TORONTO GREEN STANDARD VERSION 2.0

Similar documents
Performance Level: Tier 1 (Required) Tier 2 Tier 3 Tier 4. Application Information: Site Plan Control Zoning Bylaw Amendment Draft Plan of Subdivision

Toronto Complete Streets Guidelines

EX17.24 Toronto Green Standard & Toronto Green Roof Bylaw

4780 Eglinton Avenue West - Zoning By-law Amendment and Draft Plan of Subdivision Applications - Preliminary Report

APPENDIX A - Block and Draft Plan

CITY OF CLEVELAND GREEN DESIGN GUIDELINES

10 Park Lawn Rd - Zoning Amendment Application- Preliminary Report

Design Standards. Green Development. Shadow Studies. Standards. July 2010 Updated October 2014

BOROUGH OF HADDONFIELD GREEN DEVELOPMENT PRACTICES CHECKLIST November 15, 2013

The West Vaughan Employment Area Secondary Plan Policies

North York Community Council. Director, Community Planning, North York District. Ward No. 26, Don Valley West

7437, 7439 and 7441 Kingston Road - Zoning By-law Amendment and Site Plan Control Applications - Preliminary Report

Director, Community Planning, North York District

CITY OF VAUGHAN EXTRACT FROM COUNCIL MEETING MINUTES OF MAY 27, 2014

Monitoring Performance and Effectiveness of Urban Stormwater Best Management Practices. Jim Duncker, USGS Kuldip Kumar, MWRDGC David Leopold, CDOT

30 and 44 Zorra Street - Zoning By-law Amendment Application - Preliminary Report

4155 Yonge Street Official Plan Amendment and Rezoning Application Preliminary Report

280 Manse Road - Official Plan Amendment, Zoning Amendment, Draft Plan of Subdivision Applications - Preliminary Report

Application for Site Plan Review

Planning and Growth Management Committee

City of Kelowna Consolidated Zoning Bylaw No. 8000

5959 Yonge Street Rezoning Application - Preliminary Report

SITE PLAN SUBMISSION AND APPROVAL GUIDELINES

Appendix I. Checklists

City of Langford Green Development Checklist

8 Oak Street - Official Plan and Zoning By-law Amendment Application - Preliminary Report

150 Eighth Street Zoning By-law Amendment Application Preliminary Report

City of Richmond. Engineering Design Specifications

REZONING APPLICATION MPD SUPPLEMENT

Surrey Ecosystem Management Study

Proposed for Vic West Neighbourhood Plan. Design Guidelines for Intensive Residential Development - Townhouse and Attached Dwelling

ENVIRONMENTAL PAVING SOLUTIONS

CITY OF TUMWATER 555 ISRAEL RD. SW, TUMWATER, WA (360) (360) (FAX)

Director, Community Planning, Etobicoke York District

70 and 80 Wicksteed Avenue, 202, 204 and 206. Parkhurst Boulevard and 99 Vanderhoof Avenue

251 Manitoba Street- Official Plan Amendment and Zoning By-law Amendment Application- Preliminary Report

APPLICATION FOR REZONING PROPERTY CITY OF HOLLAND, MICHIGAN. Name of Applicant. Address, and Phone # of Applicant

240 and 242 Finch Avenue West Zoning By-law Amendment Application Preliminary Report

What does LEED characterize?

From: Director, Community Planning, Etobicoke York District

River Friendly Landscape Program Frequently Asked Questions (FAQs) December 2016

Ville de. Côte Gelée

1296 Kennedy Road - Zoning Amendment Application - Preliminary Report

Landscape and Streetscape Design 2.5

GREEN BUILDING PROGRAM. COUNTY OF LOS ANGELES A joint effort by Department of Regional Planning and Department of Public Works

ARTICLE 17 SITE PLAN REVIEW

C H A P T E R 43. Landscaping, Irrigation and Grading. Sections

FARMING PROTECTION. The Farming Protection Development Permit Guidelines are organized into five main categories:

Broadview Avenue Zoning Amendment Application Final Report

FFL Home Landscape Recognition Checklist

ARTICLE 12. LANDSCAPING REQUIREMENTS.

FORMER CANADIAN FORCES BASE (CFB) ROCKCLIFFE SECONDARY PLAN. Official Plan Amendment XX to the Official Plan for the City of Ottawa

Amendment to the Green Roof Bylaw for Public and Separate School Board Buildings

20 & 50 Ashtonbee Road, 1920 & 1940 Eglinton Avenue East, and 880, 890 & 900 Warden Avenue Zoning Amendment Application Final Report

646 Kingston Road - Official Plan Amendment and Zoning Amendment Applications - Preliminary Report

Yonge Street Zoning Amendment Application - Preliminary Report

60-64 Queen Street East and Church Street - Zoning Amendment Application - Preliminary Report

LOW DENSITY RESIDENTIAL

City of Yelm. Tahoma Terra Final Master Plan Development Guidelines. Table of Contents

SITE PLAN REVIEW APPLICATION AND CHECKLIST

1407 Military Trail Zoning Amendment Application Final Report

Queen Street West - Zoning Amendment Application - Preliminary Report

CITY CLERK. Consolidated Clause in North York Community Council Report 8, which was considered by City Council on October 26, 27 and 28, 2004.

599 Kennedy Road - Official Plan Amendment and Zoning Amendment Application - Preliminary Report

Smart Growth Development Checklist

DRAFT Northeast Quadrant of Kipling Avenue and Highway 7 DRAFT AUGUST 29, Goals Land Use. The goals of this Plan are to:

Eco-Roof Incentive Program application: 77 Glen Rush Boulevard

3686 and 3688 St Clair Avene East Zoning Application Final Report

Mixed Use Centres Development Permit Guidelines

LANDSCAPING. Design. Development of the site shall not unreasonably impair the ability of adjoining properties to utilize solar energy.

MONTGOMERY COUNTY PLANNING DEPARTMENT THE MARYLAND-NATIONAL CAPITAL PARK AND PLANNING COMMISSION

5. LOW IMPACT DEVELOPMENT DESIGN STANDARDS

URBAN DESIGN BRIEF URBAN DESIGN BRIEF 721 FRANKLIN BLVD, CAMBRIDGE August 2018

CITY OF VAUGHAN EXTRACT FROM COUNCIL MEETING MINUTES OF SEPTEMBER 26, 2017

FURTHER TO EXECUTIVE COMMITTEE MEETING #11/12 To be held on Friday, January 11, 2013

Eco-Roof Incentive Program application: 6 Curity Avenue

71 75 Curlew Drive - Zoning Amendment Application - Preliminary Report

Planned Development Review Revisions (Project No. PLNPCM )

Complete Neighbourhood Guidelines Review Tool

Edward R. Sajecki Commissioner of Planning and Building. Land Use Review- Former Parkway Belt West Lands- Fieldgate Drive and Audubon Boulevard

BUFFERS, TREE PROTECTION AND LANDSCAPING. Sec Purpose and Intent.

Wide asphalt driveway abutting school property. garage built with incompatible materials, too close to park. incompatible fencing materials

350, 370, and 390 Queens Quay West Official Plan Amendment and Zoning Amendment Applications - Preliminary Report

Stormwater Technical Guide

Lawrence Avenue West Zoning By-law Amendment Application Final Report

393, 395, 397, 399, 401 and 403 Spring Garden Avenue Official Plan and Zoning By-law Amendment Application Preliminary Report

Wellington Street West - Zoning Amendment Application - Preliminary Report

Example Stormwater Control Plan For a Residential Subdivision Project. Whispering Pines Lane Anytown, USA

The purpose of the requirements in this Article is to provide for landscaping and screening of parking and other outdoor areas that will:

4121 Lawrence Avenue East Rezoning Application Preliminary Report

Town of Windham. Planning Department 8 School Road Windham, ME voice fax

PRELIMINARY STAFF PLANNING REPORT TO THE WALWORTH COUNTY ZONING AGENCY X CONDITIONAL USE

SUBMITTAL REQUIREMENTS

Best Management Practices

Planning, Design, and Construction of Green Infrastructure.

CITY OF SANTA ANA Public Works Agency. PARKWAYS..What are they, and why are they important?

SITE PLAN REVIEW ITEMS - REFERENCE CHECKLIST

SMCWPPP IPM Training March 8, 2017 Bay-Friendly Landscaping, IPM and Stormwater

COMPLIANCE CHECKLIST HILLSIDE RESIDENTIAL DESIGN GUIDELINES MANUAL

1071 King Street West Zoning Amendment Application - Preliminary Report

Transcription:

For New Low-Rise Residential (5 dwelling units or more) The Toronto Green Standard (TGS) is a two-tier set of performance measures, with supporting guidelines for new development. Its purpose is to promote sustainable site and building designs that address Toronto s urban environmental pressures: air quality, climate change and energy efficiency, water quality and efficiency, ecology and solid waste. This Checklist is part of a Complete Application. It must contain adequate detail on how the design meets the Toronto Green Standard. The Checklist must also reference the appropriate plans, drawings and reports that demonstrate compliance with the performance measures. Complete the Checklist in conjunction with the appropriate Standard that applies to the development type, including the Specifications, Definitions and Resources column that provides more information on how to comply. The Checklist is completed by the project architect or planning consultant and is submitted to City Planning staff as part of your development application. Application Submitted Site Plan Control Zoning Bylaw Amendment Draft Plan of Subdivision Office Use Only District Offices: North York District Toronto East York District Scarborough District Etobicoke York District Date Received: Planner: Application No.: Is this checklist revised from an earlier submission? Yes No Property and Applicant Address of Subject Land (Street Number/Name): Applicant/Agent Name: Telephone: E-mail: Registered Owner: Proposal Gross Floor Area: Number of Storeys: Number of Units: Project Information (include a narrative of your project highlighting green attributes or performance measures) Tier 1 performance measures are required by the City and must be addressed as part of your approved development application. Tier 2 performance measures are voluntary with higher performance levels. Achieving Tier 2 means that you are eligible to apply for a refund of development charges equivalent to 20% of the 2014 rate. Check here if you intend to achieve Tier 2 of the Toronto Green Standard (complete pages 7-9).

For New Low-Rise Residential (5 dwelling units or more) TIER 1: AIR QUALITY AQ 2.1 UHI, Non-roof hardscape EXAMPLE One of the following is provided: High-albedo surface materials OR Open grid pavement OR Shade within 5 years of construction OR Combination of above 3 options AQ 1.1 Connectivity Safe, accessible pedestrian routes that connect with off-site pedestrian networks and priority destinations A minimum of 50% of the hard surface area is treated with high albedo surface materials with an SRI value of 29. The total hard surface area is 200m 2 and 100m 2 is treated with highalbedo materials. L1-01 AQ 1.2 Sidewalk space Pedestrian clearway at least 2.1m wide to accommodate pedestrian flow AQ 1.3 Pedestrian specific lighting Pedestrian-scale lighting AQ 2.1 UHI, Non-roof hardscape One of the following is provided: High-albedo surface materials OR Open grid pavement OR Shade from tree canopy within 5 years Shade from structures covered by solar panels OR Combination of above options 2

For New Low-Rise Residential (5 dwelling units or more) AQ 3.1 Green & cool roofs One of the following is provided: Cool roofing materials for 100% of the Available Roof Space OR Green roof and cool roofing materials for 100% of the Available Roof Space Roof Plan # TIER 1: GREENHOUSE GAS EMISSIONS/ENERGY EFFICIENCY GHG 1.1 Energy efficiency Design building(s) to achieve Supplementary Standard SB-12 (OBC 2017) Energy Efficiency Design Summary TIER 1: WATER QUALITY, QUANTITY AND EFFICIENCY WQ 1.1 Erosion & sediment control Adherence to Erosion and Sediment Control Guidelines for Urban Construction WQ 2.1 Stormwater balance Stormwater retained on-site to the same level of annual volume allowable under predevelopment conditions Stormwater Management Report 3

For New Low-Rise Residential (5 dwelling units or more) WQ 2.2 Stormwater retention & reuse One of the following is provided: The first 5mm from each rainfall retained on-site OR Maximum allowable annual runoff volume is no more than 50% of the total average Stormwater Management Report WQ 3.1 Total suspended solids (TSS) Remove 80% of total suspended solids based on the post-development level of imperviousness Stormwater Management Report WQ 3.2 E. Coli reduction Control the amount of E. Coli directly entering Lake Ontario and waterfront areas Stormwater Management Report WQ 4.1 Drought-tolerant landscapes Water efficient plant material provided for at least 50% of landscaped area 4

For New Low-Rise Residential (5 dwelling units or more) TIER 1: ECOLOGY EC 1.1 Tree protection Adherence to the Tree Protection Policy and Specifications for Construction Near Trees EC 1.2 Preservation of mature trees Protect and retain all trees that are 30 cm or more DBH from injury or removal EC 1.3 Ravine protection Within the Ravine Protected Area, protect and retain trees of all diameters EC 1.4 Street tree retention Protect and retain all trees adjacent to City of Toronto streets and roadways and City-owned Parkland EC 2.1 Tree planting Tree canopy cover distributed across site area and public boulevard Tree Preservation Plan # Tree Preservation Plan # Tree Preservation Plan # Tree Preservation Plan # 5

For New Low-Rise Residential (5 dwelling units or more) EC 2.2 Soil volumes Provide all trees planted with a minimum volume of 30 m³ of high quality soil per tree EC 2.3 Trees along street frontage Plant large shade trees along all street frontages EC 2.4 Trees in parking lots Plant shade trees throughout the parking lot interior EC 2.5 Watering program Provide a watering program for trees for at least the first 2 years after planting EC 3.1 Biodiversity in landscapes Plant landscaped site area using a minimum of 50% native species EC 3.2 Ravines and natural areas buffers Where a setback from top-of-bank is required, plant landscaped area of the setback with native species 6

For New Low-Rise Residential (5 dwelling units or more) EC 3.3 Invasive species No invasive species on properties along streets abutting ravines and natural areas EC 4.1 Bird friendly glazing Where abutting ravines or natural areas, treat exterior glazing using a combination of the following strategies: Visual markers Muted reflections Visual markers on all glass railings EC 4.2 Grate porosity Ensure ground level grates have a porosity of less than 20 mm x 20 mm (or 40 mm x 10 mm) Building Elevation # Building Cross- # EC 5.1 Exterior lighting Shield all exterior light fixtures Lighting Plan # TIER 1: SOLID WASTE SW 1.1 Waste collection and storage Tier 2 Voluntary Performance Provide an easily accessible dedicated area for the collection and storage of recycling materials Other 7

For New Low-Rise Residential (5 dwelling units or more) Tier 2 is the voluntary, enhanced performance level. Site plan applications received on or after May 1, 2009 that meet both Tier 1 and 2 of the Toronto Green Standard are eligible to apply for a refund of development charges equivalent to 20% of the 2014 rate. Completion of Tier 2 involves meeting all of the performance measures identified below as CORE and selecting three performance measures identified as OPTIONAL. Indicate where Tier 2 performance measures will be documented in the right hand columns of the checklist. Tier 2 is verified during the construction stage by third party evaluators registered with the City. The detailed eligibility criteria, application and verification procedures are found at: toronto.ca/greendevelopment. TIER 2: CORE Enhanced UHI, Non-roof hardscape Tier 2 Voluntary Performance Treat at least 75% of the site s non-roof hardscape AQ 2.2 Declaration template GHG 1.2 Enhanced energy efficiency Design and construct building(s) to achieve at least ENERGY STAR or R2000 requirements Proof of Certification from a NRCan Authorized Service Provider GHG 1.3 Energy efficient appliances Provide ENERGY STAR labeled refrigerators, clothes washers and dishwashers in each unit Declaration template WQ 4.2 Water efficient fixtures Install high efficiency (low flow) fixtures and fittings Declaration template WQ 4.3 Irrigation Design the landscape and irrigation system to reduce the overall irrigation demand by 50%. Roof Plan # Lighting Plan # 8

For New Low-Rise Residential (5 dwelling units or more) TIER 2: OPTIONAL (SELECT 3) GHG 2.1 On-site renewable energy Tier 2 Voluntary Performance Design and install on-site renewable energy systems Declaration template WQ 2.3 Enhanced stormwater retention & reuse Provide enhanced stormwater retention and reuse Stormwater Management Report EC 2.6 Enhanced trees in parking lots Plant shade trees in surface parking areas EC 2.7 Enhanced tree planting Provide additional tree planting beyond the development site and the associated public boulevard EC 3.4 Enhanced landscaping Restore or protect a minimum 50% of the site area or 20% of the total site area with native or drought tolerant vegetation 9

For New Low-Rise Residential (5 dwelling units or more) Tier 2 Voluntary Performance EC 4.3 Enhanced Bird friendly glazing Treat the exterior glazing using a combination of the following strategies Visual markers muted reflections Treat all glass railings with visual markers SW 1.2 Enhanced waste collection & storage Provide separated kitchen cabinet space for segregated collection of recyclables, organics and waste Floor Plan # SW 2.1 Construction waste Recycle at least 75% of non-hazardous construction and demolition debris. Declaration template SW 3.1 Regional materials Ensure that at least 20% of a project s building materials or products have been extracted, harvested, recovered or processed within 800 km of the final manufacturing site. Declaration template 10