Providing power to the railway

Similar documents
In your area. Ravenfield to Clayton LA13. June Introduction

E16: MAINTENANCE OF LANDSCAPED AREAS

Looking Forward. Tuesday 22 nd April 2018

Canal & River Trust response to the Consultation on the Working Draft Environmental Impact Assessment Report

HS2 Environment. Protecting the environment

HS2 Interchange Station Design

Welcome to our Public Consultation

Infrastructure and the environment

University Park, Worcester Non Technical Summary December 2011

HS2 Hybrid Bill Petitioning. Summary of SMBC Asks 23/09/13. Background

DraFt EnvironmEntal StatEmEnt

Welcome to our public exhibition

HS2 EIA Scope and Methodology Consultation

Rannoch 132 / 33 kv Substation Extension

Chapter 27 Route Window SE7 Church Manorway Bridge. Transport for London

Thank you for coming. We want to hear your views on proposed improvements to the A1 between junction 65 (Birtley) and junction 67 (Coal House).

The journey so far. The new masterplan for Dargavel Village

1 Final S.Ricks P.Collins C.Leafe S.Worton 20/07/09. 0 Draft for comment S.Ricks P.Collins C.Leafe S.Worton 10/07/09

OUR AREA SECTION 02 I NEXT PAGE. 2.1 This section sets the scene in regard to the role of the Legacy Corporation and the baseline

Haydock Point. Welcome

We are improving the A69 Styford and Bridge End junctions to cut congestion and journey times for motorists using them and to improve safety.

BREEDON NORTHERN LIMITED

In Title Your Area 10: Lower Boddington to Southam & Offchurch

Welcome to our public exhibition

SOUTH WOKINGHAM STRATEGIC DEVELOPMENT LOCATION PUBLIC CONSULTATION

Better, faster railways: new maker and breaker of northern cities?

High Speed Rail (London- West Midlands)

NON-TECHNICAL SUMMARY

SETTLEMENT ASSESSMENT PROFORMA

SPG 1. * the northern and western sections which are open fields used for pasture and grazing;

Welcome. Proposals for land at Smug Oak Lane BRICKET WOOD

LAND AT HOWES LANE, BICESTER ENVIRONMENTAL STATEMENT NON-TECHNICAL SUMMARY. March 2017 Our Ref: Q70433

Local Wildlife Sites in Leicestershire and Rutland

Weaver Valley Green Infrastructure data

Frequently Asked Questions

INTRODUCTION. Welcome to the third round of information events on the emerging Yorkshire Energy Park proposals. THE CONSULTANT TEAM WHERE IS THE SITE?

Former North Works, Lickey Road, Longbridge, Birmingham

The proposals presented in September drew a large number of comments and feedback and have been grouped together as follows:

Welcome to our public exhibition

LAND USE SHEET 3 LOWER THAMES CROSSING LOWER THAMES CROSSING STATUTORY CONSULTATION. Main works construction compound

London-West Midlands. Non-technical summary. November 2013 ES 3.0.0

London Bridge London Bridge Area Vision Map

Former RAF Sealand Site EIA

Brockholes Wetland and Woodland Nature Reserve, Preston Lancashire

Welcome to the Public Consultation Exhibition

`Code 2 - Accepted with comments

Moving from Vision to Action

In Title Your Area 5: Amersham to Great Missenden

Who Is Parkside Regeneration?

WELCOME. Land North of STEVENAGE. We would like to thank you for attending our public exhibition today.

Local Development Scheme

A38 Derby Junctions. Preliminary Environmental Information Report: Non-Technical Summary

Final Report for the Preliminary Analysis of GHS-OWLS Impact Study

Replacement Golf Course Facilities and Residential Development, Churston. Environmental Statement Non-Technical Summary

Decent homes need decent spaces

THE COUNTRYSIDE STEWARDSHIP SCHEME TRADITIONAL FARMING. in the modern environment

IM Properties, one of the UK s largest privately owned property companies, is developing proposals for Peddimore, a new employment park in Minworth.

Making the case for Sustainable Transport Project Potential

Linden Homes Proposals for land off Ringwood Road, Verwood

Causeway Farm, Petersfield Environmental Statement Non-Technical Summary October 2015

Market Place Bythell Place Queen Street Park Riverside Park. Public Spaces. Blenheim CBD Streetscape Final Report 36

Welcome to our exhibition

Welcome. Welcome to our first Open Day event

Land at Rampton Road. Cottenham

Preferred route announcement M25 junction 10/A3 Wisley interchange Improvement scheme

Construction of the A30 Bodmin India Queens Improvement

LearnEcology Training

Kilnw Envir ood Vale onmental Statement Volume 3: Non Technical Summary July 2010

WELCOME SMDA

NON TECHNICAL SUMMARY

TRANSPORT AND WORKS ACT 1992 TRANSPORT AND WORKS (APPLICATIONS AND OBJECTIONS PROCEDURE) (ENGLAND AND WALES) RULES 2006

A21. Start of works exhibition Tonbridge to Pembury. Welcome. Dualling Scheme

WELCOME. North East Haverhill. The Planning Process

PROPOSED RESIDENTIAL DEVELOPMENT LAND AT GREEN LANE, YARM

Public Consultation. Land at Monks Farm, North Grove. Welcome

Small Heath Rail Sidings, Anderton Road, Small Heath, Birmingham, B11 1TG

Sankey Valley Corridor Enhancement Project Green Infrastructure data Biodiversity and ground nesting bird habitat

AGENCIES and OFFICIALS CONTACTED FEDERAL Federal Aviation Administration Federal Emergency Management Agency Natural Resources Conservation Service U.

EFUF 2014 : Lausanne. Alan Simson Professor of Landscape Architecture + Urban Forestry Leeds Metropolitan University Green Streets Task Group

Kibworth Harcourt. Introduction. Introduction

Statewide Greenways Vision

NORTH WEST SECTOR HORLEY, SURREY

BASS PONDS, MARSH, & WETLAND HABITAT RESTORATION PROJECT

Plenty Gorge Park Draft Master Plan Consultation Report. Draft Master Plan April 2018

Start of works exhibition

WELCOME. Welcome to our second public exhibition on proposals for the redevelopment of the Paddington Central Management Office.

Statement of Community Involvement LAND OFF SOUTHDOWN ROAD HORNDEAN, HAMPSHIRE

Welcome to our exhibition

A46 Coventry Junctions Public information exhibitions

B - Coalfield River Corridor Landscape Character Type

Longbridge Town Centre Phase 2 Planning Application

Making Space for Nature A Leicester Case Study. Dr Helen O Brien Leicester City Council

Linden Homes Land at Hill Place Farm, East Grinstead

Great Fen Action Plan

Land at BROOK STREET PROPERTIES TENCREEK FARM, LISKEARD. Environmental Statement: Non-Technical Summary

Wylfa Newydd Project Site Preparation and Clearance

The Land of Oak & Iron - Sculpture Commission

Greening the Thameslink Route

Rooley Moor Neighbourhood Development Plan

Guidance for Developers on the Management of Biodiversity issues in the Planning Process

Transcription:

photo: Crossrail Providing power to the railway To provide power to the railway, we need to connect into the National Grid network at a number of points along the route. These sites, known as autotransformer feeder stations (ATFS), will house the equipment required to make this connection. To allow sufficient space for this equipment, these sites need to be approximately 200m by 135m and approximately 8m high. Along the Phase 2b route we currently think we need ATFS sites in the following locations: Kingsbury, North Warwickshire Thurcroft, near Rotherham Bottom Boat, near Wakefield Kegworth, Leicestershire Hoo Green, Cheshire In addition to the ATFS sites, we also need a series of smaller sites every three miles (5km) along the route to house equipment required to boost the power available to the trains. These sites, known as autotransformer stations (ATS), will need to be approximately 50m by 20m in size.

Why HS2 will be good for jobs and businesses By bringing our major cities, regions and communities closer together we are encouraging business and innovation Chris Grayling MP, Secretary of State for Transport We will help small businesses in the Midlands and the North to grow by improving their access to finance and support networks HS2 is set to create 25,000 new jobs, including 2,000 apprenticeships, with the newly-opened National College for High Speed Rail playing a key role in generating the workforce of the future By more than halving the journey time from Birmingham to Manchester and Leeds, as well as to other destinations in the North, we will make it easier for the region to operate as a single economic unit and access new markets Improved connectivity will drive productivity growth across the Midlands and the North Survey of businesses and regional bodies

Park Street Gardens construction compound for Curzon Street station, Birmingham Construction compounds Two types of construction compounds are required along the route: main construction compounds satellite construction compounds Main construction compounds act as strategic hubs for engineering, planning and construction staff, including areas for: storing construction equipment and materials maintenance and parking facilities welfare facilities and accommodation for staff Smaller satellite compounds are used as a base to manage specific works along a section of route and for local storage. Satellite compounds will also be used for work on the track, and for signal and communications systems following completion of the main works. Compound sizes will vary and sites will be required for the duration of the construction process. Construction compounds are regulated by the Code of Construction Practice (CoCP), which is monitored and regulated by the local authority.

Realignment of roads and public rights of way The proposed scheme will cross many existing roads and public rights of way. Rather than alter existing layouts, where practicable, the railway will be designed so that roads and public rights of way are carried over or under the railway. During construction, both temporary and permanent realignments may be required. Temporary arrangements will remain until work is completed and the road or public right of way is either re-established or a permanent realignment is constructed. Where permanent realignments are required these will usually adopt the shortest practicable route. We aim to minimise the impacts on vehicles, pedestrians, cyclists and equestrians when developing new road layouts and public rights of way. We will work with highway authorities, Local Access Forums and communities to identify the best way of maintaining road access and public rights of way during construction.

Can I help you? We have a variety of staff with different expertise. We can answer many different questions about HS2, but we also specialise. If you want specific answers to queries you will see that our badges have different coloured lanyards. Please make a note and find someone with the coordinating colour: HS2 Property Representative Orange White Engineering Engagement Yellow Purple Environment Policy Green Black

Surveys As plans for HS2 develop, we need to build a clear picture of the local environment. Surveys are an important part of this. Where possible, we work on land accessible to the public, but for some surveys we need access to private land. In these cases, we agree access with the people who own and use the land. Non-intrusive surveys These surveys don t cause significant disturbance to the environment or to land and property. They take place in: woodlands, rivers and streams buildings - for ecological species surveys agricultural land - ground sampling to check soil archaelogical and heritage sites Ecology surveys These include surveys on protected wildlife species in: ponds and lakes (e.g. amphibians) hedges, woodland scrubland, grassland, heathland or bog (e.g. dormice, badgers) flowing water, ditches and rivers (e.g. crayfish, otters, fish, water plants and kingfishers) buildings or human structures (e.g. barn owls)

Farm impact assessments We will be meeting with people who own or rent farmland that might be affected by HS2. These meetings will help us understand the potential effects on individual farms and will help inform part of the Environmental Impact Assessment (EIA) for Phase 2b. The type of information we will be looking to gather includes: size, location and use of the farm type and size of agricultural land and nonagricultural businesses based on the farm potential impacts of HS2 on the structure and operation of the farm potential options to reduce, avoid and manage impacts, although no commitments can be made at these initial meetings A record of the meetings will be shared with each farm to check that the facts and subjects we discussed have been correctly understood and recorded. This information will form part of the Farm Pack that we will use to help reduce, avoid and manage disturbance.

Keeping you informed We have local engagement teams that cover every area of the route. We also try to keep you up-to-date with different aspects of HS2 in a number of ways. Residents Charter and Commissioner The Residents Charter is our promise to communicate as clearly as we can with people who live near the route. Visit www.hs2.org.uk to learn more. Property and compensation If you live near the line of route, you may be eligible for compensation. To find out more, visit www.hs2.org.uk. Project updates For more information about Phase Two plans, visit www.gov.uk/hs2 and click on HS2 Phase 2b: Crewe to Manchester and the West Midlands to Leeds. For details of events in your area, visit www.hs2.org.uk Jobs and skills To see what jobs are available on HS2 at the moment, check out our careers page: www.hs2.org.uk/careers If you re interested in a career in high speed rail, visit www.nchsr.ac.uk And if you re a business wondering how to get involved with HS2, go to www.hs2.org.uk/supply-chain