STREETSCAPE MANUAL ONLINE TRAINING SESSION 2: Searching the Manual

Similar documents
STREETSCAPE MANUAL ONLINE TRAINING SESSION 2: Searching the Manual

STREETSCAPE MANUAL ONLINE TRAINING SESSION 3: Decision-Making

STREETSCAPE MANUAL ONLINE TRAINING SESSION 1: Background

Toronto Complete Streets Guidelines

TORONTO COMPLETE STREETS GUIDELINES

Maintenance Fees for Pavers on City Streets

Downtown Streetscape Manual & Built Form Standards

MASTER PLAN QUEEN ST. WEST BIA

Lambeth Main Street Streetscape Improvements

CHAPTER 5: GUIDING PRINCIPLES

The Project. In 2013, construction was completed between 100 Street and 102 Street.

QUEEN-RIVER SECONDARY PLAN

4.9 Mendocino Avenue Corridor Plan Design Guidelines

Town of Oakville Streetscape Strategy

PROPOSED REDEVELOPMENT OF THE GLEN ABBEY GOLF CLUB. STREETSCAPE DESIGN STUDY (excerpt from the Urban Design Brief) TOWN OF OAKVILLE.

Scope of Services. River Oaks Boulevard (SH 183) Corridor Master Plan

CITY OF VAUGHAN EXTRACT FROM COUNCIL MEETING MINUTES OF JUNE 7, 2016

Toronto Complete Streets Guidelines

SUBJECT: Waterfront Hotel Planning Study Update TO: Planning and Development Committee FROM: Department of City Building. Recommendation: Purpose:

South Yonge Street Corridor

1.0 Purpose of a Secondary Plan for the Masonville Transit Village

Reconfiguration of The Six Points Interchange. Community Update #2 June 18, 2014

East Bayshore Road Neighbourhood

Public Open House. YWCA, 87 Elm Street December 2nd, 2017, 10 a.m. 2 p.m.

KING-SPADINA COMMERCIAL HERITAGE CONSERVATION DISTRICT PLAN COMMUNITY CONSULTATION MEETING #1

GETTING ALONG IN THE RIGHT-OF-WAY

c. DTAH Toronto Complete Streets Guidelines

5 SOUTH YONGE STREET CORRIDOR STREETSCAPE MASTER PLAN STUDY DRAFT FINAL REPORT

13 THORNHILL YONGE STREET STUDY IMPLEMENTATION CITY OF VAUGHAN OPA 669 AND TOWN OF MARKHAM OPA 154

WELCOME TO OPEN HOUSE TWO November 28, 2018

St. Clair Avenue West Area Transportation Master Plan

COMPLETE GREEN STREET CHECKLIST

Creating Complete Roadway Corridors:

Streets for People, Place-Making and Prosperity. #TOcompletestreets

Attachment 1 TOWN OF NEW TECUMSETH. Manual for the Preparation of an Urban Design Report

Integration of Public Realm and Library Precinct Landscape Plan Ground Floor

Bloor St. W. Rezoning - Preliminary Report

Agenda. 7 Wright Crescent Urban Design Study. Public Meeting and Urban Design Workshop. 1 INTRODUCTION AND BACKGROUND (City of Kingston)

URBAN DESIGN BRIEF. Terms of Reference. Purpose. When is an Urban Design Brief Required

Midtown in Focus Parks, Open Space and Streetscape Plan for the Yonge-Eglinton Area

TRANSPORTATION ELEMENT

DRAFT. October Wheaton. Design Guidelines

South Yonge Street Corridor

Derry Green Corporate Business Park

Historic Yonge Street HCD Study Public Meeting #2

PART 1. Background to the Study. Avenue Study. The Danforth

Mid-Rise Buildings on Toronto s Avenues Responding to the Public Realm Andrea Oppedisano, City of Toronto

THE CORPORATION OF THE CITY OF VAUGHAN MAJOR MACKENZIE STREETSCAPE STUDY

Director, Community Planning, Toronto and East York District

TOURIST AREA DESIGN GUIDELINES

Comprehensive Plan. Faribault, Minnesota. Hoisington Koegler Group Inc. Claybaugh Preservation Architecture Inc. Howard R. Green Company Bonz/REA

Definitions. Average Daily Traffic Demand (ADT): The actual number or projected number of cars that pass a point in a 24-hour period.

ASPEN HILL Minor Master Plan Amendment

King-Spadina Secondary Plan Community Consultation Meeting. Michelle Knieriem, City Planner October 11, 2017

Courtice Main Street Study Community Vision Workshop PLANNING SERVICES DEPARTMENT

URBAN DESIGN BRIEF REPORT

BUILDING SCALE AND SETBACKS 5 ELEMENTS:... 5 FAÇADES (COMMERCIAL/RESIDENTIAL) 5

URBAN DESIGN BRIEF 181 Burloak Drive, Oakville

PRIORITIES COMMITTEE MEETING

Future Five. Design/ Development Guidelines. January 2008 Amended June 08 per City Council motion

COMMUNITY DESIGN. GOAL: Create livable and attractive communities. Intent

Proposed Downtown Plan

PART 2 THE AMENDMENT DRAFT

3.0 master plan concept

Workshop 3. City of Burlington Waterfront Hotel Planning Study. September 14, The Planning Partnership

1071 King Street West Zoning Amendment Application - Preliminary Report

URBAN DESIGN BRIEF New Street Burlington, ON

Welcome. Walk Around. Talk to Us. Write Down Your Comments

toronto's coordinated street furniture program

Emery Village Road 2A Municipal Class Environmental Assessment Study

Executive Summary. NY 7 / NY 2 Corridor

North York Centre South Service Road

Conceptual Design. Main Street Enhancement and Extension Project. Bothell, Washington. June 11, 2009

Proposed Walkability Ordinance for City of Knoxville (6/16/17)

Clairtrell Area Context Plan

Urban Design Brief Woodland Cemetery Funeral Home 493 Springbank Drive

Complete Street and the EA Process. Queen Street Corridor- Brampton Golden Mile

400 West Georgia Street Urban Design Panel. Public Realm

Urban Design Review Panel Submission. The Ottawa Train Yards - Office Development. 405 Terminal Avenue. 17 April Table of Contents.

Integration of Trees into Roads Policy - the road to success -

EXHIBIT 887C STREETS PLAN

URBAN DESIGN BRIEF 305, 309, & 315 SOUTHDALE ROAD WEST LONDON ONTARIO

Date: April 10, 2017 City Council Work Session April 24, 2017: Status Report on the Comprehensive Plan Update and Transportation Master Plan

Central Village Design Guidelines Westport, MA

Table of Contents. Introduction Role of the Guidelines Document Structure Existing Planning Framework Structure of the City 9

Bank Street Secondary Plan

Appendix I. Access Management & Land Use Zoning Strategies Memo

Table L-1 Summary Action Strategy. Action Item Timing Status Responsible Agency

City of Plattsburgh DRI: Downtown Streetscapes & Riverfront Access. Downtown Streetscape and Riverfront Access Design

Don Mills Crossing Study and Celestica Lands Development Application Community Meeting, Open House, and Breakout Discussions

D ESIGN REVIEW COMMITTEE

Chairman and Members of the Planning and Development Committee. Thomas S. Mokrzycki, Commissioner of Planning and Building

PUBLIC RIGHT-OF-WAY IN THIS CHAPTER PUBLIC REALM

4-1 An Urban Orchard at Downsview Park 4-2 Olive Square 4-3 Dundas St. West Parkettes 4-4 Montclair Parkette

The George Washington University Streetscape Concept Plan. May 6 th 2009 Public Presentation for Discussion EHRENKRANTZ ECKSTUT & KUHN ARCHITECTS

Report to: Development Services Committee Report Date: April 24, 2017

Long Branch Neighbourhood Character Guidelines Final Report

Design Guidelines and Standards for Sight Triangles. Sight Triangle MANUAL

The purpose of tonight s PIC is to:

4.1.3 LAND USE CATEGORIES

Transcription:

TRAINING SESSION 2:

The Urban Design Streetscape Manual is a reference tool developed to help implement City policy and guide the design, construction and maintenance of streetscape improvements in Toronto.

What is a streetscape? A streetscape is made up of paving, lighting, trees, street furniture and sidewalks, framed by buildings and open spaces, that combine to form an overall aesthetic and identity for a place.

To begin, launch the Streetscape Manual website at: toronto.ca/streetscapemanual Click on the search link to find a street or design detail.

Read the complete Terms of Use and click I accept when ready to move ahead to search the Manual.

1 2 3 There are 3 ways to search the Streetscape Manual online.

1 Search by Map is the most common option and is normally used when planning, designing or maintaining a streetscape for a specific location.

Additional search options 2 3 Search by Street Name provides an alphabetical list of all streets found in the Manual and offers a text-based alternative to the map search. Search by Streetscape Element is an inventorybased search normally used to inform maintenance or the design of new streetscapes.

Streetscape Elements The Manual provides design direction for 5 streetscape elements. The Search by Streetscape Element option provides access to an inventory of all design details referenced in the Streetscape Manual. paving trees medians lighting furniture

To learn more about each streetscape element expand the Elements tab on the main Streetscape Manual page and click on the + beside the element. Example of the Paving element section expanded

To begin an inventorybased search click on one of the five streetscape elements links. This allows you to access a list of all standard and site-specific design details for each element.

Click on each numbered link (e.g. P-1) to view a summary and open the PDF design detail in a separate window. This process can be repeated to review all details in the Manual. Sample of a standard paving detail (PDF)

The Streetscape Manual includes standard, site-specific and BIA design details. Site-specific details are identified by an s in the drawing number. Business Improvement details are identified by BIA in the drawing number.

Streetscape Location The Streetscape Manual is most often searched for design information about a particular street or location in the city. The search by map or search by street name options should be used during the preparation of streetscape designs for development applications, capital work and any other street or sidewalk-related construction projects. new development capital project sidewalk reconstruction

To begin a locationbased search click on the Search by Map link.

1 2 An interactive map will open in a new window. Use the search option(1) or zoom icons(2) to find the street or location in question.

Click on the button to bring up a window that allows you to zoom in on the desired street location (1). 1

Click directly on the line for the desired street location (1). This brings up a window with a link to information and design details for that particular section of street (2). 1 2

Streetscape Summary Street name, segment and streetscape type Review the streetscape information provided. Weblink to the Planning District Related Links to policies, guidelines and other initiatives that may relate to the streetscape Link to City of Toronto BIA website if part of a local Business Improvement Area Standard and/or site specific design details recommended for the street segment Note: the streetscape design is finalized through consultation with City staff and implemented after City Council approval.

Click on Related Links to review other policies, guidelines and initiatives that may affect the streetscape design.

Click on the BIA link, if shown, to view a map of the BIA boundaries. Contact the Toronto BIA office for assistance coordinating the streetscape design within these areas.

Click on each streetscape element design detail to review the recommended streetscape treatments for this location. Each numbered link (e.g. P-s3) opens a PDF document in a separate window. Sample of design details (PDF) Note: all lighting installations in the public right-of-way must be approved by Toronto Hydro Corporation

Click on the Street Trees link to access the standard planting guide and Urban Forestry tree planting specifications.

Visit the City s Coordinated Street Furniture website and the Manual s Street Furniture link to review design options and placement strategies.

When specific details are not identified or more options are available, click on the Standard element link to review additional streetscape treatments.

Many streets have more than one standard or site-specific design detail to choose from. After reviewing each streetscape element and design option, the most appropriate streetscape treatments are determined by: the existing or planned context; available space in the sidewalk zone and setback; width and location of the pedestrian clearway; location of above and below-grade utilities; other sidewalk/boulevard activities. These and other key considerations are outlined in Training Session 3: Decision- Making. Always consult City Staff before developing a final streetscape design.

Once a suitable streetscape design concept is developed, refer to the City s Road Works Standards website for technical construction drawings and specifications.

Locations in the Manual can also be searched by street name. To begin this type of search, click on the Search by Street Name link.

Streets and street segments included in the Streetscape Manual are listed in the Street Index in alphabetical order Note: Not all city streets are included in the Streetscape Manual. Only arterial roads (Major and Minor) from the Transportation Services Road Classification System, and some important collector and local roads are included. Streets that are not part of the Manual should still be designed and built to achieve a high quality public realm.

Use the alpha toolbar to look up the street name, then click on the appropriate street segment to access a Streetscape Summary and design details

Streetscape Summary The same streetscape summary will appear as when using the mapbased search

paving Example concrete paver band (2 rows) 1 2 3 1. Streetscape Manual Design Detail 2. Standard Construction Drawing 3. As-built Condition This simple 3-part sequence shows how the Streetscape Manual identifies a recommended design treatment, the City Construction Standards inform the preparation of technical drawings, and the final streetscape outcome is built to reflect the Toronto Official Plan s vision for a high-quality public realm.

The Streetscape Manual is often used to inform streetscape improvements that are part of a Development Application review process. The following brief example shows how the Manual could be applied on a portion of Yonge Street. Pre-Development Condition

A Search by Street Name is carried out to retrieve all relevant streetscape information and design options for the street segment.

A final streetscape design is negotiated with City staff and key stakeholders, approved by City Council, and built as part of the site redevelopment. Post-Development Condition

is now complete. To continue learning, launch Training Session 3: Decision-Making. To begin using the Manual, click the ONLINE link below. STREETSCAPE MANUAL ONLINE END OF TRAINING SESSION 2: