Planning & Zoning Board Meeting. DRAFT Comprehensive Transportation Plan Update, February 23, 2018 version

Similar documents
MORRISVILLE TRANSPORTATION PLAN TOWN COUNCIL PRESENTATION AUGUST 22, 2017

Transportation Projects Quarterly Report. Morrisville Planning Department May 22, 2018

MORRISVILLE TRANSPORTATION PLAN

2040 Long Range Transportation Plan

Henderson County Project Prioritization Discussion

Citizen Comment Staff Response Staff Recommended Revision Planning Committee

1.0 INTRODUCTION 1.1 TH 14 WEST STUDY AREA Project Description Functional Classification Purpose of the Project

Ridgefield Drive, east of Green Level Church Road and north of McCrimmon Parkway Schedule. Public Hearing March 26, 2015

1.0 Introduction. Purpose and Basis for Updating the TMP. Introduction 1

Welcome. Northern Segment of Hwy 100 I-90 to South of Madison Street Meeting Goals:

Secrest Short Cut and Monroe Expressway Small Area Plan AUGUST 29, 2018

Date: April 10, 2017 City Council Work Session April 24, 2017: Status Report on the Comprehensive Plan Update and Transportation Master Plan

ALTERNATIVES. NCDOT made an early decision to first determine how to build the project (construction method) followed by what to build (alternatives).

I. DESCRIPTION OF PROPOSED ACTION... 1 A. General Description... 1 B. Historical Resume and Project Status... 2 C. Cost Estimates...

CHAPTER 7: VISION AND ACTION STATEMENTS. Noble 2025 Vision Statement

Application Number: SD Project Name: Walton Farms Preliminary Subdivision (acting as Master Plan)

CLACKAMAS COUNTY BOARD OF COMMISSIONERS 2051 Kaen Road, Oregon City BCC Hearing Room - 4th Floor. LAND USE HEARING October 3, :30 AM

III - design standards

Comprehensive Development Guide

State Highway 121 Southwest Parkway. Fort Worth s Transportation Success Story in Design and Cooperation

Rich Valley Greenway Master Plan. Central Greenway Connectivity Study

2017 General Obligation Bond

Carrboro Greenways Commission January 9 th, 2007

Asbury Chapel Subdivision Sketch Plan

HILLSBOROUGH COUNTY Greenways and Trails Plan Update. Executive Summary. Date

Route 1 Corridor Study

SH 199 Corridor Master Plan. Community Meeting No. 2 May 31, 2017

Existing Transportation System 5-1

I-95 Interchange & Ellis Road PD&E Study

12/9/2013. HOLLYWOOD/PINES CORRIDOR PROJECT AMPO 2013 Annual Conference October 24, Our Perspective. Broward.

Portage Parkway Environmental Assessment Public Information Centre No. 1

DAVIDSON MOBILITY PLAN REQUEST FOR PROPOSALS. Town of Davidson, NC June 12th, 2017

PART 1: PROJECT SUMMARY. Proposed Land Use: 120 single-family lots. The application is Attachment A. The site plan is Attachment B.

CITY OF LAKEWOOD 2012 THREE-MILE PLAN

PROPOSED IMPROVEMENTS

OVERMOUNTAIN VICTORY TRAIL BURKE CALDELL CORRIDOR FEASIBLITY STUDY REQUEST FOR QUALIFICATIONS CALDWELL COUNTY PATHWAYS

Pine Island Road Corridor Master Plan

A raised and landscaped median will be constructed in South College Avenue between Trilby Road and Skyway Drive.

NORTH-SOUTH CORRIDOR STUDY EXECUTIVE SUMMARY. Executive Summary

Right-of-Way Acquisitions and Relocations Technical Memorandum

THREE-YEAR CAPITAL IMPROVEMENT PLAN FY

REQUEST FOR QUALIFICATIONS

2. AGENCY COORDINATION AND PUBLIC INVOLVMENT

ARTICLE 13 STREETS General

Midtown Corridor Alternatives Analysis. Appendix A - Initially Considered Alternatives Screening

MILLS PARK & PANTHER CREEK GREENWAY

Access Management: An Overview

Neuse River Corridor Plan

CITY OF WESTERVILLE, PLANNING AND DEVELOPMENT. BASSEM BITAR / (614) /

Proposed Comprehensive Plan Strategies DRAFT for discussion June 28, 2017

Northwest Rail Corridor and US 36 BRT Development Oriented Transit Analysis 4.4 STATION AREA FINDINGS

Public input has been an important part of the plan development process.

PD&E STUDY SR 9/I-95 FROM SOUTH OF SR 870/COMMERCIAL BOULEVARD TO NORTH OF CYPRESS CREEK ROAD FM # ETDM 14222

Project Overview. Get Involved. Public Information Meeting. Contact Information

Regional Mobility & the US 380 Bypass Concept. Informational Meeting February 9, 2017

2016 REVISIONS COMMENT FORM RULES AND REGULATIONS FOR CONSTRUCTION IN THE PUBLIC WAY COMMENT PERIOD: JUNE 1 TO JUNE 30, 2015

Chapter 2: Preliminary Analysis

North Carolina Department of Transportation Project Development and Environmental Analysis Branch

CHAPTER 7: Transportation, Mobility and Circulation

DOMINION BOULEVARD CORRIDOR STUDY AND ECONOMIC DEVELOPMENT STRATEGIC PLAN A MODEL FOR CHESAPEAKE S FUTURE

Chapter 1 - General Design Guidelines CHAPTER 1 GENERAL DESIGN GUIDELINES

PLANNING COORDINATING COMMITTEE

Municipality of Anchorage. Community Council Survey Capital Projects Needs Ranking Survey (ALPHABETICAL) Airport Heights

Building Great Neighbourhoods. Strathcona

INDEPENDENCE BOULEVARD AREA PLAN. June 24, 2008

Complete Streets Guidelines & Implementation Strategy. Public Open House #2 June 12, :30-8:00 pm

TREASURE COAST REGIONAL PLANNING COUNCIL M E M O R A N D U M. To: Council Members AGENDA ITEM 8B5

ARTICLE 13 STREETS General

FDOT D4 Complete Streets

ADOPTED AT NOVEMBER 15, 2012 PACC MEETING

FOUR MILE RUN VALLEY WORKING GROUP AND CHARGE

WELCOME TO OPEN HOUSE TWO November 28, 2018

Scope of Services. River Oaks Boulevard (SH 183) Corridor Master Plan

Historic Carpenter Special Planning Area

COLVER ROAD INDUSTRIAL CONCEPT PLAN

Rezoning Petition Final Staff Analysis June 18, 2018

Silver Line CPAM UPDATE. Transportation and Land Use Committee October 20, 2016

ALLEN CREEK GREENWAY. Citizens Advisory Committee Meeting #5 July 19, Allen Creek Greenway Master Plan. July 2017

Transportation Land Use Integration & Regional Planning. Don Kostelec, AICP Senior Planner, Louis Berger Group February 1, 2010

YORK COUNTY GOVERNMENT

City of Lake Oswego Transportation System Plan Update PLAN AND POLICY REVIEW, PART 2

include playgrounds, sports fields, community gardens and picnic areas.

Welcome to the. Open House

Trail Feasibility and Planning Project for Northern Dutchess County, New York

Creating Complete Roadway Corridors:

CITY OF BOYNTON BEACH SE 1 ST STREET COMPLETE STREETS IMPROVEMENTS

MODEL ACCESS MANAGEMENT PLAN MINNESOTA TRUNK HIGHWAY 7 COMPREHENSIVE PLAN AMENDMENT (HUTCHINSON SEGMENT)

ARGENTA TRAIL (CSAH 28/63) REALIGNMENT SOUTH PROJECT (CP 63-25)

Southern Gateway Project and Public Green

Beatties Ford Road & Mt. Holly-Huntersville Road Small Area Plan

Rezoning Petition Pre-Hearing Staff Analysis May 21, 2018

The transportation system in a community is an

Executive Summary. NY 7 / NY 2 Corridor

Description of Preferred Alternative

Project Overview. Fairfax County Parkway Widening Fairfax County. Get Involved. Public Information Meeting. Contact Information

Rezoning Petition Final Staff Analysis October 2, 2018

C h a p t e r 4 - L a n d U s e, T r a n s p o r t a t i o n N e t w o r k & S o c i o e c o n o m i c C h a r a c t e r i s t i c s

OPEN SPACE TYPES. SIZE 8 acres. SIZE 20 acres. SIZE 1 acre

Community Development Rezoning Report REZ14-006

Pennsy Greenway Trail

Transcription:

Planning & Zoning Board Meeting DRAFT Comprehensive Transportation Plan Update, February 23, 2018 version May 10, 2018

Overview Overview of Agency Comments Overview of proposed modifications to the Draft Comprehensive Transportation Plan Update, February 23, 2018 version Planning and Zoning Board Schedule Public Input Opportunities Public Comment Session Planning and Zoning Board Discussion

Overview of Agency Comments Town of Cary, City of Durham, RTP, NCDOT

Town of Cary

Town of Cary Staff Comments Add the circled section of Cary s Kit Creek Greenway into Draft Comprehensive Transportation Plan Update Identified as one of five crosstown routes in Cary (Planned to extend from Morrisville Parkway to Kit Creek Road) The greenway will provide connections to: RTP Parkside Town Commons shopping center Northwest Park Carpenter Elementary School Approximately 0.4 miles of greenway constructed north of Morrisville Parkway Existing greenway easement through the development around River Pine Drive

Morrisville Staff Response Wake County considering Town request to add parcel outlined in red to Morrisville s ETJ Section of Kit Creek greenway in Morrisville ETJ will be added into Draft CTP Update

City of Durham

City of Durham Staff Comments Roadway Recommendations Davis Drive Widening The Durham Chapel Hill Carrboro MPO (DCHC MPO) does not have any improvements on Davis Drive in either the Comprehensive Transportation Plan (CTP) or draft 2045 Metropolitan Transportation Plan (MTP). The traffic volumes for Davis Drive generated by the Triangle Regional Model (TRM) are within the capacity of the roadway crosssection NC 54 Widening The DCHC MPO s CTP and draft 2045 MTP also do not have any roadway improvements for NC 54. The DCHC MPO s plans appear to conflict with the map on page 3-8 of the Morrisville CTP. Bicycle & Pedestrian Recommendations DCHC MPO s CTP includes the following recommendations: Bicycle lanes on Davis Drive A multiuse path adjacent to NC 147 and NC 54

Morrisville Staff Response Roadway Recommendations Difference due to Base Year Travel Demand Model used: Draft CTP Update prepared using the 2010 Base Year Triangle Regional Model (TRM) DCHC MPO s CTP and Draft 2045 MTP prepared using updated 2015 Base Year TRM Bicycle & Pedestrian Recommendations Draft Plan includes Sidepaths on Davis Drive Consistent with recommendations in Cary s Community Plan Draft Plan recommends alternative NC 147 alignment to Davis Drive in RTP 10-foot wide sidepath provided on the east side of NC 54

Research Triangle Park Comments Provided by Research Triangle Foundation (RTF) Staff

RTP Staff Comments NC 147 Extension Staff is in agreement with the general concept of extending 147 to Davis Drive near Little Drive The alignment as shown on the Draft CTP Update goes through RTP Site S- 33A The alignment is conceptual and the final alignment would depend on site and field conditions Final alignment subject to approval by RTF and NCDOT

RTP Staff Comments Millicent Way Extension to Little Drive Staff is in general agreement with this connection Whether Roadway or Greenway Connection to Little Drive will require NCDOT and RTF approval prior to construction

Morrisville Staff Response NC 147 Extension Alignment Town staff requested RTP input on alignment of NC 147 through RTP land to Davis Drive Staff also requested RTP input on an extension of Town Hall Drive north of McCrimmon Parkway to provide secondary access to neighborhoods along the west side of Church Street between McCrimmon Parkway and NC 540

Morrisville Staff Response Millicent Way Extension Town staff requested input from RTP on the potential extension of Millicent Way to Little Drive PZB designated Millicent Way for further study in Draft Plan Road, Greenway, or no connection RTP owns land between the end of Millicent Way and Little Drive Will be part of Study

NCDOT

NCDOT Staff Comments Committed Projects I-40 Widening: clarify whether auxiliary lanes between I-540 and Harrison or managed lanes Include Airport Boulevard Interchange Project in Table 3-1 Figure 3-1 Modeled Congestion Year? Roadway hierarchy Appears to be some mixing of federal functional classification terminology, e.g. principal arterial, with NCDOT terminology, e.g. major or minor thoroughfare Local Street classification = Townmaintained road? Street Cross-Sections Cross-Section 3A implies Sharrows may be used on 45 MPH roadways Davis Drive Table 3-3 shows Davis Drive being widened from the Wake County line to Morrisville Carpenter Road Figure 3-1 shows that Davis Drive is above capacity south of Morrisville Carpenter Road NC 54 4 Section of NC 54 Widening limits difficult to follow Morrisville-Carpenter Road Clarify location of Grade Separation Consideration of 2 westbound through lanes at Davis Drive Strategic Corridors Town s Strategic Corridors are different than NCDOT s Strategic Transportation Corridors

NCDOT Staff Comments Recommended Roadway Extensions Map of all recommended roadway extensions in Table 3-6 would be helpful Intersection Improvements Map of recommended intersection improvement locations in Table 3-5 would be helpful Roadway Prioritization Feed into CAMPO Metropolitan Transportation Plan horizon years?

Morrisville Staff Response Committed Projects Next version of Draft CTP will clarify I-40 Widening projects Airport Boulevard Interchange will be added to Table 3-1 Figure 3-1 Modeled Congestion Year is 2040 Roadway hierarchy Classifications are Morrisvillespecific, using common terminology Local Streets is a classification does not denote maintenance Street Cross-Sections Morrisville will follow MUTCD guidance on installation of Sharrows Davis Drive Draft CTP Update recommendation for Davis Drive south of Morrisville-Carpenter Road matches recommended in Cary Community Plan NC 54 Sections match NC 54 & More Feasibility Study, STIP, CAMPO 2045 MTP Morrisville-Carpenter Road Next version of Draft CTP Update will clarify location of grade separation Two westbound through lanes will be considered as part of intersection improvement Strategic Corridors Staff does not believe this will cause confusion

Morrisville Staff Response Recommended Roadway Extensions Projects are shown on Figure 5-2 in Chapter 5 Intersection Improvements Projects are shown on Figure 5-2 in Chapter 5 Roadway Prioritization Local Prioritization Does not directly feed into MTP horizon years Similar timelines can be matched where applicable

Recommended Modifications Staff, Planning & Zoning Board, and Town Council recommended modifications to DRAFT Comprehensive Transportation Plan Update, February 23, 2018 version

Recommended Modifications General Add hyperlinks to the Table of Contents (S) Add Table of Contents title (Page 3 of the PDF) and List of Figures title (Page 4 of the PDF) (S) Add Town Hall Drive Extension impacts multiple chapters (S) No connection to NC 147 Design consistent with direction provided by RTP at March 7 th meeting Town Hall Drive extension would provide secondary access to neighborhoods along Church Street between McCrimmon Parkway and NC 540 that currently only have access to one collector street (Church Street) Hyperlink the terms in the text of the document that are defined in Appendix A (PZB) Specific terms cannot be linked to a definition in the glossary A hyperlink to the Glossary can be added. Chapter 1 No changes proposed S = Staff Recommendation PZB = Planning & Zoning Board Recommendation Chapter 2 Revise Figures 2-2 and 2-22 to show the Crabtree Hatcher Creek Greenway and the connections from the greenway to Crabtree Crossing Parkway and Morrisville-Carpenter Road as existing greenways (S)* *Recommendation based on comments provide to staff at community outreach events

Recommended Modifications Chapter 3 Revise Figure 3-2 to include road names for all streets included in the hierarchy (S) Ensure project lengths in Table 3-3 match Project Sheets in Appendix C (S) Revise Figure 3-3 to reflect that the recommended alignment of NC 147 in the Draft CTP does not match the preferred NCDOT alignment for the project funded in the STIP (PZB) Clarify that the widening on I-40 consists of adding auxiliary lanes and managed lanes under Other Relevant Committed Roadway Projects on Page 3-2 (PC) Update Table 3-1 to include the I-5700 Airport Boulevard/I-40 Interchange Project (PC) Specify that the proposed Morrisville-Carpenter Road Grade Separation is located at the intersection of Morrisville-Carpenter Road, railroad tracks, NC 54 and Aviation Parkway in Table 3-5 (PC) S = Staff Recommendation PZB = Planning & Zoning Board Recommendation PC = Recommendation based on Public or Agency Comment

Recommended Modifications Chapter 4 Add multiuse paths recently installed at the Lake Crabtree Apartment development to Figure 4-6 (PC) Revise Figure 4-6 to show the Crabtree Hatcher Creek Greenway and the connections from the greenway to Crabtree Crossing Parkway and Morrisville-Carpenter Road as existing greenways (S)* Extend greenway proposed on the east side of Church Street north to connect to the Church Street and Shiloh Community Parks in Figure 4-6 (TC) Add greenway connections from McCrimmon Parkway Extension (Phase II) to the greenway proposed along the eastern boundary of Morrisville in Figure 4-6 (TC) Add the section of Cary s Kit Creek Greenway connecting to Louis Stephens Road at Parkside Valley Drive in Figure 4-6 (PC) S = Staff Recommendation TC = Town Council Recommendation PC = Recommendation based on Public or Agency Comment *Recommendation based on comments provide to staff at community outreach events

Recommended Modifications Chapter 5 Revise Table and Figure numbers in Figures 5-2 and 5-3 and Table 5-8 and 5-8 to remove duplicates (S) Rename Figure 5-2 to Figure 5-3 and Rename Figure 5-3 to Figure 5-4 Update the Crabtree Crossing Parkway Extension label in Figure 5-3 and show the Crabtree Hatcher Creek Greenway connections to Crabtree Crossing Parkway and Morrisville-Carpenter Road as existing greenways (S)* Label greenways and move location of sidepath on Airport Boulevard in Figure 5-3 (S) Add the following Action Items in Table 5-6 Develop an Intersection Safety Improvements Study Program for all intersections in Town (S/PZB) Evaluate cross-section for Church Street to require 14 lanes with sharrows (S)* S = Staff Recommendation PZB = Planning & Zoning Board Recommendation *Recommendation based on comments provide to staff at community outreach events

Recommended Modifications Chapter 5 Modify Prioritized Roadway Improvements Table 5-8 as follows (S/PZB) Change to Short-Term Davis Dr./McCrimmon Pkwy. Airport Blvd. Grade Separation Crabtree Crossing Pkwy./Morrisville Pkwy. Slater Rd./Carrington Mill Blvd. Change to Mid-Term NC 54/Morrisville Pkwy. NC 54/Cary Pkwy. Change to Long-Term Morrisville-Carpenter Rd. Grade Separation Add to Short-Term NC54 and Keybridge Drive Intersection* Davis Drive and Parkside Valley Drive Intersection* Place Table on one page S = Staff Recommendation PZB = Planning & Zoning Board Recommendation *Recommendation based on comments provide to staff at community outreach events

Recommended Modifications Chapter 5 Revise the prioritization of the Airport Boulevard Grade Separation (NC 54 to Church Street) to Short-Term in Table 5-6 (PZB) Revise the prioritization of the Airport Boulevard Extension (from west of Town Hall Drive to Church Street) to Mid-Term in Table 5-6 (PZB) Revise Figure 5-2 to reflect that the recommended alignment of NC 147 in the Draft CTP does not match the preferred NCDOT alignment for the project funded in the STIP (PZB) Add the section of Cary s Kit Creek Greenway connecting to Louis Stephens Road at Parkside Valley Drive to Table 5-8 and Figure 5-3 (PC) PZB = Planning & Zoning Board Recommendation PC = Recommendation based on Public or Agency Comment *Recommendation based on comments provide to staff at community outreach events

Recommended Modifications Appendix B Revise rights-of-way widths for cross-sections to accommodate all elements (S) S = Staff Recommendation Appendix C Add the following Project Sheets (S) Marcom Drive Ext. Morrisville East Connector Southport Drive Ext. Ensure project lengths on Project Sheets match project lengths in Table 3-3 (S)

Recommended Schedule Planning & Zoning Board

Recommended Schedule March 8, 2018 Staff presentation Planning and Zoning Board Discussion & Questions April 12, 2018 Public Comment Session Planning and Zoning Board Discussion & Questions May 10, 2018 Public Comment Session Planning and Zoning Board Discussion & Questions June 14, 2018 Planning and Zoning Board Recommendation

Public Input Opportunities

Opportunity #1 Comprehensive Engagement Campaign

Community Events March 22 nd : Morrisville Transportation Fair (4:00-7:00pm) April 4 th : Cedar Fork Community Center (5:30pm-7:00pm) April 7 th : MFD Bike Safety Rodeo (Saturday 10:00am- 12:00pm) April 11 th : Kitts Creek (5:30-7:00pm) April 17 th : Perimeter Park (12pm 1:30pm) April 24 th : Town Council Meeting (5:00-6:00pm) April 27 th : Cedar Fork Community Center (10am 12:30pm)

Community Events May 3 rd : Park West Village Concert Series (6:00pm 8:00pm) May 7 th : Morrisville Aquatics and Fitness Center (10:00am-12:30pm and 5:30pm-7:00pm) May 12 th : Morrisville Community Park (Saturday 1:00pm 2:30pm) May 17 th : Breckenridge Clubhouse (5:30pm 7:00pm) May 19 th : SpringFest (Saturday 4:00-9:00pm) May 24 th : Morrisville Chamber of Commerce Coffee & Connections (7:30am 8:30am) May 23 rd : Triangle Rock Club (1:00-3:00pm)

Methods of Outreach Press Release Social Media Town Website Postcard Mailing Flyers Town Email Lists Emails to Homeowner Associations and other Stakeholders

Opportunity #2 Public Comment Portal

Public Comment Portal

Public Comment Portal All comments provided to the Planning & Zoning Board and Town Council Submit comments online at: www.townofmorrisville.org/transportationplanupdate

Public Comment Session

Planning & Zoning Board Discussion