Standard Operating Manual

Similar documents
Standard Operating Manual

Standard Operating Manual. PEL Wet Station X Clean Organic Solvent Station

Standard Operating Manual. Semitool Spin Rinser Dryer SRD

Standard Operating Manual

Standard Operating Procedure: Spinner

Equipment Standard Operating Procedure Greg Allion and Kimberly Appel

Standard Operating Manual. Ultra Fab Wet Station F Non-standard Processing Station

Standard Operating Manual

Standard Operating Manual. Ultra Fab Wet Station C Oxide/ Nitride Etch Station

University of Minnesota Nano Fabrication Center

Teaching Lab Headway Spinner SOP

NRF PDMS Processing SOP 2/12/18 Rev 2 Page 1 of 9. NRF PDMS Processing SOP

Arizona State University Center for Solid State Electronic Research Title: Oxford Plasmalab 100 PECVD Page 1 of 7

Experiment #6 Photolithography: Microprocessing Technology Fabrication of the microstructures with SPR photoresist

OXFORD PLASMALAB 100 PECVD

Plasma-Therm 790 RIE (Reactive Ion Etcher) Basic Operation Guide

Photolithography SOPs

Standard Operating Procedure: Sputter

Operation Manuals. EVG 101 Users Manual Maintenance

MCD200-NPP. Pos. Qty P/N Description 01 1 pce. MCD200- NPP

ACME DIAGNOSTICS STANDARD OPERATING PROCEDURE

PicoTrack PCT-200CRS Standard Operating Procedure

Revised: January 8, Goal: Deposit, expose, and develop standard positive photoresist films as an etch mask, liftoff mask, or sacrificial layer.

Operating Instructions for the SAMCO RIE800iPB

Operation Procedure for SMiF Wet Hoods (Solvent, Spin Coat, Acid, and Develop Hoods)

Oerlikon Ebeam Evaporator SOP short. UNT Cleanroom

University of Minnesota Nano Fabrication Center Standard Operating Procedure

PDS 2010 Parylene Coater SOP

Installing ProSeries software for stand-alone use

Protocol Photolithography

1.0 Denton Thermal Evaporator

Syringe Pump. User Manual

Nanoscale Fabrication & Characterization Facility. PVD Products PLD 3000 Deposition system User Guide

ND4000 Manual Marine Hydraulics

AJA THERMAL EVAPOTOR STANDARD OPERATING PROCEDURE

Operating Instructions for the STS ICP Metal Etcher

General Acids/Bases Bench Right and Left SOP

Revised: July 18, 2017

JAG group microwave manual. (updated October ) Table of contents. 1 General information 2. 2 General safety rules 2. 3 The microwave reactor 3

ALLERGEN MIXING ASSISTANT

Alaris Syringe Module v9

Operations Manual TS400. Test Station for G450/G460 Gas Detector

Alaris Syringe Module v9

Guide for Thin Film Evaporation Edited 7/22/13 by Stephen Albright, BJAM & Steven Palefsky

CNS Cleanroom Safety Orientation Form

OPERATING INSTRUCTIONS

QIAcube HT Unpacking and Installation Instructions

COOKBOOK for. > A reference guide for all GTX Series users >>> <<<

Requests for Daily Care and Maintenance

ICE-45. Recipe Booklet Reverse Side INSTRUCTION BOOKLET. Mix It In Soft Serve Ice Cream Maker IB-6405

Multi-Mode Electrode pro

Alarm Client. Installation and User Guide. NEC NEC Corporation. May 2009 NDA-30364, Revision 9

Emergency Response Cart Guide

Wet Bench Standard Operating Procedures

Premium Micro Desoldering station

Freestyle 2000 Cleaning

Ion OneTouch Template Kit Publication Part Number Revision E Date 31 October 2011

Precision Fluid Dispenser TS9150 USER GUIDE

OPERATING MANUAL UNIT 8 - WHITEBRIDGE INDUSTRIAL ESTATE STONE STAFFORDSHIRE ST15 8LQ ENGLAND TEL: +44 (0) FAX: +44 (0)

Advisor Advanced Mobile Application User Manual

CBT LW MAINTENANCE GUIDE

BriskHeat NDT Kit for Elevator Inspection

Operations Manual TS400. Test Station for G450/G460 Gas Detector

Wise&Cute WSC Series IP Cameras User-Manual

Amerimade RCA Wet Bench SOP Page 1 of 13 Rev /22/2014

Falex Thermal Fowling Tester (FT2)

Requests for Daily Care and Maintenance

Slot-Die Coater. User Manual. enabling materials science. Manual Version: 1.0.E Product code: L2005 Product Version: 1.0 Software Version: 1.

OPERATION MANUAL Model 800 Nanoimprint Controller

OPERATING INSTRUCTIONS FUSION MODEL 610 DIGITAL DISPENSING SYSTEM

POLOS Options

Premium Desoldering station with Electric Pump

Filabot EX6 Extruder. Operation Manual. CAUTION! Read Carefully. Filabot Vermont, USA, Earth

Automatic Cell Washing System Operation Manual

NMOS Fabrication Process Description

Sanitise Syrup Lines & Valves. Taylor PH61 Cleaning every 14 days

Table of Contents. Part I SAFETY MESSAGE TO INSTALLERS OF EMERGENCY WARNING EQUIPMENT 2 Part II Vehicle Operation 4. Part III Safety Messages 13

SimpleVIS Viscometer Reference Guide P

VS LD series vertical steam sterilizers

PRO 2000i LOW LEVEL DEPOSITOR

University of Minnesota Nano Fabrication Center Standard Operating Procedure

Installation & Operating Guide

Step 1 - Install ProSeries Basic software

0. Table of contents. Author: M.C.Martens

Requests for Care and Maintenance

Glovebox Usage Manual v1.4. When you enter the lab walk straight to the log book. Enter all information including N2 and O2/H2O levels.

VANTAGE. Installation Manual. Release Date: April 16, 2003 Publication Number: INS Revision Date: January 22, 2015 Revision: E

PDMS Casting Station Supplies

NRF Lithography Processes SOP 8/3/2015 Rev 17 Page 1 of 24. NRF Lithography Processes SOP

Before you install ProSeries Express Edition software for network use

Reliability in Laboratory Centrifuges Since Operator s Manual. Models 614B, 614L, 614U/UL and 614V/VL Laboratory Centrifuge. Rev. 5.

written manually or through a guided Protocol wizard. For a more in depth manual please refer the Robbins

Safety Issues In Upper- Level Biology Labs

Covidien Articulating Absorba Tack Foil Pouch Leak Tester Owner s Manual IPE SN Rev 1

Environmental Express, Inc. AutoBlock Plus Operation Manual and Instructions CONTENTS. i. Introduction/General Information 2

MiniAmp Thermal Cycler and MiniAmp Plus Thermal Cycler Installation and Operation

Training Report Matan JetSet

Fire Operator Workstation (Fire OWS) User s Guide

Epson Stylus. Pro GS6000 QUICK REFERENCE GUIDE

Smart Home WIFI Series Quick Guide

Transcription:

Standard Operating Manual EVG 101 Spray Coater Version 1.1 Page 1 of 24

Contents 1. Picture and Location 2. Process Capabilities 2.1 Cleanliness Standard 2.2 Substrate Size 2.3 Spin speed 2.4 Spin ramp up speed 3. Contact List and How to Become a Qualified User 3.1 Contact person 3.2 Training to Become a Qualified User 4. Operating Procedures 4.1 System Description 4.2 Safety Warning 4.3 Operation Precautions and Rules 4.4 Initial check 4.5 Initial System Checks 4.6 Prepare Photoresist Mixture 4.7 System Startup (For Staff ONLY!) 4.8 EVG Explorer 4.9 Login to EVG software 4.10 Dispose Acetone from Syringe 4.11 Load Syringe with photoresist 4.12 Dummy Dispense 4.13 Chuck replacement 4.14 Wafer Coating Procedure 4.15 Interrupted Coating 4.16 Acetone Syringe Wash 4.17 Process Bowl Cleaning 4.18 Check Out 4.19 System Shutdown (For Staff ONLY!) Version 1.1 Page 2 of 24

1. Picture and Location EVG 101 Spray Coater This tool is located at NFF Phase II Cleanroom Class 100. 2. Process Capabilities 2.1 Cleanliness Standard: all level (different chucks) 2.2 Substrate Size: fragments to 6 2.3 Spin speed: <2000rpm 2.4 Spin ramp up speed: <40000rpm/sec Version 1.1 Page 3 of 24

3. Contact List and How to Become a Qualified User 3.1 Emergency Response and Communications 1. Security Control Center: 2358-8999 (24hr) & 2358-6565 (24hr) 2. Safety Officer: Mr. Wing Leong CHUNG 2358-7211 & 64406238 3. Deputy Safety Officer: Mr. Man Wai LEE 2358-7900 & 9621-7708 4. NFF Senior Technician: Mr. Henry YEUNG 2358-7896 3.2 Training to Become a Qualified User Please follow the procedure below to become a qualified user. 1. Read through the on-line equipment operating manual of the equipment; http://www.nff.ust.hk/equipment-and-process/equipment-operation-manual.ht ml 2. Attend the equipment hand-on operation training either by peer or NFF staff. 3. If training is provided by NFF staff, user must log in NFF equipment reservation system, and register these trainings. 4. Send an e-mail to Mr. Henry YEUNG requesting EVG 101 Spray Coater qualified exam. 5. Pass the examination for the equipment operation and security. Version 1.1 Page 4 of 24

4. Operating Procedures 4.1 System Description The EVG 101 Advanced Resist Processing System is designed for single wafer processing in R&D and small scale production. Conformal layers of photoresist are achieved on 3D structured wafers for interconnection techniques with EVG's advanced OmniSpray coating technology. This ensures low material consumption of precious high-viscosity photoresists while improving uniformity and resist spreading options. User Interface Exhaust Gauge Mechanical pre-aligner Syringe Swivel arm (Spray) EMO-Button Keyboard EBR-arm Coat module 4.2 Safety Warning 1. Follow NFF Health and Safety Manual. 2. Never operate the system with door opened. Version 1.1 Page 5 of 24

3. Never operate system without trained and approved by NFF staff. 4. Never operate the system without exhaust. 5. Do not open the electronics cabinets. 6. Covers and process cups may only be removed by authorized personnel! 7. The User should be aware at all times of the moving components associated with this tool. The spin chamber door must be closed at all times while processing your sample. The spin chamber door is interlocked and tool will not operate with the door open. 8. Check drip pans and leakage sensor daily for correct function. 9. Resists may have irritating effects to eye, skin and mucous membranes! Observe and obey Material Safety Data Sheet (MSDS) of the corresponding materials used in the system! 10. Make sure the entire vacuum surface is easily covered by your sample. This will cause the resist to be sucked into the vacuum port on the spindle and damage the spin motor. 11. If an error or problem occurs, stop all work immediately. Leave notice that the machine is not to be used and contact NFF staff. Do not attempt to fix the problem. 12. If using heated chuck, don t touch the chuck and uninstall after cool down only. 13. The Emergency Off Button (EMO Button) shuts down the machine immediately. Only use the EMO in emergency situations. Emergency situations are where injury of personnel or serious damages of the system impends immediately. 14. According to the general fire emergency procedure of HKUST, please report the accident to the Security Control Center first. The nature of other emergencies will determine whether you will call police, staff, or both. If someone is injured, the Version 1.1 Page 6 of 24

9-999 emergency number should be called before calling staff. If there is a facilities problem, such as a flood or a utility problem that does not present a danger to lab users but may result in damage to equipment, the staff or EMO need to be called. The 9-999 emergency should not be called for facility or equipment problem. Always call 9-999 when a potentially life threatening situation might exist (injury, fire, gas leak, etc.) 4.3 Operation Precautions and Rules 1. Please reserve the time slot on NFF reservation system. 2. Please check the checklist and fill all the details of the log sheet attached. 3. Never let photoresist dry in the line. If you don t need to use the tool with photoresist in the tube for more than 1 hour, you must clean the line with acetone before you leave. After you complete your process, you must clean out the tube with acetone. 4. Never leave the toll without clean the chuck and bowl with acetone. 5. Clean the chuck in the fume hood after each use. If any user fails to clean the chuck and system properly, you may ban to use the system in future. 6. When cleaning the spin bowl or spin chuck, always cover the vacuum port. If material enters the vacuum port, it can damage the vacuum system. 7. All recipe programming is done by NFF Staff. If you need a special recipe, you may request a new recipe to Staff. 4.4 Initial Status checks 1. Please check the status of shutdown notice posted in the NFF reservation website. 2. Please check the reservation status on the website and reserved this equipment by Version 1.1 Page 7 of 24

you. 3. Please check-in the equipment on your own according to the reserved time slot via card reader or NFF reservation website. 4. Before operate the machine, please make sure you have read the check list, and fill the log sheets. 4.5 Initial System Checks Before starting, verify the machine is in the correct idle state: 1. Verify that exhaust systems are properly connected. 2. Verify that all system utilities (Compressed air, nitrogen and vacuum) are turned on. 3. Ensure that the correct spin chuck is used, depending on substrate form, cleanliness level and substrate size, special chucks are available. 4. Verify that spin chamber door to be closed. 5. Make sure that no objects are blocking the path of the moving parts. 6. If the machine is off, do not reboot. Contact staff on the contact list. 7. If no syringes are available, contact staff on the contact list. 4.6 Prepare Photoresist Mixture 1. Mix your desired photoresist mixture in the wet bench. 2. Standard mixture used includes a combination AZ9260, MEK, and PGMEA (1:8:1 by weight). The mixture ratio is recommended to do by weight. The Electronic Balance can be borrowed from Wet Station F. 3. Let mixture 24 hours to sit before use to insure uniform mixture. Version 1.1 Page 8 of 24

AB9260, MEK, PGMEA Electronic Balance 4.7 System Startup (For Staff ONLY!) 1. Turn the main switch fully counter-clockwise (locate the Main Witch Rack) 2. Press the green ON button 3. Check if all circuit breaker are on. 4. Turn the mini environment key switch to ON. 5. PC has booted the EVG Explorer will be started automatically Circuit Breaker Mini Environment Main Switch PC power switch 4.8 EVG Explorer Main Switch Rack 1. After the boot procedure, windows will load the EVG Explorer automatically. Version 1.1 Page 9 of 24

2. Click EVG Machine Software to open it. 4.9 Login to EVG software 1. To login click on the Login-Button. Then following dialog box appears: In ID enter the username and in Password the concluding password. Version 1.1 Page 10 of 24

2. If you are first one to use the equipment that day, the error message display MACH Missing Machine facilities (Vacuum) Please presses it to ignore it. 4.10 Dispose Acetone from Syringe 1. Take out the photoresist mixture from Standard Photoresist Storage freezer and let it warm up around 15min. 2. Flip the red lever (plunger clamps) to the right to move up the plunger so that the plunger doesn t push on the top of the syringe. 3. Move outward left and right clamps from the holder unit syringe of park station. Version 1.1 Page 11 of 24

4. Remove the syringe from park station. 5. Keep the syringe in inverted position. 6. Remove push-fit the resist line from the tip of syringe. 7. Dispose the acetone in the syringe to acetone waste bottle at wet station Z. 4.11 Load Syringe with photoresist 1. Pour a certain amount of photoresist to clean breaker from resist bottle 2. Withdraw photoresist into syringe, 30ml or more is recommended and quickly invert. The estimated photoresist volume is equal to number of cycles * 0.8ml Version 1.1 Page 12 of 24

(0.8ml/cycle) + 10ml (for fill the tube and dummy dispense). 3. Keeping syringe in inverted position and wrapping a cleanroom clothe wiper over the tip, and push-fit the resist line onto the tip of syringe. Keep the syringe inverted for this entire procedure. 4. Hold the push-fit and the syringe push the plunger until the resist has filled the line. 5. On the user interface, click pumps from bottom toolbar to show a screen about all pumps. Select the syringe in the top left corner DIS1 (spray syringe), left click Version 1.1 Page 13 of 24

on syringe and then choose change material on the next screen. A window will be pop out. 6. Using the motor controls, Press keyboard or button to move up/down the plunger until the syringe can fit easily within the holder. Up/down button 7. Invert the syringe to download orientation. Slide the syringe into the holder. Version 1.1 Page 14 of 24

8. Using the motor controls, hit keyboard or button to move up/down the plunger until the plunger touches the top of the syringe. Flip the red lever to the left (use hand to hold the syringe). Then the plunger will push on the top of the syringe. Close the Door. 9. To make sure the photoresist fill the photoresist line, Press keyboard down button on the motor controller until the resist has filled the whole line and has entered the nozzle. And, make sure no any air bubbles are left in the line. 10. On the computer control screen, press Okay to having finished the materials change. 4.12 Dummy Dispense 1. Select Job from the lower task selection bar on the computer control, left click the spray arm and select dummy dispense to exercise the head. Version 1.1 Page 15 of 24

2. A window will pop out. Press Dispense and set the N2 pressure to 400dl/min gas flow 3. Wait for the prompts in the terminal window to declare the dummy dispense is finished and press OK button back to job window. 4. Put the photoresist mixture bottle back to freezer. 4.13 Chuck replacement If the lid is closed, you can t replace the chuck, ignore this section, and do it Version 1.1 Page 16 of 24

later. 1. Carefully lift the chuck from the spindle. 2. Replace the chuck with proper cleanliness level. Three chucks are available, for clean, semi-clean and non-standard. 3. The notch in the chuck fits over the motor shaft. It fits over the pin in the shaft to prevent twisting on the shaft. 4. Return the removed chuck to its proper place. 4.14 Wafer Coating Procedure 15. Click open to open an existing recipe in your recipe folder from menu bar, if you need edit or make a new recipe; please contact staff to do it with you. Version 1.1 Page 17 of 24

16. Select Jobs from lower task selection on the computer control, and press Start in the process control bar; a window will be pop out. 17. Select your wafer size, 2, 4 and 6, and then select the recipe. 18. The Mechanical Pre-aligner jig will lower down and prompt you to put a wafer on the raised chuck. 19. If you can t replace the chuck before, you can replace the chuck with proper cleanliness level now. Please follow Section 4.13. 20. Place your wafer onto the spin chuck, making sure the end it pressed against the mechanical pre-aligner jig. 21. The wafer flat part cannot be the part pressed against the alignment jig; otherwise, the wafer may not be centered. Version 1.1 Page 18 of 24

22. Close the chamber door, select Okay on the computer controller to run the recipe 23. You can check the status from the window. 24. After coating, the chuck will move up and a window will be pop out to ask you to remove the wafer from chuck, wait at least 1 minute for fumes to dissipate before opening chamber door. 25. Open the chamber door, and use tweezers to remove the wafer from the chuck and clean the wafer backside with wiper dipped acetone in the wet station before Version 1.1 Page 19 of 24

soft bake. 26. If you want to coat another wafer, repeat the wafer coating procedure step 5-10. 27. If you complete your process, clean-up the machine. 4.15 Interrupted Coating 1. Stop process Click in the Process Control Bar to stop the process. The current movement will be finished. 2. Abort process Click in the Process Control Bar to stop the process immediately (even the current movement). 3. System Clean up Click in the Process Control Bar. After a process has been aborted, a clean-up needs to be done before staring a new process. 4.16 Acetone Syringe Wash 1. Select pumps from lower task selection on the computer control, select the top left corner spray syringe pump, and chose change material. Version 1.1 Page 20 of 24

2. Flip the red lever to the right to move up the plunger doesn t push on the top of the syringe. 3. Slide syringe out of holder and invert, keep the syringe in inverted position. 4. Separate the push-fit from the syringe, squeeze out remaining resist into acetone waste collector in Wet station Z 5. Fill up beaker with acetone. Re-load syringe with acetone, invert, and carry back to machine. 6. Push-fit the resist line onto the tip of syringe. Keep the syringe inverted for this entire procedure. 7. Hold the push-fit and the syringe, push the plunger until the acetone has filled of the whole tube and has entered the nozzle, and no any air bubbles are left in the tube. Version 1.1 Page 21 of 24

8. Press keyboard button to move up the plunger until the syringe can fit easily within the holder. 9. Invert the syringe to downward orientation. Slide the syringe into the holder. 10. Using the motor controls, hit keyboard button to move down the plunger until the plunger touches the top of the syringe. Flip the red lever to the left. Then the plunger will push on the top of the syringe. 11. Keep hit keyboard down button until acetone has completely filled the line and is running out of the bottom of the nozzle. 12. On the computer, press Okay to having finished the materials change 13. Repeat the Section 4.12 for dummy dispense procedure to clean the spray head.. 14. Select up in the spray arm to move up the spray arm, use cotton stick or cleanroom wiper dip with acetone to clean spray head (black part) gently, press down to bring spray arm to original down position. Version 1.1 Page 22 of 24

4.17 Process Bowl Cleaning Use Cleanroom Wipes dips with proper solvents (i.e Acetone) to clean the bowl thoroughly. Take out vacuum chuck and clean it at the wet station. 4.18 Check Out Logout EVG software and check out the equipment in the NFF Equipment Version 1.1 Page 23 of 24

reservation website or card reader immediately after use. 4.19 System Shutdown (For Staff ONLY!) 1. Close the EVGVisu-Software, by clicking on the menu File and on Exit. 2. To shut down the PC, click on the Shutdown -Button in the EVG Explorer. 3. The red button means OFF and the green button means ON. Press the red button. Turn the main switch (2) fully counter-clockwise. This will turn off all hazardous energy to the system. Version 1.1 Page 24 of 24