Dave Hague NFPA Staff Liaison 12 21,

Similar documents
Technical Committee on Sprinkler System Installation Criteria

Correlating Committee on Automatic Sprinklers

Technical Committee on Sprinkler System Installation Criteria

Technical Committee on Water Mist Fire Suppression Systems

Technical Committee on Sprinkler System Installation Criteria

Technical Committee on Sprinkler System Installation Criteria

Correlating Committee on Automatic Sprinkler Systems

Correlating Committee on Automatic Sprinkler Systems

NFPA Technical Committee on Hybrid (Water and Inert Gas) Fire Extinguishing Systems

Technical Correlating Committee on Automatic Sprinklers

Call to Order Chair Jack Poole called the meeting to order at 8:00 AM on Monday, July 17, 2017.

NFPA 550 ROP Meeting Minutes

Technical Committee on Hanging and Bracing of Water-Based Fire Protection Systems

1. Welcome. Robert Smith, Chair. 2. Introductions and Update of Committee Roster. (attached)

MEETING MINUTES. APRIL 27-29, 2015 Hyatt Regency Buffalo Hotel and Conference Center Buffalo, New York ORGANISATION

Obstructions and ESFR Sprinklers Phase 2 FINAL REPORT

The committee completed self-introductions. TECHNICAL COMMITTEE MEMBERS PRESENT REPRESENTING

Minutes. NFPA Technical Committee on Fire Code. NFPA First Draft Meeting

National Fire Protection Association (NFPA) Fire Service Occupational Safety and Health Technical Committee Meeting March 14 15, 2012 San Diego, CA

REPRESENTING. Honolulu Fire Dept., Rep. International Association of Fire Fighters. API/Petroleum Safety Consultants

MEETING MINUTES NFPA Technical Correlating Committee on Safety to Life January 6, 2011 ROC Meeting The Wyndham Phoenix, Phoenix, AZ

NFPA 25 Technical Committee for Inspection, Testing and Maintenance of Water-Based Fire Protection Systems

National Fire Protection Association (NFPA) Fire Service Occupational Safety and Health Technical Committee Meeting. October 10 12, 2011 Baltimore, MD

2016 Annual Revision Cycle Consent Document NFPA 75

Technical Committee on Residential Sprinkler Systems

MEETING AGENDA High Rise Building Safety Advisory Committee

1. The meeting was called to order by Chair James Lathrop at 8:00 AM (CDT) on Wednesday, August 26, 2015.

NFPA Technical Committee on Fire Tests FALL 2011 ROC MEETING MINUTES

1. Call to Order. The meeting was called to order at 1:05 PM. (See Enclosure A [Agenda])

Correlating Committee on Automatic Sprinkler Systems

TECHNICAL COMMITTEE MEMBERS PRESENT

TECHNICAL COMMITTEE ON WATER-COOLING TOWERS. First Draft Meeting Agenda. February 7, :00 AM - 5:00 PM EST Web/Teleconference Meeting

TECHNICAL COMMITTEE MEMBERS WHO PARTICIPATED

Protection of Rack Stored Exposed Expanded Group A Plastics with ESFR Sprinklers and Vertical Barriers

1. Revise and A to read as follows:

NFPA Technical Committee on Fire Tests FALL 2010 ROC MEETING MINUTES April 15-16, 2010 Southwest Research Institute San Antonio, TX

2015 Fall Revision Cycle Notice of a Consent Standard NFPA 102

AGENDA. 1. Call to Order 8:00 am (8/23) 2. Introduction and Attendance. 3. Chairman Comments. 4. Approval of Previous Meeting Minutes

NFPA Technical Committee on Building Systems. NFPA 900 First Draft Teleconference/Web Meeting AGENDA. Thursday, February 13, :00 a.m.

Introductions made by the Chair, committee members, NFPA Staff Liaison, Jacqueline Wilmot and Dan Gorham of the Fire Protection Research Foundation.

TECHNICAL COMMITTEE ON FINISHING PROCESSES

AGENDA TECHNICAL COMMITTEE ON CARBON MONOXIDE DETECTION OCTOBER 7, 2010 TELECONFERENCE (10:00 A.M. ET)

FLAMMABLE AND COMBUSTIBLE LIQUIDS CODE COMMITTEE

NFPA Technical Committee on Deployment and Organization of Fire Prevention Activities

MEETING AGENDA High Rise Building Safety Advisory Committee

Chairman s Report for the TC on NEC CMP 2

Report on Comments A2006 Copyright, NFPA Report of the Committee on

National Fire Protection Association. 1 Batterymarch Park, Quincy, MA Phone: Fax:

1. Call to Order. The meeting was called to order by Chair Jeffrey Collins at 8:00 AM, October 24, REPRESENTING

Protection of Rack Stored Exposed Expanded Group A Plastics with ESFR Sprinklers and Vertical Barriers

1 Batterymarch Park, Quincy, MA Phone: Fax: M E M O R A N D U M

NIFAD CONFERENCE 2018

Technical Committee on Residential Sprinklers

Technical Committee on Standpipes (SPI-AAA)

Technical Committee on Foam-Water Sprinklers

Significant Advancements in Water Based Fire Suppression for Storage Occupancies

ROP MEETING MINUTES. 2. Introduction of Attendees. The following committee members and guests were in attendance. TECHNICAL COMMITTEE MEMBERS PRESENT

National Fire Protection Association. 1 Batterymarch Park, Quincy, MA Phone: Fax:

NFPA 1091 FIRST DRAFT MEETING

MEMORANDUM. Technical Committee on Board and Care Facilities. NFPA 101 Second Draft Technical Committee FINAL Ballot Results (A2017)

Technical Committee on Water Mist Fire Suppression Systems (WAM-AAA)

Technical Committee on Commissioning and Integrated Testing (CMI-AAA) Memorandum

TECHNICAL COMMITTEE ON FIRE CODE

Fire Code Action Committee (F-CAC) Meeting Minutes June 19-20, 2012 Chicago IL. Summary of Actions and Regional Work Group (RWG) Assignments

Testing and Maintenance of Water-Based Systems

National Fire Protection Association (NFPA) Fire Service Occupational Safety and Health Technical Committee Meeting October 8 9, 2010 San Diego, CA

Using Ethernet and Networks for Fire Alarm and Emergency Communications Systems

SECTION DRY PIPE SPRINKLER SYSTEMS MODEL G SERIES DRY VALVE

SECTION DRY PIPE SPRINKLER SYSTEMS MODEL F SERIES DRY VALVE

TECHNICAL COMMITTEE ON ELECTRONIC SAFETY EQUIPMENT. December 10-12, 2013 San Diego, CA AGENDA

SECTION WET PIPE FIRE PROTECTION SPRINKLER SYSTEM

Technical Committee on Private Water Supplies

SFPE Austin/San Antonio Chapter Meeting

UL Listings & FM Approvals Their Impact on Fire Sprinkler System Performance/Design

Technical Committee on Mining Facilities First Draft Meeting - NFPA 120 and 122

SECTION WET-PIPE SPRINKLER SYSTEMS EASY RISER CHECK VALVE

Report on Proposals A2006 Copyright, NFPA Report of the Committee on

Technical Committee on Gas Process Safety

TECHNICAL COMMITTEE ON SAFETY AT MOTORSPORTS VENUES. NFPA 610 First Draft Meeting. October 17-18, 2016

FIF AAA (F2014) Second Draft Meeting Web/Teleconference Meeting Agenda March 18, :00 5:00 p.m. ET

Technical Committee on Water Spray Fixed Systems (WAS-AAA)

CASS COUNTY MICHIGAN MASTER PLAN

NFPA Technical Committee on Garages and Parking Structures. NFPA 88A Second Draft Web/Teleconference Meeting

Floor Action on Certified Amending Motions Documents for the June 2015 Association Technical Meeting

AGENDA. NFPA Correlating Committee on Safety to Life (SAF-AAC) NFPA 101 Second Draft Meeting. November 17, NFPA Headquarters, Quincy, MA

4. General Discussion of NFPA 4 Document Direction a. Review of the Council Minute Items for NFPA 4 and NFPA 72.

MEMORANDUM. Technical Committee on Notification Appliances for Fire Alarm and Signaling Systems

Technical Committee on Private Water Supply Piping Systems

Minutes of the Pre-ROP Meeting of the T/C on Protected Premises Signaling September 22-23, 2010 Indianapolis, IN

GREATER CHARLOTTE CHAPTER

Revised Medical Gas Standards Offer New Opportunities

M E M O R A N D U M. NFPA Technical Committee on Water Spray Fixed Systems

Technical Committee on Standpipes (SPI-AAA)

Fire Sprinklers Standards And Approvals Redbook Live

NFPA TECHNICAL COMMITTEE ON ELECTRONIC SAFETY EQUIPMENT. March 18-19, 2014 Fort Lauderdale, FL AGENDA

Report on Proposals A2006 Copyright, NFPA NFPA 13 Report of the Committee on

Storage Sprinkler U.S. Quick Reference Guide

National Fire Protection Association. 1 Batterymarch Park, Quincy, MA Phone: Fax:

CSRA News Flash. Greetings from your President

Item Review Dates and Times for Future Meetings/Conference Calls

Transcription:

Technical Committee on Sprinkler System Installation First Draft Meeting Marriott Gas Lamp Hotel San Diego, CA August 9-11, 2016 1. Ray Grill TC Chair called the meeting to order at 8:00am and self-introductions were made (see attached attendance list). 2. Minutes of the Pre-First Draft meeting were approved 3. SL Dave Hague gave the staff report and meeting procedures. 4. The committee then acted on Public Input (PI s) and First Revisions (FR s) based on Task Group Reports (see attached listing of Task Groups) and individual action on same. 5. The Second Draft Meeting will be held during the week of June 25, 2017 in Raleigh, NC. 6. The meeting adjourned at 4:00pm on the 11 th. Dave Hague NFPA Staff Liaison 12 21,

NFPA 13 A2018 SSI Task Groups Chapter 1-3, 7-8 - Administration, Referenced Publications & Definitions, System Components and Hardware, System Types and Requirements Dave Burkhart - Chair Pat Brock, David Royse (Potter Electric davidr@pottersignal.com, 314-595-6900) Chapter 9-12 - Sprinkler Location Requirements, Standard Pendent, Upright, and Sidewall Spray Sprinklers, Extended Coverage Upright, Pendent, Sidewall Spray Sprinkler, Residential Sprinklers Cecil Bilbo Chair Steve Scandaliato, Roland Asp, Dave Lowry, Karl Wiegand (Globe Sprinkler karl.weigand@globesprinkler.com, 914-447-8484), Robert Holliday (bobbito6250@aol.com), Mark Fasel (Viega, mark.faser@viega.us), Tom Wellen Chapter 13-15 - CMSA, ESFR & Special Sprinklers Wil Smith - Chair Ken Linder, Adam Seghi, Kerry Bell, Luke Hilton, Wes Baker, Scott Franson, Tom Wellen Chapter 16/28 - Piping, Valves and Appurtenances, Existing System Modifications Bob Caputo - Chair Pete Schwab, Ahmed Saleh, Larry Keeping, Jeff Hebenstreit, Jason Gill, Zeljko Sucevic Chapters 27, 29 & 30 - Systems Acceptance, Marine Systems, System Inspection, Testing, and Maintenance Joe Noble Chair Floyd Luinstra, Pete Schwab, Elwin Joyce Cloud Ceilings Steve Scandaliato - Chair Dave Lowrey, Cecil Bilbo, Karl Weigand (Globe Sprinkler karl.weigand@globesprinkler.com, 914-447-8484), Roland Asp 12 21, Overhang Task Group Bob Caputo Chair Larry Keeping, Dave Burkhart, Dave Lowrey, Sultan Javeri

Name Office Organization Grill, Raymond Chair Arup Asp, Roland Principal National Fire Sprinkler Association Bahadori, Hamid Principal JENSEN HUGHES Baker, Weston Principal FM Global Bilbo, Cecil Principal Academy of Fire Sprinkler Technology, Brock, Pat Principal Oklahoma State University Caputo, Robert Principal Fire & Life Safety America Franson, Scott Principal National Fire Sprinkler Association Hebenstreit, Jeff Principal UL LLC Hilton, Luke Principal Liberty Mutual Property Keeping, Larry Principal PLC Fire Safety Solutions Ketner, Charles Principal United Assn. of Journeymen & Apprentices Leavitt, Russell Principal Telgian Corporation Lowrey, David Principal City of Boulder Fire Rescue Noble, Joe Principal International Fire Marshals Association Scandaliato, Steven Principal SDG, LLC 12 21, 3

Name Office Organization Schwab, Peter Principal Wayne Automatic Fire Sprinklers, Inc. Seghi, Adam Principal Coda Risk Analysis Smith, William Principal Code Consultants, Inc. Sucevic, Zeljko Principal Canadian Automatic Sprinkler Association Victor, Terry Principal Tyco Fire Protection Products Wake, Daniel Principal Victaulic Wellen, Thomas Principal American Fire Sprinkler Association Asplund, David Alternate National Fire Sprinkler Association Burkhart, David Alternate Code Consultants, Inc. Charrette, James Alternate National Fire Sprinkler Association Gill, Jason Alternate American Fire Sprinkler Association Karr, Mark Alternate Academy of Fire Sprinkler Technology, Moore, E. Parks Alternate American Fire Sprinkler Association 12 21, 4

Morcos, Angele Alternate FM Global Overton, William Alternate Consolidated Nuclear Security, LLC, Y-12 Saleh, Ahmed Alternate Victaulic Silva, Manuel Alternate Tyco Fire Protection Products Slocum, LeJay Alternate JENSEN HUGHES Hague, David Staff Liaison National Fire Protection Association 12 21, 5