Similar documents
A. Contractor shall provide product data for each type of product indicated.

SILT FENCE MACHINE SLICED ERO-1A STEEL FENCE POST (T-POST), MINIMUM 5' LONG, 6' MAXIMUM SPACING.

SECTION EARTHWORK

Tree Pits Construction Guide

Department of Agriculture. Conservation Service. United States. Natural Resources REVISED 8/26/16

A. Install all temporary erosion control measures (in accordance with MNDOT General Conditions 2573) prior to site disturbance.

PROPOSED DRAINAGE PATTERNS

Erosion Control for Home Builders in the. City of Jacksonville

Geosynthetics for Erosion Control and Reinforcement

Feet. Overland. Drainage Area Boundary. To Swale. Swale. To Catch Basin. Culvert Pipe. To Drain Outfall. NRCS Soil Area Boundary

Methods, approaches, and procedures to minimize active agricultural land impacts during pipeline construction, surface restoration, and pipeline

Methods, approaches, and procedures to minimize active agricultural land impacts during pipeline construction, surface restoration, and pipeline

BREWSTER SR173 PROPOSED: OKANOGAN RIVER PADDLERS CAMPGROUND WATERBODY: OKANOGAN RIVER NEAR: BREWSTER COUNTY: OKANOGAN STATE: WASHINGTON

CONSTRUCTION SPECIFICATION FOR RIP RAP, ROCK PROTECTION AND GRAVEL SHEETING

MARBLE RIVER WIND POWER PROJECT Agricultural Protection Measures

Analyzing the Bioretention Construction Sequence

Shelbyville, KY Stormwater Best Management Practices. Section 2 EROSION PREVENTION AND SEDIMENT CONTROL PLAN

A. Install all temporary erosion control measures (in accordance with MNDOT General Conditions 2573) prior to site disturbance.

POND Construction. Perry L. Oakes, PE State Conservation Engineer Natural Resources Conservation Service

SECTION AMENDED TOPSOIL

Case Study Bioretention Installation and Maintenance

STORM WATER MANAGEMENT PLAN APPLICATION Manheim Borough

SOP 6: Erosion and Sedimentation Control SOP 6: EROSION AND SEDIMENTATION CONTROL

Key Topics. Bioretention Crime Scene Investigation The Bioretention Construction and Maintenance Sequence

SECTION 6. Routine Maintenance Activity Details

REFERENCE DRAWINGS FOR 332 W. MAIN STREET ROCK HILL, SOUTH CAROLINA

Urban Conservation Practice Physical Effects ESTABLISHMENT, GROWTH, AND HARVEST NUTRIENT MANAGEMENT

Town of Excelsior, Sauk County, Wisconsin DRIVEWAY ORDINANCE

Information for File # JTF

UPLAND EROSION CONTROL, REVEGETATION, AND MAINTENANCE PLAN

Town of Essex Small Site Erosion Control Guide

Construction Progress Report

Rainwater Harvesting: Soil Storage and Infiltration Systems

HILCORP ALASKA, LLC HAPPY VALLEY MIDDLE NATURAL GAS EXPLORATION PROJECT DEEP CREEK UNIT BOUNDARY PROPOSED ACCESS ROAD T02S T03S R14W

V. EROSION CONTROL. -Drainage swales separation -Under rip-rap protected -Under rip-rap unprotected

CHAPTER 4. SPECIAL CONDITION EROSION CONTROL MEASURES

511 - RIP RAP - OPSS 511 ROCK PROTECTION - OPSS 511 GRAVEL SHEETING - OPSS 511 GEOTEXTILE - OPSS 511

STREAM ALTERATION PRACTICES

HILCORP ALASKA, LLC KALOTSA PAD

Appendix F Construction phase management

Alternative Names: Erosion Control Matting, Erosion Control Netting, Rolled Erosion Control Products (RECP)

Cedar Niles Future Park Site Wetland #1

RAIN GARDEN ILLINOIS URBAN MANUAL PRACTICE STANDARD. (feet) CODE 897 DEFINITION

WET PONDS INSPECTION & MAINTENANCE CHECKLIST

Preventing Storm Water Pollution: What We Can Do

General Information. Site Conditions. 9b 9b. 9a 1b. Best Management Practices Illustration

EROSION & SEDIMENT CONTROL

INSTALLATION GUIDELINES FOR GEOTEXTILES USED IN FILTRATION AND DRAINAGE APPLICATIONS

FIRST SISTER LAKE STORMWATER RETROFIT

PERMANENT SEEDING. Overview of Sedimentation and Erosion Control Practices. Practice no. 6.11

ABBREVIATIONS. Dwg LID of 1. Abbreviations

Example Codes. City of Brentwood, Tennessee Brentwood Hillside Protection Overlay District Summary

Pondless Waterfall Vault

Subsurface Infiltration Bed

EROSION & SEDIMENT CONTROL

MILL PONDS. Tel:

Residential Rain Gardens. Dr. Cathy Neal Extension Specialist Landscape Horticulture

ARROW BOWEN PIPELINE ENVIRONMENTAL MANAGEMENT PLAN OUTLINE SOIL MANAGEMENT PLAN

WAKE COUNTY STORMWATER MAINTENANCE CHECKLIST

STANDARD SPECIFICATIONS SECTION TEMPORARY EROSION AND SEDIMENT CONTROL

UBC Technical Guidelines Section Edition Planting Preparation Page 1 of 6

Wisconsin Contractors Institute Continuing Education

Appendix E Preliminary Design

Appendix N. Preliminary Design

WQ-23 MOUNTAINOUS AND STEEP SLOPE SITES

NOTICE OF INTENT. Submitted To: Bremo Power Station 1038 Bremo Bluff Road Bremo Bluff, VA 23022

Structural Storm Water Best Management Practices (BMPs)

Final Report: Appendix C. LID Parking Lot Design and Teaching Tool at Bridgewater State University, Bridgewater Supporting Information

APPENDIX C: HILLSIDE DEVELOPMENT REGULATIONS (prev. Ordinance #2008-1)

Guidance on Preparation of Construction and Maintenance Costs

WQ-07 INFILTRATION TRENCH

SECTION SOIL BIOENGINEERING OR SHORELINE STABILIZATION

December 13, 2005 Meeting Status of NPDES Post Fire BMPs

2-B-18-UR. Revised: 3/27/2018

The proper use of erosion and sediment controls will allow the following objectives to be met:

Bioretention. Matt Scharver Northeast Ohio Regional Sewer District. #ProjectCleanLake

Florence County Small Commercial Land Disturbance Permit Application

Drainage Analysis-Newgate/Phelps & Hatchett Hill Road Areas Rev. 0 Erosion & Sediment Control Measures

Bio-Engineering Techniques to Revegetate Streambanks

South Fraser Perimeter Road (SFPR)

Low Flow Rates Low Filtration Sandy Soils Medium Flow Rates Medium Filtration Clayey Soils [1] High Flow Rates High Filtration Polluted Soils

KENT COUNTY STORMWATER MAINTENANCE DISTRICT STORMWATER BMPs MAINTENANCE TASKS AND RESPONSIBILITIES GUIDANCE DOCUMENT BIO-RETENTION FACILITIES

SECTION SOIL PREPARATION

Letter of Credit Itemized Cost Estimate For: 100% Site Development Costs

CITY OF ALPHARETTA, GEORGIA LANDSCAPE STANDARDS INDEX

Inspection and Maintenance of Stormwater Best Management Practices

City of Stoughton Erosion Control Permit Application (effective 2/6/2018)

Soil Reclamation and Site Reinstatement

E R O S I O N C O N T R O L

Please make the following changes in your copy of the bid proposal for the captioned project:

Chesapeake Energy Center. Submitted To: Chesapeake Energy Center 2701 Vepco Street Chesapeake, VA 23323

5/15/2013. Basin Area. Vegetation. Rainfall & Runoff. Soil Type. Topics. Factors Influencing Erosion. Factors Influencing Erosion

FOR PROJECTS INITIATED AFTER FEBRUARY 1, 2010 REVISION 1 ITEM 709 TRIANGULAR FILTER FABRIC FENCE

SOIL EROSION AND SEDIMENT CONTROL

PLAN SUBMITTER'S CHECKLIST

SECTION 900 TURF ESTABLISHMENT

Silva Cell 2 Installation Guidelines

The following general requirements will be met for all planter box installations:

Milpitas College Extension Milpitas Dry Landscape

Rolled Erosion Control Products (RECPs) General Usage and Installation Guidelines for Slope

Transcription:

3" TO 4" OF TOPSOIL 2:1 MIRAFI HP 565 GEO FABRIC OR EQUIVALENT 9' SPILLWAY EL=7147 2:1 SPILLWAY SECTION N.T.S. TOP OF POND EL=7149' RIP-RAP D 50 8" WRAPPED IN FILTER FABRIC 45 MIL HDPE POND LINER OR EQUIVALENT TO EXTEND UNDER THE SPILLWAY FIRE TRUCK ACCESS AND TURNAROUND: 1. THE FIRE TRUCK ACCESS MUST BE OPEN YEAR ROUND AND SUITABLE TO SUSTAIN THE WEIGHT OF THE FIRE TRUCK. 2. THERE IS A TURNAROUND AT THE END OF THE PARKING LOT POND WATER SUPPLY: IT IS UNDERSTOOD THAT THE POND WILL BE FILLED WITH WATER TRUCKS. IN ADDITION, RUNOFF FROM THE HILLSIDE WILL BE DIVERTED TO THE POND GENERAL NOTES 1. BEFORE DIGGING NOTIFY ALL APPLICABLE UTILITY COMPANIES. 2. ALL WORK SHALL COMPLY WITH ALL APPLICABLE CODES AND ORDINANCES. 3. NOTES AND DETAILS ON SPECIFIC DRAWINGS TAKE PRECEDENCE OVER GENERAL NOTES AND TYPICAL DETAILS. 4. CONFLICTS OR DISCREPANCIES WITH GRADES SHALL BE BROUGHT TO THE ATTENTION OF THE ENGINEER IMMEDIATELY AND PRIOR TO PROCEEDING WITH WORK. 5. ALL FINISH GRADES SHALL PROVIDE FOR NATURAL RUNOFF OF WATER WITHOUT LOW SPOTS OR POCKETS. 6. ALL COMPACTION SHALL BE DONE IN ACCORDANCE WITH THE SOILS REPORT PREPARED FOR THIS SITE. 7. ALL DISTURBED AREAS WILL BE RESTORED AND REVEGETATED. CONSTRUCTION NOTES: 1. THE POND IS EXCAVATED TYPE OF POND 2. ALL VEGETATION MUST BE REMOVED FIRST. 3. ALL TOPSOIL SHOULD BE REMOVED NEXT. 4. EXCAVATE THE POND ACCORDING TO THE PLAN. 5. REMOVE ANY SHARP OBJECTS OR PROTRUDING ROCKS FROM THE POND SUBGRADE. 6. INSTALL FEW INCHES OF FINE SAND AND/OR A FABRIC GEOTEXTILE TO PROTECT THE POND LINER. 7. THE POND LINER MUST BE CONSTRUCTED AND SEALED ACCORDING TO THE MANUFACTURERS RECOMMENDATIONS. 8. THE INSTALLATION OF THE POND LINER MUST BE DONE BY A CERTIFIED POND LINER INSTALLER OR UNDER THE SUPERVISION OF A CERTIFIED OR LICENSED INSTALLER. 9. ALL NEWLY CONSTRUCTED AREAS MUST BE COVERED WITH A MINIMUM OF SIX-INCHES OF TOPSOIL AND RE-VEGETATED TO PREVENT EROSION. 10. CARE SHOULD BE TAKEN TO PROTECT AND MAINTAIN THE NEW CONSTRUCTION. BY DESCRIPTION TEMPORARY EROSION CONTROL 1. THE CONTRACTOR SHALL PROVIDE EROSION CONTROL IN ACCORDANCE WITH THE BEST MANAGEMENT PRACTICES. 2. SILT FENCE SHALL BE CONSTRUCTED ON THE DOWNHILL SIDE OF THE LIMITS OF DISTURBANCE AND AT THE BASE OF DATE STOCKPILED MATERIAL, PRIOR TO EXCAVATION, AND MAINTAINED AND KEPT IN PLACE UNTIL THE FINISH GRADE IS CONSTRUCTED AND REVEGETATED. NO. 3. THE CONTRACTOR SHALL BE RESPONSIBLE FOR PREVENTING THE RELEASE OF SEDIMENT WITH THE RUNOFF FROM THE SITE AND SHALL BE RESPONSIBLE FOR THE INSTALLATION OF ADDITIONAL EROSION CONTROL MEASURES AT THE REQUEST OF 7142 POSITION LARGE ROCKS ON BOTH SIDES OF DRY HYDRANT TO PROTECT AGAINST VEHICLE DAMAGE 6-INCH DIAMETER SCH40 PVC FOR SAFETY (IF NEEDED, DEPENDING ON USE) ENCLOSE THE POND WITH A FENCE STRAINER EL=7141.5' 7147 7145 7143 7142 BOTTOM OF POND FLOW LINE 7147 TOP OF POND LEDGE = 7149' 3:1 3:1 2:1 EL=7141.2' 9' +47 +49 +49 +47 19'+/- 25'+/- NINE (9) FEET WIDE TRAPEZOIDAL OVERFLOW SPILLWAY WITH 4-FT SIDES AT 2:1 SLOPE (SEE DETAIL) EL=7147' LINE THE POND WITH 45 MIL HDPE LINER OR EQUIVALENT APPROVED B Y THE ENGINEER PROTECT THE POND LINER WITH A LAYER OF FINE SAND OR MIRAFI HP 565 GEO FABRIC OR EQUIVALENT EXTEND THE POND LINING SYSTEM UNDER THE SPILLWAY FOR A MINIMUM OF 30 FEET 25-FT FLAT SECTION AT 0% SLOPE (HATCHED AREA) THE APPROPRIATE BUILDING OFFICIALS. DRY FIRE HYDRANT OPERATION AND MAINTENANCE System must be checked and pump tested upon completion to verify system capacity and condition. Perform regular pump test and back flushing on at least an annual basis or as per NFPA recommendations. Records and schedules should be coordinated with local fire department training and testing needs. Maintain access to dry hydrant free of debris and woody vegetation. Keep the all-weather road clear of snow and debris and in good repair. Maintain area in pond around intake strainer free from floating debris and all pond vegetation that could become lodged in the strainer during pumping. Water weeds must not be allowed to plug the inlet of the pipe. CAREFULLY COMPACTED BACKFILL 1 4 Bc min Bc PIPE BEDDING DETAIL N.T.S. 12" COMPACTED GRANULAR MATERIAL SITE 24" POND - DRY FIRE HYDRANT DESIGN 1450 COPPER SPUR ROAD SE 1 4 NW 1 4, SE 1 4 SEC 4, T2S, R83W 6th P.M. EAGLE COUNTY, COLORADO MARY'S MEDICAL POND WATER SURFACE ELEVATION = ' BOULDER WALL, 1-FT HIGH H 4' MAINTAIN OPEN AREA FOR SPILLWAY ACCESS AND MAINTENANCE FROM TOP OF POND EL 7149 TO EL=7147 THE SLOPE IS 3:1, FROM 7147 TO 4-FEET BELOW THE WATER SURFACE ELEVATION IS 2:1. TO THE BOTTOM OF THE POND THE SLOPE IS AGAIN 3:1. EXTEND POND LINER UNDER THE SPILLWAY 1-FT HIGH BOULDER WALL +47 +46 +47 REVEGETATE VEGETATED OVERFLOW DISCHARGE DITCH NOTE: REQUIRED VOLUME OF WATER FOR FIRE FIGHTING PURPOSES PER EAGLE COUNTY BUILDING DEPARTMENT = 25,000 GALLONS. PROVIDED DESIGN VOLUME = ~40,000 GALLONS. 1.5' MIN. 2.5' L PROFILE OF INSTALLATION L1 P.O. Box 724 Eagle, CO 81631 tel (970) 926-9088 www.lkpengineering.com RIP-RAP D50=12" OVERFLOW TO THE WEST TO NATURAL DRAINAGE PER OWNER 7140 7140 +40 7142 7142 +42 +44 RIP-RAP AT CORNER OF DITCH TO PREVENT EROSION SILT FENCE 1. AT THE TOE OF HILLS, INSTALL THE SILT FENCE ALONG A LEVEL CONTOUR AND PROVIDE AREA BEHIND THE FENCE FOR RUNOFF TO POND AND SEDIMENT TO SETTLE. A MINIMUM OF 5 FEET AWAY FROM THE TOE OF THE FILL IS RECOMMENDED. 2. THE HEIGHT OF THE SILT FENCE FROM THE GROUND SURFACE SHALL BE MINIMUM 24 INCHES AND SHALL NOT EXTEND 36 INCHES. 3. SILT FENCES SHALL BE PERIODICALLY MAINTAINED. REMOVE SEDIMENT ACCUMULATED BEHIND THE SILT FENCE WHEN IT HAS REACHED HALF THE EXPOSED FABRIC HEIGHT. 4. DAMAGED SILT FENCE SHOULD BE PROMPTLY REPAIRED. 5. REMOVE SILT FENCES AFTER THEY HAVE SERVED THEIR USEFULNESS. SOIL BACKFILL N.T.S. POND LINER ANCHOR 12" MIN. POND LINER (30 MIL MINIMUM) GRADED POND 12" MIN. FILTER FABRIC, BELOW AND ABOVE THE POND LINER POND LINER ANCHOR NOTE: SITE PLAN BY GREG MACIK, NCARB TAB ASSOCIATES, INC. The Architectural Balance DRAWN BY: CHECKED BY: PROJECT NO.: DATE: DRAWING NO.: L.P. L.P. 14-2916 JUNE 20, 2016 14-2916FirePond.COM SHEET C-1