ELECTRICAL/MECHANICAL INFRARED INSPECTION REPORT. The Corporate Facility 2001 Freedom Way United City, USA

Similar documents
Infrared Electrical Inspection Report

NLR ELECTRIC MURRAY HYDRO PLANT NORTH LITTLE ROCK, ARKANSAS

SYSCO CENTRAL PENNSYLVANIA, LLC. HARRISBURG, PENNSYLVANIA

Sample Infrared Report Company Address Line 2

Executive Summary. CNBC Global Headquarters Christine Cajilig

PAVESTONE COMPANY MIDDLEBORO, MASSACHUSETTS

SIDEWINDER DRILLING RIG 107 HOUSTON, TEXAS

ARAMARK CLEANROOM SERVICES LOS ANGELES, CALIFORNIA

Electrical Systems Existing Conditions and Building Load Summary Report

Assessing Your Airfield Electrical Distribution System

Old Jail HVAC Replacement Feasibility Report

Thermography Report. For: (Client) at: (location)

Assessing HVAC Leak Damage with Infrared

TONY ESPOSITO LIGHTING/ELECTRICAL TECHNICAL REPORT II SEPTEMBER 15, 2011 HUNTER S POINT SOUTH INTERMEDIATE SCHOOL AND HIGH SCHOOL QUEENS, NY

Thermography Inspection SAMPLE REPORT

Infrared Inspection Reference Letters Commercial & Residential

Property risk solutions

INITIAL ELECTRICAL ASSESSMENT REPORT (EAR)

APPLICATION NOTE INFRARED SCANNING FOR ENERGY EFFICIENCY

Meeting PHMSA Alarm Management Requirements: How TiPS Can Help

EQUIVALENT INITIAL ELECTRICAL SAFETY ASSESSMENT

EQUIVALENT INITIAL ELECTRICAL SAFETY ASSESSMENT

NYC Department of Education

Stockton Infrared Thermographic Services, Inc. presents. A Qualitative Infrared Thermographic Survey Of Electrical Switchgear at the facilities of

Multi-Technology Fault Identification

Brown University Revised June 29, 2012 Facilities Design & Construction Standards SECTION ELECTRICAL DESIGN CRITERIA

INITIAL ELECTRICAL ASSESSMENT REPORT (EAR)

EQUIVALENT INITIAL ELECTRICAL SAFETY ASSESSMENT

State College Area School District High School South Building EXISTING CONDITIONS ASSESSMENT

Newark, Delaware Architectural Engineering Senior Thesis Portfolio. Electrical Analysis

INITIAL ELECTRICAL SAFETY ASSESSMENT - EXPANSION

Delta T Alert: Wireless Temperature Monitoring of Electrical Enclosures

INITIAL ELECTRICAL ASSESSMENT REPORT (EAR)

Case Study. A Geothermal Energy Generation Facility Embraces Infrared. Polymer Window Inspections. Overview: iriss.com

NYC Department of Education

Guide to the Heating and Cooling Systems at McLean Gardens

Certification of Thermographers

Technical II Report Electrical Systems

Sequence of Operations (excerpt)

White Paper. Reducing Arc Flash Risks with Electrical Maintenance. Safety Devices. Abstract: iriss.com

Standard for Infrared Inspection of Building Envelopes

UNIVERSITY OF ROCHESTER ENVIRONMENTAL HEALTH & SAFETY

Index D45 D45. system. Catalogue. System overview 4 Entrance panel overview 6 Internal unit overview 7

Reducing Arc Flash Risks with Electrical Maintenance Safety Devices - Part 2

Ti Thermal Imaging LTD

EQUIVALENT INITIAL ELECTRICAL SAFETY ASSESSMENT

INITIAL ELECTRICAL ASSESSMENT REPORT (EAR)

NYC Department of Education

BIMBO BAKERIES USA ROSEVILLE, MINNESOTA

INITIAL ELECTRICAL ASSESSMENT REPORT (EAR)

See it before it becomes a problem. Infrared Thermography for predictive maintenance

SECTION 1-1 SAFETY PRECAUTIONS DOUGH CONVEYOR CHAPTER 1: SAFETY

NYC Department of Education

Pages Modified: REPORT RE-ISSUED Illustrations Replaced: Ills. Nos. 1, 2, 3, 4, 5, 6, 8, 9 and 10

3D Equipment Library Order Form

The North American Electric Reliability Corporation ( NERC ) hereby submits

2 Main Office Building BLDG-955A Building Purpose Building Area Administration offices. Training room 7,610 SF Inspection Date August 16, 2016 Inspect

Non-destructive testing Infrared thermographic testing General principles

Chandler City Hall Chandler, Arizona

Electrical Systems Existing Conditions and Building Load Summary Broadway Plaza, Rochester, MN. Appendix A

EQUIVALENT INITIAL ELECTRICAL SAFETY ASSESSMENT

Enhancing Current Maintenance Practices 04. Managing the Risk 06. Constant Monitoring of Electrical Enclosures 08

SYNRAD Laser Safety 101

CHAPTER 1 TABLE OF CONTENTS SAFETY SPIRAL FLOW DOUGH FEEDER

BIMBO BAKERIES USA ALBANY CAKE ALBANY, NEW YORK

Friday, September 25, 2015 Des Moines, IA. 12:45 1:45 p.m. OLDER BUILDING SYNDROME: IT DOESN T GET BETTER WITH AGE

FIRE AND LIFE SAFETY EDUCATOR II NFPA 1035, Chapter 5, 2015 Edition

INITIAL ELECTRICAL ASSESSMENT REPORT (EAR)

Technical Report #3 Mechanical Systems Existing Conditions Evaluation

INITIAL ELECTRICAL ASSESSMENT REPORT (EAR)

Setting up Homebase, Exporting and Importing time clock files into OptRight Online

STATEMENT OF WORK ELECTRICAL REPAIR / MAINTENANCE BUILDING PROJECT FDC RACCOON CREEK STATE PARK (BEAVER COUNTY)

Electrical Inspection Service & Distribution

CONVERSION KIT INSTRUCTIONS Commercial Electric Water heaters

OPERATING AND MAINTENANCE MANUAL FOR PLATE HEAT EXCHANGER INDIRECT FIRED WATER HEATER. Electric Heater Company Base Model "BWXP"

Computing Services Center

Technical Report #2. Newseum and Freedom Forum Headquarters. Washington, D.C. Ryan Wise Lighting/Electrical Prof. Dannerth November 2, 2007

-SQA- SCOTTISH QUALIFICATIONS AUTHORITY. Hanover House 24 Douglas Street GLASGOW G2 7NQ NATIONAL CERTIFICATE MODULE DESCRIPTOR

Guide to Condition Reports for Domestic Electrical Installations

NYC Department of Education

2018 SC 4-H Small Garden Project Individual Record Book Juniors and Seniors Ages 9-18

American Standard Furnace Error Codes 4 Flashes

Guide To Troubleshooting INEFFICIENT COOLING FANS

November 11, City of Sparks 215 S. 21 st St. Sparks, NV

RDT Refrigeration Book

The evolution of level switches and detectors

Your computer system is the lifeblood of your business. Cyber threats are. what you hear most about today. Hacks, viruses and spyware get constant

Building Electrical System Overview

NYC Department of Education

Allianz Engineering Inspection Services Ltd. Electrical Services. Product Information

RESNET Infrared Inspection Standard and Certification

LIGHT LEVEL REQUIREMENTS MINIMUM ACCEPTABLE FOOT CANDLES

Case Study. Custom Solutions for High Arc Flash Incident Energy and. Interlocked Electrical Enclosures. Overview: iriss.com

ALDRICH COMPANY THREE PASS FIRETUBE BOILER CLASSIC SERIES OPERATING & MAINTENANCE MANUAL

INITIAL ELECTRICAL ASSESSMENT REPORT (EAR)

Funding is available to applicants on a first come, first served basis, and applications will be considered in the order they are received.

INITIAL ELECTRICAL ASSESSMENT REPORT (EAR)

Explain in writing if the address of the building is different than the address on this form:

Overview of FRAP-K1 And Status of Major Modifications

Explain in writing if the address of the building is different than the address on this form:

Transcription:

ELECTRICAL/MECHANICAL INFRARED INSPECTION REPORT for The Corporate Facility 2001 Freedom Way United City, USA January 01, 2012 Job Number: 1111-12

TABLE OF CONTENTS I - Introduction to the Report Explains the purpose of the report and what it contains. II - Certification Certification of inspection authenticity and completeness, signed by certified thermographer. III - Inspection Equipment List Provides a complete list of all equipment inspected with summary results detailing the equipment inspection status. IV - Explanation of Problem Documentation Discusses Section V (Thermographic Documentation & Analysis) and Section VI (Equipment Repair Summary Page) and explains the Repair Priority Guide V - Thermographic Documentation & Analysis Contains a full page of documentation for each problem found, including photo and color or B&W thermogram. VI - Equipment Repair Summary Form Includes a form (Equipment Repair Summary Page) to document equipment repair information including the date of repair, the responsible person, and the action(s) taken to resolve the problem.

I INTRODUCTION Infrared Inspections, Inc., recently performed an infrared inspection of your electrical and mechanical equipment (Section III contains a complete list of all equipment inspected). The purpose of this report is to present the results of that inspection, especially for any potential problems indicated by the presence of excessive heat. The infrared device used to perform the inspection is a sophisticated electronic camera that sees the heat emitted from your equipment. The pictures produced by this camera are called thermograms, and they are essentially multi-colored temperature maps of your equipment in which each color indicates a different temperature. The infrared thermographer who performed your inspection used this special camera to look for potential problem points in your equipment which could cause premature deterioration and costly down time. With our advance warning, you can proactively service this equipment before it causes costly problems. Section IV contains a detailed explanation of the thermographic analysis description to help prioritize repair scheduling for problems identified during the infrared inspection procedure. The results of the inspection are presented in Sections III, V and VI of the report. Section III contains a complete list of all equipment inspected, with summary results detailing the equipment inspection status. Section V contains a full page of documentation for each problem found, including photographs, thermographs, apparent temperature measurements, thermographic analysis and recommended actions. Section VI presents an Equipment Repair Summary Form to be completed by the customer. This inspection and report have been performed and prepared under the direction of an Infrared Inspections thermographer who is certified by the Infraspection Institute. This report fully meets the Infraspection Institute s Guidelines for Infrared Inspection of Electrical and Mechanical Systems.

II CERTIFICATION I hereby warrant that the inspection, which is the subject of this report, was conducted personally by me or by a thoroughly qualified assistant under my direction. I further warrant that this report has been prepared under my personal guidance and has been found by me to be totally accurate and complete to the best of my ability as a certified thermographer. Certified Thermographer, Level I and II Infraspection Institute Certificate No. 3788

III - INSPECTION EQUIPMENT LIST Location: The Corporate Facility, 2001 Freedom Way, United City, USA Date(s): January 01, 2012 Job: 1111-12 LOCATION EQUIPMENT PHOTO DETAILS Penthouse, motor control Motor control center #13, main incoming center room. connections. Motor control center #13, starter for supply fan SF-9 Motor control center #13, starter for exhaust fan EX-10 Motor control center #13, starter for supply fan SF-11 Motor control center #13, starter for exhaust fan EX-8 Motor control center #13, starter for pump P- 65 Motor control center #13, starter for pump P- 67 Motor control center #13, starter for main exhaust fan Motor control center #13, fused disconnect for room heater Breaker panel LP-12 Transformer T-12 Penthouse, mechanical area. Motor & pump bearings for pump P-65 Motor & pump bearings for pump P-67 Motor & fan bearings for exhaust fan EX-8 Motor & fan bearings for exhaust fan EX-10 Motor & fan bearings for supply fan SF-9 Motor & fan bearings for supply fan SF-11 Motor & fan bearings for main exhaust fan Penthouse, outside roof area Disconnect for cooling tower fan motors Motor and fan bearings for exhaust fan 6 th floor electrical closet Breaker panel LP-6 Breaker panel RP-6 Transformer T-6 Fused disconnect for T-6 Fused disconnect for LP-6 Fused disconnect for RP-6 Fused panel EM-6 for emergency lighting 5 th floor electrical closet Breaker panel LP-5 Breaker panel RP-5 PHOTO COLUMN: A RED # represents a thermographic anomaly analysis photo page and A BLUE # represents a thermographic sample analysis photo page, both will be included in SECTION V of this report. DETAILS COLUMN: =panels/doors off or open, N=panels/doors on or closed, NI = not inspected, OFF=equipment was not in operation, UI=ultrasonically inspected Page 1

III - INSPECTION EQUIPMENT LIST Location: The Corporate Facility, 2001 Freedom Way, United City, USA Date(s): January 01, 2012 Job: 1111-12 LOCATION EQUIPMENT PHOTO DETAILS 5 th floor electrical closet Fused disconnect for LP-5 Fused disconnect for RP-5 Fused panel EM-5 for emergency lighting 4 th floor electrical closet Breaker panel LP-4 Breaker panel RP-4 Transformer T-4 05 Fused disconnect for transformer T-4 Fused disconnect for LP-4 Fused disconnect for RP-4 Fused panel EM-4 for emergency lighting 3 rd floor electrical closet Breaker panel LP-3 Breaker panel RP-3 Fused disconnect for LP-3 Fused disconnect for RP-3 Fused panel EM-3 for emergency lighting 2 nd floor electrical closet Breaker panel LP-2 Breaker panel RP-2 Transformer T-2 Fused disconnect for transformer T-2 Fused disconnect for LP-2 Fused disconnect for RP-2 Fused panel EM-2 for emergency lighting Computer room, main area Control panel for Liebert A/C #1 unit Breaker disconnect for Liebert A/C #1 unit Power distribution unit PDU #2 Power distribution unit PDU #3 Computer room, south Breaker distribution panel LP-C 07 electrical closet 07R Breaker panel RP-C Main 225 KVA transformer Fused disconnect for 225 KVA transformer Fused disconnect for LP-1C Fused disconnect for RP-1C Starter for exhaust fan EF-C1 Starter for supply fan SF-C1 Fused panel for emergency lighting Fused disconnect for emergency lighting PHOTO COLUMN: A RED # represents a thermographic anomaly analysis photo page and A BLUE # represents a thermographic sample analysis photo page, both will be included in SECTION V of this report. DETAILS COLUMN: =panels/doors off or open, N=panels/doors on or closed, NI = not inspected, OFF=equipment was not in operation, UI=ultrasonically inspected Page 2

III - INSPECTION EQUIPMENT LIST Location: The Corporate Facility, 2001 Freedom Way, United City, USA Date(s): January 01, 2012 Job: 1111-12 LOCATION EQUIPMENT PHOTO DETAILS 1 st floor main electrical room Breaker panel RP-1 Breaker panel LP-1 Breaker panel BP-25 03 Transformer T-1 Fused disconnect for T-1 Fused disconnect for BP-25 Fused disconnect for LP-1 Fused disconnect for RP-1 Fused panel EM-1 for emergency lighting Main equipment room Switchboard #5, fused disconnect for panels LP 6-1 Switchboard #5, fused disconnect for panels RP 6-1 Switchboard #5, fused disconnect for panels emergency lighting panels EM 6-1 Switchboard #5, fused disconnect for panels transformers T 6-1 Switchboard #5, fused disconnect for chiller #1 Switchboard #5, main fused disconnect for switchboard Bus riser 04 Automatic transfer switch ATS #1 (under normal power mode) Starter control panel for domestic water pumps Motor and pump bearings for domestic water pumps Starter control cabinet for RM #1 06 Control panel for domestic hot water tank Fused disconnect for domestic hot water tank UPS equipment for computer systems Breaker distribution for unit heaters 1-6 Fire pump room Starter control cabinet for fire pump 01 Motor and pump bearings for fire pump 02 PHOTO COLUMN: A RED # represents a thermographic anomaly analysis photo page and A BLUE # represents a thermographic sample analysis photo page, both will be included in SECTION V of this report. DETAILS COLUMN: =panels/doors off or open, N=panels/doors on or closed, NI = not inspected, OFF=equipment was not in operation, UI=ultrasonically inspected Page 3

IV - EXPLANATION OF PROBLEM DOCUMENTATION Maintenance personnel need to prioritize their repair efforts. To help them do this, we provide you with a repair priority rating for each problem point identified in this report. The repair priority rating is an objective measure which is based on the severity of the apparent temperature rise measured by the thermographer (see table below). These ratings adhere to established industry standards and guidelines. To determine repair schedules, the ratings should be combined with the judgement of your maintenance personnel as to the importance of each potential problem with regard to personnel safety and the consequences of equipment failure. RATING REPAIR PRIORIT RATING SERVICE GUIDE APPARENT RECOMMENDATION TEMPERATURE RISE Serious 1-35 C 1-63 F Repair as soon as schedule allows Severe 36-50 C 64-90 F Repair as soon as possible Critical > 50 C > 90 F REPAIR IMMEDIATEL Sections V of this report contains complete and comprehensive documentation of the potential problem(s) identified during the thermographic inspection of designated equipment. It contains a full page of documentation for each problem, including equipment location and description, equipment photograph, thermal image, apparent temperature measurements, thermographic analysis of probable causes and recommendations for corrective action. Section VI is an Equipment Repair Summary Form that may be used by the customer s engineering department to document important repair information.

January 05, 2012 SAMPLE REPORT Mr./Ms. Customer The Corporate Facility 2001 Freedom Way United City, USA Dear Mr./Ms. Customer Thank you for selecting INFRARED INSPECTIONS, INC. to perform the thermal electrical/mechanical inspection at The Corporate Facility, United City, USA. The full report detailing the results of that inspection is enclosed. If there are any questions regarding the report, or if there is anything else we can do to be of service to you, please call us at 708-865-7700. We wish to thank you and your staff for the cooperation and assistance provided to us during the inspection. our business is very important to us, and we look forward to serving you again in the future. Sincerely, James Berg President and Certified Thermographer Level 1 & 2