REGISTRATION EXAMINATION, NOVEMBER 2011 CERTIFYING PLUMBER QUESTION AND ANSWER BOOKLET. Time allowed THREE hours

Similar documents
REGISTRATION EXAMINATION, JUNE 2013 CERTIFYING PLUMBER QUESTION AND ANSWER BOOKLET. Time allowed THREE hours

REGISTRATION EXAMINATION, NOVEMBER 2017 TRADESMAN PLUMBER QUESTION AND ANSWER BOOKLET. Time allowed THREE hours

REGISTRATION EXAMINATION, NOVEMBER 2014 LICENSED PLUMBER QUESTION AND ANSWER BOOKLET. Time allowed THREE hours

REGISTRATION EXAMINATION, NOVEMBER 2011 CERTIFYING PLUMBER ANSWER SCHEDULE

REGISTRATION EXAMINATION, JUNE 2015 LICENSED PLUMBER QUESTION AND ANSWER BOOKLET. Time allowed THREE hours

CRAFTSMAN EXAMINATION, NOVEMBER 2009 PLUMBING QUESTION AND ANSWER BOOKLET. Time allowed THREE hours

CRAFTSMAN EXAMINATION, JUNE 2007 PLUMBING QUESTION AND ANSWER BOOKLET. Time allowed THREE hours

CRAFTSMAN EXAMINATION, NOVEMBER 2009 GASFITTING QUESTION AND ANSWER BOOKLET. Time allowed THREE hours

REGISTRATION EXAMINATION, NOVEMBER 2017 TRADESMAN PLUMBER ANSWER SCHEDULE

CRAFTSMAN EXAMINATION, JUNE 2007 PLUMBING ANSWER SCHEDULE

REGISTRATION EXAMINATION, NOVEMBER 2016 CERTIFYING PLUMBER ANSWER SCHEDULE

REGISTRATION EXAMINATION, JUNE 2015 LICENSED PLUMBER ANSWER SCHEDULE

REGISTRATION EXAMINATION, NOVEMBER 2016 LICENSED GASFITTER QUESTION AND ANSWER BOOKLET. Time allowed THREE hours

REGISTRATION EXAMINATION, JUNE 2012 LICENSED GASFITTER QUESTION AND ANSWER BOOKLET. Time allowed THREE hours

REGISTRATION EXAMINATION, NOVEMBER 2014 LICENSED PLUMBER ANSWER SCHEDULE

STUDENT NOTES Plan, size and layout sanitary pipe work and fixtures

2. Sanitary Plumbing General Installation Requirements

1 Exam Prep Plumbing State Contractors Practice Exam 2

Level 1 Economics, 2016

PROPOSED NEW BUILDING

Denotes a new question! Denotes a revised/revisited question. September 2009 General:

Australian/New Zealand Standard

Pipe Sizing Table. Hydraulic Load Served (fixture units)

1 Exam Prep Plumber s Handbook Tabs and Highlights

AS/NZS :2015. Plumbing and drainage AS/NZS :2015. Part 4: Heated water services. Australian/New Zealand Standard

PLUMBING INSTALLATIONS

Installing, modifying and maintaining domestic plumbing systems. Water Supply (Water Fittings) Regulations 1999

ENGINEERING STANDARD FOR SANITARY PIPEWORK ORIGINAL EDITION JAN. 1995

LABOUR RATES FOR PLUMBING CONTRACTORS. A guide to the labour costs of plumbing works LABOUR RATES FOR PLUMBING CONTRACTORS

SUBCOURSE EDITION EN US ARMY ENGINEER SCHOOL PLUMBING FIXTURES (PLUMBING IV)

Read Only Document Not For Distribution

Water Supply (Water Fittings) Regulations 1999

Read Only Document Not For Distribution

AIR ADMITTANCE VALVES FOR DOMESTIC PROPERTIES Guidance Notes

Level 1 Agricultural and Horticultural Science, 2011

Level 1 Physics, 2016

HOME INSPECTION CHECKLIST

SUBCOURSE EDITION EN5155 US ARMY ENGINEER SCHOOL CLEAR WASTE SYSTEM STOPPAGES PLUMBING VI

Greenleaf 600 Macerator Toilet Waste Pump

ICP Plumbing Exam. Name: Carefully read each question and then circle the letter of the best answer.

Technical Certificate in Plumbing Sample Version September Question Paper Pack

House Drainage System. Building Utility & Services

Helping you to understand your water use

Greenleaf 400 Macerator Toilet Waste Pump Instruction Manual

Level I Chapter 1 Worksheet

Flue & Flue Kits for NVx, VPC & NVS

plumbing for greywater

Sanitary Drainage Systems

IPC Plumbing Exam. Name: Carefully read each question and then circle the letter of the best answer.

SMALLBORE PIPEWORK GREASE TRAPS SEPTIC TANKS / CESS PITS INTERCEPTORS

4. Plumbing fixtures. a) The plumbing fixtures are from the original building. They are appear old and not to comply with ADA requirements.

SCHOOL DISTRICT PALM BEACH COUNTY BUILDING DEPARTMENT PLAN REVIEW CHECK LIST -- PLUMBING

USING YOUR PRESSURE SEWER SYSTEM

MATERIALS Traps TRAPS. No. IPC IRC Description

PLUMBING CURRICULA OUTLINE

2015 UPC Chapter 8 Indirect Wastes RV

System Name. Customer Awareness- Cross Connections and Backflow Prevention

Building Utilities 1 Plumbing and Sanitary Systems

Level 1 Physics, 2014

DOMESTIC & COMMERCIAL PLUMBING SYSTEMS FURTHER INFOMATION

Installer s Guide IMPORTANT INFORMATION Read This Document First On completion, sign and leave with owner

Level 1 Physics, 2013

Flue Installation Manual

Smarter. Easier. Faster. Product Guide

FEATURES. Other Fed-Flush Arrangements

Multipoint. Unvented point of use hot water

A GUIDE TO PASSING THE PLUMBING EXAM

ProVent Systems Plumbing Fundamentals. Educational Literature. Comparison of ProVent Design Rules and The International Plumbing Code

Keeping. Fats, Oils, and. Grease. Out of the Sewer

1. Description - THIS UNIT IS FOR DOMESTIC USE ONLY

IPC Plumbing Exam. Name: Carefully read each question and then circle the letter of the best answer.

Special Requirements For Health Care Facilities

Module number 8 provides an on-line, self-paced training seminar on portions of Chapter 14-Fuel Gas, Chapter 25-Ohio Plumbing Code; Chapter 29-Fire

Grease Interceptors. General For the purpose of this standard, the following terms shall have the meaning indicated in this section.

Low pressure indoor copper cylinders

SCHEDULE OF FEES. Penalty Fees. Building Fee Schedule FEE

-SQA- SCOTTISH QUALIFICATIONS AUTHORITY. Hanover House 24 Douglas Street GLASGOW G2 7NQ NATIONAL CERTIFICATE MODULE DESCRIPTOR

Self-Containment Of Motor Caravans

CUSTOMIZED TEACHER ASSESSMENT BLUEPRINT PLUMBING. Test Code: 5924 Version: 01

Minor Home Repairs. November 4, County of Henrico Department of Community Revitalization

APPENDIX J ILLUSTRATIONS

Plumbing. Definitions. Background Factors. Air Chambers. Air Gap (Drainage System) Air Gap (Water Distribution System) Air Lock.

Unvented Hot Water Criteria

Test Code: 8117 / Version 1

SOLAR HEATING SYSTEMS

Water Supply and Sanitation 16. Dr Nabil El-Sawalhi Associate professor Engineering Projects Management

INSTALLATION INSTRUCTIONS REVISED: JUNE 2014

Lecture : Introduction to building services I - Plumbing & Drainage Services 22 September 2016

PHCC Educational Foundation Plumbing Year 4

1845 Tech Manual.qxd 23/11/05 1:20 pm Page 2 EXCELSIOR UNVENTED WATER HEATERS INSTALLATION MANUAL. Design for living

Plumber Level 3 Rev. May 2011

City of Gainesville Inspection Permitting Fees Effective July 1, 2012

Building Permit Fees (cont.)

The following test is Continuing Education for: Master Plumbers, Journeyman Plumbers, UDC Plumbing Inspectors, and Commercial Plumbing Inspectors.

Trade of Plumbing. Module 2: Domestic Hot and Cold Water Service Unit 11: Sanitary Appliances Phase 2

Hamad bin Isa Al Khalifa King of The Kingdom of Bahrain

WC2 & WC3 Installation & Maintenance Instructions

Methods of Venting Plumbing Fixtures and Traps in the 2018 IPC

The easy solution for waste water removal

OUTDOOR DISHWASHER INSTALLATION INSTRUCTIONS

Transcription:

ffix label with andidate ode Number here. If no label, enter candidate Number if known No. 9195 RGISTRTION XMINTION, NOVMR 2011 RTIFYING PLUMR INSTRUTIONS QUSTION N NSWR OOKLT Time allowed THR hours heck that the andidate ode Number on your admission slip is the same as the number on the label at the top of this page. o not start writing until you are told to do so by the Supervisor. Total marks for this examination: 100. The pass mark for this examination is 60 marks. Write your answers and draw your sketches in this booklet. If you need more paper, use pages 19 21 at the back of this booklet. learly write the question number(s) if any of these pages are used. ll working in calculations must be shown. andidates are permitted to use the following in this examination: rawing instruments, approved calculators, document(s) provided. Publications, cts, Regulations, odes of Practice, or Standards other than the ones provided are NOT permitted in the examination room. heck that this booklet has all of 21 pages in the correct order and that none of these pages is blank. YOU MUST HN THIS OOKLT TO TH SUPRVISOR T TH N OF TH XMINTION Plumbers, Gasfitters and rainlayers oard, 2010. ll rights reserved. No part of this publication may be reproduced by any means without the prior permission of the Plumbers, Gasfitters and rainlayers oard.

andidates that sat this examination in November 2011 were provided with the following documents: New Zealand uilding ode clause G1 New Zealand uilding ode clause G12 Water Supplies S/NZS 3500 Part 2: Sanitary plumbing and drainage

STION QUSTION 1 (a) Give TWO reasons why a cover is fitted to a storage water tank installed in a roof space. 1 2 (2 marks) (b) S/NZS 3500 Part 1: Water services section 8.3.2 apacity of storage tanks Measurement states the following. The storage capacity of any tank shall be taken to be the volume of water above the invert of the outlet pipe when the water surface is 20 mm below overflow level. The diagram below shows a tank that meets this requirement. 1.3 metres 1.1 metres 300 Litres Storage apacity 975 mm 75 mm ll connection points for the tank are 25 mm. Using the information shown on the diagram, calculate the diameter of the tank. (5 marks) ertifying Plumber 9195, November 2011 1

QUSTION 1 (cont d) (c) In addition to a cover, state FOUR factors that must be provided for the installation of a tank to comply with New Zealand uilding ode lause G12/S1 Water Supplies. 1 2 3 4 (4 marks) (d) Give TWO benefits of installing break tanks in a high rise building. 1 2 (2 marks) Total 13 marks ertifying Plumber 9195, November 2011 2

QUSTION 2 section of land is being converted into a camping ground. The camping ground will have 200 sites, and is to provide separate male and female ablution blocks. (a) State the minimum number of people the site ablution blocks must cater for. (1 mark) (b) omplete the table below to show the minimum number of fixtures required for the ablution blocks. amper Facilities W Pans Urinals asins Showers/baths Female Male isabled access facilities W Pans asins Showers/baths (13 marks) Total 14 marks ertifying Plumber 9195, November 2011 3

QUSTION 3 (a) The drawing opposite shows a schematic diagram of the cold water supply pipework for a commercial operation. Possible locations for backflow prevention devices are shown numbered 1-18. Only reduced pressure zone (RPZ) devices and double check valve assemblies (V) are to be used to complete the backflow prevention system. The system is to comply with the minimum requirements of New Zealand uilding ode lause G12/S1 Water Supplies. (i) In the table below write the numbers identifying the locations, in addition to location 2, where backflow prevention devices must be installed. Location number Hazard rating evice type Protection type 2 H RPZ (ii) For each of the locations identified in (i) complete the table to show: the hazard rating the device type the protection type (ontainment, Zone Z or Individual I) The first row of the table has been completed for you as an example. (12 marks) ertifying Plumber 9195, November 2011 4

QUSTION 3 (cont d) airy shed wash down Storage tank 18 ore water supply 15 13 14 16 attle dosing system 17 Swimming pool Troughs 6 10 Lunchroom 8 9 11 Sprinkler system Hair salon Residence 7 hicken house 5 12 4 3 2 oundary 1 Town water supply ertifying Plumber 9195, November 2011 5

QUSTION 3 (cont d) (b) Fully describe a solution that will provide adequate backflow prevention for a site during an annual test without interrupting the water supply. (2 marks) (c) xplain why a reduced pressure zone device cannot be installed in an area subject to ponding. (1 mark) Total 15 marks ertifying Plumber 9195, November 2011 6

QUSTION 4 (a) The starter drawing below shows three flat plate solar collector panels. (i) There are two ways in which the panels can be manifolded. Select one of these ways, and write the name of this way. (1 mark) (ii) omplete the drawing to show the required pipework to manifold the panels according to the way given in (i). On the drawing, show and label the flow and return pipework to the storage unit. RIG OLLTOR OLLTOR OLLTOR SPOUTING (3 marks) (b) Give an advantage of installing solar panels using the way selected in (a). (2 marks) Total 6 marks ertifying Plumber 9195, November 2011 7

QUSTION 5 (a) The starter drawing below shows a primary hot water circuit feeding hot water outlets. omplete the drawing to show a secondary circuit system connected to points and feeding the radiators. Indicate on the diagram where the secondary circuit pump should be installed. Supply Tank Radiators Outlets oiler (5 marks) (b) Give an advantage of installing a secondary circuit. (1 mark) Total 6 marks ertifying Plumber 9195, November 2011 8

QUSTION 6 100 mm diameter single stack system has been installed on a three-storey commercial building. The system has been installed to comply with S3500 Part 2: Sanitary plumbing and drainage. (a) omplete the table below to give the maximum number of each fixture permitted to be connected to a single stack from any floor level of the building. Fixture asins leaner s sinks Kitchen sinks Wall hung urinals W pans Showers Number permitted per floor (3 marks) (b) omplete the table below relating to sanitary fixtures that are allowed to enter the stack system through floor waste gullies on any one level of the building. Sanitary fixture Quantity Total discharge units (6 marks) (c) Give the TWO design criteria that must be met if a stack vent is to serve as a fixture vent pipe for a basin. 1 2 (1 mark) Total 10 marks ertifying Plumber 9195, November 2011 9

QUSTION 7 The drawing opposite is a plan view of a proposed concrete-floored building. (a) omplete the drawing to show the following: under slab pipework required to convey discharge from fixtures. the diameter of each pipe. any required vent connections. The installation is to comply with the minimum requirements of S/NZS 3500 Part 2: Sanitary plumbing and drainage. (b) omplete the following table by entering the diameter of each pipe used in (a) and the gradient for each diameter pipe. iameter Gradient Total 10 marks ertifying Plumber 9195, November 2011 10

QUSTION 7 (cont d) OUNRY WLL Tub asin Sink FWG OUNRY WLL HW FWG Shower FWG W asin W asin asin W Sewer ertifying Plumber 9195, November 2011 11

QUSTION 8 (a) It is possible for a trap to lose its water seal due to hydraulic jump. (i) xplain how hydraulic jump occurs. (2 marks) (ii) xplain why hydraulic jump results in loss of seal. (2 marks) (b) Give TWO design solutions that will help prevent water seal loss due to hydraulic jump. 1 2 (2 marks) Total 6 marks ertifying Plumber 9195, November 2011 12

STION nswer the following multiple-choice questions by writing your answer (,,, or ) in the box provided after each one of the questions. ach correct answer in this section of the examination is worth 1 mark. Note that should your choice of answer be unclear in this section of the examination no marks will be awarded for that question. 1. What is the maximum diameter for a roof penetration that is permitted to be sealed with an PM rubber boot flashing before a soaker flashing is required? 50 mm. 60 mm. 75 mm. 90 mm. 110 mm. 2. What is the maximum diameter a penetration in a corrugated profile roof can be before additional framing support must be provided at the edge of the penetration? 100 mm. 200 mm. 250 mm. 300 mm. 500 mm. 3. What is the minimum distance under a cover sheet a soaker flashing must extend? 100 mm. 200 mm. 250 mm. 300 mm. 500 mm. ertifying Plumber 9195, November 2011 13

4. What is the maximum permissible pitch of a corrugated profile roof on which an PM rubber boot flashing can be used to seal a roof penetration? 10 15 20 30 45 5. What is the minimum period a flashing sealing a roof penetration must last in order to be compliant with the New Zealand uilding ode? 1 year. 2 years. 5 years. 15 years. 50 years. 6. What is the minimum period under-slab waste pipes must last in order to be compliant with the New Zealand uilding ode? 1 year. 2 years. 5 years. 15 years. 50 years. 7. What is the minimum period pipework concealed behind wall linings must last in order to be compliant with the New Zealand uilding ode? 1 year. 2 years. 5 years. 15 years. 50 years. ertifying Plumber 9195, November 2011 14

8. Which of the following specifies the minimum diameter for an overflow pipe on a safe tray situated under a 180 litre water tank? 25 mm. 40 mm. 50 mm. 2 the inlet pipe diameter. The same size as the inlet pipe diameter. 9. waste disposal unit is to be installed in one of two sink bowls in a kitchen. single trap is to be used to serve both bowls. What is the maximum length of waste pipe permitted between the waste disposal outlet and the trap water seal? 1.0 m 1.2 m 1.5 m 1.8 m 2.0 m 10. How many discharge units does a double sink and waste disposal unit combination have? 2 3 4 5 6 ertifying Plumber 9195, November 2011 15

11. Why is it not permitted to install two commercial sinks sharing a single 50 mm plastic trap? In the event of a waste pipe blockage, dirty water from one sink could contaminate clean water in the other. The total discharge units will exceed the amount permitted. If the waste pipe blocked, neither sink could be drained. The temperature of the waste from a commercial sink can exceed 60. The grease content in commercial kitchen sink wastes is high and can often cause blockages. 12. What is the purpose of the charge pipe in relation to an overflow relief gully? To provide an overflow point for the gully. To convey any overflow to a suitable location. To keep an effective water seal in the trap. To bring the height of the overflow relief gully to above ground level. To convey waste from the overflow relief gully to an appropriate outfall. 13. What is the minimum permitted capacity for a storage hot water cylinder for a solar water heating system with 7 m 2 of solar panels? 180 litres. 200 litres. 250 litres. 300 litres. 350 litres. 14. Why must a minimum capacity be provided for hot water storage in a solar water heating system? To prevent the system from overheating. To provide the water at an adequate temperature. To prevent the growth of legionella bacteria. To ensure there is enough water to meet the demand. To give an equal volume of water in the cylinder and panels. ertifying Plumber 9195, November 2011 16

15. What do solar water heating systems and wetback systems have in common? They are both indirect heating systems. They both use radiant heat exchange methods. They must both be installed below the storage cylinder. They can be installed as open vented or valve vented systems. They are both uncontrolled heat sources. 16. What is the maximum number of 90º bends permitted in a relief valve drain that is 8 metres long? 4 5 6 7 8 17. Which of the following is a supplementary heating source as stated in S/NZS 3500 Part 0: Glossary of terms? solar panel. wetback heat exchanger. continuous flow water heater feeding a swimming pool. n electric element connected to a solar water heating system. n extra element installed near the top of an electric storage water cylinder. 18. What is the maximum sized hole that can be drilled through a 200 mm floor joist under NZS 3604: Timber Framed uildings? 15 mm. 20 mm. 25 mm. 32 mm. 40 mm. ertifying Plumber 9195, November 2011 17

19. Where in a floor joist does NZS 3604: Timber-Framed uildings recommend a hole be drilled? In the top third. In the top half. In the middle third. In the bottom half. In the bottom third. 20. ccording to NZS 3604: Timber-Framed uildings, how close are notches in a stud allowed to be cut? 200 mm 300 mm 400 mm 500 mm 600 mm Total 20 marks ertifying Plumber 9195, November 2011 18

For xaminer s use only Question number Marks Marks 1 2 3 4 5 6 7 8 Section Total