Step by Step Detailed Procedure Expected Result Observations Verify power off at all loads on emergency power. Verify all loads have power.

Similar documents
ENGINE GENERATORS AND ACCESSORIES

VACUUM BREAKER MEDIUM VOLTAGE AUTOMATIC TRANSFER SWITCHES

PART 4 ELECTRICAL STANDARDS

UltraLITE Model ELU Centralized Emergency Lighting Inverter 4.2 KW- 5 KW

SECTION AUTOMATIC TRANSFER SWITCHES PART 1 - GENERAL

SECTION CENTRAL BATTERY INVERTERS. A. This Section includes fast-transfer central battery inverters with the following features:

SECTION AUTOMATIC TRANSFER SWITCHES

Model LTN-3R Outdoor Rated Uninterruptible Power System Single Phase

Brown University Revised June 29, 2012 Facilities Design & Construction Standards SECTION ELECTRICAL DESIGN CRITERIA

CONTENTS AUTOMATIC TRANSFER SWITCHES

elite Model ELN Centralized Emergency Lighting Inverter Systems 550 W to 1.5 KW Systems

NORTHWESTERN UNIVERSITY PROJECT NAME JOB # ISSUED: 03/29/2017

A. This Section includes transfer switches rated 600 V and less, including the following:

Baldor Electric ProSPEC MASTERFORMAT SPECIFICATION 10/26/05

GPS 140 NEC Requirements for Generators. Professional Development Seminar Series NEC Requirements for Generators

Constant voltage 3-phase rectifier.

1.1 REFERENCES.1 American National Standards Institute/National Fire Protection Association (ANSI/NFPA).1 ANSI/NFPA 20, Centrifugal Fire Pumps.

ILLUMINATOR E & IE CENTRAL INVERTER FOR EMERGENCY LIGHTING

Spectron LSN (Life Safety Network) Suggested Specifications

M770 ph Controller Owner s Manual

Liebert PPC Second Generation Power Distribution Cabinet

WORKING DRAFT OF COMMITTEE MEETING OUTPUT

SECTION EMERGENCY POWER SYSTEMS

SECTION PANELBOARDS. A. Drawings and general provisions of the Contract, including General and Supplementary Conditions, apply to this Section.

Soft Start Series MP700 Solid State, Reduced Voltage

Heat Pump Defrost Board Replacement Kit

CONTROL PANEL INTERFACE ACTIVATE THE GENERATOR DISPLAY INTERFACE MENUS. Control Panel USING THE AUTO/OFF/MANUAL SWITCH

M2000 Engine Controller

Owner s Manual RD432-0 Chemical Controller

Figure 30: Sample Case 8

ILLUMINATOR E & IE CENTRAL INVERTER FOR EMERGENCY LIGHTING

Installation Instructions. PS902 Power Supply. These instructions cover the following parts: PS902 Power Supply Specifi cations:

A. This Section includes packaged engine-generator sets for [emergency] [standby] power supply with the following features:

Datasheet: K-22 LO Sensor

DEIF A/S. Technical Manual. Type EC-2 Engine Control Unit D. Technical Manual

INSTALLATION AND OPERATION MANUAL ISM-4081 INTEGRATED SHUTDOWN MODULE

La Marche Manufacturing Company Option 16 Series. Digital Combined Accessory Package. Installation and Operation Manual

AT&T TECHNICAL PUBLICATION NOTICE

SECTION AUTOMATIC TRANSFER SWITCHES

16620 EMERGENCY POWER SYSTEMS

24V PCU CORE FIRE PROTECTION INSTALLATION SUMMARY

DS9400 Series. Release Notes for Firmware V2.07. Fire Alarm Control Panel

Across-the-Line SERIES MP300 Combined Manual and Automatic

SECTION AUTOMATIC TRANSFER SWITCH

Guide Specification Model CTG Automatic Transfer Switch

M790 ph/orp Controller. Owner s Manual

Operator: Save these instructions for future use!

Smart Temp. Model

1F Non-programmable Electronic Digital Heat Pump Thermostat INSTALLATION AND OPERATION INSTRUCTIONS

SERVICE MANUAL VC3ED FULL SIZE ELECTRIC CONVECTION OVEN - NOTICE -

UC700 EMERGENCY TRANSFER SYSTEM SPECIFIER S HANDBOOK. 40 Dale Street West Babylon, NY Ph: Fx:

IMPORTANT SAFETY INSTRUCTIONS READ AND FOLLOW ALL INSTRUCTIONS SAVE THESE INSTRUCTIONS

Revision: None DCN No. First Issue Date: November 30, 1998 Product: Standard DCT, 120-volts

DIESEL Engine Fire Pump Controllers Features. FD120 Diesel Engine Controllers

HOSHIZAKI AMERICA, INC. SERVICE BULLETIN

HA-263K HA-263D. OWNER'S MANUAL Installation And Operation 8-ZONE ALARM CONTROL PANEL FOR HOME AND OFFICE PROTECTIONS OPEN THE CABINET FOR SERVICE

CIRRUS AIRPLANE MAINTENANCE MANUAL

ILLUMINATOR EM. CENTRAL LIGHTING INVERTER 1000 VA/W through 2800 VA/W 98% Efficiency!

Silcon DP300E Series 480V kVA User Guide

Operational Overview and Controls Guide

FRONT END ENCLOSURE (FEE) - ROOM DATA SHEET

CommStat 4. Controller for Redundant Telecom HVAC Systems PRODUCT DATA SHEET. Features and Benefits

Operation Manual. EGCP-3 Engine Generator Control Package. MC (Master Control) Model. Manual (Revision C)

IMPORTANT SAFETY INSTRUCTIONS READ AND FOLLOW ALL INSTRUCTIONS SAVE THESE INSTRUCTIONS

Capacity: 1.5 to 6.0 Ton

MANUAL RESET ALARM RELEASE

1S25. Arc Fault Monitor 4 Zones, 8 Sensors. Features. Introduction. ARC Fault Protection

Michigan State University Construction Standards COMMISSIONING OF FIRE ALARM SYSTEMS PAGE

Capacity: 1.5 to 6.0 Ton

AUTO RESET ALARM RELEASE BOX MODEL AR-C INSTRUCTION MANUAL

1F Non-Programmable Electronic Digital Multi-Stage Thermostat INSTALLATION AND OPERATION INSTRUCTIONS

CITY OF WHITEHORSE SERVICING STANDARDS MANUAL SECTION 2 - CONSTRUCTION DESIGN CRITERIA SUB-SECTION 2.A SCADA STANDARDS.

Fire Alarm and Life Safety System Inspection Certificate

SECTION AUTOMATIC TRANSFER SWITCHES

M-20 Oil Mist Concentration Detection and Alarm Device

SECTION POWER SUPPLIES AND DISTRIBUTION

SCHOOL DISTRICT PALM BEACH COUNTY BUILDING DEPARTMENT PLAN REVIEW CHECK LIST -- ELECTRICAL

Instruction manual. Remote control electric IR HEATER

Annunciation, Remote Monitoring, Control Industrial Control Panels

NFPA CODE TESTING & INSPECTION. Requirements & Recommendations for. Licensed Florida Hospitals, Ambulatory Surgery Centers,

CommStat 6. Controller for Redundant HVAC Systems PRODUCT DATA SHEET

SECTION GAS-FIRED RADIANT HEATERS

MA Electric Code Challenges for Architects

Installation Instructions

CIRRUS AIRPLANE MAINTENANCE MANUAL

Union County Vocational - Technical Schools Scotch Plains, New Jersey


DIESEL Engine Fire Pump Controllers Features

Major Fault Caused by Stator Winding Circuit Ring Failure

50M Integrated Single or Two-Stage HSI Integrated Furnace Control Kit INSTALLATION INSTRUCTIONS

Non-Parallel Generation Application

No fan function in heat mode. Fan ON continuously. Indicates incorrect room temperature

DGC-1000 DIGITAL GENSET CONTROLLER

American University Design Standards

Operation & Maintenance Manual

Installation Instructions Wall Ovens

SECTION FUNCTIONAL PERFORMANCE TESTING (FPT) PROCEDURES - CONSTRUCTION MANAGER EDITION

FLORIDA SHERIFFS ASSOCIATION & FLORIDA ASSOCIATION OF COUNTIES

ModSync Sequencing System Installation & Operation Manual. For use with Fulton Steam Boilers.

Fire Alarm Acceptance Testing & On-Going Maintenance with The Joint Comm. Standards / Reporting. Prepared Especially for : OSFM TEC 2016

Transcription:

1. ATS Breaker Open ATS Breaker Verify power off at all loads on emergency power. Close ATS Breaker & put ATS Sw. to Auto Verify all loads have power. 2. Generator Cold Open normal power breaker & immediately Time delay from power failure to engin start should be Start connect full load bank load capacity to ATS within sec. units. (This connection must be made Cranking time until prime mover starts and runs should before the generator engine is up to speed be within sec. & transfer to emergency power is complete. Time until engine-generator is at proper voltage and Observe the systems performance & record frequency should be within sec. the date using a Power Line Disturbance Total time from power failure until ATS switch is on Monitor to monitor transient responses. emergency power should be within sec. Compare to specifications. 3. Repeat Generator Open normal power breaker & immediately Time delay from power failure to engin start should be Cold Start connect full load bank load capacity to ATS within sec. units. (This connection must be made Cranking time until prime mover starts and runs should before the generator engine is up to speed be within sec. & transfer to emergency power is complete. Time until engine-generator is at proper voltage and Observe the systems performance & record frequency should be within sec. the date using a Power Line Disturbance Total time from power failure until ATS switch is on Monitor to monitor transient responses. emergency power should be within sec. Compare to specifications. TN Higher Education - Standard Documents - May 2018 Page 1 of 10

4. Phase Testing Record voltage & amperage of each phase Voltage V & frequency using analyzer, not generator Frequency HZ gages; engine temperature, oil pressure & Amperage A battery charge rate at 5 minute intervals for Coolant Temp. F a period of one hour. Measure the temp. of PSI all generator & ATS connections using a laser guided infrared temperature meter. 5. Return to Normal Disconnect Load Bank from ATS, before Power transfer back to normal power. Oil Pressure Battery Charge Rate ATS Contacts Input Temp. ATS Contacts Onput Temp. ABOVE VALUES PERFORMANCE CRITERIA FOR TABLE IN SECTION 26 08 32 Time delay to return normal power should be within Restore Normal Power Breaker and record delay to normal power transfer using PDM. sec. Neutral delay time should be within sec. Record neutral delay time by recording V Generator Power to Utility Power, V should be 0. differential between EGP & UP at the time of the transfer back to normal power using Engine continues to run & cool down time should be PDM. min. 6. Step Load After cool-down timer has expired, start the Step Voltage FrequencyFrequency Stability Testing generator by opening the ATS normal input Specified V HZ Criteria power breaker. With the emergency bus 0-25% V HZ energized perform the step load test verify 0-50% V HZ that volts & HZ stay within specified range 0-100% V HZ during transition & HZ stability (rate of 100-50% V HZ change) is acceptable using PDM. 100-25% V HZ F F TN Higher Education - Standard Documents - May 2018 Page 2 of 10

7. Temperature on Load Bank Connect full load bank to ATS There should be no significant diff in temp between Phs Maintain power flow for 15 min and then Phase 1 Phase 2 Phase 3 take temperature readings with infrared F F F meter looking for hot spots. F F F 8. Temperature on Utility Transfer load to Utility source There should be no significant diff in temp between Phs Maintain power flow fro 15 min and then Phase 1 Phase 2 Phase 3 take temperature readings with infrared F F F meter looking for hot spots. F F F 9. ATS Test Switch Operate the ATS test switch & verify that Generator should start and emergency power sequence generator starts and emergency power initiate. Verify that total time to emergency power meets sequence is initiated. that specified (see procedure 2) Bypass the return to normal timer to accelerate the test sequence. 10. Safety Interlocks Operate the ATS and controls in a deranged Alarms should be generated and emergency power ATS mannet to create an alarm condition remains off. 11. Alarms ATS Simulate all alarms, alarm contact operation All alarms are properly annunciated in the remote panel and remote enunciator operation by jumping across alarms TN Higher Education - Standard Documents - May 2018 Page 3 of 10

12. ATS Digital Check calibration of ATS digital readouts of ATS should be within tolerances Readouts frequency, current and volts against a Specified Actual calibrated instrument. Voltage V V Ampereage A A Frequency HZ HZ 13. UPS with Load Connect the UPS to a load bank and leave UPS values should be within tolereances Bank Off the load bank off. Operate the UPS for 1/2 Specified Actual hour without load while monitoring UPS Voltage V V output with Power Line Disturbance Frequency HZ HZ Monitor and Load Profiler. Take a waveform THD < 5% % and load profiler snapshot. Observe the Waveform Minimal varations in voltage, frequency, total Deviation harmonic distortion (THD), and the wave form deviation. 14. UPS with Load Bring the UPS to its 50% kw rating UPS values should be within tolereances Bank at 50% (balanced load) in 25% increments. Operate Specified Actual the UPS for 1 hour and monitor UPS output Voltage V V Frequency HZ HZ THD < 5% % Waveform Minimal Deviation TN Higher Education - Standard Documents - May 2018 Page 4 of 10

15. UPS with Load Bring load bank load up to 100% of rated UPS values should be within tolereances Bank at 100% kw (balanced load) and monitor UPS Specified Actual output for 2 continuous hours. Voltage V V Frequency HZ HZ THD < 5% % Waveform Minimal Deviation Record all electrical distribution systems There should be no significant diff in temp between Phs connection temperatures using an infrared Phase 1 Phase 2 Phase 3 meter. F F F F F F 16. UPS Step Load Monitor and record the UPS performance Step VO, V FO, HZ THD, % Wave Test for Voltage Overshoot (VO), Frequency Specified < 5.0 Minimal UPS shall be Overshoot (FO), Total Harmonic 0%/15sec subjected to 3 Distortion (THD) and Waveform Deviation. 25%/15sec consecutive step The generator should power load and not 0%/15sce load tests. transfer to battery. The UPS will be monitored and waveform 0%/15sec deformation/harmonic content. Each of the 100%/15sec four step tests shall be performed at 1 min. intervals until 3 repitions have been completed. 100%/15sec (16. ups Step Load test continued on next page) 125%/15sec TN Higher Education - Standard Documents - May 2018 Page 5 of 10

(16. ups Step Load test continued from previous page) Step VO, V FO, HZ THD, % Wave UPS shall be Monitor and record the UPS performance Specified < 5.0 Minimal subjected to 3 for Voltage Overshoot (VO), Frequency 0%/15sec consecutive step Overshoot (FO), Total Harmonic 25%/15sec load tests. Distortion (THD) and Waveform Deviation. 0%/15sce The generator should power load and not transfer to battery. 0%/15sec The UPS will be monitored and waveform 100%/15sec deformation/harmonic content. Each of the four step tests shall be performed at 1 min. 100%/15sec intervals until 3 repitions have been completed. 125%/15sec 0%/15sec 25%/15sec 0%/15sce 0%/15sec 100%/15sec 100%/15sec 125%/15sec 100%/5min 125%/5min TN Higher Education - Standard Documents - May 2018 Page 6 of 10

17. Grounding Verify connections & grounding is in compliance with NEC, especicially grounding & bonding of UPS & generator. Wiring & grounding are in compliance with NEC. 18. UPS with Load With the UPA loaded as stated in the UPS values should be within the following. Bank at 100% previous test, the UPS INTERNAL manual Specified Actural maintenance bypass switch will be manually Voltage operated 2 consecutive times transferring Frequency the load between UPS power, alternate THD power, and back to UPS power. Switching Waveform shall occur in 2 minute intervals. Verify Deviation that specified voltage dynamic regulation is met during switching. 19. UPS with Load With the UPA loaded as stated in the UPS values should be within the following. Bank at 100% previous test, the UPS EXTERNAL manual Specified Actural maintenance bypass switch will be manually Voltage operated 2 consecutive times transferring Frequency the load between UPS power, alternate THD power, and back to UPS power. Switching Waveform shall occur in 2 minute intervals. Verify Deviation that specified voltage dynamic regulation is met during switching. TN Higher Education - Standard Documents - May 2018 Page 7 of 10

20. Safety Interlocks Operate the UPS & controls in a deranged Alarms should be generated and emergency power UPS manner to create alarm condition. will remain off. 21. Alarms UPS Simulate all alarms, alarm contact operation All alarms are properly annunciated at the remote panel. and remote enunciation operation by jumping across alarms. 22. UPS Digital Check calibration of UPS digital readouts UPS should be within tolerances Readouts of frequency, current and volts against a Specified Actual calibrated instrument. Voltage V V Ampereage A A Frequency HZ HZ 23. UPS with Load With the UPS loaded at 100%, UPS input UPS values should be within these tollerances. Bank at 100% power will be interrupted to simulate a power Specified Actual failure. The UPS output will be monitored & RMS V V recorded for RMS values, waveform Battery A/sec A/sec deformation/harmonic content. The roll-off THD < 5% of battery potential shall be monitored, Waveform Minimal recorded and compared to the battery run Deviation time spec. All accessible battery UPS shutdown at terminations will be checked for temperature low battery string volts V V variations with a infrared meter. TN Higher Education - Standard Documents - May 2018 Page 8 of 10

24. Preparation Reconnect power to the UPS and with Integrated Building100% output load on the UPS system and Test full battery recharged current (waite aprox. 5 minutes to allow batteries to charge to support load during loss of power). 25.Emergency Power Test the function of all loads on emergency Generator values should be within following tolerances. Including UPS power including UPS loads. Specified Actural Open the circuit breaker serving the ATS to Load < 100% % simulate a power failure on the feeder UPS loads should properly operate off the generator serving the ATS & Backup Power and not transfer to battery. Distribution Verify that proper power is delivered to each All emergency lights ON. device listed in the emergency panel All emergency receptacles powered. schedules and that equipment directly wired Fire Alarm system powered. function properly. Record generator output Specialty systems powered. with the Powerline Disturbance Monitor HVAC & Controls powered. and a Load Profiler. TN Higher Education - Standard Documents - May 2018 Page 9 of 10

26.Emergency Power Initiate a building smoke detector. Fire alarm Specialty System Initiate a security system alarm. Security system should work properly Test Initiate a HVAC alarm. HVAC monitoring system should work properly. Check telecom system. Telecom system works properly. Test elevator recall. Elevator works properly. Monitor UPS charging system UPS charging properly. SYSTEM THAT HAVE OFF SITE MONITORING VERIFY THAT CORRECT SIGNALS ARE SENT AND RECEIVED. 27 Emergency Power Verify the following functions by causing Including UPS the alarm, recording the time and having Monitored Alarms the monitoring company fax a copy of the alarm condition. Simulate an electrical failure or malfunction Simulate a UPS switch detection. Simulate a HVAC condition alarm. Electrical failure alarm. Response Time: Power switched alarm. Response Time: HVAC alarm. Response Time: TN Higher Education - Standard Documents - May 2018 Page 10 of 10