DOMESTIC HEATING CONTROLS ARE EASY PART 1 - THE BASICS

Similar documents
DOMESTIC HEATING CONTROLS ARE EASY PART 2 - TIMERS & PROGRAMMERS

Unvented Calorifier Range. Operating and Maintenance Manual. For Models & 500

Boiler Replacement Scheme Boiler Installer Form

Kills bills. How Vaillant technologies reduce home heating bills

Assessment Schedule - TS.6

ADVANCE ECB ELECTRIC COMBINATION BOILER

CPC-150-ABIAB. Important Installation Notes.

Understand and apply domestic central heating system installation and maintenance techniques

Mains Pressure Hot Water from an existing vented copper cylinder... Allows the cold water tank to be removed, freeing loft space.

INFORMATION BOOKLET NRG Zone Models 2,3 and 4 Designed, Developed and Manufactured in Ireland

TABLE OF CONTENTS TECHNICAL DOCUMENTATION 03. Technical Data Electrical Details Connection Details Dimensions Standing Losses

Control Packs Catalogue. Including control packs compliant with 2013 Building Regulations: Part L

CPC-180-ABNAB. 180 litres, 535mm x 1550mm high

Electronic Dual Cylinder Thermostat Installation Instructions

Link-Up. Solid Fuel Association Guide to Central Heating.

SmartRad Planning Manual

PLEASE LEAVE THIS MANUAL WITH THE OSO UNIT AFTER INSTALLATION INSTALLATION MANUAL

UNIQ HEAT BATTERIES REFERENCE MANUAL_V2.2. Version: 2018_07_19_v2.2

hxi High Efficiency Heating Only 24hxi hxi High Efficiency Heating Only 30hxi hxi High Efficiency Heating Only 38hxi

Statesman 45/50L, 50/70L, 70/90L, 90/110L, Utility 50/70L, 70/90L, 90/110L, 110/130L, 130/150L

INSTALLATION & TECHNICAL MANUAL

PLEASE LEAVE THIS MANUAL WITH THE OSO UNIT AFTER INSTALLATION INSTALLATION MANUAL

MEGAFLO HE Iss 1

ESCTDEB. Electronic Dual Cylinder Thermostat* User and Installation Instructions. Patent pending

Energy Efficiency in New Housing

IMAGINATION SOLAR LTD. Installation Guide B1. Planning the Plumbing and Wiring

Home owner user pack for the Nibe 200P

Installation, operating and servicing instructions

Spring/Summer Incentives

Spring/Summer Incentives

INSTALLATION MANUAL. Ecoline Geo RI HP PLEASE LEAVE THIS MANUAL WITH THE OSO UNIT AFTER INSTALLATION

HI-LINE SUPER RC FAN CONVECTOR MODELS: 25-18,

HI-LINE LV FAN CONVECTOR MODEL: 7-4.

RT021 User and Installation Instructions

INSTALLATION & TECHNICAL MANUAL

Grant Energy Management Control Systems. Includes weather compensation, sequence controllers, low loss headers and zone pumps

S T O R E R A N G E C Y L I N D E R & G R A N T FEATURES: GRANT MONOWAVE UNVENTED DIRECT AND INDIRECT SINGLE-COIL CYLINDERS

UK arotherm Schematics and installation guide

The iqe Boiler Range. Combination and System T Boilers.

TECHNICAL MANUAL MULTI-ELEC STANDARD BOILER 09/2011 CODE:

NON-SUBMERSIBLE WATER PUMP

Assessment Schedule - TS8

System Installation. multi-zone heating

SLIM-LINE RC FAN CONVECTOR.

Why Vaillant? Home Heating Guide. Because they can reduce our heating bills and our carbon footprint

Trade of Plumbing. Module 2: Domestic Hot and Cold Water Service Unit 10: Hot Water Supply Phase 2

Sirius FS. Working towards a cleaner future

Amptec. Electric flow boiler

5.5.1 General CD/30 (Oil Condensing Boiler Installation Assessment Form) General Technician Stationary...

INSTALLATION INSTRUCTIONS ONE LARGE ZONE

Dene Bath Shower Mixer

Installation & User Instructions

ADVANCE UNIVERSAL MULTI-FUEL THERMAL STORE

Combi Konverter Solar System

Rise. Digital. Bath with overflow filler. Rise Digital Bath installation instuctions page 1

Fusion 200, 300 & 500

Bath Shower Mixer

Instructions for Use Installation and Servicing

HHIC consumer guide to gas boiler servicing

Installation and Commissioning Manual

DANESMOOR 12-14, 15-19, 20-25, 26-32, 32-50, FLOOR-STANDING OIL-FIRED PRESSURE-JET BOILERS USER INSTRUCTIONS & CUSTOMER CARE GUIDE

General safety precautions English

MHG201 Gas Hob Manual for Installation, Use and Maintenance

Room-temperature (economy/night) unit TR 212 E

TECHNICAL BOOK 4: OIL FIRED APPLIANCE & SYSTEM INSTALLATION REQUIREMENTS

ELECTRIC COMBINATION BOILER. (European Patent No: Design Right Protected.) TH12-450U MRK 2

Stainless steel range of condensing boilers. Designed to meet carbon reduction targets. Lifetime service and support. Outputs from 50kW to 660kW

A B C D E F G H I J K L M N O P Q R S T U V W X Y Z

Baxi System 100 HE Plus. User s Operating Instructions. Wall Mounted Powered Flue Condensing Gas Fired Central Heating Boiler

Efficiency Maximiser for Solid Fuel Central Heating

Go Greener, with Gas.

INSTALLATION INSTRUCTIONS OWNERS GUIDE & WARRANTY STATEMENT

Quantum. Installation, User and Service Manual. Hot Spring

KICKSPACE 500, 600, V & 800

RE-PR3-E-27 3-Phase Panel Mount 27kW

High Output Boiler Systems

your comfort. our world. Altherma Flex Type Renewable heat pump system for every environment

Multi-Elec COMPACTE BOILER

Greenstar System Filter

Cylinder/Pipe Thermostat Cat. No. TRT044. Operating & Installation Instructions

TERMO ELECTRIC BOILER INSTALLATION MANUAL OSO TERMO RS -M

HVG620 & HVG720 Gas Hob Manual for Installation, Use and Maintenance

CRU-S Series Stainless Steel Condensate Recovery Unit

Stainless Steel Chimney Extractor

Controls for domestic central heating and hot water guidance for specifiers and installers

GPPS-evo V3.3. Installation Instructions

Extreme Domestic Hot Water Loading System TECHNICAL DOCUMENTATION. Issue 11/09

DESIGN, INSTALLATION AND SERVICE INSTRUCTIONS

VD 3401 Chauffage central Installation, Operating, Maintenance and After Sales Manual

BOSCH CONDENS 5000W ZSB18-2A

Installation Manual. Instrucciones de instalación y manual de usuario 1

instructions FAN HEATER HVF3533 Please retain these instructions for future reference

VGPS-evo V3.3. Installation Instructions. The VGPS-evo is a gas pressure proving system with ventilation interlock and optional CO2 detection.

Level 3 NVQ Diploma in Domestic Plumbing and Heating ( /025)

highline SVCS-1 INSTALLATION & USER MANUAL SMOKE VENT CONTROL SYSTEM * enclosure design may vary software version: SVCS1r6 SVCS1r7 SVCS1r10

Operating instructions Oil condensing boiler

ATMOSPHERIC GAS BOILER INSTALLATION, OPERATING AND MAINTENANCE MANUAL

Risk Assessment and Control Measures for Household Hot Water Systems

Find out more visit speedfitufh.co.uk or call Take control with JG Aura Wireless TRV & Heating Controls. speedfitufh.co.

H o t Wa te r Syste m s. Senator Electric Flow Boilers. Making Life Simpler

Transcription:

DOMESTIC HEATING CONTROLS ARE EASY PART 1 - THE BASICS Today s inescapable need to improve energy efficiency in UK homes has brought installers many opportunities to make extra earnings through the upgrading of heating and DHW controls. Often, however, misunderstandings and technical mystique surrounding some of these products inhibits installers from fitting the most appropriate energy saving devices that can cut household heating bills and reduce carbon dioxide emissions into the atmosphere. This series aims to remove some of the doubts and show that domestic heating controls really are easy. THE CONTROLLED WET SYSTEM The majority of UK centrally heated homes rely on gas, oil or lpg boilers to supply heated water for radiators and DHW primaries. This publication concentrates on these wet systems, where home comfort levels and fuel economy are usually maintained by: a) simple automatic On/Off boiler control to meet demands for heat b) directing heated water to cylinder and radiators only when and to where needed. For optimum efficiency, systems should be correctly sized, hydraulically balanced and fitted with controls that will: - maintain heating and stored DHW temperatures at preset levels enable radiators to be heated only when and where required ensure boilers fire only when heating or DHW are calling permit the boiler to achieve its full SEDBUK performance (see BUILDING REGULATIONS) BUILDING REGULATIONS There are things in our work that we just have to do. For health, safety and environmental reasons, the Building Regulations impose statutory provisions on most aspects of construction work. Unless these requirements are met, premises and installations cannot be legally handed over. From August 2001, Part L1, Conservation of Fuel and Power in Dwellings, applies both to new premises and to existing dwellings whenever a controlled service or fitting is being supplied or replaced. For heating installers, this means in effect that, when replacing boilers and hot water cylinders, it is necessary often to upgrade unsatisfactory timing, temperature and interlock controls so that the boiler s declared SEDBUK performance can be fully achieved. Key requirements of the latest version of Part L1 are: - 1. Applies not only to new build installations but also when boiler or cylinder replacement work is carried out in existing premises; and could require additional or new controls. 2. All replacement boilers must be high efficiency types with the appropriate SEDBUK ratings (78% for most gas boilers), and supported by relevant controls to enable the full SEDBUK performance to be achieved.

3. Separate timing and temperature control for space heating and hot water, except with combination boilers and solid fuel appliances. 4. Zone control of space heating to provide separate time and temperature control in areas that have different requirements such as living and sleeping areas, i.e. TRVs or separate room thermostats with motorised valves. 5. DHW cylinders with suitably sized heat exchangers (to BS 1566 minimum) only should be used to prevent wasteful boiler cycling. 6. Cylinders must be insulated to a minimum standard, as well as the first metre of pipe leading from the cylinder. 7. Boiler interlock is required for gas and oil fired systems to switch the boiler off when there is no demand for heat. Thermostats should be fully interlocked with the boiler. 8. Systems that use only TRV s should be fitted with a Boiler Energy Control, or a room thermostat electrically interlocked to prevent unnecessary boiler cycling. 9. Heating and hot water systems must be inspected and commissioned after installation to ensure they operate efficiently. 10. The building owner and/or occupier must be given a suitable set of operating and maintenance instructions for their systems. MINIMUM ACCEPTABLE CONTROLS The minimum acceptable level of control that allows users adequate operational choice with a single-zone, fully pumped system comprises:- a) a time control to provide independent time control of heating and DHW b) a room thermostat to control space heating temperatures c) a cylinder thermostat to limit the temperature of stored DHW d) motorised valve(s) to regulate the flow of heated water to radiators and DHW coil e) electrical interlock system - to prevent the boiler firing if there is no call for heat The addition of radiator thermostats (TRVs) and an automatic by-pass valve can increase energy savings and enhance a system s seasonal efficiency. However, controls can succeed only if the system itself allows them to. For instance, what is the point of fitting a programmer that offers independent control of heating and DHW if these two circuits are not individually controllable? Also, full energy efficiency cannot be achieved with gravity and semi-gravity systems, or where pipework errors exist. It is important, therefore, that every installation provides the basic system requirements for optimum energy saving performance before any attempt is made to fit controls. GETTING THE PIPEWORK RIGHT A disciplined approach to system layout will pay dividends. By following the simple 3-T s Rule (Fig. 1), and properly positioning the boiler, feed and vent (Fig. 2), installers can ensure a hydraulically correct system and help prevent pumping over, reverse circulation and short circuiting.

3-T s Rule The simple 3-T s Rule shows how the various take-off and return T s should be connected in order to avoid costly problems and call-backs arising from incorrect system circulation. 1 st T Vent 2nd T Cylinder 3 rd T Radiators Boiler Flow Return 1 st T Cold Feed 2nd T Cylinder 3 rd T Radiators Fig.1 the 3-T s rule Remember, numbered from the boiler, the correct order of the pairs of flow and return T s is as follows:- 1) Vent and Cold Feed 2) DHW Cylinder 3) Radiators (zone 1) Where there are additional heating zones, the same simple logic applies, i.e. heating zone two 4th pair of T s; heating zone three 5th pair of T s; etc. Boiler, Feed and Vent Positions Correct. The traditional positioning of boiler, cold feed and vent is shown in Fig. 2. It is by far the best arrangement Cold feed Vent Able to vent steam and feed cold water for the vast majority of domestic systems. Boiler Fig. 2 Traditional boiler, feed and vent positions Incorrect. The feed and vent arrangements illustrated in Figs. 3 and 4 are unsatisfactory and will almost certainly give rise to problems for the reasons shown Most of circuit may be below atmospheric pressure risk of corrosion from air ingress Pumping over occurs Neutral Point Fig. 3 Fig. 4

High Pressure Boilers. Sometimes, with high-pressure boilers, close-coupled feed and vent arrangements (150mm max. between vent and feed) in the flow are permissible subject to the boiler manufacturer s recommendations and the use of additional safety controls such as overheat protection. Boiler with high temperature cut-out Close coupled feed and vent (subject to boiler manufacturer approval) 150mm max Fig. 5 High pressure-drop boiler with close-coupled feed and vent Combined feed and vent systems. The following diagrams (Fig. 6 & 7) show combined feed and vent layouts, where the feed and vent pipes are connected to each other before connection to the system. Not as intrinsically safe as the other arrangements, these options should only be used if recommended by the boiler manufacturer. Boiler with high temperature cut-out 22mm Not without boiler manufacturer approval! Fig. 6 Combined feed and vent arrangement (1) Boiler with high temperature cut-out Not without boiler manufacturer approval! Fig. 7 Combined feed and vent arrangement (2) BOILER SIZING The operating efficiency of boilers decreases with low heating loads. Boilers running constantly at part capacity will most surely waste fuel. Over-sizing, therefore, should be avoided. Domestic boiler sizing is best based on the BRECSU Whole House method rather than by adding up the final radiator sizes, a practice that can produce significant over-sizing.

SYSTEMS WITH CONVENTIONAL BOILERS Gravity circulation and semi-gravity systems These systems cannot achieve full energy efficiency due to their slow response and consequent low controllability. The most cost effective way of improving their energy efficiency is to convert them to fully pumped. The cost of adding controls (programmer, cylinder thermostat and two-port motorised valve (see Fig. 8) is almost as much as conversion to fully pumped without the benefits. SEMI-GRAVITY SYSTEM UPGRADE FP715 Full programmer with 1812 spacer box RMT Room thermostat ATC Cylinder thermostat HP28C 2 port Motorised Valve with SPDT aux. sw. Junction box Fig. 8 Semi-gravity system with controls upgrade Fully pumped systems The well-known systems in Figs. 9 & 10 permit fully flexible, independent time and temperature control of heating and DHW. Programmers and thermostats are not shown. The 3-T s rule has been observed, and the pump, feed and vent are correctly positioned. Attempting a shortcut, e.g. connecting the return from the first floor radiators to the cylinder return, could lead to reverse circulation heated water entering the radiators from the return - when the heating valve is closed. FULLY PUMPED SYSTEM 2 x 2 port motorised valves 3 Tees rule observed, circulation correct OPEN CLOSED Fig. 9 Two 2-port motorised valves

FULLY PUMPED SYSTEM 3 port motorised valve 3 Tees rule observed, circulation correct Fig. 7 Mid-position valve system COMBINATION BOILER SYSTEMS Over 50% of all new central heating installations now have combination boilers. They do not require feed and vent systems, or DHW cylinders. Therefore, the 3-T s rule as such does not apply. Nevertheless, care is still required to avoid reverse circulation and/or short-circuiting. DHW CYLINDERS These require sufficiently large coils (minimum to BS1566) to allow the cylinder to absorb heat quickly. Larger coils have particular benefits with condensing boilers. A WORD ABOUT THE ELECTRICS Most installers should find making the simple electrical connections required for domestic heating controls well within their capabilities. Full instructions are invariably included with every new control device or pack and this series of publications will deal elsewhere with the wiring of individual controls and control systems. However, it is strongly recommended that those intending to do their own wiring and commissioning should attend a suitable electrical training course. A) Field (First-fix) Wiring In practice, installers will be wiring each component back to a wiring centre or junction box. It is, therefore, important to know the number of cores that are required for each cable. Manufacturers usually present this information as a Field Wiring Diagram as shown below (Fig. 8). The cables are usually presented as, for example, 3+E, which means that three cores are required from the connection, plus an earth if the component requires it. Double insulated components do not require an earth, but it is good practice to leave an earth conductor available.

Mains Supply Programmer Boiler & Pump 3 + Cylinder Thermostat 2 + 5 + 3 + Wiring Centre 3 + Room Thermostat 4 + 4 + MV MV Fig. 8 B) Mains Connection To comply with the latest wiring regulations, mains power for the boiler, pump and controls should be connected to a domestic heating system via a double-pole, switched and fused (3A) fixed spur with an On/Off indicator. C) System Tests Four basic tests should always be carried out on any appliance or control system before connection to the mains earth continuity, short circuit check, resistance-to-earth and polarity. Failure in any one test means that the appliance should not be connected. 1) Earth Continuity Check This test ensures that all the metal parts of the system are correctly bonded to the earth leading away to the supply. Failure means that, in the event of a fault, the appliance could remain live and this would not be detected until someone received an electrical shock A suitable meter should be used to measure the resistance in Ohms (Ω) from the earth connection of the double pole isolation switch to all metal parts of the case, pump, etc The reading should be less than 1Ω. A higher valve represents failure and the appliance should not be connected. 2) Short Circuit Check A short circuit in the system will immediately blow a fuse when connected and possibly damage some of the components A suitable meter should be used to measure the resistance in Ohms between the neutral and live terminals. Because of the large number of potential live circuits that may be electrically isolated when powered down (switches open) this test should be carried out on the wiring or terminal block The testing between the neutral and various live or switched live terminals should always read greater than 1Ω. A lower value indicates short circuit failure

3) Resistance-to-Earth Check This ensures that the appliance or system does not have a leakage to earth The basic test uses a suitable meter to measure the resistance between Earth and the live or switched live terminals. The meter must read infinite resistance at its highest ohms range, lower than this indicates a fault or failure This test is best done at a wiring or terminal block since this gives best access to most switched live circuits 4) Polarity Check The aim of this test is to detect whether the boiler or system s live, neutral and earth are connected the correct way round. The mains supply is connected and a suitable meter used to measure the voltages across the L, N and E terminals. The meter should be set to a suitable AC Volts scale (normally 300Vac or higher) and the results should be in accordance with the following. L-N meter should read approx 240 V ac L-E meter should read approx 240 V ac N-E meter should read approx 0-15 V ac Any other readings indicate a polarity check failure and that the appliance should be disconnected. D) Pipework Bonding Pipework bonding is an important requirement of the electrical regulations. Gas and water pipes should already be bonded to the earth in the main electricity distribution box. In addition, radiators and pipework in the bathroom should be bonded directly to the main electricity distribution box IT S EASY! Hopefully, this guide will have shown that getting a heating system right comes down to plain commonsense - not obscure, mysterious skills that only a few can learn. Anyone with basic plumbing training can do it it s easy. This series will go on to show this applies also to the operation, selection and installation of heating and DHW controls.