Steel Applications. Electric Arc Furnace: Cranes (Blast Furnaces): Converter Maintenance Lift: Desulphurisation Pit: Rabbler: Ladle Furnace:

Similar documents
The Best In Machine Guarding Interlock Options

The original VAD development work at A Finkl & Sons,

BEHIND THE LINES. Guarding & Machine Safety. Ian Hansen RotoConsult ARM Annual Meeting ARM Annual Meeting

Machine Guarding and Safety

MAINTENANCE OF CRUCIBLES AND SIPHON PIPES

Now Selling FORMER B&W FOUNDRY BARBERTON, OHIO INSPECTION BY APPOINTMENT MAJOR ITEMS INCLUDE

ADMINISTRATIVE SERVICES MANUAL

SOLIDS FLOW SENSOR SOLIDS FLOW SENSOR: MWS-DP-2

Metalworking Vacuum Cleaners One Type Does Not Fit All As the metalworking industry becomes more specialized so does the equipment that cleans it.

Kitchen Countertop Machines COUNTERTOP LAMINATING SYSTEMS

AUDION PACKAGING MACHINES SHRINK WRAP EQUIPMENT

P23 MELT CONFINED SPACE LOG

Respirable Crystalline Silica Exposure Control Plan

Hands On: Introduction to Safety Workshop Presented by Robert Jones Manufacturing in America March 14-15, 2018

Covidien Articulating Absorba Tack Foil Pouch Leak Tester Owner s Manual IPE SN Rev 1

Employee Health Protection

STERO SCT-94SC/108SC/120SC CONVEYOR SERIES

The Economical Approach to Specialized Finishing and Surface Preparation

ELECTRICAL SAFETY: QUALIFIED/NON QUALIFIED

General Industry Safety and Health Checklist Guidelines. Building and Premises. Loss Control Bulletin

Ventilation Engineering Analysis. Schust Engineering Project #1845

OPERATING & SERVICE PARTS MANUAL HDS-215 COMBINATION SHRINK SYSTEM

Competence in cement

Mobile home became 50 Non-Work

APPLICATION PROFILE EXPLOSIONS IN CEMENT PLANTS EXPLOSIONS IN CEMENT PLANTS CEMENT PLANT EQUIPMENT WITH HIGHEST EXPLOSION POTENTIAL. Form No.

A. General Safety LAB/ROOM: INSPECTED BY: DATE:

Manual / Handbuch Spare parts list / Ersatzteilliste

Schust Engineering, Inc. 701 North Street P.O. Box 128 Auburn, IN (260) Fax: (260)

Technical Rescue Incidents

POLICY STATEMENT: Policy Number: Section 600 Physical Plant. Date Adopted: May 7, Date(s) Revised: September 4, 2012

Title: Electrical Safety Effective Date: 11/28/2014 Control Number: THG_0038 Revision Number: 1 Date: 10/22/2015 Annual Review Completed: 5/13/2015

Boiler. Fire tube Boiler:

Operating and Service Manual

PELLET MILL. construction s prescriptions and safety. Besides, Nova Pellet S.r.l. has obtained in 2007 the Italian

ANSI Z50.1. Safety Standards. In this standard the following definitions shall apply:

MACHINE GUARDING. Hazards of Unguarded Machines. Occupational Safety and Health Regulations (OSHA)

Stefano Martines Tenova SpA - Strip Processing Lines Combined Annealing and Pickling Line New Technologies & Techniques applied on recent Projects

DANGERS AND HAZARDS OF ENTERING LIVE SUBSTATIONS AND ENCLOSURES Barry Gass Actom Protection and Control

MJC Mini. Cartridge Filter. Features. Principal specification and options

DuPont Formacel Z-2. Safety and Handling of DuPont Formacel Z-2: Thermoplastic* Foam Extrusion Applications FOAM EXPANSION AGENT TECHNICAL INFORMATION

Development of Induction Heating Device for Corner of Bloom in Continuous Casting machine

Waste Heat Recovery Using the Example of Slag Fuming

1. STANDARD CONTINUOUS LAMINATING MACHINE FOR THE PRODUCTION OF FLAT WALL PANELS

PELLET MILL. developed properly for pellet production and all technologies and mechanical solutions are chosen to

PLYWOOD INDUSTRY JOB EVALUATION PROGRAM JOB DESCRIPTION. Points: 242 Grade: 18

Integrated Solutions for the. Primary Metals. Industry. Engineered Products for the Process Industries

Operator s Manual. Linear Asphalt Compactor. Jesse D. Doyle Isaac L. Howard, PhD Mississippi State University. January 2010 CMRC M 10-1 Version 1

D Series Technical Data

LBX-2000 POWER STRAPPING MACHINE

Explosion Prevention & Suppression James Maness JEM Safety Consulting Rehoboth, DE.

CL64T INDUSTRIAL TOTE WASHER

TC-150 CONVEYORIZED OVEN. OPERATION AND MAINTAINANCE MANUAL Ovens with Omron PLC and Touchscreen

Title: YALE OFFICE OF FACILITIES PROCEDURE MANUAL Chapter: 01 - Yale Design Standard Division: HVAC Standards

KF-250 Knife Folding Machine

Original operating instructions Safety switch with guard locking AC901S AC902S

Technical description

COATING WATER HEATERS BY POWDERING, SPRAYING OR FLOODING ON OVERHEAD CONVEYOR CHAIN

MINIMUM TANK GAP. Greater of 3 or one-sixth of sum of adjacent tank diameters. one-half of sum of adjacent tank diameters 20

Boiler Basics. Design and operation

LIMESTONE HANDLING AND LIME MILLING SYSTEM

We make your Workplace Safe

MICRO SWITCH Miniature Industrial Limit Switch SZL-VL-S Series Issue 3. Datasheet

Heating for Soft Fruit

RORMAC PACKAGING SYSTEMS Global Business Development & Product Management Specializing in Capital Equipment

Glass Wool Production Line

WORKPLACE SAFETY INSPECTION CHECKLIST

Microwave Doppler Flow Switch. Installation & Operation Manual

Machine Guarding. 1 Copyright 2014, Rev by PEC Safety Management, Inc. PPT-SM-MG 2014, Rev

Common Area Cleaning Guide

Progressive Safety Services LLC 1

HEADLINE LOREM IPSUM COMPANY EFFICIENCY

Engineering and Work Practice Control Methods

INSTRUCTIONS FOR HL-3 HOPPER LOADER HL-3 PPE SOUTH

CL64e DISHWASHER DISHWASHER STANDARD FEATURES MODEL OPTIONS AT EXTRA COST ACCESSORIES DIRECTION OF OPERATION VOLTAGE

PEELED VENEER SLICED VENEER. Wood Technology

Chapter 12 HOT WORK OPERATIONS. Purpose:

WORKPLACE AND SAFETY SIGNS

SECTION WATER-SOURCE UNITARY HEAT PUMPS

Operating Instructions

PEELED VENEER SLICED VENEER. Wood Technology

Nine Metal Fabrication and Finishing Source Categories 40 Code of Federal Regulations (CFR) Part 63, Subpart XXXXXX (6X NESHAP)

Drum Level Instrumentation and. The ASME Boiler Code Requirements. Presented by: Jim Kolbus. Topics

C D E F. Tubular Industrial Process Circulation Heaters. Circulation Heaters. View Product

500 SERIES FOOD WASTE DISPOSERS INSTALLATION AND OPERATING MANUAL PLEASE LEAVE WITH OPERATOR 523 SERIES SERIES SERIES 17



FTNON Magnetic Onion peeler

SAFEMASTER STS. The key to more safety. Our experience. Your safety.

Group-1 Agitators. Group-2 Air Conditioning Plant. Group-3 Air Handling Plant / Air Pressurisation System. Group-4 Belts (Conveyor, V & Wedge Belts)

HRX Technical Manual. Version 1.2

Evaluating Your Property and Work for Safety Hazards

Heat Exchanger. The purpose may be either to remove heat from a fluid or to add heat to a fluid.

Countertop Machines USED KITCHEN COUNTERTOP LINE

Facility Safety Assessment Examples:

PolyRex polymer make-up unit, vacuum conveyor support Technical specification

CE Approved Portable Dryer Wiring Diagrams. Model: 1200 Series. Electrical Installation Manual PNEG Version: 1.0. Date: PNEG-2119

AUCTION. ULTRA-MODERN MANUFACTURING FACILITY PRECISION SHEET METAL CNC CUTTING, WELDING, & FINISHING EQUIPMENT 4801 Esco Drive Fort Worth, Texas 76140

BURWELL ENCLOSED BLAST FACILITIES

BOHEC R CRS86A DISHWASHER STANDARD FEATURES MODEL ACCESSORIES DIRECTION OF OPERATION VOLTAGE OPTIONS AT EXTRA COST

DANIEL C. SESSOMS QAS515 April 1, 2003 PRESS EQUIPMENT TOOL DESIGN FOR HUMAN FACTORS

Transcription:

Steel pplications lectric rc Furnace: Cranes (Blast Furnaces): Converter Maintenance Lift: Desulphurisation Pit: abbler: Ladle Furnace: Continuous Casting Machine: Continuous Billet Caster: Cranes (Slab Caster Mill): Welder: ccumulator Lines: Cold olling Mill & Slitting Line: Inspection Chamber: Coil Conveyor: ail Infeeder Line: ail Processing Machinery: ail Shop Cranes:

LCTIC C FUNC LCTODS CONTOL OOM FUNC NCLOSU Panel Switches Key xchange Door Lock Due to the heat and electricity involved in the process of steelmaking, the danger area surrounding the electric arc furnace is surrounded by guarding. Maintenance staff occasionally need to enter the enclosure but they should not be able to do this whilst there is power running to the furnace. n electric arc furnace is a refractory-lined vessel with a retractable roof through which electrodes are inserted. It functions to convert scrap metal into molten steel using high voltages whilst oxygen is blown into the scrap. mgard; SS1-CLIS-06322DO24-B, S1-CLIS-06322-B, XM5-CLIS-H & DM2-CLIS-H When staff want to enter the furnace enclosure, they press request-to-enter. When the enclosure is safe to enter, they extract both the panel keys, one which isolates the power and one the controls. These 2 keys are entered into the exchange box, which releases 3 access keys, one for each gate. The access keys are put into the gate locks, which releases the gate and the safety key is taken into the enclosure with the personnel. The furnace can t be started again until the gates are shut, and the panel keys been released to be reinserted into the control panel.

BLST FUNC CNS OVHD GNTY POW ISOLT ION CCSS BOX C N C N OVHD GNTY In the blast furnace shop, there are 17 pendant controlled cranes which are used for maintenance. These cranes are at various positions around the shop, including in the workshop and at the top of the furnace towers. The cranes tend to be used whilst other maintenance operations are in progress and there is a danger that the crane operator will move his crane into an area where there are other staff working. The cranes are used to move and position large pieces of equipment needed for maintenance operations. mgard; XM2 in special exchange box ach crane in the blast furnace shop has it s power isolated and padlocked off and besides the power isolation is a crane access box. To use a crane, the driver opens the box and enters his personal, name tagged yellow key into the interlock. This releases the green key from the stack, attached to which is the padlock key to the power isolation. The padlock is unlocked and the power to the crane can be turned on. The pendant used to direct the crane is stored in the box (not in the above picture though). The green key is simply a means of ensuring the padlock key can only be released by a crane driver. If a coloured padlock is locking the box shut, the driver must contact the PICC (person in charge of cranes). blue padlock means there s something different from usual in the crane area (scaffolding etc.) and a red padlock means the crane can t be used.

CONVT MINTNNC LIFT CONVTO MINTNNC LIFT Converter Being Cleaned Converter Maintenance Lift If the lift doors are opened before the lift has come to a standstill at the correct position, it presents a danger to workers in the lift and to those working in the vicinity. The converter is around 50ft tall so when it comes to relining it with reflective bricks (every 6 months or so), a lift is needed to position the workers and the raw materials at various positions in the converter. amgard pro; Lok body with tongue actuator; T2T6SL411 The amgard lok ensures that the lift doors may only be opened at certain programmable positions, when the lift is stationary. t the bottom, both doors may be opened, but at the top, only the east side door can be opened to allow reloading and workers to enter from the platform.

DSULPHUISTION PITS HOOD WLKWY CONTOL BOX Gate into Desulphurisation Pit Control Box View of Desulphurisation Pit System from Corridor The hood is designed to move back and forth from one side of the pit to the other. Therefore, whilst the hood is positioned on one side of the pit, there is a 30 foot drop to the bottom of the pit from the access gates on the other side of the pit. The desulphurisation pits are where lime and magnesium are added to the ladles of molten iron by means of a lance, which is inserted into the ladle, causing the impurities to precipitate and collect on the surface. mgard; DM1 on each gate and a panel mounted SS switch; 2 x DM1-CLIS- & SS1-CLIS-02022D024B ccess is restricted so that only an engineer may gain access to the pits after they have carried out the appropriate procedures in the control box. The engineer is only able to gain access to one of the 2 gates at any point in time, as there is only one key, cut so as it can open either of the DM1 s.

BBL Door Interlock CONTOL OOM abbler in the nclosure and Control oom abbler In ction Due to the confined space, it is hazardous for anyone to be present in the rabbler enclosure whilst there is power to it. The rabbler requires both cleaning and maintenance so a solution is required to ensure that access may only be granted to the enclosure once the power to the rabbler has been isolated. The rabbler is a large, operator controlled, metal arm, approximately 25 feet long, which functions to scrape the layer of slag off the top of the tilted ladle. The rabbler can be seen in operation in the above picture. mgard; panel mounted switch and door lock; DMS1-BLBB-H & S-BLBB-02022 emoving the key from the panel switch causes the power to the rabbler to be isolated and this key can then be used to open the gatelock, in which it is trapped. This ensures that no-one is able to gain access to the rabbler enclosure whilst power is running to it.

LDL FUNC LCTODS FUNC NCLOSU Gate Lock Control Panel Switches CONTOL OOM View of nclosure and lectrodes xchange Box There are 3 access gates into the electrode enclosures, which must remain shut whilst a ladle is being processed. When substances are being added to the ladle and when the electrodes are lowered, molten metal is blown into the surrounding enclosure. the access gates are in the operators blind-spots and therefore there is the danger that maintenance staff who enter through these gates may be trapped in when the operator initiates the process. This ladle furnace is where the alloying materials are added to the ladles of molten steel. The ladle is delivered to the furnace by an overhead crane which places it underneath the electrodes and lances ready for processing. mgard; Door locks (DM2-CLIS-S), Control Panel Switches (S-CLIN-02040), xchange Boxes (XM4-CLIS, XM5- CLIS & XM6-CLIS) To enter the enclosure, the personnel extract the key from the control panel which isolates the power to the ladle furnace. This is then entered into the exchange box and every member of the team who will enter the enclosure then takes a key, the panel key remains trapped. The supervisor uses their key to open the DM1 and takes the safety key (every other person retains their exchange box key). When the team has finished, the supervisor is the last one out and locks the door, exchanging his safety key for the exchange box key. The access key will only be released once every key has been put back into the stack and can then be put back in the control panel to restart the process.

CONTINUOUS SLB CST Power Maintenance box (2) Master key (1) xchange Boxes (1) CONTOL OOM 1 CONTOL OOM 2 The continuous casting machine has molten metal passing through it which is processed by many moving parts. Under normal operations, there is no need to enter the caster, so access is usually only for maintenance. s the machine is so large, with numerous blind-spots and 2 control rooms, the danger is that an operator will start the machine, unaware that an engineer is working on parts of the machine. This continuous slab caster solidifies molten metal into semi-finished steel slabs. The tundish distributes the molten steel to open based moulds that provide the shape. Final solidification and cooling of the strands takes place as they pass through the water cooled roller segments. mgard; master key, 2 exchange boxes and multiple door locks; SS1-CLIS-02022D024B, DM2-CLIS-H and specials To enter the caster, personnel press request-to-enter on the panel in the top control room and the machine enters a rundown cycle. When the machine has halted, the master key can be removed. This is entered into the exchange box to release access keys to zones 1,2 and 3. ach key may only be used on the gates in its zone (there are up to 5 gates per zone, one gate open at once). In the lower control room, the master key can only be released by pressing request-to-enter in the top control room. This master key is put into the lower room exchange box to release keys to zones 4 and 5. The power maintenance box can only be opened by qualified engineers who have the padlock key. The master key is inserted and releases zone access keys, to allow access whilst some power remains. The access keys are used to open the gate locks and the maintenance staff take the safety key into the machine with them.

CONTINUOUS BILLT CST TOP CONTOL OOM LOW CONTOL OOM Power Maintenance The continuous casting machine has molten metal passing through it which is processed by many moving parts. Under normal operations, there is no need to enter the caster, so access is usually only for maintenance. s the machine is so large, with numerous blind-spots and 2 control rooms, the danger is that an operator will start the machine, unaware that an engineer is working on parts of the machine. This continuous billet caster solidifies molten metal into semi-finished steel billets. The tundish distributes the molten steel to open based moulds that provide the shape. Final solidification and cooling of the strands takes place as they pass through the water cooled roller segments mgard; master key, 2 exchange boxes and multiple door locks; SS1-CLIN-02022D024B, DM2-CLIS-H and specials There are 2 control rooms for the continuous billet caster, one top and one lower. The lower one is the main control room as this is where the most access is required. There are 3 zones each with 4 gates. When maintenance staff need to enter, they press request-to-enter and when safe, the panel key is released (the top control room panel key is also released). This is put into the exchange box (lower room has keys for 2 zones, top room has 1) and the access keys are released. There are 4 access keys for each zone, so all gates may be accessed at the same time and the safety key is taken in by whoever opens the gate. Sometimes, maintenance need power running whilst in the area. There is a second key exchange box padlocked shut and only some staff have the padlock key. If the panel key is put into the second exchange box instead, access keys are released for the zones, but some power remains.

SLB CST MILL CNS Crane Unavailable Control oom Mounted Boxes O V H D O V H D G N T YCN OPTO CB G N T Y Crane in Use CONTOL OOM The crane operators sit in cabs hanging besides the cranes and direct them from there. There is limited visibility from these cabs and there is a danger that the crane operator will not be aware of other personnel working in the surrounding area when he is operating his crane. There are 8 cranes in the slab casting mill, so a way of controlling which cranes may be operated is needed. The cranes in the slab casting mill are used to pick up slabs and place them in cooling bays or on train cars. mgard; Special exchange boxes and S-CLIS-02022-B In the control room, there are 8 crane key boxes fixed to the wall. To operate a crane, the driver inserts his yellow key into the box and extracts the green key. This key is taken with them up to the cab and inserted into the panel switch, which grants access to start operating the crane. There is a danger slide bar on each box can be padlocked in position; red means crane is unavailable, green means available and blue means contact supervisor. Some boxes have 2 yellow locks so a second driver can insert a key and go up to the cab to take over. When the crane is unavailable (red), the yellow locks may be padlocked shut so drivers can t insert their yellow keys.

WLD WLD STL MOVMNT CONTOL PNL Front View of Welding Machine The welding machine is surrounded by guarding as there is moving sheet metal and heavy machinery. Maintenance personnel need to gain access to the enclosure occasionally and a system is required that ensures that the line is at a standstill before they can enter. The welder is used to join together the end of one uncoiled sheet to the start of the next uncoiled sheet. amgard and mgard; door lock and panel mounted switch; T1FOOT-CLIN & SS1-CLIS-02022110B When an engineer wants to enter the welding enclosure, they press request-to-enter on the control panel, which causes the machine to enter a rundown cycle. When the machine is safe, the solenoid is energised and the key may be extracted and used to open the door lock. The machine can t be started until the key has been returned to the panel.

CCUMULTO LINS O O O L L L L L L STL STIP O O O STL LSTIP L L STL STIP L L L OO O L L L L L L View long the ccumulator Line The steel sheet is moving quickly through the rollers and due to the length of the line (300m) from any point on the line, it is difficult to see if anyone is in the enclosure, working on the lines. The danger is that an engineer will be working on the line at one end and someone at the other end will start the line assuming it is safe. The accumulator is a part of the pickling lines in the cold rolling mill. The steel sheet is run backwards and forwards through a series of rollers to create an accumulation of sheet that feeds continuous processes further down the line. amgard; Lok body with option pod; TLOK024024PODB To get onto the line, the personnel press the request-to-enter button on the option pod at each gate which causes the line to enter the rundown cycle. When the line is safe to enter, the solenoid is energised and the door may be opened. The line will not start again until all of the doors are locked again. This product need to cope with the heavy vibrations caused by the moving steel sheets and rollers.

COLD OLLING MILL & SLITTING LIN S T L LVLL PINCH OLL SLITT PINCH OLL LVLL SH S T L Side View of Cold olling Mill Interlock Mounted on nclosure Gate There are a number of dangerous machines on the cold rolling mill and slitting line and therefore the entire area is surrounded by fencing. Staff need to enter the enclosure every 2 hours or so to carry out inspections and maintenance work. system is required which isolates the power to the machines in the area before someone can open the gate to the enclosure. The cold rolling mill functions to reduce the thickness of the steel by passing the sheet through a series of pinch rolls and flatteners which apply pressure to make the sheet thinner whilst maintaining its shape and width. The steel then passes through the slitting line where it is cut into uniform lengths and stacked. amgard; Lok body with handle actuator; MLOK024024 & MGD4 20 year old interlock When personnel want to enter the enclosure, they press request-to-enter on the control panel for the specific area. Once the machines in that area have fully stopped, the solenoid is energised and the gate may be opened. Opening the interlock breaks the safety contacts and means that the machines in that area of the line may not be restarted until the actuator is replaced in the head. The previous Fortress locks have been installed for around 20 years.

INSPCTION CHMB INSPCTION WLKWY O L L SHT STL INSPCTION WLKWY Top View of ollers Inspection Chamber and Walkway The sheets of steel which are coming off the rollers must be inspected regularly for thickness, surface quality and imperfections. The rollers along which the sheet steel is passed are in a guarded enclosure so for the inspections, an operator must enter this enclosure. system is therefore required which ensures that the power to the rollers is isolated whilst the operator is in the enclosure, so that the steel sheets are stationary during this period. The inspection chamber is at the end of the buffer zone. This is where the sheet steel is run through a series of rollers so that the machines downstream can be permanently fed, even when the upstream machines are stopped for several minutes at a time, for inspection and maintenance. amgard; Lok body with slide-bar and option pod; SBN-LOK024024-PODB ccess is requested by pushing the entry button. When the machines have stopped, the led will light to indicate the machine is safe to enter and the door may be opened. When the door is shut again and the slide-bar shot back across, the request-to-enter is removed and the machines may be started again.

COIL CONVYO I button coil coil COIL coil MOVMNT coil coil INSPCTION WLKWY OV HD CN The steel coils are moved to the end of the shop by conveyors and at this stage, operators examine the edges of the coils using a handheld device and to do this, the operators need to enter the guarded enclosure around 20 times per hour. The danger is in operators gaining access to the conveyor enclosure whilst the lines are still moving and also, as the coils are large, that someone may close the door and start the line whilst an operator is in the enclosure. t the end of the pickling lines, the steel is re-coiled and the coils are transported to the end of the shop by the conveyors, where the coils are taken away for further processing or sale. amgard; Lok body with slide-bar, option pod, emergency stop and internal release; SBNLOK024024IBX*** When an operator wants to enter the enclosure, they press the white request-to-enter. When the conveyor has stopped, the solenoid is energised and the slide-bar may be opened, causing the red LD to illuminate. In the event that someone traps an operator in the enclosure and starts the line, there is an internal release button to trigger an emergency stop and an external emergency stop to open the door. To restart the conveyor, the door must be locked and the green pushbutton pressed.

IL INFD LIN WLDING BUILDING IL MOVMNT CONTOL PNL In the rail shop, sections of rail are welded together to form longer sections. The rails are travel down a long line and pass through a number of machines (brushing, grinding, welding and saw machines) which process the rails to make them suitable for use. The entire length of line is enclosed by guarding but staff need to enter for maintenance. s the line is so long, there is a danger that staff in the enclosure could be overlooked when the line is started. The infeed lines functions to supply the welding machines with a continuous supply of short rail sections of rail. mgard; SS1-CLIN-02022-D-24B, XM3-CLIS & DM2-CLIS-H When staff want to enter the infeed area, they shut off the power to the line by turning the control panel key. This key is then put into a key exchange box to release 2 access keys, which may be used to open any 2 of the numerous gates onto the line at once. The control panel key can t be removed (so the line can t be restarted) until both of the access keys have been returned to the stack.

T IL POCSSING MCHINY Grinding Machine IL MOVMNT PSS GIND CONTOL PNL The machines in the rail processing shop are surrounded by guarding and can t be accessed when running. The operators occasionally need to make changes to the setup of the machines so they need a way of putting the machines into a different operating mode. The rails are passed through a number of machines which perform various operations on the lengths (grinding, pressing, brushing, welding and cutting). mgard; 3 panel switches; SS1-CLIN-02022D024-B & 2 x S-CLIS-02022-B When the operator wants to change the setup of the machines, they extract the control panel key and enter it into the panel switch for the machine which they want to setup. This allows the operator to make the required changes to the machine setup without entering the enclosure. The gate lock is part of the line entry system, which uses the same control panel key, which is entered into the key exchange box rather than the other panel switches.

CN IL SHOP CNS O V H D IL STO CN TIN TCKS O V H D G N T Y CN G N T Y ail Infeed Storage Yard CN CCSS BOX Crane in Use CONTOL PNL Crane Not in Use t both the start and the end of the rail shop line there are storage areas, where the rails are stocked before/after processing. The overhead cranes in these areas should only be used by qualified operators so a system is needed which ensures only certain personnel can use the pendant control boxes. The overhead cranes are used to transfer bundles of unprocessed rail sections from the train cars to the stores and to transfer bundles of finished rail sections back onto train cars. The infeed cranes are magnetic and the outfeed cranes are camlock style. mgard; XM2 in special exchange box and S-CLIS-02022-B When an operator wants to use the cranes, they unlock the box with the attached key. The pendant is stored inside, but will not operate the cranes in this state. The operator inserts their personal, name tagged yellow key into the exchange box and removes the green key. This green key is inserted into the control panel switch which allows the pendant to operate the cranes.