Case Study. New San Francisco 49ers Stadium Scores Big with BioMod System. Project Overview. The BioMod Method. Design & Construction Team

Similar documents
BIOMOD SYSTEM. Modular Bioretention/Biofiltration System BIORETENTION / BIOFILTRATION. Working in Harmony with Nature

6.1 Bioretention Areas

Preparing a Stormwater Control Plan for a Small Land Development Project

COMMUNITY DEVELOPMENT DEPARTMENT POLICY DRAINAGE FOR RESIDENTIAL PROJECTS WITH ONE OR TWO UNITS REVISED JANUARY 4, 2018

Post Construction BMP Inspection. Scott Taylor, P.E. Stormwater

Appendices: Glossary. General Terms. Specific Terms. Low Impact Development Approaches Handbook

Selecting Appropriate Stormwater Control Measures for Your Development Project

Stormwater Control Plan: Small (Tier 1) Land Development Project

General Technical Guidance for Treatment Measures

Green Infrastructure and Low-Impact Development Technologies

Appendix D - Technical Design Criteria for BMPs

Urban Water Management and Soils (ESRM 311 & SEFS 507)

Bioretention cell schematic key

4.5 City of Indianapolis Stormwater Green Infrastructure Guidance: Bioretention (rain gardens) Bioretention Fact Sheet Bioretention Technical Design

Local Stormwater Retrofit Case Studies. Westmoreland County Conservation District Updated 11/2011

Homeowners Guide to Stormwater BMP Maintenance

Technical Guidance for Stormwater Treatment and Site Design Measures

STORMWATER FACILITIES OPERATION AND MAINTENANCE PLAN. Example Commercial Project. February 21, 2018

[TEMPLATE FOR] STORMWATER FACILITIES OPERATION AND MAINTENANCE PLAN. [date] [revision date]

Example Stormwater Control Plan For a Residential Subdivision Project. Whispering Pines Lane Anytown, USA. February 21, 2018

C.3 STORMWATER TECHNICAL GUIDANCE. Table of Contents. Glossary... viii. Chapter 1 Introduction/How to Use this Handbook

Example Stormwater Control Plan For a Residential Subdivision Project. Whispering Pines Lane Anytown, USA. February 21, 2018

BIORETENTION CELLS. Green Infrastructure For Stormwater Management WHAT ARE BIORETENTION CELLS? WHERE ARE BIOCELLS INSTALLED?

Urban Water Management (ESRM 311 & SEFS 507) Cougar Mtn Regional Wildland Park & Lakemont Blvd, Bellevue WA

Kittson Parkway / Watershed Park Parking Lot

LANDSCAPING. Design. Development of the site shall not unreasonably impair the ability of adjoining properties to utilize solar energy.

New Development Stormwater Guidelines

Kearney Post-Construction Stormwater Program

Raingardens and Bioretention Tree Pits MAINTENANCE PLAN. EXAMPLE June 2008

Small Town Sustainable Stormwater Solutions

County of Prince Edward. Stormwater Management Plan. Agreement in lieu of a Stormwater Management Plan

General Technical Guidance for Treatment Measures

JCCC Campus Stormwater Project: Retrofitting Yesterday s Parking Lots With Today s Best Management Practices

Stormwater Regulations & Considerations Morse Study Area. Pam Fortun, P.E. CFM Senior Stormwater Treatment Engineer Engineering Services Division

RETAINING RUNOFF AT ITS SOURCE

LOUISIANA STATE UNIVERSITY COMPREHENSIVE & STRATEGIC CAMPUS MASTER PLAN. APPENDIX G - Stormwater Study Findings & Stormwater Solutions

4. CONCEPT PLAN DEVELOPMENT

Standard Specifications for Lot-Scale Measures for Small Projects

Case Study: Dallas Green Infrastructure for Stormwater

Lesson 2: Stormwater Best Management Practices (BMPs)

Urban Rain Gardens: Capturing our local water. Martha Berthelsen The Watershed Project

The following general requirements will be met for all planter box installations:

Stormwater Technical Guide

Stormwater Management Techniques WMPF LAND USE TRAINING INSTITUTE MARCH 14, 2018

Sustainable Stormwater Retrofit Best Practices

Example Stormwater Control Plan For a Commercial Project 123 Main Street Anytown, USA

From and

Old Mill Community Association Bioretention Facility

Green Infrastructure & Low Impact Development

INFILTRATION TRENCH - LEAKY PIPE

Appendix G. Detailed Design

2012 Saginaw Bay Watershed Conference

Subsurface Infiltration Bed

Use of Best Management Practices

A Review of Green Infrastructure Projects Implemented in the Grand Traverse Region

Green Infrastructure Overview

INTRODUCTION TO GREEN INFRASTRUCTURE HOW WE CAN PROTECT OUR COMMUNITIES AND OUR WATERS Maywood Public Library Bergen County, New Jersey

3.4 Bioretention Facility

2008 SWMM, 2010 Revision City of Tacoma

6.2 Flow-Through Planter

Stormwater Low Impact Development - A Natural Solution

GREEN INFRASTRUCTURE DESIGNS RAIN GARDEN

General Technical Guidance for Treatment Measures

APPENDIX C: STORMWATER CONTROL PLAN

Site design measures. Chapter. This Chapter explains how site design measures can reduce the size of your project s stormwater treatment measures.

Planning, Design, and Construction of Green Infrastructure.

Example Stormwater Control Plan For a Residential Subdivision Project. Whispering Pines Lane Anytown, USA

CHAPTER 11 SITE DESIGN AND LOW IMPACT DEVELOPMENT

Bioswales: A Guide to Low-Impact Development Design and Maintenance. Introduction and Compilation by: Leslie D. Bartsch And Jennifer S.

Figure 1. Bioswale along roadside. Photo courtesy of CalTrans. Figure 2. Diagram of typical bioswale (adapted from UDFCD 1999)

Why and How to Evaluate the Feasibility of Infiltrating or Harvesting and Using Stormwater. Laura Prickett, EOA, Inc.

Green Street BMP Matrix

Low Impact Development Site Design

Putting a LID on Stormwater Pollution. Michele Loudenback, RPES Stormwater Enforcement Water Quality Division

Time Value of Money and Optimization Process

Site Design for Protecting Water Quality 2013 Award Winning Projects

3. Are there any projects exempt from the definition of Regulated Projects?

Slow it, Spread it, Sink it using Green Stormwater Infrastructure

Introduction to Low Impact Development. Fred Milch. East Central Florida Regional Planning Council

Structural Stormwater Best Management Practices

Project Applicant Checklist for NPDES Permit Requirements SAN MATEO COUNTYWIDE STORMWATER POLLUTION PREVENTION PROGRAM

Example Stormwater Control Plan For a Commercial Project 123 Main Street Anytown, USA. February 21, 2018

Tips for Maintaining and Enhancing Stormwater Management Areas

Zoning Regulation Amendments Adopted December 19, 2018 effective date January 7, 2019

DEALING WITH STORM WATER MANAGEMENT

BIORETENTION FACILITY

Infiltration basin under normal conditions, with generous grassed area for water soakage (Source: WSUD in the Sydney Region)

What Are We Inspecting? Stormwater Treatment Measure Type and Design

Costs Design Construction Operation Maintenance

Horsley Witten Group Sustainable Environmental Solutions. Rich Claytor, P.E. Janet Bernardo, P.E. horsleywitten.com

12/31/2014 County of Mendocino s Low Impact Design Standards Manual v1.0 A P P E N D I X 8. Site Design Measures. 32 P a g e

SITING CONSIDERATIONS

MANUAL OF DESIGN, INSTALLATION, AND MAINTENANCE REQUIREMENTS FOR STORMWATER MANAGEMENT PLANS

The Silence of the Sprinklers April 13, Water Conservation Update Reduce Outdoor Water Use

INTRODUCTION TO THE ADAPTING TO RISING TIDES EXISTING CONDITIONS AND STRESSORS REPORT

New England Grows February 8, (c) 2013, Chris Webb & Associates, Inc., PS 1

Low Impact Development (LID) and Bioretention Techniques

Green Infrastructure Modeling in Cincinnati Ohio. Small Scale Green Infrastructure Design Using Computer Modeling

Guide to Low Impact Development

Appendix E: Illustrative Green Infrastructure Examples

Transcription:

New San Francisco 49ers Stadium Scores Big with BioMod System Project Overview A large construction project such as a major league sports stadium can include significant expanses of runoffgenerating hardscape. A venue capable of seating nearly 70,000 people requires large grounds and parking areas. If rain can turn a football field into a mud pit, it can also turn a parking lot into a floodplain. Draining that area effectively and treating the runoff is a basic function that should be provided from the very beginning of the project, but it can present challenges. The new San Francisco 49ers Stadium in Santa Clara, California is a case in point. The new stadium moves the team out of Candlestick Park in San Francisco, into a location with about double the stadium square footage, better freeway access, and more than twice the parking spaces. Parking lot runoff always carries with it petrochemical pollutants that drip or leak from vehicles, as well as litter and other debris. The new stadium sits adjacent to San Tomas Aquino Creek, which flows directly into the Guadalupe Slough and San Francisco Bay, sensitive ecologies less than six miles away. The site is on land with a high water table, and existing storm-drain lines are not very far below the surface. An infiltration system would not work. To handle stormwater in the parking lots, access roads, and other hardscape surrounding the stadium, project engineers GHD Engineering, San Francisco (formerly Winzler & Kelly) selected the BioMod biofiltration system, a stormwater collection and natural treatment system made by industry leader Oldcastle Stormwater. The stadium site will have six biofiltration systems, in parking lots and in the grounds immediately adjoining the stadium itself. The first two systems needed to be installed at the very outset of the project, even before the contract for stadium construction had been awarded, which added to the overall challenge. The BioMod Method Water is one of nature s most powerful forces. Hardscaping can turn that force destructive, both in terms of erosion and pollution. A stormwater collection system has three mandatory functions: 1.) Remove rainwater from the hardscape and other impervious surfaces 2.) Channel runoff so it does not erode the surrounding landscape 3.) Treat runoff so it does not pollute the landscape or downstream waters Design & Construction Team Engineer: GHD Engineering San Francisco, CA Contractors: Ghilotti Construction (1st Phase) Turner-Devcon (2nd Phase) Santa Rosa, CA System Manufacturer: Oldcastle Stormwater Biofiltration module being installed in the San Francisco 49ers new stadium complex. The BioMod system collects and treats runoff in the parking lot that will support construction activities. It was on the critical path of site development, before virtually any other construction could begin, so there was heavy time pressure to produce and install the system.

The BioMod Method (cont.) Biofiltration is one of the simplest, most natural, and cost-effective ways to collect runoff and treat it onsite, and it is considered a best practice under U.S. Environmental Protection Agency (EPA) guidelines for Low-Impact Development (LID). BioMod is a modular system of precast concrete biofiltration units. The fully deployed system looks to the casual observer like nothing but a flower bed or tree-planter, with the earth-level somewhat lower than the surrounding pavement. Beneath the surface, it is a series of concrete cells filled with layers of mulch, biofiltration media and drainage rock, with pipe in the bottom to carry treated water out of the system. To the casual oberserver, the drainage system appears to be simply a series of flower beds. The planting media actually filter pollutants out of runoff water, and breaks them down biologically to provide nutrition for the plants. The surface-level of soil in one of these biofiltration modules is about 6-inches below pavement-level, to provide ponding depth. In storm conditions, water runs into the modules, ponds, and percolates into the media, where it is naturally filtered along the way. The filtered water is collected in a perforated pipe that runs through the bottom of the biofiltration system and carries water into a storm drain system. Cutaway elevation of a bioretention cell used on the 49ers stadium. Runoff percolates through the layers of mulch and biofiltration media, where pollutants are filtered out. Drain rock surrounds the perforated pipe that collects treated water at the bottom of the cell. The overflow drain (right) collects excess runoff in extreme rain events and sends it directly into the stormwater system. Filtered pollutants are naturally broken down by microbes and provide nutrients for the plantings in the module. Plants and trees are irrigated by the rainwater. In locations where rainfall may not be frequent or consistent enough to sustain them such as the 49ers stadium integral drip-lines that are built into the modules can deliver supplemental irrigation water.

BioMod module types include basic units (used with small ornamental plantings), tree modules, pre-filtration units, light pole modules, and custom modules for special situations. Pre-filtration modules have an upper chamber designed to collect litter and other solid debris, and detain it so it does not interfere with drainage. Pre-filtration units must be periodically cleaned to dispose of collected debris. Overflow drains are built into selected modules to handle extremely heavy rains. During unusually high flows, when the ponding depth is filled and cannot be drained fast enough through the filtration media to keep up with rainfall, the parking lot must still be protected from flooding. Excess water then goes into the overflow drains and directly into the stormwater system. The stadium system was designed to handle a 10-year rain event. Having an integrated overflow bypass built into the biofiltration system eliminates the need to design and install a separate peak conveyance system, as is often necessary with other biofiltration setups. Cutaway drawing of a BioMod pre-filtration unit. Debris collects in the pre-filter and can be easily removed by maintenance personnel. Integral overflow bypass allows excess runoff to go directly to the stormdrain system in extreme conditions. The biofiltration system prevents hazardous conditions and collects water so it does not erode the surrounding landscape. Simultaneously, it is treated so it can be safely reintroduced into the landscape or drained into the creek, the natural drainage basin of the area. Pollutants are kept out of the bay, but no chemicals are used, there are no moving parts to maintain, no energy is consumed to do it, and maintenance is minimized. Special Conditions Project Facts Hardscape area drained: 5+/- acres Total lineal feet of bioretention cells: 2,500 ft Total bioretention surface area: 15,000 sf Scheduled completion: August 2014 The high water table of the site was a primary challenge. Even though BioMod closed-bottom modules would be able to filter runoff without interference from existing groundwater, the runoff system would have to tie into the existing, shallow storm-drain lines, dictating that the drain system could not go very deep into the ground. Modules for the 49ers stadium had to be custom designs that are slightly shallower than standard BioMods. The reduced filtration depth available had to be compensated for in the overall design of the drainage system by increasing bioretention surface area. The first system installed includes special units for that purpose. These sections are more than twice as wide as standard BioMods, and are laid out perpendicular to the main system, with a large rounded end for aesthetic purposes and to allow for easier entry to neighboring parking stalls. The shape has been described as resembling a hockey-stick. These special wide modules were custom designed and fabricated for the 49ers project. They are needed to increase surface area of the filtration system to compensate for site conditions. Each drains 7,500-10,000 sf of parking lot. Custom fabrication did not delay the tight production schedule for this system.

The architect designed the side walkway of one parking lot with a shallow S-shaped jog in its otherwise straight path. The biofiltration system runs along the edge of this walkway, and follows the jog. This required custom modules. None of the custom pieces caused any production delays or presented any problem to fit into the modular system. Constructing the System The installed BioMod system has been filled with drainage rock (bottom layer not visible here) and planting media. The upper edge of the system has precast holes for dowels to connect to paving. This system is just over 600-feet long. The kickoff to construction at the stadium site was to create the parking lot on the east side, next to the training field. It will serve the parking needs of construction activities, plus those of the 49ers team offices. It was started in January 2012, months before the official ground-breaking for the stadium. The lot has two biofiltration systems. The one on the north side, featuring the wide, rounded special modules, was manufactured and installed first. The main run is 2.5-feet wide and just over 600-feet long, mostly basic curb-cut units without pre-filtration. The hockey-stick modules that lie perpendicular to the main run are 7-feet wide. They divide the parking lot into six drainage management (DMAs) areas, each comprising about 100-feet of the main run, and each draining 7,500-10,000 square feet of parking and walkways. Installation of the BioMod units was relatively simple. The excavation was cut to the proper depth and leveled, and the units set in place. Sections weighed 10-13 tons. Joints between sections were sealed with a specialized tape and adhesive. The tops of the sections include holes for dowels to attach to adjacent pavements. At the ends of the U-shaped sections, a small amount of fresh concrete was required to fill around curves. Perforated pipe was laid into the bottom and connected to the overflow drains, and the system was ready to be filled with drainage rock and filtration media. The second system in the east parking lot of the stadium included an overflow drain with a unique filter device that retains floatables within the system, seen here before being piped and filled with filtration media.

Constructing the System (cont.) The drainage rate is determined by the surface area of the bioretention system and by the composition of the filtration media. The system does not require proprietary biofiltration media. Fo r the 49ers st adium, engineers selected a blend that yields 5-10 in/hr of drainage in accordance with the Contra Costa County requirements. Other growing media blends are capable of drainage as high as 100 in/hr, where required. Computed against the size of the lot and the predictable rainfall, the size of the required bioretention system can be calculated. However, the media must be selected not only for drainage characteristics, but also for compatibility with the intended plantings. The greatest challenge of the first phase proved to be timing. The underground contractor had a mere 70 days to install the system and tie it into an existing stormdrain, or pay liquidated damages of $25,000/day for every day the project ran over. Use of the BioMod system helped him meet this deadline. The modules for the first system were manufactured and delivered in under six weeks. The second system was installed later, with a mere two weeks production time for 55 modules. The two systems will be fully installed, filled, and planted by early June 2012. The contractor noted there was a learning curve, but it was a fast one. They installed 120-feet of the system on the first day. By the fourth day, they set 480-feet in a day with a single crew. The second, main phase of the project includes four more bioretention systems: two in a large parking lot south of the stadium, and two lining the walkway area surrounding the main entrance to the stadium. Onsite parking for the public will include about 10,000 parking spaces. A total of over 2,500 lineal feet of BioMod cells, approximately 14,000 square feet of bioretention area, will drain the overall stadium site. While the standard bioretention modules used in most of the 49ers project are 3-feet wide, two systems in the second phase feature tapered plans: one is 3-feet wide at one end and 14-feet at the other, an irregular wedge over 300-feet long. The other is 230-feet long and rectangular over most of its length, with a subtle taper at the south end. The main entrance to the stadium runs between the two systems, and the area they drain is immediately outside the luxury boxes. The unusual shapes were designed by the architect with specific visual goals, helping to define the focus of a key space in the stadium s grounds. The Long Term One of the great advantages of a biofiltration system is that it is easy to maintain and essentially self-sustaining. It harnesses the method by which nature breaks down petrochemical pollutants, a process that needs little help from us. Debris must be occasionally removed from the system, and plants must be maintained like any other landscaping, but little more is necessary. The San Francisco 49ers biofiltration system will largely maintain itself, keeping the grounds looking good and safe from flooding, and protecting the San Francisco Bay and sensitive areas surrounding it from contamination. Image by Joel Moses One of the BioMod systems is seen running vertically along the right side of picture to the right of the stadium building and walkway.