Final Report: Appendix C. LID Parking Lot Design and Teaching Tool at Bridgewater State University, Bridgewater Supporting Information

Similar documents
Final Report: Appendix G. LID Driveway Retrofit and Teaching Tool at Bristol County Agricultural High School, Dighton - Supporting Information

Final Report: Appendix F. LID Driveway Retrofit at Ocean Spray Processing Facility, Middleboro Supporting Information

Analyzing the Bioretention Construction Sequence

Bioretention. Matt Scharver Northeast Ohio Regional Sewer District. #ProjectCleanLake

Letter of Credit Itemized Cost Estimate For: 100% Site Development Costs

Case Study Bioretention Installation and Maintenance

Key Topics. Bioretention Crime Scene Investigation The Bioretention Construction and Maintenance Sequence

Low Impact Development Practices

The following general requirements will be met for all planter box installations:

PREPARED UNDER. The 319 Nonpoint Source Pollution Grant Program FUNDED BY. MA Department of Environmental Protection Boston, MA PREPARED BY

Final Report: Appendix D. Mill River park and Riverwalk at City Hall, Taunton Supporting Information

Chapter 2 Roof Downspout Controls

5. LOW IMPACT DEVELOPMENT DESIGN STANDARDS

Guidance on Preparation of Construction and Maintenance Costs


Appendix G. Detailed Design

6.2 Flow-Through Planter

2008 SWMM, 2010 Revision City of Tacoma

Please make the following changes in your copy of the bid proposal for the captioned project:

2.1.4 Roof Downspout Rain Gardens

ROME CANALWAY TRAIL ERIE BOULEVARD WEST AND SOUTH CHARLES STREET ROME, NEW YORK DELTA PROJECT NO SEPTEMBER 2017 ISSUED FOR BID

Feet. Overland. Drainage Area Boundary. To Swale. Swale. To Catch Basin. Culvert Pipe. To Drain Outfall. NRCS Soil Area Boundary

Old Mill Community Association Bioretention Facility

Table 4.7.1: Swales Potential Application and Storm Water Regulation

STANDARD SPECIFICATIONS SECTION TEMPORARY EROSION AND SEDIMENT CONTROL

6.1 Bioretention Areas

CITY OF OZARK STANDARD DRAWING DETAILS FOR PUBLIC IMPROVEMENTS

Besides performing this function, they also look really nice

Placement of the soil should be in lifts of mm and loosely compacted (tamped lightly with a backhoe bucket).

PLANS FOR THE CONSTRUCTION OF A NEW COMMERCIAL BUILDING FOR: & MONTGOMERY ROAD, SYCAMORE TOWNSHIP, HAMILTON COUNTY, OHIO ZONED "E"

n1. Design 5.4.6a Urban Bioretention 5.4.6a Urban Bioretention Variations: Planter box, Extended tree pits, Stormwater curb extensions.

CHAPTER 102 REQUIREMENTS CRITCAL STAGES DURING CONSTRUCTION ACTIVITIES

CITY AND COUNTY OF DENVER DEPARTMENT OF PUBLIC WORKS CONTRACT NO CONFLUENCE BIKE/PED RAMPS-SOUTH PLATTE GREENWAY STATEMENT OF QUANTITIES

Inspection and Maintenance of Stormwater Best Management Practices

Appendix B DETAILED DESIGN

Structural Storm Water Best Management Practices (BMPs)

Local Stormwater Retrofit Case Studies. Westmoreland County Conservation District Updated 11/2011

4.5 City of Indianapolis Stormwater Green Infrastructure Guidance: Bioretention (rain gardens) Bioretention Fact Sheet Bioretention Technical Design

- 33 Years. - HQ in Richmond VA. - New England Merrimack NH Compost Silt fence. - Product Distributors, Manufacturers and Innovators

STORMWATER MANAGEMENT DESIGN ASSISTANCE MANUAL. Guide to Choosing Stormwater BMPs

BMP #: Recharge Garden/Rain Garden/Bioretention Garden

Rainwater Management an issue for the 21 st Century. Hydrological Cycle

Severn River Sub-Watershed: BMP 09-Retrofit

SILT FENCE MACHINE SLICED ERO-1A STEEL FENCE POST (T-POST), MINIMUM 5' LONG, 6' MAXIMUM SPACING.

SUPPORTING DOCUMENT STORMWATER POLLUTION PREVENTION PLAN (SWPPP) NARRATIVE

SECTION A-1: DESCRIPTION

FEB 2016 COUNTY MAP NTS

GREEN INFRASTRUCTURE DESIGNS RAIN GARDEN

HILCORP ALASKA, LLC HAPPY VALLEY MIDDLE NATURAL GAS EXPLORATION PROJECT DEEP CREEK UNIT BOUNDARY PROPOSED ACCESS ROAD T02S T03S R14W

STANDARD DETAILS QUICK REFERENCE

R1a: REINFORCED TURF TO REPLACE GRAVEL /GRASS PARKING ADJACENT TO SOUTH PENNSYLVANIA AVENUE.

WHEREAS, the CCSD has agreed to reimburse the City for the cost of the sidewalk, trail, and the bioretention area

GPCID Mall Boulevard & Gwinnett Place Drive Complete Street: Sectional View of Concepts

Request for Approval of Design Modification

2. HORIZONTAL DATUM = NAD 83. VERTICAL DATUM = NAVD 88.

APPENDIX E DESIGN CRITERIA FOR POST-CONSTRUCTION WATER QUALITY BMPS

WQ-07 INFILTRATION TRENCH

Tree Pits Construction Guide

4. CONCEPT PLAN DEVELOPMENT

SIMPLIFIED APPROACH TO STORMWATER MANAGEMENT FOR SMALL PROJECTS

Construction Site Erosion Control

Bioretention cell schematic key

Urban Rain Gardens: Capturing our local water. Martha Berthelsen The Watershed Project

RAIN GARDEN ILLINOIS URBAN MANUAL PRACTICE STANDARD. (feet) CODE 897 DEFINITION

LONDONDERRY PLANNING BOARD SITE PLAN APPLICATION & CHECKLIST

Small Town Sustainable Stormwater Solutions

Standard for Bioretention Systems

LONDONDERRY PLANNING BOARD MINOR SITE PLAN APPLICATION & CHECKLIST

Nuts and Bolts (or Gravel and Asphalt) of the Main Street Project

Operation Maintenance and Repair Plan Rain Garden


Appendix D - Technical Design Criteria for BMPs

PLAN SUBMITTER'S CHECKLIST

Charles County, MD Low Impact Development (LID)/ Environmental Site Design (ESD) Ordinance & Design Manual

PERMANENT SEEDING. Overview of Sedimentation and Erosion Control Practices. Practice no. 6.11

John F. Kennedy STEM High School Green Infrastructure Information Sheet

HILCORP ALASKA, LLC KALOTSA PAD

Stormwater Control Plan: Small (Tier 1) Land Development Project

Table of Contents. Preface... xv

APPENDIX F: DETAIL DRAWINGS

ABBREVIATIONS: TABLE OF CONTENTS: REFERENCE MATERIALS: CITY OF SEATTLE COMBINED SEWER OVERFLOW GALLONS PER MINUTE POLYVINYL CHLORIDE SQUARE FEET

STORMWATER MANUAL: A GUIDE TO STORMWATER REQUIREMENTS FOR LAND DISTURBING ACTIVITIES IN ARLINGTON COUNTY. March 2018

Rainwater and Land Development Manual Bioretention Design Specification Updates. Jay Dorsey & John Mathews ODNR-DSWR June 18, 2014

Bioretention Systems

Introduction to Low Impact Development. Dr Kathy Chaston Coral & Coastal Management Specialist NOAA Office of Ocean & Coastal Resource Management

Structural Stormwater Best Management Practices

Site Formation Excavation - 6' depth square yard $8.00 $0.00 Grading square yard $1.50 $0.00 Hauling off-site - 6' depth square yard $10.00 $0.

PROJECT SCOPE OF WORK CITY OF TOWN AND COUNTRY STORMWATER PROGRAM

GRAND ARBOR RESERVE GRAND ARBOR RESERVE, LLC ULIAN KISSIOV D'ONOFRIO KOTTKE & ASSOC., INC.

High Point Community: Site Drainage Technical Standards. High Point Community Site Drainage Technical Standards

ROADWAY SECTION PRINCIPAL ARTERIAL 2-01

Types and Basic Design of Post-Construction BMPs

STANDARD SPECIFICATIONS Book 2 ENGINEERING DRAWINGS INCLUDES ADDENDUMS

SECTION EARTHWORK

General Information. Site Conditions. 9b 9b. 9a 1b. Best Management Practices Illustration

STORM WATER MANAGEMENT PLAN APPLICATION Manheim Borough

A. Install all temporary erosion control measures (in accordance with MNDOT General Conditions 2573) prior to site disturbance.

Technical Guidance for Stormwater Treatment and Site Design Measures

BIORETENTION FACILITY

ABBREVIATIONS. Dwg LID of 1. Abbreviations

Transcription:

Bridgewater State University Virtual Commons - Bridgewater State University Phase II Final Report Taunton River Watershed Project 2011 Final Report: Appendix C. LID Parking Lot Design and Teaching Tool at Bridgewater State University, Bridgewater Supporting Information Horsley Witten Group, Inc. Recommended Citation Horsley Witten Group, Inc. (2011). Final Report: Appendix C. LID Parking Lot Design and Teaching Tool at Bridgewater State University, Bridgewater Supporting Information. Taunton River Watershed Project Phase II Final Report. Item 11. Available at: http://vc.bridgew.edu/taunton_riv_ph2/11 This item is available as part of Virtual Commons, the open-access institutional repository of Bridgewater State University, Bridgewater, Massachusetts.

APPENDIX C. LID PARKING LOT DESIGN AND TEACHING TOOL AT BRIDGEWATER STATE UNIVERSITY, BRIDGEWATER SUPPORTING INFORMATION

Parameter Specification Size Notes Planting Soil Media See Below n/a USDA soil types loamy sand or sandy loam Mulch shredded hardwood Aged 6 months, minimum. Finely shredded softwood will be considered by Engineer as required with sample submission. Pea Gravel Layer 2 to 4 inch layer of washed stone 3/8 inch For use between the filter media and the underdrain gravel. Filter Fabric Mirafi 140N, Geotex 351 or approved equal n/a Non-woven geotextile fabric w/ flow rate of > 110 gallons/minutes/square foot. Erosion Control Bionet S150BN n/a Short term biodegradable erosion control Blanket blanket. Gravel Layer (underdrain) AASHTO M-43 0.375 to 0.75 Underdrain Piping Underdrain Cleanout ASTM D 1785 or AASHTO M-278 4 inch perforated schedule 40 PVC Non-perforated PVC pipe, PVC 4 inch elbow, cap, and all associated fittings 3/8 perf. @ 6 on center, 4 holes per row. T s and Y s as needed depending on underdrain configuration. Extend cleanout pipes to surface with vented caps at Ts and Ys. BIORETENTION SCHEDULE: Bottom Surface Area (sf) Lowest Top Elevation/ Spillway (ft) Design Freeboard (ft) Depth Bottom Depth Planting Soil Planting Soil Pea (ft) (ft) Gravel (ft) OVF Type OVF Rim Ponding Bottom Depth Mulch Bottom No. & # (ft) Depth (ft) Elev. (ft) 1 (ft) Mulch (ft) 1 850 WEIR 54.00 1.25 52.75 0.75 52.00 0.25 51.75 2.00 49.75 0.50 49.25 2 1,466 DI 52.00 1.25 50.75 0.75 50.00 0.25 49.75 1.00 48.75 0.50 48.25 3 706 WEIR 54.50 0.75 53.75 0.75 53.00 0.25 52.75 2.00 50.75 0.50 50.25 4 546 DI 53.00 1.25 51.75 0.75 51.00 0.25 50.75 2.00 48.75 0.50 48.25 BIORETENTION UNDERDRAIN SCHEDULE: Elevation Change Min. Underdrain Underdrain from Lower Stone cover Pipe Size No. Bio Cell Cell (ft) (in.) (in) Length Underdrain (ft) Slope Underdrain (ft/ft) Bottom Underdrain Stone (ft) Distal Underdrain Stone Depth (ft) Outlet Depth Stone (ft) Underdrain Distal Inv (ft) Underdrain Inv In (ft) Min. Outlet Inv (ft) 2 1 UPPER 2 3.00 4.00 48.63 100 0.005 48.13 47.38 47.88 0.88 1.38 2 LOWER - 3.00 4.00 47.63 90 0.005 47.18 47.08 46.93 0.88 1.33 3 UPPER 2 3.00 4.00 49.63 85 0.005 49.20 47.53 48.95 0.88 1.30 4 LOWER - 3.00 4.00 47.63 60 0.005 47.33 47.23 47.08 0.88 1.18 Abbreviations: SA Bottom Surface Area CB Catchbasin OVF Overflow Inv Invert Bottom Pea Gravel (ft)

UNDERGROUND RECHARGE CHAMBER SCHEDULE RECHARGE AREA # COVER TYPE NUMBER OF UNITS URC1 PAVEMENT 36 URC2 PAVEMENT 69 CHAMBER TYPE/MODEL STORMTECH SC-740 STORMTECH SC-740 DIVERSION WEIR - ELEV. A (FT) CHAMBER HEIGHT (IN.) BOTTOM OF CHAMBER TO INVERT (IN.) DIAMETER HEADER MANIFOLD (IN) DIAMETER CHAMBER INLET STUB (IN) INVERT HEADER MANIFOLD ELEV. B (FT) INLET PIPE INVERT ELEV. C (FT) OUTLET PIPE INVERT ELEV. (FT) BOTTOM OF CHAMBERS ELEV. D (FT) STONE UNDER CHAMBER (IN) BOTTOM OF STONE ELEV. E (FT) 47.75 30.00 0.10 12 12 46.75 46.75 47.79 46.74 6 46.24 49.24 6 49.74 54.10 52.75 4.86 3.51 44.00 2.24 56.63 30.00 0.10 12 12 46.72 46.72 47.76 46.71 6 46.21 49.21 6 49.71 56.30 53.10 7.09 3.89 44.00 2.21 TOP OF CHAMBER ELEV. (FT) STONE ABOVE CHAMBER (IN) TOP OF STONE ABOVE CHAMBER ELEV. F (FT) MAXIMUM FINISH GRADE (FT) MINIMUM FINISH GRADE (FT) MAXIMUM COVER OF CHAMBERS (FT) MINIMUM COVER OF CHAMBERS (FT) ESTIMATED SHGW (FT) (SEE NOTE) SEPARATION FROM SHGW (FT)

ITEM NUMBER TAUNTON RIVER WATERSHED PLAN - BRIDGEWATER STATE UNIVERSITY BRIDGEWATER, MA PARKING LOT IMPROVEMENTS - SCIENCE BUILDING 75% DESIGN PLANS CONSTRUCTION COST ESTIMATE 12/9/2010 DESCRIPTION ESTIMATED QUANTITY UNIT UNIT PRICE TOTAL AMOUNT 1.0 MOBILIZATION/DEMOBILIZATION 1 LUMP SUM $10,000.00 $10,000 2.0 TEMPORARY FENCE AROUND WORK ZONE 2,000 LUMP SUM $10.00 $20,000 3.0 GENERAL GRUBBING & VEGETATION CLEARING 1 LUMP SUM $5,000.00 $5,000 4.0 EARTH EXCAVATION 560 CUBIC YARD $25.00 $14,000 5.0 RELOCATE EARTH EXCAVATION WITHIN SITE 560 CUBIC YARD $4.00 $2,240 6.0 COMPACTED FILL 9,790 CUBIC YARD $35.00 $342,650 7.0 DENSE GRADE BASE MATERIAL 3,510 CUBIC YARD $65.00 $228,150 8.0 FINE GRADING AND COMPACTING 10,530 SQUARE YARD $4.00 $42,120 9.0 BITUMINOUS ASPHALT PAVEMENT 10,530 SQUARE YARD $30.00 $315,900 10.0 BIT. TACK COAT FOR PAVEMENT 1 LUMP SUM $5,000.00 $5,000 11.0 EXISTING PAVEMENT EXCAVATION 1,000 CUBIC YARD $25.00 $25,000 12.0 RIPRAP STONE 50 CUBIC YARD $85.00 $4,250 13.0 LOAM & SEED (GRASS) 4,610 SQUARE YARD $9.00 $41,490 14.0 SAWCUT & SEALING PAVEMENT 1,240 LINEAR FOOT $12.00 $14,880 15.0 VERTICAL CURBING 1,720 LINEAR FOOT $45.00 $77,400 16.0 ASPHALT BERM 3,110 LINEAR FOOT $8.00 $24,880 17.0 SIDEWALK - BITUMINOUS 400 SQUARE YARD $30.00 $12,000 18.0 HANDICAP SIDEWALK RAMP 60 SQUARE YARD $125.00 $7,500 19.0 TRAFFIC SIGNS 1 LUMP SUM $15,000.00 $15,000 20.0 REMOVE SIGN 1 EACH $100.00 $100 21.0 REMOVE & RESET SIGN 6 LUMP SUM $130.00 $780 22.0 RELOCATE HYDRANT 2 LUMP SUM $2,000.00 $4,000 23.0 WATER LINE EXTENSION 40 LINEAR FOOT $80.00 $3,200 24.0 REMOVE CURBING 466 LINEAR FOOT $5.00 $2,330 25.0 REMOVE & RESET VERTICAL CURB 181 LINEAR FOOT $30.00 $5,430 26.0 REMOVE GUARDRAIL/DISPOSE 340 LINEAR FOOT $5.00 $1,700 27.0 REMOVE & RELOCATE CURBING 181 LINEAR FOOT $25.00 $4,525 28.0 ADJUST/RAISE MANHOLE COVER 18 EACH $500.00 $9,000 29.0 ADJUST/RAISE VALVE COVER 5 EACH $250.00 $1,250 Prepared by: Horsley Witten Group, Inc. Page 1 of 2

30.0 RELOCATED UTILITY POLE 2 EACH $8,000.00 $16,000 31.0 REMOVE/DISPOSE BUILDINGS 566 SQUARE FOOT $25.00 $14,150 32.0 PAINTED STOPLINE 20 SQUARE FOOT $1.50 $30 33.0 CROSSWALKS STRIPING 480 SQUARE FOOT $1.50 $720 34.0 PARKING STRIPING (WATERBOURNE) 6,040 LINEAR FOOT $1.50 $9,060 35.0 BOLLARDS W/ PAINT 2 EACH $750.00 $1,500 36.0 BIORETENTION FACILITY MATERIALS W/ LANDSCAPING 3,570 SQUARE FOOT $15.00 $53,550 37.0 STONE WALL 75 SQUARE FOOT $90.00 $6,750 38.0 DRAINAGE INLETS 2 LUMP SUM $1,200.00 $2,400 39.0 PRECAST STANDARD CATCHBASIN 2 EACH $3,000.00 $6,000 40.0 DRAINAGE MANHOLE 4 EACH $3,500.00 $14,000 41.0 DRAINAGE MANHOLE - DOGHOUSE TYPE 1 EACH $4,000.00 $4,000 42.0 BIO DRAINAGE STRUCTURE 2 EACH $2,000.00 $4,000 43.0 4" PVC DRAINAGE PIPE 344 LINEAR FOOT $15.00 $5,160 44.0 12" HDPE DRAINAGE PIPE 159 LINEAR FOOT $40.00 $6,360 45.0 CLEANOUTS/INSPECTION MANHOLES 2 EACH $250.00 $500 46.0 PAVED DRAINAGE FLUME 17 EACH $600.00 $10,200 47.0 12" HDPE FLARED END SECTION 1 EACH $650.00 $650 48.0 WEIRS STRUCTURES 2 EACH $6,000.00 $12,000 49.0 UNDERGROUND CHAMBER SYSTEM W/ INSTALLATION 105 PER CHAMBER $900.00 $94,500 50.0 CONSTRUCTION ENTRANCE 120 SQUARE YARD $60.00 $7,200 51.0 EROSION CONTROL - SILT SOCK 2,740 LINEAR FOOT $6.00 $16,440 52.0 EROSION CONTROL - SILT SACKS 12 EACH $250.00 $3,000 53.0 RELOCATE LIGHT W/ POLES 15 EACH $3,000.00 $45,000 54.0 LIGHTING PROVISION 1 LUMP SUM $90,000.00 $90,000 55.0 DEWATERING MEASURES 1 LUMP SUM $5,000.00 $5,000 56.0 TESTING - COMPACTION 1 LUMP SUM $15,000.00 $15,000 57.0 POLICE DETAIL 40 HOURS $45.00 $1,800 SUB TOTAL $1,684,745 ESTIMATED BID PRICE $ 1,685,000 Owner Contingency 30% $ 506,000 ESTIMATED CONSTRUCTION BUDGET $ 2,191,000 NOTES: CONTINGENCY IS PROVIDED BASED ON 75% DESIGN PLANS REFLECTING THE FACT THAT UNCERTAINTY EXISTS BETWEEN THIS STAGE AND CONSTRUCTION STAGE DRAWINGS. FINAL CONSTRUCTION ESTIMATES WILL BE DEPENDANT ON FACTORS RESOLVED AT THE CONSTRUCTION BIDDING STAGE. Prepared by: Horsley Witten Group, Inc. Page 2 of 2