Mississauga Waterfront. Parks Strategy - Draft

South th E ast Communit ity Centre (SECC)

10.0 Open Space and Public Realm

Welcome! to Keller Town Hall

Planning for Staten. Habitat Restoration and Green Infrastructure. Island s North Shore

Johnson Street Bridge Public Realm Update

CITY AND COUNTY OF DENVER DEPARTMENT OF PUBLIC WORKS CONTRACT NO CONFLUENCE BIKE/PED RAMPS-SOUTH PLATTE GREENWAY STATEMENT OF QUANTITIES

2035 General Plan Update and Belmont Village Specific Plan. Joint Study Session with the City Council and Planning Commission April 12, 2016

Water Works: Downtown Minneapolis Riverfront Destination

Rhode Island Shoreline Change Special Area Management Plan

Lynn Waterfront Master Plan

February 27, 2018 City Council Presentation The Crown Jewel Park in the City of Fairfax

Popp s Ferry Causeway Park Back Bay Environmental Educational Center CASHIO COCHRAN LLC

M i s s i o n B a y W a t e r f r o n t

Baselands Trails Master Plan Public Meeting. April 28, 2015 Fire Academy, 895 Eastern Avenue, Toronto 6:30 p.m. to 9:00 p.m.

Workshop 3. City of Burlington Waterfront Hotel Planning Study. September 14, The Planning Partnership

4. Parks, Open Space and Urban Forest

Population, Housing, and Employment Analysis

Port of Camas-Washougal Waterfront Trail Master Plan

TOWN COUNCIL / PLANNING COMMISSION

MEMORANDUM. March 10, 2017

HURON WATERFRONT DEVELOPMENT AND AMPHITHEATER

BAY AREA PARKS & RECREATION

Brooklyn Bridge Park: Storm Resilience through Design

jmt.com MARINE Part of a diversified family of solutions

AMBLESIDE WATERFRONT

Hastings Park-PNE Public Board Meeting March 4, 2019

Online Survey Results 1 Port Street East

4 Semi-Private & Private Open Spaces

Review of Opportunity Area C Draft Comprehensive Plan and Draft BOS Follow-On Motions. Special Working Group Meeting March 4, 2015

Request for Proposals

City of Naples Parks Master Plan (Draft)

Project purpose. advise. The purpose of the Beaumaris Lake Open Space Rehabilitation project is to: + Develop a Functional Program Concept

Cold Lake Marina Master Plan

Description of Preferred Alternative

Building Great Neighbourhoods. Strathcona

Once Upon a Gravel Pit: Reconnecting Floodplain through Aggregate Extraction

FORT MONROE WATERFRONT PARK. February 09, 2016

WELCOME. Welcome and thank you for visiting today.

BRADENTON RIVERWALK EXPANSION MASTER PLAN

CRYSTAL CITY BLOCK PLAN # CCBP- G 1

HUMBER BAY PARK PROJECT - BUILDING CONCEPT

A CONCEPTUAL PROPOSAL BY THE UMDLOTI FORUM Representing the Umdloti Ratepayers and Residents Association and the emdloti UIP

Northeast False Creek : Past, Present and Future

I602. Birdwood Precinct

City of Kingston. North King s Town Secondary Plan Open House + Workshop #1 February 28, 2018

Highland Falls Waterfront Redevelopment Feasibility Study Village Board Meeting March 20, 2017

April 11, 2016 Park Board Chair and Commissioners General Manager Vancouver Board of Parks and Recreation New Brighton Salt Marsh - Preferred Concept

Executive Summary. Project Description. Project Legislation

AMENDMENT NO. 30 TO THE OFFICIAL PLAN OF THE TOWN OF MILTON

Adaptation and Resilience at the City of Fort Lauderdale

Ashbridges Bay Erosion and Sediment Control Project

PUBLIC SPACE/AMENITY PROJECTS

CENTER FOR GREAT LAKES ECOLOGY 3

City of Langley, WA, Request for Qualifications (RFQ) Seawall Park Design

Billing Code: DEPARTMENT OF HOUSING AND URBAN DEVELOPMENT [Docket No. FR-6072-N-01]

New Brighton Park Shoreline Habitat Restoration Project

Design Alternatives Workshop. Hilfiker Park Master Plan Workshop #2

Reconnecting to a Forgotten River St. Cloud MN. Aaron Hanson Design Design Thesis LA 572, Thesis, Spring 2012

edmonton.ca/ribbonofgreen #ribbonofgreen

Lansing s Moores River Drive Regional Network Trail project extended the Lansing River Trail system to Waverly Road, and also included bike lane

2.1 Location and Size

Port Macquarie Town Centre Landscape Architects

1.1 WATERFRONT SEATTLE

Planning Commission March 14, Presented by: City of Bellingham Port of Bellingham

2.0 DEVELOPMENT PERMIT AREA 2 MARINE WATERFRONT (DPA-2)

I615. Westgate Precinct

A. INTRODUCTION. Julie Cowing 5/22/13 11:47 AM Deleted: Considered

Hamilton Pier 7&8 Public Meeting and Workshop #1

HUMBER BAY PARK EAST BUILDING PROJECT Architectural Community Resource Group Meeting #2 July 5, 2017

DRAW SEVEN PARK RENOVATION PROJECT SOMERVILLE, MASSACHUSETTS

Park Board Chair and Commissioners General Manager Vancouver Board of Parks and Recreation Love Locks Concept Plan

SBPO BOARD MEETING APRIL 3, 2018

Crofton Manor 2803 West 41st Avenue WHAT WE HEARD. Public Consultation: Phase 1

ADOPTED CAPITAL IMPROVEMENT PROGRAM BUDGET ARROYO PROJECTS

Land at Fiddington Hill Nursery, Market Lavington

City of Farmington. Downtown Plan. Amendment to the 1998 Master Plan Adopted October 11, 2004

Draft Environmental Impact Statement

Transcription:

Background The Ship Point master planning process was initiated in March of 2017 to advance policy direction from Harbour Vitality Principles (2014) Ship Point design and initial implementation a key action in the 2015-2018 Strategic Plan

The Process Phase 1: Detailed Assessment, Design Framework Phase 2: Conceptual Design 2 open houses with over 300 people in attendance Online survey with 147 responses Council approved design concept as basis for Phase 3 Phase 3: Master Plan Document Detailed (schematic) design Implementation & Phasing Strategy Cost estimate and Funding Strategy

Draft Design Concept - what we heard

Guiding Principles Vitality through high quality design Year-round activation and programming Strong connectivity and access Site design that supports a range of active uses Design Themes

Site Design and Program Overview

Site Design and Program The Terraces

Site Design and Program Picnic Site

Site Design and Program Harbour Air Plaza

Site Design and Program Festival Pier

Site Design and Program Wharf Street Promenade

Site Design and Program Ship Point Promenade

Site Design and Program Conceptual Built Form

Site Design and Program Conceptual Built Form

Success Stories from Elsewhere

Success Stories from Elsewhere

Shoreline and Structural Approach Ship Point will require a combination of repair, replacement and structural stabilization of the sea wall and portions of the site

Shoreline and Structural Approach Shoreline Strategies Retreat: Remove existing damaged sea wall and replace with rip-rap bank Unload: Removing approx. 1 metre of material approx. 3 metres back from the shoreline to reduce load bearing on existing wall Support: reinforcing existing wall with vertical strapping in some areas with upfront and ongoing repair and maintenance Reinforce: A series of interlocking jet grouted columns adjacent to the existing sea wall to contain the unconsolidated fill and materials Phased Replacement of pier: Full Emergency Repairs in 2018 with Steel Piles and Replace Restricted Portion by 2023 Settlement management: use of geo -grid and resin bound materials to improve site stability and long term maintenance

Conceptual Phasing, Funding

Thank You!

The Master Plan Design framework Schematic design and layout Materials and furnishings Shoreline and structural approach Conceptual built form Programming and operations Sustainability and resilience strategy Implementation and phasing Class C cost

Site Design and Program Character

Shoreline and Structural Approach Shoreline Strategies Jet grouting is a soil improvement technique that involves injection of water-cement grout and mixing into the existing soil. Site and shoreline structural restoration does not include mitigation for seismic events Approach premised on management of seawall settlement through ongoing operations and maintenance

Shoreline Treatment Benched Seawall: Softer edge Habitat and filtering contaminated surface runoff Rip Rap bank + blocks: Modular for settling support Informal gathering at various scales Stepped Seawall: Access to water s edge Seating Views

Site Design and Program Site resilience and storm water ecology

Site Design and Program Materials

Site Design and Program Program and Activities

Site Design and Program - Overview Grand stair case and ramps Terraced landscape and amphitheatre Pavilion Restaurant Improved Circulation Improved Circulation Harbour Air Plaza Access to water Playable features Festival Pier Constructed foreshore and marine habitat