The feedhorn heaters consist of heater wire attached to a strap and covered with heatshrink. They are attached to a rib on the feedhorn.

Similar documents
The feedhorn heaters consist of heater wire attached to a strap and covered with heatshrink. They are attached to a rib on the feedhorn.

Deice System for 3.4 Meter Antenna, half, 240v Prodelin

Installation Instructions

Band Heaters W A T L O W. Special Mica Barrel and Nozzle

JOHN DEERE GATOR HPX/XUV 2 PASSENGER HEATER INSTALLATION INSTRUCTIONS (p/n: 9PH20S30)

MNEFDD54 & MNBCDD54 GALVANIZED WALL FANS Installation, Operation, and Maintenance Instructions

Fitting Instructions: Street Triple Rx, Daytona 675 from VIN and Daytona 675 R from VIN A

Water Distiller Service Manual

Warnings 2. Installation Instructions 3. Wiring Instructions 3. Mounting Instructions 4-5. Replacement Element Installation 5. Replacement Parts 5-6

Installation Instructions

SM Field Installed Electric Heat Kit

Flexible Heaters. of Silicone Rubber & Kapton

DRAFT INSTALLATION INSTRUCTIONS. Solid-State Series !! NOTE!! Covers the following models: Refer to INSERT for additional information

Camaro A/C Install Instructions

500, 600, 700, IC-27 Dual Installation Heater

(3 plastic wire connectors,blade balancing kit, 2 extra mounting screws #10-32 for outlet box.)

5800 Refrigerator Compressor Capacitor/Relay Kit

OWNER S MANUAL MODEL BW4B SLICER WARMER

CMU701/ 705 OPERATIONS & INSTRUCTION MANUAL

INSTALLATION AND OPERATING INSTRUCTIONS. For Reliance Controls Emergency Power Transfer Switch Kit Model Number 30216BRK

Model 6021 Electrically Heated Rain and Snow Gauge

IB 835. Installation Manual. Integrated Bidet Toilet TABLE OF CONTENTS

General System Layout Sketch

IMPORTANT WARNINGS IMPORTANT SAFETY INSTRUCTIONS

INSTALLATION INSTRUCTIONS

CEILING SPEAKER SYSTEMS F-2352CU2

FlowMark Model Mark-II-SC Installation Operation Manual. EPA Est.#: FL-1

High-Density Industrial

MASTERPIECE /THERMADOR PROFESSIONAL SERIES BUILT-IN OVEN

Warnings 2. Installation Instructions 3. Wiring Instructions 3. Mounting Instructions 4. Replacement Element Installation 5. Replacement Parts 5

Installation Instructions

Summer Breeze Heater Service Manual

FLCH4R Garage and Utility Electric Heater

Installation and Operation Manual For Hunter Ceiling Fans

DISHWASHER INSTALLATION GUIDE SPECIFICATIONS, INSTALLATION, AND MORE

Caliber Series LED Edgelit Exit Sign EXPORT AC Only or Emergency Operation READ AND FOLLOW ALL SAFETY INSTRUCTIONS

Owner s Guide and Installation Manual

OPERATOR S MANUAL. BASIC PROJECT CENTERS Some instructions and drawings may not apply to your specific unit. SAFETY SERVICE PARTS CAPACITIES

Hanson LED C e i l i n g F a n

propanel Series Installation Manual

INSTALLATION INSTRUCTIONS FOR 9330F4552 FREE DELIVERY PLENUM KITS

Installation Instructions

Homestyle Stack Washer/Dryers

installation and operation manual for Hunter Ceiling Fans

Installation Instructions

Homestyle Stacked Washer/Dryer

CEILING SPEAKER SYSTEM

SERVICE MANUAL FOR 6636A & 6636B SERIES TWO TON HIGH EFFICIENCY PACKAGED AIR CONDITIONERS

FIREPLACE INSTALLATION

INSTALLATION. Glass Panel Doors (select models) CAUTION

Bravo II. High Performance Multi-Purpose Speaker

Service Manual. Model Number: Compact Fireplace DF203A DF2006. UL Part Number to 800

Service Manual for X9.5 and Older Models

Home Stacked Washer/Dryer

DISHWASHER. Models DW2432 and DW2432SS. Installation Manual. Write Serial Number (on inner door of unit) here:

Owner s Guide and Installation Manual

Installation Instructions

Installation Instructions

KIT NOTICE. These instructions are for replacing the three existing thermostats with a single new solid-state thermostat.

PACER 30 VACUUM IMPORTANT SAFETY INSTRUCTIONS READ AND UNDERSTAND ALL INSTRUCTIONS BEFORE OPERATING OR SERVICING MACHINE

Thermostats. Digital Non-Programmable. GEAppliances.com. Owner s Manual & Installation Instructions RAK148D2 RAK164D2

CEILING SPEAKER SYSTEM

OWNER S MANUAL AVN SERIES RETRACTABLE NOZZLE VACUUM SEALER WITH GAS PURGE

918 Clock Gauge Installation, Operation, and Maintenance Instructions

Installing and operating your Cabinet Cooling System, with Digital Thermostat

Installation Instructions

3500 SERIES CONVECTION STEAM COOKER PARTS AND SERVICE MANUAL

Installing and operating your Enclosed Cabinet Cooling System and digital thermostat

IMPORTANT SAFETY INFORMATION

SEA FROST BAITFREEZER 110-VOLT AIR-WATER Twin Valve

BF5000NT BF5000 EF2604 SF2603 DF2603

CU1526, CU2026, CU3030 Service Parts

Installation Instructions

INSTALLATION INSTRUCTIONS

Lifetime Limited Warranty

Owner s Guide and Installation Manual

EIC SOLUTIONS, INC. Thermoelectric Air conditioner installation and operation manual. FOR 500 Btu MODEL # S

PERFECT FIT IN-DASH HEAT/ COOL/ DEFROST 1968 CHEVROLET IMPALA

Product Support Bulletin

Installation Instructions

Installation Instructions

INSTALLATION INSTRUCTIONS

Sloan AQUS Installation Instruction, Operation, and Maintenance Guide

Remote Water Quality System Standard Equipment (supplied by EPI) Remote Water Quality System Optional Equipment (supplied by EPI)

TS93 EMF SERIES. INSPK NO Rev.03/10

SUPPORT EQUIPMENT MODULAR RAPIDLY DEPLOYABLE MOBILE RUGGED RELIABLE VERSATILE

SERVICE MANUAL FOR MODEL RM-49

Installation Instructions

Wiring Instructions. High-Capacity Steam Humidifiers

CC-2222C-PL, CC-2222C-PRL, CC-2222C-PR-2, CC-2222C-PL-2,

EIC SOLUTIONS, INC. Thermoelectric Air conditioner installation and operation manual. FOR 1500 Btu MODEL # S

OWNER S MANUAL CAVN SERIES SELF CONTAINED RETRACTABLE NOZZLE VACUUM SEALER WITH GAS PURGE

BV155. Operator s Manual. Beverage Vendor

TRUERH Series HE-67xx Humidity Element with Temperature Sensor

Installation Instructions for SHD Series Drawers

CEILING SPEAKER SYSTEMS F-2352C

Home Stack Washer/Dryers

WIDE AREA VACUUM MODEL PF2030 WARNING: OPERATOR MUST READ AND UNDERSTAND THIS MANUAL COMPLETELY BEFORE OPERATING THIS EQUIPMENT.

TS40 Product Assembly & Service Information Manual

F AN-ASPIRATED RADIATION SHIELD

Transcription:

Satellite Antenna De-icing Systems Automatic De-icing System for Protection against Snow and Ice Simple to Field Install and Operate Engineered for Customer Specified Voltages Low Energy Costs User selectable Automatic, Off or Manual On Modes Available for DH Satellite Reflector Sizes: 1.8, 2.4, 3.0, 3.3, 3.7, 3.8, 3.9, 4.2, 4.5, 5.0 and up o 12 Meter DESCRIPTION The De-icing system consists of a factory pre-wired control unit, heater pads for reflector coverage, and a feedhorn heater. All systems are engineered to be easily assembled, installed and operated. The control unit has three modes of operation: Automatic, Manual Off and Manual On. The Automatic mode allows the control to monitor the ambient temperature and sense the presence of moisture. An ambient temperature of less than 40 degrees F and the presence of moisture activate a heater contactor. The heater contactor is rated up to 50 amps. The heaters will remain on for a factory preset time of one hour longer than conditions warrant. The Manual Off mode turns the heaters off, regardless of the weather conditions. The Manual On mode turns the heaters on, regardless of the weather conditions. Control units are factory preset to operate on 120 to 240 volts, single or three phase power. All cabling to attach the heater pads is factory pre-wired. The larger systems have a control unit with remote moisture sensor. The heater pads consist of heater wire sandwiched between layers of aluminum foil. Heater pads allow for a faster install without the need for templates. The aluminum foil is coated with an aggressive acrylic adhesive and a peel and stick liner. Watt density of the heater pads, depending on the reflector, is between 40 and 55 watts per square foot. The aggressive acrylic adhesive adheres to a variety of substrates and will not release when pad temperature increases. Heater pads have water resistant connectors that plug into the cables from the control unit. The feedhorn heaters consist of heater wire attached to a strap and covered with heatshrink. They are attached to a rib on the feedhorn. Installation of the de-ice system consists of applying the heater pads to the backside of the reflector, mounting the control unit / moisture sensor, routing power to the control unit, attaching the feedhorn heater, and connecting the heater pads to the control cables. The De-icing systems can be custom made for a variety of antennas and applications.

Typical Installation Instruction Manual for the 240 Volt Full Coverage Heater System with Large Feedhorn Heater Materials Provided List Quantity Part Number Description 16 16 1 2 1 4 1 Heater pad for X meter full coverage 240 volt Heater pad for X meter full coverage 240 volt Controller for 3.8 meter full coverage 240 V with mounting feet and feedhorn heater attached Cable tie 36 for controller to mast attachment Grommet for feedhorn heater cable hole Foil strips for lead wire attachment Instruction manual for 240 volt full coverage heater system with large feedhorn heater Tools and Supplies Needed Standard slotted screwdriver (medium) Drill ¼ drill bit 7/16 drill bit Adjustable wrench Clean rags Windex glass cleaner Cable tie straps Cable supplying power to the control and heater system Read these instructions carefully and follow all of the procedures for installing this system. All electrical wiring must be performed in accordance with all applicable electrical codes.

Control and Harness APPLY THE HEATER PADS TO THE REFLECTOR PANELS 1. Properly support the reflector so that no distortion results from heater pad attachment. 2. The surface temperature of the panel should be above 50 degrees Fahrenheit, 10 degrees Celsius for proper adhesion of the heater pads. 3. Thoroughly clean the area to be heated on the rear of the reflector with Windex and dry thoroughly. 4. Test fit the pads by laying all of them on the back of the reflector and orienting them for the best alignment. See the Heater Pad Placement and Connections drawing for the proper locations. The heater pads are designed so that the 85434 pads will fit inside of the 60 inch ring and the 85435 heater pads will fit outside of the ring. 5. Remove the backing paper from the heater pads one at a time and carefully apply to the cleaned reflector. Smooth each pad as it is placed on the reflector. The adhesive is pressure sensitive so be sure to apply pressure and rub the heater pad as it is smoothed to activate the adhesive and adhere properly. 6. Use the supplied foil strips to cover the exposed heater wire that hinges the two parts of the 85435 heater pads. Do not let the heater wire cross itself, potentially causing a hot spot. Page 3 of 9

CONNECT THE HEATER PAD LEADS Heater Pad Placement and Connections 1. Plug the heater pad connectors together as illustrated on the Heater Pad Placement and Connections drawing. The upper eight 85435 heater pads will connect together in seven places, leaving a male and female connector to plug into one of the heater pad power cables. The lower eight 85435 heater pads connect together in the same way. The sixteen 85434 heater pads connect together in fifteen places, leaving a male and female connector to plug into a heater pad power cable. The connectors are difficult to fully seat, and will not properly seal until a small snap is felt. Male leads are designated M and insert into female leads F. 2 Eight connected 85435 pads = 21.7 26.6 ohms, sixteen 85434 pads = 63.4 77.4 ohms. 3. Use the supplied foil strips to anchor any connected leads with excess slack. ASSEMBLE AND CALIBRATE THE REFLECTOR

ATTACH THE CONTROL ENCLOSURE TO THE MAST PIPE 1. Pass a 36 strap through the back of a hole drilled through the mounting bracket secured to the control enclosure. 2. Return the strap through the adjacent hole so that both ends of the strap are behind the control enclosure when finished. 3. Repeat step #2 for the other mounting bracket with a second strap. 4. Place the control enclosure against the mast pipe and tighten the straps sufficiently to secure. The cables exiting from the enclosure should exit in the downward direction. The final adjustment of the control enclosure must be done before the cable ties are fully tightened. The control enclosure must be mounted within six feet of the center of the reflector to ensure adequate heater pad cable length. 5. Mast pipes with a large circumference may be too large for the 36 straps. Self tapping screws may be used to secure the De-ice control to the mast pipe. Enclosure to Mast Pipe Attachment Drawing ROUTE HEATER PAD CABLES AND CONNECT TO THE HEATER PADS 1. Route the heater pad cables and connect to the heater pads as illustrated in the Heater Pad Power Cable drawing. All three cables are identical. Some heater pad connections will have extra leadwire length unused. Extra cable and leadwire should be hanked and secured to the ring. Do not attach cable or leadwire to anything that will not support their weight. Leave extra slack to accommodate moving parts. 2. Use tie straps (not supplied) to anchor the heater pad cables at a point where the leads enter or exit the heater pads and at a point where they branch.

Heater Pad Power Cable Connections MOUNT THE MOISTURE SENSOR 1. Drill a ¼ hole in the reflector and mount the moisture sensor with the nylon insert nut provided. The sensor should be mounted in an area where the moisture sensor grid is parallel with the horizon and it will receive a representative amount of falling and blowing precipitation. 2. Use one tie strap (not supplied) to anchor the sensor cable near the moisture sensor.

ATTACH THE FEEDHORN HEATER TO THE FEEDHORN 1. Route the feedhorn heater cable along the feedhorn support arm. ** For inboard feedhorn support arms, drill a 7/16 hole through the reflector near a support arm mount and insert a grommet into the hole. Unplug the heater from the cable by pulling the connectors apart. Do not pull on the wires. The feedhorn heater cable should now pass through the hole and follow the support arm. Plug the heater and the cable back together. 2. Place the feedhorn heater around the feedhorn and loosely attach it by passing the tail of the strap through the head. Be sure the heater wire in the feedhorn heater is against the feedhorn. 3. Position the heater with the head of the cable tie and the connectors toward the bottom of the feedhorn and tighten the strap fully. Do not cut the tail off of the feedhorn heater at this time. It will be done when the final test of the system is performed and the feedhorn heater is warmed. See the Feedhorn Heater Placement picture for proper placement. 4. Use one tie strap (not supplied) to anchor the Feedhorn Heater Cable near the feedhorn heater branch. ROUTE POWER TO THE CONTROL ENCLOSURE Feedhorn Heater Placement 1. Unscrew the cordgrip nuts sufficiently to allow the cables to move in and out of the enclosure. Sufficient cable slack should still be available to move the cables in and out. 2. Remove the four screws securing the cover on the control enclosure. 3. Remove the enclosure lid as the cables are fed through the cordgrip.

4. Wire 240 volt single phase AC power to the L1 and L3 positions on the contactor. An empty hole has been supplied in the side of the enclosure for wiring power in. * The entire system supplies 5625 watts of heat and draws approximately 23.4 amps. 5. Replace the enclosure cover as cable is pulled from the inside of the enclosure. Leave a minimum of one inch of the SJTW cable protruding from the inside of the cordgrips. 6. Tighten the cordgrips until all cables are secured. Over tightening can damage the cordgrip. 7. Replace the four cover screws securing the lid and tighten sufficiently. SECURE ALL CABLES WITH TIE STRAPS 1. Secure the entire lengths of the heater pad cables, the feedhorn heater cable, and the moisture sensor cable with tie straps (not supplied). TEST THE HEATER SYSTEM 1. Apply 240 VAC single phase power to the system. 2. Allow the sensor to go through its start-up test. 3. When the sensor enters the Automatic Enabled mode (steady green indicator), push the selector switch twice to place the sensor in the Manual On mode (steady amber indicator). 4. Wait a few minutes and feel the surface of the reflector for warmth. The feedhorn heater should also feel warm to the touch. Retighten the feedhorn heater strap while the heater is warm and cut off all but ½ of the excess strap material. 5. Return the system to the Automatic Enabled mode by pressing the selector switch one more time. FINALIZE ALL OTHER INSTALLATION ISSUES DE-ICE CONTROL SPECIFICATIONS The control operates electric heaters to prevent the build-up of snow and ice on the reflector when conditions are conducive to their formation. That is, during precipitation when the ambient temperature is below 40 F. 1. The controller will assure a minimum On time of approximately one hour. The system will continue to supply heat as long as conditions warrant it. 2. The controller provides AUTO, OFF, and ON functions. These modes are user selectable through a single push button switch which alternates through each mode. - The normal power-up mode is AUTO. In this mode, the controller will turn on the heater contactor when conditions are conducive to the formation of snow and ice. - When in the OFF mode, the heater contactor remains disengaged regardless of the weather conditions. - When in the ON mode, the heater contactor is engaged until the controller mode is changed or the power is reset.

3. The control provides two indicator lights. The green indicator lights when the control is in the AUTO mode. The yellow indicator lights when the heater contacts are closed and the heaters are on. 4. The moisture sensor is heated to melt snow and ice for detection as moisture. 5. The controller has been factory preset to operate on 240 volt single phase power. 6. The heater contactor provided is rated at 50 amps resistive. The heater system draws approximately 23.4 amps. 7. The control panel and heater contactor are housed in a UL and CSA rated, weather resistant, gasketed enclosure. System Wiring SatelliteDish.com (954) 941-8883