Clay Street Bridge Replacement Project

Similar documents
PROJECT BACKGROUND. Preliminary Design Scope and Tasks

The Illinois Department of Transportation and Lake County Division of Transportation. Route 173, including the Millburn Bypass

PROJECT STATEMENT LOCATION/DESIGN PUBLIC HEARING. 19 th AVENUE NORTH EXTENSION PROJECT FROM SPRINGDALE DRIVE TO NORTH 2 ND STREET/U.S.

WELCOME! 8 8:30 6: TH STREET IMPROVEMENTS. Open House. Presentation & Q&A

ARGENTA TRAIL (CSAH 28/63) REALIGNMENT SOUTH PROJECT (CP 63-25)

INFRASTRUCTURE EXISTING INFRASTRUCTURE A. Circulation B. Signals C. Drainage D. Utilities

BEST PRACTICES FOR PROJECT NOMINATIONS TA Set-Aside Program

The transportation system in a community is an

Creating Complete Roadway Corridors:

Beckett Bridge PD& E Study. Presentation to: Board of County Commissioners

DESIGN PUBLIC HEARING MAY 10, 2018 GRANBY TOWN HALL FIRST FLOOR CONFERENCE ROOM 10 WEST STATE STREET GRANBY, MASSACHUSETTS 7:00 PM FOR THE PROPOSED

DRAFT SECTION 4(f) EVALUATION INTERSTATE 73 FEIS: I-95 to I-73/I-74 in North Carolina

Meeting Display Boards for Public Hearing on the Wilson Transfer Station Project held Tuesday, February 18, 2014.

West Dennis Center: Bass River to Old Main Street. West Dennis Business District: Old Main Street to Dennis Commons

THREE-YEAR CAPITAL IMPROVEMENT PLAN FY

Project Overview. Fairfax County Parkway Widening Fairfax County. Get Involved. Public Information Meeting. Contact Information

Los Angeles Department of City Planning RECOMMENDATION REPORT

COMMUNICATION URBAN DESIGN REVIEW BOARD CITY OF DES MOINES, IOWA MAY 16, 2017 MEETING

City of Larkspur. Notice of Mitigated Negative Declaration for the 285

SAN MARTIN BOULEVARD OVER RIVIERA BAY PROJECT DEVELOPMENT & ENVIRONMENT (PD&E) STUDY

Welcome. Date: Thursday March 2, 2017 Time: 6:30 p.m. 9:00 p.m. Location: Woodview School Gym, 69 Flatt Road, Burlington Presentation Time: 7:00 p.m.

California Environmental Quality Act (CEQA) Environmental Review Process

Project Overview. Get Involved. Public Information Meeting. Contact Information

2040 Long Range Transportation Plan

COMMUNITY DEVELOPMENT SERVICES PLANNING AND BUILDING DEPARTMENT PLACERVILLE OFFICE:

Welcome. to the 95th Street Terminal Improvement Project Public Hearing

RESOLUTION NO. R Refining the route, profile and stations for the Downtown Redmond Link Extension

Eastside Transit Corridor Phase 2 Technical Study Update Community Outreach Meeting February 2017

Description of Preferred Alternative

4.1 Build Alternative 1 Construction Phasing

2 ALTERNATIVES AND OPTIONS

Welcome. Northern Segment of Hwy 100 I-90 to South of Madison Street Meeting Goals:

NOTICE OF PREPARATION

Alternatives Development Three conceptual alternatives were developed for the Race Road/Jessup Village Planning Study and are described below:

Open House Public Involvement Meeting Howland High School Cafeteria, 200 Shaffer Drive NE, Warren, Ohio. Informational Handout

PROJECT UPDATE BON AIR ROAD BRIDGE REPLACEMENT AND MAGNOLIA AVENUE WATER QUALITY FACILITIES

Appendix E Preliminary Location Hydraulic Study

Public Hearing. Charlotte County-Punta Gorda MPO - Meeting Rooms A and B March 14, open house at 4 p.m., formal presentation at 5 p.m.

Bucks Bar Road Bridge Project Public Informational Meeting Wednesday, January 6, 2010

SR-2 Freeway Terminus Improvement Project

City of Bristol Route 6 Corridor Implementation Program

WELCOME TO OPEN HOUSE TWO November 28, 2018

Derby-Shelton Bridge Pedestrian and Bicyclist Enhancements [1]

AGENDA ACTION ITEMS INFORMATION ITEMS

SOUTHEAST AREA SPECIFIC PLAN. Planning Commission Study Session August 18, 2016

Fall 2017 Construction Update

DESIGN CRITERIA PACKAGE

A. WHAT IS A GENERAL PLAN?

July 12, Columbus City Council City Hall 90 West Broad Street Columbus, OH RE: I-70/71 Columbus Crossroads Project

North Carolina Department of Transportation Project Development and Environmental Analysis Branch

IOWA HIGHWAY 57 / WEST 1 ST STREET STUDY PUBLIC INFORMATIONAL MEETING APRIL 22, 2014

Bypass #16 - Bend Parkway (new alignment for US 97) (MP )

Community Workshop. City of Richmond. January 25, 2011 SF Bay Trail Connection - Castro St to Richmond-San Rafael Bridge

2.1.8 Cultural Resources Regulatory Setting. Affected Environment, Environmental

PREPARED FOR: PLATTEVIEW ROAD CORRIDOR STUDY EXECUTIVE SUMMARY

REPORT TO: Council FOR: Regular Meeting. PRESENTED: April 1, 2008 FILE: , Byl 1932 & 1936

Reconfiguration of The Six Points Interchange. Community Update #2 June 18, 2014

Municipality of Anchorage. Community Council Survey Capital Projects Needs Ranking Survey (ALPHABETICAL) Airport Heights

ALTERNATIVES. NCDOT made an early decision to first determine how to build the project (construction method) followed by what to build (alternatives).

Appendix G Response to Comments

Route 66 Business Corridor

BEST PRACTICES FOR DETAILED APPLICATIONS TA/SRTS Program

Section 4(f) De Minimis Memorandum for the Hickman Road over Tuolumne River Bridge Replacement Project (Bridge No. 38C 0004)

Supporting our communities. Bridges

SBCAG STAFF REPORT. MEETING DATE: March 17, 2016 AGENDA ITEM: 5I

Services Department F May 28, 2007

7.0 DRAFT SECTION 4(f) EVALUATION

Project Study Report Equivalent The Old Road Widening SIX FLAGS MAGIC MOUNTAIN. On Street The Old Road Between Magic Mountain Pkwy And Turnberry Lane

REGIONAL TRANSPORTATION COMMISSION OF SOUTHERN NEVADA AGENDA ITEM

Old Town Neighborhoods Plan. Choices Event Wednesday, December 9, 2015

Asbury Chapel Subdivision Sketch Plan

Reconnecting New Haven: Downtown Crossing

Berkshire Regional Planning Commission Clearinghouse Review Report

STATE OF TENNESSEE DEPARTMENT OF TRANSPORTATION ENVIRONMENTAL DIVISION

I-90 Mississippi River Bridge & Interchange Project

Capital Projects impacting Odenton Town Center

Rezoning Issues Setting a Foundation for Zoning Decisions

DRAFT MAP AMENDMENT FLU 04-4

VALLEY COUNTY MINIMUM STANDARDS FOR PRIVATE ROAD DESIGN AND CONSTRUCTION

Public Information Centre. Welcome

NOTICE OF AVAILABILITY (NOA) OF A DRAFT ENVIRONMENTAL IMPACT REPORT AND NOTICE OF PUBLIC HEARING 2190 Shattuck Avenue Mixed-Use Project

S SUMMARY S.1 PREFACE S.2 PURPOSE AND NEED S.3 PROJECT BACKGROUND

HISTORIC BRIDGES IN CRAWFORD COUNTY. Bridges Listed on the National Register of Historic Places in Crawford County

Pennsy Greenway Trail

SAN RAFAEL GENERAL PLAN 2040 INTRODUCTION AND OVERVIEW

SECTION 5 - SCENIC HIGHWAYS

Cottage Grove Road Reconstruction. City of Madison Engineering

CTH C RESURFACING Douglas County, Wisconsin

Capital Projects in and near Odenton Town Center

Glenn Highway MP DSR. Landscape Narrative

TORONTO COMPLETE STREETS GUIDELINES

Chapter 1 - General Design Guidelines CHAPTER 1 GENERAL DESIGN GUIDELINES

SH 199 Corridor Master Plan. Community Meeting No. 2 May 31, 2017

Commissioners Road West Realignment Environmental Assessment

The purpose of tonight s PIC is to:

Northwest Rail Corridor and US 36 BRT Development Oriented Transit Analysis 4.4 STATION AREA FINDINGS

PUBLIC HEARING. DRAFT Environmental Impact Statement. Matthews Memorial Baptist Church Washington, DC October 18, National Capital Region

Highway 427 Industrial Secondary Plan Area 47 Schedule C Class Environmental Assessment For Arterial Roadways

Section 4.11 Traffic and Transportation 4.11 TRAFFIC AND TRANSPORTATION

I-70 Corridor Enhancement Plan

Transcription:

Clay Street Bridge Replacement Project Frequently Asked Questions (FAQs) No. 2 April 4, 2018 The project is located in downtown Placerville on Clay Street between US Highway 50 and Main Street and Cedar Ravine Road. The proposed project will replace the existing one lane bridge on Clay Street over Hangtown Creek with a two lane bridge with sidewalks and bike lanes. The project will also realign Clay Street between US Highway 50 and Main Street, to intersect Main Street at a four way stop or signal control at Cedar Ravine Road. There are questions about the project being circulated within the community, and the City of Placerville would like to take this opportunity to respond to those questions. March 8, 2018 FAQ #1 can be found here: https://evogov.s3.amazonaws.com/media/17/media/116470.pdf NEW FAQ S SINCE MARCH 8, 2018: Will the project be taking any private property for construction? Answer: No. As stated in the Draft EIR, the project is not anticipating any right of way acquisitions from private property owners. (Draft EIR Pages ES 9, 2.0 23, 4.8 7) Will the project be turned into a minor arterial roadway with a Highway 50 bypass going through a neighborhood? Answer: No. As stated in FAQ #1, Clay Street is currently classified as a local road and this classification will not change with the bridge replacement or realignment. Will project construction equipment and their vibration damage adjacent buildings and structures? Answer: No. Please see page 4.4 22 of the Draft EIR where this impact is discussed in detail and the project would be subject to the Caltrans Transportation and Construction Vibration Guidance Manual limitations on continuous vibrations near historical buildings. The City has proactively initiated efforts to address this issue and reduce potential impacts as part of ongoing project planning and will complete necessary evaluations of vibrational effects. The City will require specific construction methods be used to ensure vibration levels from heavy construction equipment do not pose a risk of structural damage to historic buildings/resources (like Pearson s Soda Works). Once the project is complete, will there be an increase in vibration levels on local streets? Answer: No. The day to day vibrations experienced currently will be the same once the project is completed because no new land use or traffic is generated as part of this project. Page 1 of 12

Why not keep the existing bridge as a pedestrian bridge and build a new one next to the existing one? Answer: Unfortunately, there isn t sufficient room with the presence of Highway 50. The clearance at the freeway overpass is only 28 feet wide from face of curb to face of curb and that current width is not sufficient for construction of 2 separate bridge approaches. To build the approaches needed, the overpass would need to be reconstructed for a larger clear width. Please see photo below. Existing clear width is only 28 feet. Clay Street Looking North to Highway 50 Overpass would need to be reconstructed for clear width to accommodate 2 bridge approaches. Is the Clay Street Bridge Unique and One of a Kind to the area? Answer: No. It s one of more than over 45 bridges still in service of the same style and characteristics within just the west slope of El Dorado County. The existing bridge, along with 43 of the 45 bridges of its kind, is not eligible for the National Register of Historic Places. (Reference: Caltrans Local Agency Bridges Search for El Dorado County). Because there have been so many bridges built in the same era with the same characteristics, for all intents and purposes, the structural composition and aesthetics of the Clay Street Bridge make it as common as a modern day interchange overcrossing of the 1940 s in its functionality and appearance, thus making it ineligible for the National Register. The existing bridge was also searched through California records as well and is not eligible for the California Register either. What is planned for the project to bring a Historical feel to the Clay Street Project? Answer: The Clay Street Bridge Replacement Project is a community project to replace the existing one lane bridge with a two lane structure for safe passage of vehicles, bicycles, and pedestrians alike in the area. The City will be holding community meetings to solicit public input for a range of design related topics, including incorporating historical elements to celebrate our history while delivering this important safety project. Together, the City and Page 2 of 12

the Community will work to maintain the historical feel and unique charm of the area within the needed replacement of the existing unsafe bridge. What are the issues with the existing intersection? Answer: Descriptions of the existing intersection and proposed alternatives are discussed in detail in the Draft EIR available on the City s website, located here: https://www.cityofplacerville.org/environmental documents The City is soliciting written public comment on this document up to April 18, 2018 at 5 pm. What are the impacts; positive and negative to the proposed project and reconfiguration of the intersection? Answer: All impacts are discussed in detail in the Draft EIR available on the City s website, located here: https://www.cityofplacerville.org/environmental documents The City is soliciting written public comment on this document up to April 18, 2018 at 5 pm. What will happen to the Farmer s Market during and after construction of this project? Answer: The Farmer s Market is in the process of planning its move to the El Dorado Trail between Clay Street and Locust Avenue, starting this summer. During and after construction, the Farmer s Market will continue to operate on the El Dorado Trail. Please see the conceptual layout of the relocated Farmer s Market at El Dorado Trail. Page 3 of 12

What and where is the Cedar Ravine Culvert? Answer: The Cedar Ravine Culvert conveys Cedar Ravine Creek underground to Hangtown Creek from just south of the Cedar Ravine Road/Pacific Street intersection to its connection ends at the southern abutment of the existing Clay Street Bridge. The culvert itself was constructed over various decades and consists of different cross section geometry and materials. Please see the photos below of the approximate culvert alignment and location at the Clay Street Bridge. CEDAR RAVINE CULVERT ALIGNMENT Page 4 of 12

What is the history of the Cedar Ravine Culvert? Answer: City holds copies of the 1891 Sanborn Map Fire Insurance Maps that reference the Cedar Ravine Platform in the location of what would eventually become the Cedar Ravine Culvert. The Platform allowed crossing of Cedar Ravine Creek and consisted initially of wood panels over the existing alignment of the creek as it connects and becomes a tributary to Hangtown Creek. The original Platform structure was replaced over several decades with the underground culvert in place today, including the segment that was built into the bridge abutment at Clay Street. The Sanborn Map also shows the original (first) wooden Clay Street Bridge that was demolished and replaced with the current Clay Street Bridge (standard bridge plans developed in 1928, built as a common structure of the time in the 1920 s 1940 s). It is important to note that the existing Clay Street Bridge and the Cedar Ravine Culvert were both constructed prior to the adoption of Section 106 of the National Historical Preservation Act of 1966, prior to the adoption of the National Environmental Policy Act (NEPA) of 1970, and prior to the adoption of the California Environmental Quality Act (CEQA) of 1970. Therefore, the excavation and construction of both the existing Clay Street Bridge and the Cedar Ravine Culvert took place prior to any government instated preservation or protection requirements related to cultural, historical, or mining resources that could ve been present in the area of the project. When the existing bridge was built in the 1940 s, any resources found were likely removed and/or destroyed at the time the Clay Street Bridge was constructed. Please see the 1891 Sanborn Map below. 1891 SANBORN MAP OF CEDAR RAVINE PLATFORM AND ORIGINAL WOODEN CLAY STREET BRIDGE Page 5 of 12

What has the City done to monitor and maintain the Cedar Ravine Culvert? Answer: City records indicate repairs of culvert segments have been completed in the 1970 s, 2003, and 2005. The most intense of these repairs was in 2003 to reconstruct the bottom of a segment of corrugated metal pipe (CMP) that spans from the concrete bridge archway at Clay Street up to the first manhole located within the Ivy House parking lot. The culvert is monitored regularly through visual inspections. Additionally, as part of the Clay Street Bridge Replacement Project, the City has included an assessment of the culvert that will provide the exact alignment and documenting the condition of the culvert for its entire length. Please see photos of the culvert below taken at various monitoring periods of the culvert, including LiDAR data collected in 2016. The City will continue to monitor and inspect the culvert and is considering several options for repairs and/or full replacement of the culvert. As with all aged infrastructure, repair or replacement of the Cedar Ravine Culvert will inevitably be required. Construction methods would likely include excavation and shoring for placement of a new culvert, with particular care for the area adjacent to the Druid Monument. Page 6 of 12

Page 7 of 12

Page 8 of 12

How does the Clay Street Bridge Replacement Project affect the Cedar Ravine Culvert? As mentioned, the outlet to the culvert is located as part of the southern bridge abutment at the existing Clay Street Bridge. Replacement of the bridge would include, at the very least, reconstruction of a segment of the Cedar Ravine Culvert. The segment to be reconstructed is the same segment that was repaired in 2003 (Please see Page 6 of this FAQ). The Clay Street Bridge Project team recently reviewed the culvert s condition and location with respect to various important features within the Clay Street Project footprint, amongst the features discussed included the Druid Monument. A concern over the culvert s remaining useable lifespan and its proximity to the Druid Monument s existing location was specifically discussed as it related to any future reconstruction efforts. The DEIR s mentions the culvert, as stated on page 2.0 23, There is a portion of the existing culvert within close proximity to the Druid Monument. Recent investigation using LIDAR technology indicates the segment close to the monument is in poor condition and could fail, which could impact the monument. The clearance between the Druid Monument and the outside of the existing Cedar Ravine Culvert (with an approximate culvert material thickness of 6 ) is 3. Please see the illustrations on the following page. Page 9 of 12

Page 10 of 12 If the realignment alternative for the Clay Street Bridge Replacement Project (as described in the Draft Environmental Impact Report) is selected as the project alternative, it would be methodically and cost efficient to reconstruct the culvert as part of the project once the Druid Monument is temporarily relocated off site, prior to resetting the monument within the intersection at the proposed pedestrian refuge island. Temporarily removing the Druid Monument off site would protect the monument during construction of the new culvert by reducing the risk of complications with excavation, equipment vibration (2 away or less), and shoring of the excavation during removal of the existing culvert structure and construction of

the new culvert. The Druid Monument would be moved back to the intersection permanently at the appropriate time when it would be unaffected by construction activities. What happens after Council certifies the Environmental Impact Report (EIR)? Once the public period closes on April 18, 2018, the City will review all written comments received and will prepare the Final EIR with consideration and responses to the comments on the draft document. City Council will then hold a public hearing and make a determination whether to certify the EIR if the EIR is found to be in conformance with the California Environmental Quality Act (CEQA). Following certification of the EIR, the Council will hold a public hearing to consider approval of the project. Since this is a federally funded project, once the EIR is certified, Caltrans, as the National Environmental Policy Act (NEPA) Delegated Reviewer for the Federal Highway Administration (FHWA) will prepare the NEPA document based on the comments received on the Draft EIR and the certified Final EIR. That document will go out for public review this summer (circulation date unknown). Once the NEPA document is finalized, the project will proceed into design. If historical resources are found during construction will they be preserved for future generations? Answer: In addition to the mitigation requirements proposed in the Draft EIR, there will also be language included within the construction contract that protects cultural resources found during construction. This project is federally funded and will be using the 2015 Caltrans Standard Plans and Specifications as the basis for the construction contract. As a standard contract requirement within the Caltrans Standard Specifications, Section 14 2 Cultural Resources and specifically, Subsection 14 2.03 Archeological Resources cites the procedures for monitoring an active construction site and statement of procedures if resources are discovered during construction. The resources will be protected or recovered following a field review and evaluation from the archaeological monitor. The specifications referenced can be found at the following link and the City is represented as the Department in the construction contract. (http://www.dot.ca.gov/hq/esc/oe/construction_contract_standards/std_specs/2015_stdspec s/2015_stdspecs.pdf Page 211 of the document) Additionally, Caltrans is requiring a Management Plan that will specifically outline the process and protective measures if any artifact is found during construction. This plan will be reviewed and approved by Caltrans Cultural Staff. The Draft EIR cites references, but they are not attached to the document. Where can I find these references? The Draft Environmental Impact Report, inclusive of all appendices and references can be found here: https://www.cityofplacerville.org/environmental documents Page 11 of 12

Is it necessary to build the new bridge +2 higher to clear creek flows? Answer: The project is federally funded and must comply with federal design guidelines and requirements, mainly the use of American Association of State Highway and Transportation Officials (AASHTO). Per the federal design guidelines and requirements, the new bridge is required to have 2 of freeboard from the water elevation of a 50 year storm and the existing bridge does not meet this requirement. Please see the photo taken from the Clay Street Bridge during the heavy storm of March 22, 2018, classified as only a 10 year event based on rain gauge data and NOAA Atlas 14 Point Precipitation Map. PHOTO TAKEN FROM CLAY STREET BRIDGE, MARCH 22, 2018 STORM Page 12 of 12