SUNSET CORRIDOR LAND. The property is now available and ready for corporate utilization, development or investment.

Similar documents
Micco Park Village Development

CRESCENT PARK GREENWAY VISION

DOMINION BOULEVARD CORRIDOR STUDY AND ECONOMIC DEVELOPMENT STRATEGIC PLAN A MODEL FOR CHESAPEAKE S FUTURE

POCKET COMMUNITY PLAN

Northwest Rail Corridor and US 36 BRT Development Oriented Transit Analysis 4.4 STATION AREA FINDINGS

Making the Land Use Light Rail Connection. Andy Cotugno Metro Rail~Volution 2010

Senator Sieben SF Representative Schoen HF Presentation Guide

RESOLUTION NO. R Refining the route, profile and stations for the Downtown Redmond Link Extension

Mississippi Skyway Preliminary Engineering Report

Retail-Office Space For Lease

RE-Imagining the Downtown Colorado Springs Master Plan

A citizen s guide to the. Comprehensive Plan. City of Lakeville, Minnesota 1

Making the Land Use, Transportation, Air Quality Connection

Madison St. Oak Park. Request for Proposals. Village Owned Parcel Madison Street Oak Park, Illinois Reissued May 25, 2018.

SOUTH NATOMAS COMMUNITY PLAN

CITY OF TIGARD EXPECTED SERVICE AREA

City of Fort Lauderdale UPTOWN URBAN VILLAGE. Public Workshop December 7, 2016

Comprehensive Plan. Faribault, Minnesota. Hoisington Koegler Group Inc. Claybaugh Preservation Architecture Inc. Howard R. Green Company Bonz/REA

Gold Line Bus Rapid Transit Transit Oriented Development (BRTOD) Helmo Station Area Plan

10 Year Family Dollar NNN Lease - Rare Urban location

FOR SALE Bannister /- Acres Residential/Multifamily Urban Infill

Prepared for the Citizens of Forsyth County by the City-County Planning Board

Subject: City of Richfield Cedar Avenue Corridor Plan Comprehensive Plan Amendment, Review File No

IH35 Corridor Plan Amendment to the Comprehensive Plan

Isabel Neighborhood Plan: Alternatives

ITEM #8. Regional Smart Growth Program. Regional Smart Growth Program. Presentation Overview. Coast Highway Vision and Stategic Plan.

Peppertree Business Park

Westbound: A One-day Exploration of Growth

LAND USE AMENDMENT CORNERSTONE (WARD 3) 60 STREET NE AND COUNTRY HILLS BOULEVARD NE MAP 26NE BYLAW 22D2017

COLVER ROAD INDUSTRIAL CONCEPT PLAN

Mendota-Lebanon Hills Greenway Master Plan Executive Summary. August draft for more information visit

BUILDER LOTS FOR SALE

Public may provide comments on the GDP within the next two weeks (December 24)

IH35 Corridor Plan Amendment to the Comprehensive Plan

Community Open House March 26 th, 2018

POLICY 41, URBAN GROWTH BOUNDARY EXPANSIONS:

1.0 Circulation Element

The transportation system in a community is an

PRELIMINARY REPORT. HIGHWAY 18 CORRIDOR NEIGHBORHOOD PLAN VILLAGE OF DOUSMAN November, 2014

CITY OF COLWICH COMPREHENSIVE PLAN LAND USE LAND USE 1

LAND USE DESIGNATIONS AND ZONING CLASSIFICATIONS

BeltLine Corridor Environmental Study

General Location Annex, Rezone & Preliminary Plat Lansdowne Addition, Unit Three

TIRZ 17/Redevelopment Authority Capital Improvements Plan Projects

REZONING GUIDE. Zone Map Amendment (Rezoning) - Application. Rezoning Application Page 1 of 3. Return completed form to

Existing Transportation System 5-1

MEMORANDUM AGENDA ITEM #6c

Staff Report and Recommendation

The Next Great Growth. The Next Great Growth Region of Florida. Infrastructure and Other Improvements. A Presentation Delineating the Major

TOD IMPLEMENTATION BEST PRACTICE TOOLBOX Leveraging Transit for City Shaping

Pine Street Waterfront Overlay CITY OF ROSEBURG PINE STREET WATERFRONT OVERLAY FEBRUARY City of Roseburg

$1,000 Signing Bonus For Leases Executed by the End of 2016

MAYFIELD WEST SECONDARY PLAN PHASE 2

TEN MILE & FRANKLIN LAND 39± ACRES 2954 WEST FRANKLIN ROAD MERIDIAN, ID

Elm Fork Land Use. Trinity River Corridor Project Committee May 13, 2013

SUSSEX COUNTY COMPREHENSIVE PLAN COUNTY PLANNING AND ZONING COMMISSION WORKSHOP

1.0 PROJECT PURPOSE AND NEED

APPENDIX D: BACKGROUND AND VISION

Nob Hill Area Commercial Mixed Use

MEMORANDUM. I2 District Downtown Parking Overlay District 24,000 square feet /.55 acres. Industrial Employment District North Loop Small Area Plan

Potential Green Infrastructure Strategies May 6, 2015 Workshop

Existing Conditions. Planning and Design Principles

University Parkway Corridor Plan. Public Workshop Sept. 18, 2017

Dwelling Units Max 12 dwelling units per acre/min 8 dwelling units per acre. Development Mix 80% non residential/20% residential

EAST SACRAMENTO COMMUNITY PLAN

ADMINISTRATION RECOMMENDATION 2016 November 03. That Calgary Planning Commission recommends APPROVAL of the proposed Land Use Amendment.

IMPLEMENTING SOMERSET COUNTY S INVESTMENT FRAMEWORK

Rapid City Planning Commission Rezoning Project Report

Chapter 1: Introduction

Erik Rundell, Project Manager

CHAPTER 7: Transportation, Mobility and Circulation

Atlanta BeltLine, Inc. Pathways to Urban Sustainability

City of Redmond. Urban Holding Area Master Planning Requirements and Approval Process

This application has been applied for with support of an Outline Plan to provide the technical details for the site s development.

Welcome. Comprehensive Plan & Transportation Plan Open House November 7, 2012

5 TOWN OF MARKHAM OFFICIAL PLAN AMENDMENT NO. 144 MILLIKEN MAIN STREET SECONDARY PLAN

Yadkin River Greenway Feasibility Study Fact Sheet Village of Clemmons, Town of Lewisville, Town of Bermuda Run

Joint Public Hearing. Preliminary Subregion 5 Master Plan and Proposed Sectional Map Amendment

Woodburn Comprehensive Plan Growth Management Goals and Policies

Natomas Vision Plan and PLNP

LEED-ND 101: Practical Strategies for Achieving Sustainability Goals. Travis Parker Lakewood Planning Director

PROJECT BACKGROUND. Preliminary Design Scope and Tasks

Town of Castle Rock DRCOG 2013 Annual Growth and Development Report. Introduction. Section 1 Metro Vision 2035

TREASURE COAST REGIONAL PLANNING COUNCIL M E M O R A N D U M. To: Council Members AGENDA ITEM 5H

Secrest Short Cut and Monroe Expressway Small Area Plan AUGUST 29, 2018

Development Land with Freeway Visibility and Access for Sale

PDR /21/15 Noah Beals 1/7/15 xx

Strategic Growth Area #1 Northampton Boulevard Corridor Area

Opportunities. Class A and Built-To-Suit 400,000 SF OFFICE PARK 142,000 SF CLASS A OFFICE. Metropica is here. Your clients can be too.

Applicant Name Phone / Fax / Address City State Zip Code . Property Owner Phone / Fax / Address City State Zip Code

REQUEST FOR COUNCIL ACTION 6A AGENDA ITEM ORIGINATING DEPT. AGENDA ITEM CITY ADMINISTRATOR APPROVAL

Midtown Greenway Land Use and Development Plan Executive Summary

Issues Requiring Future Study

Features: -Excellent MX-M Zoning allows a variety of uses. -Close to Nob Hill. -Can be Redeveloped into a Live/Work Space

BYLAW NO. 3549/2015. Being a Bylaw of The City of Red Deer to provide a uniform levy of off-site costs in respect of previously undeveloped land.

LAND USE AMENDMENT CORNERSTONE (WARD 3) COUNTRY HILLS BOULEVARD AND STONEY TRAIL NE BYLAW 9D2017

7Page 1 CLEMMONS COMMUNITY COMPASS 1 PLAN OVERVIEW

FOR SALE Roosevelt Way Seattle, WA Features. Michael Todd

Growth Management: Common Value 2 of Community Character

City of Tacoma Planning and Development Services

Transcription:

SUNSET CORRIDOR LAND The property is now available and ready for corporate utilization, development or investment. This 275-acre site is now available and ready to develop. Just off US 26, this west Sunset Corridor location is situated between two freeway interchanges and will provide a quality corporate environment in an aesthetic natural setting with proximity to commercial services, residential neighborhoods and west side light rail. Corporate neighbors include Intel, Nike, Genentech, SolarWorld, Volkswagen, Epson and Oracle. The property is now available and ready for corporate utilization, development or investment.

NW 271ST Property Highlights Largest developable property in the Sunset Corridor Direct access to Hwy 26 Flexible future zone will allow industrial, flex, office, and service when annexed NW JACKSON SCHOOL RD 1N2200004600 1N2200004500 Infrastructure planning and development underway Excellent visibility with extensive frontage on Jackson School Road Unique opportunity for corporate facility/campus Potential for up to 2,300,000+ square feet Established natural environment adjacent to high-quality corporate development 1N2200004500 NW 273RD AVE 275 acres in three parcels Approximately 225 net usable acres Divisible for qualified use PRELIMINARY SALE PRICE: $4.00/sf - $174,240/acre CALL FOR CURRENT INFORMATION & PRICING NW EVERGREEN RD NE 25TH

Attractive & Planned for Development Site Boundary: Storm Pond: Building 8 90,000 SF Paved Surface: Transportation Improvements Full Street: Frontage Road: NW JACKSON SCHOOL ROAD Half Street: Building 7 270,000 SF Building 6 15,000 SF Building 5Building 4 80,000 SF 80,000 SF Building 2 0 SF 3 75,50 Building 270,000 SF Building 1 75,500 SF Building 11 297,500 SF Building 14 265,000 SF Building 10 225,000 SF Building 13 175,000 SF Building 9 225,000 SF Building 12 175,000 SF Corporate Development Site Comprehensive plan designation underway NW 273RD AVENUE Landscaping: Waible Creek Ready for annexation into the City of Hillsboro upon completion Property provides natural aesthetic Jackson School Road off US Highway 26 Direct access to regional transportation networks Central to residential, retail and commercial services Three family-owned parcels Divisible depending on size, location, and qualified use Ready for qualified buyer seeking institutional-quality, scale and location Site discovery information available including: Site profile, legal description and ownership information, site assessment, site and development characteristics, improvement cost summary, development opportunities, infrastructure/environmental/natural resource information, market and economic impact review and Jackson East Subarea Community Planning and Development Grant. sunsetcorridorland.com

!! WEST UNION JACKSON SCHOOL! MEEK WAIBLE CREEK SUNSET WAIBEL CREEK STOREY CREEK SUBAREA B STOREY CREEK SUBAREA A WAIBEL CREEK SEWELL 30TH 41ST SUNSET HUFFMAN W ES T UN IO N SUNSET-SHUTE BROOKWOOD HELVETIA SHUTE-SUNSET Jackson East Project In 2014, the Legislature through House Bill 4078 added approximately 545 acres to the region s Urban Growth Boundary (UGB). The City of Hillsboro has been awarded a Metro Construction Excise Tax (CET) Grant in the amount of $195,000 to fund necessary planning work for the 545 acres and an adjacent rural-residential area brought into the UGB in 2005. The entire project area, referred to as Jackson East, is generally bounded by Evergreen Road to the south, Jackson School Road and Waibel and Story Creeks to the west, Sunset Highway to the north, and the North Hillsboro Industrial Renewal Area to the east. EVERGREEN 25TH EVERGREEN Project Overview Project Area Subareas Industrial Renewal Area Urban Growth Boundar y (UGB) 100- Year Floodplain Proposed Roadway Extension City Limits Tax lots

Project Area Project Area Subareas STO REY CREEK SU N S ET H IG H W AY STO REY CREEK Jackson East Project City Limits Tax Lots 100-Year Floodplain W AIBLE C R EEK WAIBEL CR EEK SUBAREA A W AIBEL C R EEK M EEK The Jackson East Project began in June 2016 and will be completed by December 2017. Project planning will result in the adoption of Comprehensive Plan amendments, including the application of Comprehensive Plan Map designations to guide growth and development over the long-term. Though preliminary planning has been performed for several large lots within Jackson East, alignments, costs, and financing must be completed for utilities, public facilities, and services for the entire project area. This work will include planning for the Crescent Park Greenway the City s vision for a continuous green loop around Hillsboro with a multitude of recreation and ecosystem, and active transportation functions. JAC KSO N S C H O O L 25TH SUBAREA B SEW ELL EV ER G REEN While land within the project area was added to the UGB for employment, over three-quarters of project area tax lots are 5 acres or less. Project planning will involve preparation of a Master Plan to determine the urbanization of these rural-residential lots as residential, employment, and/or a mix of uses. EV ER G REEN

Sunset Corridor & North Hillsboro The Sunset Corridor stretches approximately 10 miles along US Highway 26, west from Downtown Portland. It is in the heart of Washington County, which has the strongest overall employment, job growth, and population demographics of any metropolitan county in Oregon. It is home to two of the Portland region s top employers Nike and Intel, which employ over 27,000 people in the area. Commonly referred to as The Silicon Forest, with over 30 years of history of major high-tech industry presence. The North Hillsboro industrial district is home to many of Oregon s largest and most economically critical industrial businesses. Forty-eight percent of the City s total jobs and 84% of the City s manufacturing jobs are in North Hillsboro. Total employment is over 32,000 with an annual average wage of nearly $110,000. Nearly onefifth of the region s manufacturing employment is located in the district. Overall average wages are 216% greater than the average wage in the Portland region.

City of Hillsboro Oregon Hillsboro is home to some of the best land, power and water resources in the country. As a result, many high tech and advanced manufacturing companies put down roots in Hillsboro. Hillsboro is particularly attractive for its manufacturing infrastructure, its technologically skilled workforce, its proximity to airports, major highways and interstates, and its businessfriendly climate. Washington County 30 minutes west of Portland» Easy access to State Highway 26 (East/West), Interstate 5 (north/south), Interstate 84 (east/west) Western terminus of a 33 mile metropolitan light rail line 30 miles to the Portland International Airport Hillsboro Airport is Oregon s busiest general aviation airport

THE LARGEST AND MOST ATTRACTIVE LAND SITE AVAILABLE IN THE SUNSET CORRIDOR The property is now available and ready for corporate utilization, development or investment. Although all information furnished regarding the property for sale is from sources deemed reliable, such information has not been verified and no express representation is made nor is any to be implied as to the accuracy thereof and it is submitted subject to errors, omissions, change of price, other conditions, prior sale, or withdrawal without notice and to any special conditions imposed by our principal or agency.