TO: Port of Orcas FROM: Tina Whitman, Science Director SUBJECT: Master Plan Update DATE: September 7, 2018

Similar documents
EXHIBIT A CITY OF FORT WALTON BEACH, FLORIDA COASTAL MANAGEMENT & CONSERVATION

WASHINGTON COUNTY OREGON

The Salt Marsh Advancement Zone Assessment of Connecticut

PURPOSE: The purpose is to provide commercial facilities in the Vancouver and Clark County vicinity.

Staff will be providing an overview of the project need, purpose and intent for consideration as part of the Amendment cycle.

ESSENTIAL PUBLIC FACILITIES

ALL SECURE SELF STORAGE SEPA APPEAL RECOMMENDATION TO THE HEARING EXAMINER

CONSERVATION ELEMENT GOALS, OBJECTIVES, AND POLICIES

Port of San Diego Sea Level Rise Ad Hoc Committee Meeting 1 of 3.. September 18, 2018

Commercial Launch Site Addendum to Wetland Mitigation Plan. Revision 2. April 25, SpaceX Proprietary

Table of Contents TABLE OF CONTENTS SECTION TITLE PAGE

THE CORPORATION OF THE CITY OF WINDSOR Office of the City Solicitor Planning Department

CAO Update Status Work continues on products: Draft ordinance BAS report CAO process summary (2002 to present) Comprehensive e Plan policy review Some

Options for addressing City of Edmonds Alternatives to Ecology s Required Changes addressing Edmonds Marsh Buffers and Setbacks.

JOINT PUBLIC NOTICE. 26 June United States Army Corps of Engineers State of Louisiana

Chapter 3 Site Planning and Low Impact Development

Folly Beach Planning Commission

Sierra Club Comments on ACOE Public Notice NAE Re: Proposed Town Neck Beach Project at Sandwich, Massachusetts

Master Plan for Preservation and Scenic Conservation (1995)

Introducing Green Infrastructure for Coastal Resilience

Pine Flat Lake Master Plan Update FACT SHEET September 2014

NJ Department of Environmental Protection

Introduction to the Shoreline Master Program (SMP) Update. City of Bellingham Planning Department 2005

STREAM BUFFERS

Virginia Beach and Sea Level Rise: Where Do We Go From Here?

Sustainable Natural Environment Wetlands

PSRC REVIEW REPORT & CERTIFICATION RECOMMENDATION

CHATHAM COUNTY S PATH TO SUSTAINABILITY - THE NATURAL RESOURCES SIDE

Development Reviews. An overview of the Commission s review process, primarily in Klickitat County. March 13, 2018

Zoning Ordinance Chapter 10

April 11, 2016 Park Board Chair and Commissioners General Manager Vancouver Board of Parks and Recreation New Brighton Salt Marsh - Preferred Concept

Kevin M. Rampe, President -- Lower Manhattan Development Corporation

17.18 SENSITIVE AREAS

Chesapeake Bay Critical Area Conservation Plan

Shoreline Master Program Town of La Conner, Washington

Folly Beach Planning Commission

4.1 LAND USE AND HOUSING

Draft Rhode Island Stormwater Design and Installation Standards Manual

Site Plan Review Residential Accessory Building

APPENDIX F: EXTERNAL APPROVALS

Planning for Staten. Habitat Restoration and Green Infrastructure. Island s North Shore

Public Review Draft Oceanside Subarea Habitat Conservation Plan/ Natural Communities Conservation Plan

THE PROTECTION OF CHATHAM COUNTY S NATURAL RESOURCES - THE POLICY SIDE

TREASURE COAST REGIONAL PLANNING COUNCIL M E M O R A N D U M. February 19, 2010 Regional Planning Council Meeting

Natural Resource Adaptation Action Area Addressing Sea Level Rise in Estuarine Ecosystems TO: TOWN OF YANKEETOWN MAY

Public Review Draft Encinitas Subarea Plan

FAQ S about Restoration Planning FROM THE Department of Ecology WEBSITE:

City of Tacoma Shoreline Master Program Update Stakeholder Advisory Committee Meeting September 10, 2009

Project Description WOO/LUC-SR /0.00. Waterville Bridge Replacement

Venice Pumping Plant Dual Force Main Project Draft EIR

ELIGIBILITY CRITERIA CHECKLIST OPEN SPACE CLASSIFICATION

Hazard Mitigation Planning. Association of New Jersey Environmental Commissions Workshop Edison, New Jersey October 20, 2012

What now for home building?

Bay County RESTORE Act Direct Component Proposals The project will encompass all of Unincorporated Bay County as a whole.

CONSERVATION & COASTAL ZONE MANAGEMENT ELEMENT GOALS, OBJECTIVES, & POLICIES

LEGAL NOTICE. City of Tacoma Determination of Environmental Nonsignificance. Fred Wagner, Wagner Development. Demolition of Manitou school buildings

Working Group Meeting

PLANNING COMMISSION S DRAFT FINDINGS OF FACT, CONCLUSIONS OF LAW, & RECOMMENDATION: State Route 20 (SR-20) / Sharpe s Corner Vicinity Improvements

Scarborough Waterfront Project

Virginia s Tidal Wetlands: Managing for Resilience. Pam Mason

SECTION 1 CLEARING /GRADING PERMIT APPLICATION:

STAFF REPORT FOR STANDARD COASTAL DEVELOPMENT PERMIT #CDP FEBRUARY 26, 2015 CPA - 1 PO BOX 238 APTOS, CA 94001

NORTH KINGSTOWN PILOT PROJECT May 9, 2016 North Kingstown Town Council

26/Old Dominion Task Force

Figure 1. Proposed Strategic Habitat Conservation Areas for Florida

3.10 Land Use and Planning

PUBLIC NOTICE. us Anny Corps CENAE-R-A FILE NO. NAE

Goleta Community Plan Update

Storm Water Quality and Shoreline Restoration Improvements - Grant Funding Request City of Mound Carlson Park Bolton & Menk Project No.

Dwelling Units Max 12 dwelling units per acre/min 8 dwelling units per acre. Development Mix 80% non residential/20% residential

STEWARDSHIP OF LONG ISLAND SOUND S ECOLOGICAL AND RECREATIONAL RESOURCES

CITY OF SCANDIA ORDINANCE NO. 174

COASTAL MANAGEMENT ELEMENT. Last amended December 6, 2016 as part of the 2016 EAR

Rhode Island Shoreline Change Special Area Management Plan

SHORE PROTECTION ACT STAFF S FINDINGS & RECOMMENDATIONS

SHORE PROTECTION ACT STAFF S FINDINGS & RECOMMENDATIONS

Environmental Review Part 55 Floodplain Management Subpart C. 8-Step Decision Making Process

NC Coastal Management Program Update. Mike Lopazanski Policy & Planning Section Chief April 3, 2015

PLANNING APPROVAL & PLANNED UNIT DEVELOPMENT Date: April 6, 2017

St. Croix County Shoreland Overlay Zoning Districts. Public Hearing Community Development Committee December 19, 2013

Circular L8/08 2 September Water Services Investment and Rural Water Programmes Protection of Natural Heritage and National Monuments

Northeast Ohio Regional Sewer District Stormwater Management Plan Review Policy

TOWNSHIP OF LOGAN SOIL & FILL IMPORTATION AND PLACEMENT APPLICATION SUBMITTAL CHECKLIST

Building Ecological Solutions to Coastal Community Hazards: Guidance and NJ Coastal Community Assistance

Planning Commission Report

COASTAL MANAGEMENT ELEMENT GOALS, OBJECTIVES, AND POLICIES

Map Development 5/15/2012. New Virginia Modeling Tools

2005 GALLATIN COUNTY/BOZEMAN AREA PLAN

SUMMARY. Support the Southeast Arkansas Regional Intermodal Facility.

HAZARD MITIGATION GOALS AND OBJECTIVES

UNIFIED INTERPRETATION OF PROVISIONS OF IMO SAFETY, SECURITY, AND ENVIRONMENT-RELATED CONVENTIONS

MUNICIPAL RESILIENCE PLANNING ASSISTANCE PROJECT

January 18, JOINT PUBLIC NOTICE Savannah District/State of Georgia

CHAPTER 4 FUTURE LAND USE AND URBAN SERVICES DISTRICTS

Executive Office of Energy and Environmental Affairs Massachusetts Vulnerability Preparedness Program. June 6, 2018

Coastal Climate Change Vulnerability and Flexible Adaptation Planning: the Cockburn Sound Coastal Alliance Experience

MEMORANDUM. Council Meeting of June 7, 2007

Blue/Green Infrastructure Study Accomack County, VA

Chelsea Creek Municipal Harbor Plan

Zoning Ordinance Article 3

Transcription:

TO: Port of Orcas FROM: Tina Whitman, Science Director SUBJECT: Master Plan Update DATE: September 7, 2018 Friends of the San Juans appreciates the opportunity to provide input to the Port of Orcas Master Planning process and respectfully submits the following comments, primarily related to the lack of sufficient detail on relevant natural resources and associated regulations that affect future development at the Port of Orcas including wetlands, shorelines, cultural resources and land use. Wetlands Wetlands are a high value habitat type that provides multiple public benefits including water quality, fish and wildlife habitat, and flood attenuation. As a result, wetlands are protected under local, state and federal laws. With extensive, known wetlands on and adjacent to the airport, as well as current active wetland mitigation required to rectify recent Port of Orcas violations, it should come as no surprise that the management of wetland habitats will play a major role in the design and selection of alternatives under the master planning process. The current level of detail regarding the wetlands themselves, as well as the impacts to them from the various design alternatives and phasing, is not sufficient. Each wetland should be clearly identified in each of the master planning documents (site plans, alternatives evaluation tables, introduction to the development alternatives report) including clear identification for each individual wetland, the wetland category or rating, as well as the associated buffers for each wetland. Description and evaluation of each alternative/phasing must also demonstrate how it follows the required local, state and federal wetland mitigation sequence of avoidance, minimization, and lastly, compensatory mitigation, with estimated square footage or acreage of impacts in the wetlands and their buffers clearly defined for each of the alternatives/phasing. Right now the only place where wetland impacts are even mentioned is the evaluation of alternatives table where impacts to wetlands are defined as none, none anticipated, minor or potential in earlier draft documents and as none, potential, yes or no in the materials provided September 5, 2018. No discussion at all of the type and size of wetlands present, avoidance of impacts or likely impacts are provided in the development alternatives report. Without any associated documentation of the wetland values, rating and area of impact, the findings in the evaluation table cannot be credibly

supported. As wetland mitigation can also have a large impact on the cost estimates of the various alternatives, sufficient detail is required on avoidance of likely impacts to wetlands of each of the alternatives to inform cost benefit analysis. In addition to more clearly identifying potential future impacts to wetlands, consistency of the proposed design alternatives with the existing required mitigation actions from the wetland violations that occurred in 2017 to multiple wetlands on Port of Orcas properties must also be addressed. For example, the rerouting of Mount Baker road illustrated in the new Figure 3. Ultimate Development or the previous Figure 9. Runway 34 RPZ Alternatives figure will directly impact the wetland, including those areas currently the subject of required mitigation action to restore function, yet no detail is provided beyond potential impacts to wetlands or yes in the table. Mitigation sites should have long-term protection and subsequent development should avoid impacting the mitigation area and associated buffer. Shorelines There is no discussion of the shoreline environment in any of the documents produced to date in the master planning process. Multiple relevant issues related to marine shorelines should be reviewed and used in both the development and evaluation of design alternatives and phasing including: the Shoreline Master Program jurisdiction (200 feet from the ordinary high water mark and all associated wetlands) and required protective regulations; the fact that the largest wetland on the Port property is an estuarine, coastal wetland; and the fact that significant Port infrastructure and proposed future developments and property acquisitions are located within mapped coastal flood hazard zones. At a minimum, the shoreline jurisdiction and floodplain boundaries should be clearly marked on all design alternatives/phasing site plans, and as with wetlands, sufficient detail on how the various alternatives will avoid, minimize and compensate for unavoidable impacts (see San Juan County Code 18.50.140). The projected area of impact and effects on the function of the estuarine wetland as well as marine shoreline and floodplain habitats must also be included. As coastal erosion and flood hazards are expected to increase with rising sea levels and more frequent and larger storm events, any long range planning for the acquisition of new property or development of new permanent infrastructure must include consideration of likely potential effects. As with wetland mitigation, costs to fortify low lying coastal infrastructure as well as the associated mitigation for impacts to shoreline habitats can be substantial and may influence the selection of a preferred alternative. Cultural Resources No mention of cultural or historic resources are made in any of the Master Plan documents. Marine shorelines and associated coastal wetlands within the San Juan Islands, including north Orcas were

heavily utilized by multiple area Tribes and First Nations. The State Environmental Policy Act requires an evaluation of proposed development in these areas that must include adequate identification of the cultural and historic resources present and plans to avoid impacts. As with natural resource mitigation, the presence of cultural resources can add substantially to the costs of the various design alternatives and timely understanding of the likelihood of encountering protecting cultural resources is essential. Land Use The Orcas airport is located in close proximity to substantial residential and commercial development in the Eastsound subarea. Potential impacts to neighboring uses should be explicitly included in the master planning process, in both the development and evaluation of alternatives. Multiple methods exist for the Port to improve its understanding and consideration of local land use concerns, including expanding participation in the master planning committee and identifying relevant plans and policies that will impact the ultimate success of any preferred alternative. The proposed master planning committee is heavily weighted towards airplane-dependent and other commercial interests; efforts should be made to expand committee participation to better include residential interests. With significant proposed changes to public infrastructure included in the design alternatives, it is logical for the Port to involve the San Juan County Public Works Department; their expertise in planning public projects, as well as public engagement could further improve the process. In addition, while the master planning website references future environmental analysis, it would be prudent for the Port to identify the relevant plans and policies and how they may be supported by or are in conflict with the proposed alternatives at this stage of the master planning process. These include, but are not limited to: the Eastsound subarea plan, the San Juan County Critical Areas Ordinance, the state Shoreline Management Act and county Shoreline Master Program as well as federal Clean Water and state Water Pollution Control Acts, as well as National Historic Preservation and Endangered Species Acts. As just one example of why this type of review is essential at this stage of the process, the proposed September 5, 2018 Short Term Development (Figure 1) actions include acquisition of additional shoreline property; yet the fact that this property is located in a shoreline designation under the county s Shoreline Master Program that specifically prohibits airport and nonwater dependent uses is even not mentioned (San Juan County Unified Development Code 18.50.600). Substantial recent information on community values and perspectives for the future of Eastsound are also available as part of the comprehensive plan update process and could inform the Master Planning process. In summary, significant additional detail to wetland, marine shoreline, cultural resources and land use issues are needed to improve the quality of the various development design options being proposed, the evaluation of the alternatives as well as the public s ability to meaningfully review and provide comment. Thank you for your consideration.

Attachments: a) Port of Orcas region, Eastsound wetland habitat map b) Port of Orcas region, Eastsound shoreline resources map c) Port of Orcas region, Eastsound parcel and building map d) Port of Orcas region, Eastsound floodplain map e) Port of Orcas region, Eastsound sea level rise vulnerability map e CC: Paul Kamin, Chair Eastsound Planning Review Committee Doug Gresham, Washington Department of Ecology

FEMA Floodplain