Joseph Brennemann Elementary School

Similar documents
Richard Henry Lee Elementary School

Washington Irving Elementary School

Agustin Lara Elementary Academy

Josefa Ortiz De Dominguez Elementary School

Edward Jenner Elementary Academy of the Arts

Genevieve Melody Elementary School

Charles W Earle Elementary School

Calmeca Academy of Fine Arts and Dual Language

John Palmer Elementary School

Oscar DePriest Elementary School

Francis M McKay Elementary School

Alessandro Volta Elementary School

Sidney Sawyer Elementary School

DeWitt Clinton Elementary School

George B Swift Elementary Specialty School

MUKWONAGO AREA SCHOOL DISTRICT CAPITAL IMPROVEMENT / MAINTENANCE STUDY

SITE SYSTEMS: FANNIE MAE EXPECTED USEFUL LIFE TABLES (FMEUL)

Tighe&Bond. Groton Heights School Mechanical Evaluation. 1 Existing Conditions. 1.1 Water Service Entrance

3. 21st Century Learning A. Districtwide Flexible Learning - Allowance for Flexible Furniture $600,000 Subtotal $600,000

VOTER BOND REFERENDUM 2018 SUMMARY OF WORK PROPOSED

MARY CRAPO CENTER Miller Road, Swartz Creek, Michigan

Facility Condition Assessment Summary Report. British Columbia Institute of Technology NE6 - Plumbing and Pipefit Building

2 Main Office Building BLDG-955A Building Purpose Building Area Administration offices. Training room 7,610 SF Inspection Date August 16, 2016 Inspect

Chariho Regional School District Five-Year Capital Facilities Improvement Plan (2/10/15)

Mechanical Inspection Plumbing

PLAN REVIEW SUBMITTAL GUIDE

DOCUMENT TABLE OF CONTENTS

Briar Crest Elementary

NYC Department of Education

PLATTEVILLE MIDDLE SCHOOL

NYC Department of Education

2014 Bond Project Guide

HOLUM EDUCATION CENTER. Architectural. January 13, 2014 DeForest Area School District

Estimated Repair, Replacement, and Upgrade Costs

NYC Department of Education

NYC Department of Education

NYC Department of Education

NYC Department of Education

NYC Department of Education

MUKWONAGO SCHOOL DISTRICT CAPITAL IMPROVEMENT / MAINTENANCE STUDY

NYC Department of Education

NYC Department of Education

RECAPP Facility Evaluation Report

NYC Department of Education

NYC Department of Education

Appendix B. Facilities Assessment Report

NYC Department of Education

NYC Department of Education

NYC Department of Education

DEERFIELD SCHOOL DISTRICT REFERENDUM Committed to Excellence and Equity in Educating Our Students

GARCIA GALUSKA DESOUSA Consulting Engineers

NYC Department of Education

NYC Department of Education

Florence High School / Middle School Page 1 of 3 Florence, WI

NYC Department of Education

NYC Department of Education

NYC Department of Education

Master Facility Planning Update School Board Meeting May 26, 2016

NYC Department of Education Building Condition Assessment Survey :49AM :00PM

Axiom Property Inspections

CAPITAL OUTLAY REQUEST - IDENTIFIED AND EMERGING PROJECTS - RANKED 3-Jun-14

NYC Department of Education

NYC Department of Education

Ichabod Crane Central School District 2018 Capital Project Preliminary Estimate

GARCIA GALUSKA DESOUSA Consulting Engineers

MOUNT PLEASANT MIDDLE SCHOOL HVAC. M-01 Heating Plant: M-02 Heating & Ventilating Systems: Livingston School District Mount Pleasant Middle School

NYC Department of Education

RECAPP Facility Evaluation Report

RECAPP Facility Evaluation Report

NYC Department of Education

NYC Department of Education

NYC Department of Education

NYC Department of Education

NYC Department of Education

NYC Department of Education

New High School Concept

NYC Department of Education

NYC Department of Education

FAIRA TRANSPARENCY REPORTS th Ave NE B-3, Kenmore, WA March 28 th, 2017

Residential Construction and Remodeling Estimates. compliments of. pillartopost.com

FAIRA TRANSPARENCY REPORTS S 236th St, 10-5, Kent, WA 98032

NYC Department of Education

NYC Department of Education

NYC Department of Education

Mechanical System Description

REPAIR ESTIMATE GUIDE

TABLE OF CONTENTS. Part I Administrative... 1

Ashland School District Facility & Capacity Assessment Report 2005

$ Each additional variance per petition. $ All Other Zoning Districts: One variance per petition

NYC Department of Education

NYC Department of Education

DOMESTIC WATER PACKAGED BOOSTER PUMPS

SCHEDULE OF FEES. Penalty Fees. Building Fee Schedule FEE

NYC Department of Education

NYC Department of Education

Master Project List Report

RECAPP Facility Evaluation Report

NYC Department of Education

NYC Department of Education


Transcription:

Facility Assessment Summary This report summarizes the findings of a facility assessment completed on the date noted in the document footer below. Assessors rate each facility feature and system by visual observation only; they do not test operability or perform destructive testing inside walls, ceilings or floors. The rankings below reflect the assessors visual evaluations of the property condition as of that date. For additional information, you may review the detailed assessment report linked on this school s profile page and visit the Facilities Standards webpage under CPS Policies and Guidelines at http://www.cps.edu/about_cps/policies_and_guidelines/pages/facilitystandards.aspx. Condition ings and Descriptions 7: The item/system is new or in good condition and no work is required. 6: The item/system requires general cleaning and/or routine maintenance. 5: The item/system requires repairs and has not reached the end of its serviceable life. 4: The item/system has reached its expected useful life, but is still fully operational. CPS will maintain until replacement occurs. 3: The item/system has surpassed its expected useful life and has limited operability. CPS will maintain until replacement occurs. 2: The item/system has surpassed its expected useful life and has low operability. CPS will maintain until replacement occurs. 1: The item s/system s failure leads to an immediate life safety condition for occupants or to the potential of an uninhabitable facility.¹ Definitions means, for each item, the total number (or amount) of that item that exists and was evaluated. Within that, different portions may have different rankings. means the generally accepted standard unit of measure for each item. Some items, like doors, are measured individually and use the unit of measurement EA for each. Other items, like chimneys, are measured in terms of linear feet ( LF ). Still other items, like flooring, are generally measured in square feet ( SF ). means a basic estimate for each item needing some level of repair or replacement. does not include all expenses that would be necessary to complete a repair or replacement project. This is because, depending on the item and on the overall scope of a construction project, repair/replacement projects can include additional costs such as destructive testing, environmental needs, discovered conditions, and additional work triggered by building codes. For the same reason, the Campus Need listed at the end of this report reflects only a portion of what it would actually cost to repair/replace all of the listed features. Campus Need also does not reflect features that do not yet exist at a particular facility, such as: programmatic improvements, school-wide ADA compliance, air conditioning, space reconfiguration, or construction to alleviate overcrowding; these are viewed as separate capital needs. EXTERIOR CHIMNEY Metal Flue DOORS Exterior Steel Door Store Front Door 1 2 3 4 5 6 GRE 6 66 1 2 3 4 5 6 GRE 6 2 11 GRE 6 21 7 7 66 LF $4,247 $4,247 13 EA $5,814 2 $10,901 $16,715 Assessment Date: 1/11/2013 Page 1 of 15

ENTRANCE Concrete Exterior Stairs Entrance Controls - Audio Stair Handrails FOUNDATION Concrete Foundation LIGHTING Exterior Lights - Parapet or Roof Mounted Exterior Lights - Wall Mounted PARAPET 1 2 3 4 5 6 GRE 6 232 04 1 2 3 4 5 6,774 1 2 3 4 5 6 GRE 6 6 3 7 7 7 232 LF $24,882 $429 104 LF $25,311 1,774 LF $276,260 $276,260 6 EA $3,003 13 EA $2,789 $5,792 Coping - Metal Parapet 16" to 30" Height 1 2 3 4 5 6 GRE 6 668 7 GRE 7 412 668 LF 412 LF ROOF SYSTEM Exterior Downspouts Interior Downspouts Metal Roof Modified Bitumen Roof PVC Membrane Roof Roof Structure: Steel/Metal Deck/Concrete Topping 1 2 3 4 5 BLU 5 125 6 GRE 6 298 GRE 6 4,155 ORA 3 4,872 6,683 22,348 7 GRE 6 4,872 43,186 125 LF $2,324 298 LF 4,155 SF $31,372 4,872 SF $114,955 39,031 SF $215,156 48,058 SF $38,597 Assessment Date: 1/11/2013 Page 2 of 15

$402,404 SUPERSTRUCTURE Slab on Grade Steel WALLS Prefabricated Metal Panel Wall WINDOWS Curtain wall - Glazed Double Pane Window - Guards perforated Windows - Casement Aluminum Windows - Sash Aluminum Double-pane EXTERIOR ELECTRICAL EMERGENCY SYSTEM Automatic Transfer switch Emergency A/C power - Corridors and Stairs Emergency A/C power - Gym and Lunch rooms Emergency A/C power - Students Toilets Emergency Battery Packs - Corridors and Stairs Emergency Battery Packs - Lunchroom and Gym Emergency Battery Packs - Toilets 1 2 3 4 5 6 GRE 6 4,428 GRE 6 48,994 1 2 3 4 5 6 GRE 6 2,546 18,165 1 2 3 4 5 6 GRE 6 5,691 GRE 6 616 ORA 2 616 GRE 6 539 1 2 3 4 5 6 BLU 5 1 1 YEL 4 8,989 YEL 4 54,708,228 334 GRE 6 29 GRE 6 5 GRE 6 8 7 7 7 7 4,428 SF $9,181 48,994 SF $388,140 $397,322 20,711 SF $346,530 $346,530 5,691 SF $53,712 616 SF 616 SF $70,928 539 SF $4,625 $129,265 $1,603,845 2 EA $10,296 8,989 SF $27,637 54,708 SF $97,791 1,562 SF $4,533 29 EA $3,110 5 EA $536 8 EA $858 Assessment Date: 1/11/2013 Page 3 of 15

Exit Signs - Corridors and Stairs Exit Signs - Lunchroom - Gym - multipurpose rooms Independent Electrical Service for emergency power Public Announcement System Security System - CCTV Security System - Intrusion detection MAIN SERVICE Main Electrical service - Live Front - 1000 A and below 120/208/3PH Main Electrical service - Live Front - 1000 A and below 277/480/3PH Main Electrical service - Live Front - 800 A and below 120/240/3PH POWER DISTRIBUTION Lighting and power panels Main distribution panels above 600 amp Transformers 120/240-120/208 ELECTRICAL FIRE PROTECTION FIRE ALARM 7 GRE 6 3 GRE 6 4 GRE 6 53,422 GRE 6 53,422 GRE 6 53,422 1 2 3 4 5 6 1 2 3 4 5 6 19 GRE 6 3 7 7 17 EA $3,963 3 EA $699 4 EA $5,720 53,422 SF $32,085 53,422 SF $76,393 53,422 SF $49,656 $313,277 $96,096 $8,044 $65,208 $169,348 20 EA $19,019 3 EA $6,435 $15,730 $41,184 $523,809 1 2 3 4 5 6 7 Fire Alarm System YEL 4 48,994 48,994 SF $173,052 $173,052 FIRE PROTECTION $173,052 Assessment Date: 1/11/2013 Page 4 of 15

MECHANICAL AIR CONDITIONING Window A/C AIR HANDLING SYSTEMS Air Handling Package - Single Zone - Electric less than 4,000 cfm Air Handling Package - Single Zone - Hot Water 4,000 to 8,000 cfm Air Handling Package - Single Zone - Hot Water 8,001 to 12,000 cfm Air Handling Package - Single Zone - Hot Water less than 4,000 cfm Reheat Boxes With Hot Water Coils Return Fans - Indoor 5,000 to 10,000 CFM Return Fans - Indoor less than 5,000 CFM Return Fans - Outdoor less than 5,000 CFM Roof Top - Single Zone - Gas-Heating 5 to 10 tons BOILER SYSTEMS 1 2 3 4 5 6 BLU 5 1 2 1 2 3 ORA 3 1 4 5 BLU 5 1 BLU 5 1 BLU 5 3 6 GRE 6 4 3 7 7 3 EA $2,574 $2,574 $28,600 $15,730 $21,450 3 EA $30,030 4 EA $3,947 $1,716 $715 $4,004 13 EA $29,744 $135,936 Boiler Assembly - Condensing Hot Water Boiler 500MBH-1,000 MBH Boiler Auxiliary -Non- Condensing Flexible Tube Hot Water Boiler 500MBH-1,000 MBH Chemical Pot Feeder - Hot Water Gas Boosters Glycol Feed System 1 2 3 4 5 6 7 GRE 7 2 GRE 7 2 2 EA 2 EA $300 $13,013 $1,087 $14,400 HEATING DEVICES 1 2 3 4 5 6 7 Cabinet Heaters With Electric Coils YEL 4 8 8 EA $33,176 Assessment Date: 1/11/2013 Page 5 of 15

Fin Tube Hot Water Radiators - Hot Water Heater - Electric Heater - Hot Water Wall Heater - Electric MECHANICAL PLUMBING Piping - Hydronic Supply and Return - Steel or Galvanized Pumps - Hot Water 5 to 10 HP Pumps - Hot Water less than 5 HP TEMPERATURE CONTROL Direct Digital Control (DDC) System Thermostats - Direct Digital Control (DDC) UNIT VENTILATION Ventilators - Self Contained Electric Heating and Cooling VENTILATION Exhaust Fan - Indoor Exhaust Fans - Roof Mounted 1,501 to 8,000 cfm Exhaust Fans - Roof Mounted 500 to 1,500 cfm Exhaust Fans - Roof Mounted above 8,000 cfm Exhaust Fans - Roof mounted less than 500 CFM Type I Exhaust Hood - Kitchen or Culinary Arts YEL 4 300 YEL 4 20 GRE 6 4 YEL 4 3 GRE 6 8 1 2 3 4 YEL 4 300 5 6 GRE 6 2 GRE 6 3 1 2 3 4 5 6 GRE 6 53,372 GRE 6 26 1 2 3 4 5 6 GRE 6 4 1 2 3 4 5 6 GRE 6 8 GRE 6 4 GRE 6 4 ORA 2 1 7 7 7 7 300 LF $51,480 20 EA $25,168 4 EA $5,720 3 EA $21,450 8 EA $824 $137,818 300 LF $35,929 2 EA $4,004 3 EA $4,290 $44,223 53,372 SF $53,425 26 EA $3,718 $57,143 4 EA $6,864 $6,864 $501 8 EA $3,432 4 EA $915 $2,145 4 EA $629 $26,884 Assessment Date: 1/11/2013 Page 6 of 15

Type II Exhaust Hood - Warming Kitchen MECHANICAL PLUMBING HOT WATER GRE 7 1 $34,506 $433,464 Hot Water Heater - Electric less than 50 KW Hot Water Heater - Gas 150,000-300,000 BTU/HR Hot Water Heater - Gas less than 150,000 BTU/HR Storage Tank less than 500 gallons PIPING 1 2 3 4 5 6 7 $1,401 $22,880 $14,872 $14,872 $54,025 1 2 3 4 5 6 7 Domestic Piping - Cold Water from Risers to Fixtures YEL 4 48,994 48,994 SF $16,114 Domestic Piping - Cold Water Risers YEL 4 48,994 48,994 SF $31,528 Domestic Piping - Hot Water from Riser to fixtures YEL 4 48,994 48,994 SF $10,509 Domestic Piping - Hot Water Return Risers YEL 4 48,994 48,994 SF $22,420 Domestic Piping - Hot Water Risers YEL 4 48,994 48,994 SF $26,623 Domestic Piping Cold Water Horizontal lines YEL 4 48,994 4,428 53,422 SF $120,928 Domestic Piping Hot Water Horizontal lines YEL 4 48,994 4,428 53,422 SF $99,028 Domestic Piping Hot Water Return Lines YEL 4 48,994 48,994 SF $56,049 Sanitary Piping BLU 5 53,422 53,422 SF $32,849 Storm Piping BLU 5 48,994 48,994 SF $23,120 Vent Piping BLU 5 53,422 53,422 SF $19,098 $458,267 PUMPS 1 2 3 4 5 6 7 Ejector Pump $30,030 $30,030 Assessment Date: 1/11/2013 Page 7 of 15

PLUMBING $542,322 INTERIOR ADMINISTRATIVE SUITES Ceiling - Exposed Ceiling - Plaster/Drywall Flooring - Carpet Flooring - Tile/Sheet Lighting - Pendant/Surface Walls - Concrete Block DOORS Interior Steel Doors incl hw Interior Wood Doors incl hw Side-lite DRINKING FOUNTAINS Double Fountain Single Fountain GYMNASIUM / AUDITORIUM Ceiling - Lay-In Ceiling - Plaster/Drywall Flooring - Wood Lighting - Pendant/Surface 1 2 3 4 5 6 GRE 6 90 GRE 6 2,076,455 BLU 5 621 90 GRE 6 39 GRE 6 6,124 1 2 3 4 5 6 9 GRE 6 89 GRE 6 625 1 2 3 4 5 6 GRE 6 4 1 2 3 4 5 BLU 5 3,912 BLU 5 382 6 GRE 6 4,294 GRE 6 20 7 7 7 7 90 SF $170 2,076 SF $5,878 1,455 SF $2,081 711 SF $3,645 39 SF $28 6,124 SF $17,515 $29,316 19 EA $5,380 89 EA $25,199 625 SF $11,619 $42,198 4 EA $2,631 $386 $3,017 3,912 SF $39,159 382 SF $3,824 4,294 SF $32,421 20 EA $2,431 Assessment Date: 1/11/2013 Page 8 of 15

Sound System Stage Curtain Stage Platform Walls - Concrete Block Walls - Plaster/Drywall KITCHEN Ceiling - Plaster/Drywall Flooring - Tile Ceramic/Porcelain Flooring - Tile/Sheet Lighting - Pendant/Surface Wall - Concrete Block Wall - Structural Glazed Tile LUNCHROOM Ceiling - Plaster/Drywall Flooring - Tile/Sheet Lighting - Pendant/Surface Serving Line Wall - Concrete Block MDF/IDF Finishes Ventilation and Cooling GRE 6 2 GRE 6 382,936 GRE 6 2,903 1 2 3 4 5 6 GRE 6 896 GRE 6 717 79 GRE 6 9 GRE 6 260 GRE 6 780 1 2 3 4 5 6,420 BLU 5 1,420 6 GRE 6 20,385 1 2 3 4 5 6 GRE 6 77 BLU 5 1 7 7 7 $5,005 2 EA $18,876 382 SF $1,622 1,936 SF $16,611 2,903 SF $24,908 $144,857 896 SF $3,383 717 SF $1,825 179 SF $256 9 SF $6 260 SF $744 780 SF $5,577 $11,791 1,420 SF $4,021 1,420 SF $8,041 16 SF $11 20 LF $858 1,385 SF $3,961 $16,892 77 SF $262 $7,007 $7,269 Assessment Date: 1/11/2013 Page 9 of 15

MECHANICAL/SERVICE ROOMS Boiler Room Janitor's Closet Mechanical/Service Rooms Storage Room STAFF RESTROOM 1 2 3 4 5 BLU 5 743 6 GRE 6 2 GRE 6 762 GRE 6 432 7 743 SF $8,415 2 SF $9 762 SF $3,596 432 SF $2,039 $14,059 Accessories Ceiling - Lay-In Ceiling - Plaster/Drywall Floor Drain Flooring - Concrete Flooring - Tile Ceramic/Porcelain Flooring - Tile/Sheet Hand Dryer Lavatory Lighting - Lay-In Lighting - Pendant/ Surface Lighting - Wall Mounted Partitions Urinals Wall - Concrete Block Wall - Plaster/Drywall Wall - Tile Ceramic/ Porcelain Water Closet 1 2 3 4 5 6,916 GRE 6 380 GRE 6 42 1,494 1 GRE 6 60,608 GRE 6 248 7 1 GRE 6 30 GRE 6 8 GRE 6 23 GRE 6 2 GRE 6 6 34 6 GRE 6 4,920 BLU 5 892 487 GRE 6 272 GRE 6 44 1,916 SF $14,795 380 SF $815 1,536 SF $4,785 1 $3,303 60 SF $283 1,608 SF $4,093 248 SF $355 2 EA $217 30 EA $11,154 8 SF $6 23 SF $16 2 EA $57 40 EA $9,529 16 EA $5,949 4,920 SF $14,071 1,379 SF $5,358 272 SF $692 44 EA $16,359 $91,839 Assessment Date: 1/11/2013 Page 10 of 15

VOCATIONAL SHOP Work Sink INTERIOR ROOM CASEWORK Casework CEILING Lay-In/Drop Plaster/Drywall CHALK BOARD 1 2 3 4 5 6 GRE 6 9 1 2 3 4 5 6 GRE 6 99 567 1 2 3 4 5 6 GRE 6 20,907 GRE 6 2,095 7 7 7 9 EA $3,475 $3,475 $364,714 666 LF $37,967 $37,967 20,907 SF $44,846 2,095 SF $5,932 $50,777 1 2 3 4 5 6 7 Chalk Board YEL 4 610 610 LF $74,146 $74,146 CORRIDORS Concrete Block Concrete Epoxy/Painted Drop/Lay-In Lay-In Pendant/Surface Plaster/Drywall 1 2 3 4 5 6 1,622 76 GRE 6 564 7 GRE 7 564 BLU 5 7,955 470,249 11,622 SF $33,239 176 SF $831 564 SF $1,210 564 EA 8,425 EA $25,931 1,249 SF $2,947 Assessment Date: 1/11/2013 Page 11 of 15

Stair Handrails Tile/Sheet Flooring CORRIDORS CEILING GRE 6 52 GRE 6 858 7,955 52 LF 8,813 SF $1,227 $65,384 Plaster/Drywall FLOOR 1 2 3 4 5 6 GRE 6 8,425 7 8,425 SF $23,855 $23,855 Carpet Floor Tile/Sheet 1 2 3 4 5 6 GRE 6 930 930 BLU 5 834 7 GRE 6 7,155 11,058 2,095 1,860 SF $4,655 834 SF $8,348 20,308 SF $56,330 $69,333 LIGHTING Lay-In Pendant/Surface 1 2 3 4 5 6 7 GRE 6 346 126 GRE 6 24 472 EA $24,739 24 EA $1,716 $26,455 MARKER BOARD Marker Board 1 2 3 4 5 6 7 GRE 6 30 10 40 LF $858 $858 STAIRS Tile 1 2 3 4 5 6 GRE 6 24 7 24 SF $181 $181 Assessment Date: 1/11/2013 Page 12 of 15

WALL Concrete Block Metal/Folding Panel Plaster/Drywall ROOM SITE CIVIL/DRAINAGE 1 2 3 4 5 6,634 GRE 6 558 GRE 6 25,935 7 1,634 SF $4,673 558 SF $1,317 25,935 SF $61,194 $67,183 $416,139 Catch Basin Site Manhole 1 2 3 4 5 6 7 GRE 7 10 GRE 7 10 10 EA 10 EA FENCING Chain Link Ornamental Iron 1 2 3 4 5 6 7 GRE 6 652 80 GRE 7 585 732 LF $9,352 585 LF $9,352 FIELD HOUSE 1 2 3 4 5 6 7 Masonry Fieldhouse GRE 6 399 399 SF LANDSCAPE Asphalt Play Area/Hardscape Benches Grass 1 2 3 4 5 BLU 5 19,488 6 7 GRE 6 5 1 GRE 7 7,407 19,488 SF $55,178 6 EA $1,180 7,407 SF Assessment Date: 1/11/2013 Page 13 of 15

Hardscape - Concrete Parkway trees Planting Beds/ Areas Trash Receptacles PARKING LOT GRE 6 3,561 GRE 7 25 GRE 7 1,382 GRE 6 3 3,561 SF $6,722 25 EA 1,382 SF 3 EA $623 $63,703 Asphalt Concrete Curbs Lights, Pole Mounted Trash Enclosure 1 2 3 4 5 6 7 4,669 18,270 62 GRE 7 2 GRE 7 692 32,939 SF $12,586 162 LF $978 2 EA 692 SF $13,564 PLAYGROUND Playground - Swingset Playground Equipment - Combo 3-12 Playground Equipment - School Age 5-12 Playground Surfacing - Square Rubber Mats Playground Surfacing - Wood Chips SERVICE GARAGE Garage - Free-Standing SIDEWALKS Internal Walks Perimeter Sidewalks 1 2 3 4 5 6 GRE 6 6 GRE 6 2 YEL 4 5,200,320 1 2 3 4 5 6 GRE 6 520 1 2 3 4 5 6 GRE 6 265 GRE 6 5,043 7 7 7 6 EA 2 EA 5,200 SF $115,258 1,320 SF $8,494 $123,752 520 SF $2,454 $2,454 265 LF $2,501 5,043 SF $9,519 $12,020 Assessment Date: 1/11/2013 Page 14 of 15

SIGNAGE Flag Pole Monument Sign SITE Campus Need ² ³ 1 2 3 4 5 6 7 GRE 7 1 $224,844 $4,282,188 ¹ It is very rare for an assessor to find a feature in this condition. If they do, they are required to report it immediately to CPS, and CPS addresses it immediately. Thus, no features will be ranked 1 in summary reports; by the time the report is compiled, they have been resolved. ² As stated above, Assessed Campus Need does not include the addition of features not already in a particular facility, such as programmatic improvements, school-wide ADA compliance, air conditioning, space reconfiguration or construction to alleviate overcrowding; these items are treated as separate capital needs. The Assessed Campus Need includes current deficiencies and is based on current unit cost estimates; it does not reflect a complete project cost. ³ The overall condition of different items can change after an assessment date due to many variables, including newly occurring deficiencies, renovation or repairs and cost changes. These dollar figures in this report are estimates only and are based solely on the data that was collected as of the assessment date in the footer below. Assessment Date: 1/11/2013 Page 15 of 15