Technical Assistance Permeable Interlocking Concrete Pavement PICP

Similar documents
Permeable Interlocking Pavers

815 NE 172 nd Avenue Vancouver, WA Installation Manual

5. LOW IMPACT DEVELOPMENT DESIGN STANDARDS

Installation Manual May 9/14 No revision

Permeable Pavement Systems

Permeable Interlocking Concrete Pavement A Low Impact Development Tool Training for Developers

Appendix G. Detailed Design

GREEN COLLECTION E C O - F R I E N D LY P E R M E A B L E P A V E R S T R E M R O N. C O M

The Concept. Features. Benefits

Pavements Built for the Future

Construction of Interlocking Concrete Pavements

CLAY BRICK PERVIOUS PAVEMENT CASE STUDY CITY OF NEW ALBANY

Appendix B DETAILED DESIGN

Permeable Pavement [STRATEGY] Page 1

INFILTRATION TRENCH - LEAKY PIPE

9 Steps to a Lasting Paver Installation

P A V E R S Are they really the same? The 3-P s and how they relate to storm water management

GSI Handbook Details Pervious Pavement

Subsurface Infiltration Bed

AASHTO M Subsurface Drainage

The following general requirements will be met for all planter box installations:

A New Generation of Permeable Pavers

Why pavers?case. Study. Community Center Parking Lot City of benicia. Community Center Parking Lot City of benicia

CONSTRUCTION SPECIFICATION FOR THE INSTALLATION OF INTERLOCKING CONCRETE PAVERS

Portland, Oregon, (population 551,000) endeavors to maintain

Rainwater Management an issue for the 21 st Century. Hydrological Cycle

Concrete pavers with sand filled joints. Bedding sand 1-1/2 in. (25-40 mm) thick

ENVIRONMENTAL PAVING SOLUTIONS

ARCHITECTURAL PAVING STONE PRODUCT CATALOG

LET S GET IT DONE STORMWATER MANAGEMENT

State of Rhode Island Stormwater Management Guidance for Individual Single-Family Residential Lot Development

Sustainable Sites. hblanarc.ca. RDN Workshop June 25, David Reid, FCSLA, Landscape Architect, Environmental Designer

2.1.4 Roof Downspout Rain Gardens

92 Minnesota Stormwater Manual

Inspection and Maintenance of Stormwater Best Management Practices

Stormwater Retrofits Made Practical City of Eugene Oregon. Doug Singer, P.E., CSM Principal Civil Engineer City of Eugene Public Works

Permeable Paving. Sustainable Control Of Urban Storm Water Pollution. The volume of storm water being diverted to

County of Prince Edward. Stormwater Management Plan. Agreement in lieu of a Stormwater Management Plan

WQ-07 INFILTRATION TRENCH

Capillary Action Subsurface Irrigation

INTRODUCTION TO GREEN INFRASTRUCTURE HOW WE CAN PROTECT OUR COMMUNITIES AND OUR WATERS Maywood Public Library Bergen County, New Jersey

Tech Spec 10. Application Guide for Interlocking Concrete Pavements. Concrete pavers with sand filled joints. Edge restraint/curb

My Soil Won t Drain, Can I Still Use LID? Rob Buchert, John Knutson, Erik Pruneda

Appendix D - Technical Design Criteria for BMPs

DRIVABLE GRASS GUIDELINE FOR PLANTED INFILL INSTALLATION

2008 SWMM, 2010 Revision City of Tacoma

Topics. Grid Lattice Paving Systems. Gravelpave, Grasspave and Grassy Pavers. Applications, Materials and Construction

George Bialecki, Jr. takes green building seriously. Autumn Trails Pioneers

4/23/2012. Topics. Flexible Pervious Gravel Pavers. Flexible Pervious Gravel Pavers. Grid Lattice Paving Systems

PERMEABLE PAVEMENTS. Have been around for a long time, but are poised for a resurgence

Installation & WillowCreekPavingStones.com POWER TOOLS YOU MAY NEED TO RENT PROJECT COMPONENTS. Willow Creek pavers Aggregate base material

8 th Ave NW LID Retrofit

Bioretention Designs to Meet Different Goals. Jay Dorsey & John Mathews ODNR-DSWR June 18, 2014

Appendices: Glossary. General Terms. Specific Terms. Low Impact Development Approaches Handbook

STORMWATER MANAGEMENT

TERREWALKS Installation Manual

Christopher J. Webb, PE. Chris Webb & Associates, Inc., PS, Bellingham, WA

LET S GET IT DONE STORMWATER MANAGEMENT

Technical Bullet Series on Clay Brick Pavers

DRIVABLE GRASS. Permeable, Flexible and Plantable Concrete Pavement System

EZ Base is a high-density panel base system that replaces traditional compacted aggregate-base installations.

Introduction To Geosynthetics In Transportation

City of Bonita Springs Driveway Permit Information Packet

Stormwater Control Plan: Small (Tier 1) Land Development Project

ABBREVIATIONS: TABLE OF CONTENTS: REFERENCE MATERIALS: CITY OF SEATTLE COMBINED SEWER OVERFLOW GALLONS PER MINUTE POLYVINYL CHLORIDE SQUARE FEET

Urban Water Management and Soils (ESRM 311 & SEFS 507)

Chapter 2 Roof Downspout Controls

SMALL PAVER PROJECT. Home Gardeners School March 19, Presented by Robert W. Bellek Owner

Standard Specifications for Lot-Scale Measures for Small Projects

Urban Water Management (ESRM 311 & SEFS 507) Cougar Mtn Regional Wildland Park & Lakemont Blvd, Bellevue WA

Low Impact Development Site Design

Sustainable Stormwater Retrofit Best Practices

Te c h S p e c 3. Edge Restraints for Interlocking Concrete Pavements

Green Infrastructure and Low-Impact Development Technologies

C.3 STORMWATER TECHNICAL GUIDANCE. Table of Contents. Glossary... viii. Chapter 1 Introduction/How to Use this Handbook

n1. Design 5.4.6a Urban Bioretention 5.4.6a Urban Bioretention Variations: Planter box, Extended tree pits, Stormwater curb extensions.

Post Construction BMP Inspection. Scott Taylor, P.E. Stormwater

AWR Engineering, LLC

EARTH STABILIZATION GEOSYNTHETIC SOLUTIONS

The Engineer/Developer s Perspective on Storm Water Management

Site design measures. Chapter. This Chapter explains how site design measures can reduce the size of your project s stormwater treatment measures.

HORSE STABLE USING AZEK PAVERS.

Introduction. Functions of Non woven Geotextile (TechGeo) Separation. Filtration. Drainage. Containment. Tech Geo. . Geotextile Overview

Structural Stormwater Best Management Practices

LEADING INNOVATIONS IN SUSTAINABLE URBAN DRAINAGE

New Tools/Resources for

THE FOLLOWING IS AN EXCERPT FROM THE 2011 CITY OF SEATTLE STANDARD SPECIFICATIONS WITH MINOR CORRECTIONS MADE TO SECTION 9-03.SEATTLE.

PAVING PARKING AREAS AND ROADS DESCRIPTION. Alternate Names: Pavement Practices, Impervious Paving

Designing for Sustainability: A Consultant s Perspective

Directors Rules for Seattle Municipal Code, Chapters Stormwater Code

Preparing a Stormwater Control Plan for a Small Land Development Project

A Paving System We Can All Live With

DIVISION E ENGINEERING STANDARDS

Post Construction BMPs

A. Install all temporary erosion control measures (in accordance with MNDOT General Conditions 2573) prior to site disturbance.

5/15/2013. Basin Area. Vegetation. Rainfall & Runoff. Soil Type. Topics. Factors Influencing Erosion. Factors Influencing Erosion

Building Green: An Update on Atlanta's Green Infrastructure Approach

12/31/2014 County of Mendocino s Low Impact Design Standards Manual v1.0 A P P E N D I X 8. Site Design Measures. 32 P a g e

Stormwater Management Techniques WMPF LAND USE TRAINING INSTITUTE MARCH 14, 2018

Homeowners Guide to Stormwater BMP Maintenance

Transcription:

Permeable Interlocking Concrete Pavement PICP Rick Crooks, Director of Business Development Mutual Materials Co. Bellevue, WA 1-800-477-3008 rcrooks@mutualmaterials.com Information and tools available System Components Pavers Aggregates Edge Restraints Geotextiles Design Options PICP Sections Installation Guidelines Maintenance Cost Case Studies, Project Photos Technical Assistance www.icpi.org 1

PICP Design Manual - Fourth edition Design Specifications Construction Maintenance PICP Permeable Design Pro Design Software Balances system performance Structural support Hydraulic capacity Design Details, Guide Specifications, Videos, Technical Research Papers 2

Additional resource for product information: www.uni-groupusa.org Permeable Interlocking Concrete Pavement (PICP) PICP Product Standards PICP pavers meet ASTM C 936: Standard Specification for Solid Concrete Interlocking Paving Units, (same as impermeable standard pavers): Minimum Compressive Strength = 8,000 psi Maximum Absorption = 5% Freeze-thaw durability per ASTM C 1645 Aspect ratio (length:thickness) guidelines apply - 4:1 pedestrian only 3:1 to 4:1 for residential driveways 3:1 or less for all vehicular areas 3

Typical Paver Shapes for PICP Drainage joints Drainage features or shape PICP Aggregates Free-draining (open graded) aggregates comply with the requirements of ASTM D 448: Jointing material and bedding course - No. 8 aggregate, (#16 to ½ sieve) Base material - No. 57 aggregate, (#8 to 1-1/2 sieve) Subbase material - No. 2 stone, (3 to ¾ sieve) PICP Aggregates In addition to gradation requirements: Crushed stone - 90% fractured faces - Do not use rounded river rock! Hard, durable material - LA Abrasion < 40 per ASTM C131, min. CBR of 80% per ASTM D1883 No fines - Less than 2% passing the #200 sieve 4

PICP Aggregates When project conditions require, or when recommended aggregates are not available: PICP Edge Restraints Suitable for loading conditions Typically concrete (all commercial applications) PICP Edge Restraints Plastic & metal staked edging is suitable for residential applications. Use dense graded base under edging only: 5

Geotextiles Option of the design engineer Non-woven recommended (high water flow) AASHTO M-288 provides minimum requirements AOS selection criteria in PICP manual Or use manufacturer s recommendations Place on sides & bottom Minimum overlap 12 in. (0.3 m) Poor soils overlap 24 in. (0.6 m) AASHTO M-288 o Tables 1 & 2: Strength & Subsurface Drainage Geotextile Requirements Geotextile Optional 6

Surface Infiltration Rates UNI PRIORA 8x8 (200X200mm) 3/8 (10mm) Joint Infiltration Rate > 15 in/hr after 10 years PICP Design Basics: Exfiltration Options Full Exfiltration Partial Exfiltration No Exfiltration PICP Design Basics: Exfiltration Options Full Exfiltration Sandy soils (> 0.5 in/hr) No perforated drain pipes 7

PICP Design Basics: Exfiltration Options Partial Exfiltration - detention & exfiltration Silt/some clays Perforated pipes at bottom of base 8

PICP Design Basics: Exfiltration Options No Exfiltration - detention only High rock, High water table, poor soils Impermeable EPDM (or equivalent) liner 9

Use No Exfiltration design when. Near water supply wells (100 ft) High water table (3 ft) High depth of bedrock Some fills & expansive soils Contain potential contaminants from entering soils & groundwater Rainwater harvesting PICP Installation During excavation, do not compact native soil Compacted soil is 30 to 90% less permeable than un-compacted soil Keep delivery trucks off of native soil, if at all possible 10

Spreading Base Material Final grading of base material Compacting base material 11

Screeding No. 8 stone over No. 57 base M h i l l t Mechanical Installation Mechanical installation of PICP can decrease construction time 20-80% over manual installation Manual paver installation: 1,000 2,000 sq. ft. per man per day Mechanical paver installation: 3,000 10,000 sq. ft. per machine per day 12

Edge pavers cut and placed, then compacted Compact before sweeping in aggregate Compaction before filling openings n d Filling the openings with No. 8 stone, final compaction 13

Excess stones removed, then final compaction Keeping sediment away from the pavers Observation well: Install at lowest point of pavement Min. 6 in. dia. perf. pipe w/cap Monitor drainage rate, sediment, water quality, temperature 14

Maintenance Annually: overall system performance inspection, check observation well, inspect after major storm, vacuum surface (once, twice, or more) to ensure optimum design life performance Maintenance checklist (specific to each project) Model maintenance agreement Monitor adjacent uses PICP Inspection Checklist Vacuum surface Replenish aggregate in joints 1 to 2 times annually, adjust for sediment loading As needed Inspect vegetation around PICP perimeter for cover & stability Annually, repair/replant as needed Check drain outfalls for free flow of water and outflow from observation well Annually and/or after a major storm event PICP Maintenance 15

Cost Furnished and Installed: $5.00 to $12.00 per sq ft Includes: -Pavers placed, cut, compacted, & swept- -2 of ASTM #8 Bedding Aggregate- -4 of ASTM #57 Base Aggregate Case Studies & Project Profiles JORDAN COVE URBAN WATERSHED STUDY 16

Port of New York and New Jersey Tacoma Community College 17

State Avenue Marysville, WA 18

Snoqualmie Fire Station Mercer Island, WA Mercer Island, WA 19

Mercer Island, WA Woodinville Condos Lynwood Residence 20

Medina Development in Spanaway Medina Development in Spanaway The Bridge Tacoma, WA 21

Lowes / Safeway in Lacey, WA City of La Center, WA City of La Center, WA 22

Marysville, WA Park & Ride Evergreen State College Railway Museum Restoration, Snoqualmie, WA 23

Holbrook Ave Everett, WA Westlake Union Tacoma Landfill Pervious Pave Demo 24

Mutual Materials Branch, Vancouver, WA Pediatric Dental Clinic, Bellingham, WA Railroad Avenue, Bellingham, WA 25

Vineyard Lanes, Bainbridge Island River Front Trail Puyallup, WA Highpoint Development W. Seattle 26

South Lake Union Street Car Facility West Seattle Mix Use Building Columbia City Live Above, Seattle, WA 27

Union Station, Marysville, WA Twin County Credit Union, Lacey, WA Wastewater Treatment Plant, Winlock, WA 28

Prairie Line Trail, Yelm, WA Wedge Park Fife, WA 29

30

31

32

Thank you! Rick Crooks Mutual Materials Company (425) 452-2344 rcrooks@mutualmaterials.com 33